SlideShare a Scribd company logo
Resort Brochure Game




      Dept. / Author / Date
Resort Brochure Game

• In two teams, each team will create a Holiday Resort Brochure.
• We shall assign the Product Owner and Scrum Master roles for each
  team.
• The Product Owner will prioritise the Product Backlog.
• We shall conduct Sprint and Release Planning
• There will be two sprints.
• Each sprint will be made up of two “days”.
• Each day will start with a Daily Scrum Stand-up lasting 3 minutes. The
  Scrum Master will be responsible for updating the Progress Chart.
• Each day’s work will last another 5 minutes.
• Each sprint will end with a Review and Retrospective lasting 10 minutes
  in total.



                               Dept. / Author / Date
Resort Brochure Game




      Dept. / Author / Date
Role Assignment & Product Backlog Prioritisation
                          3 Minutes

• Each team needs a volunteer for the
  Product Owner and a Scrum Master.
• The Product Owner needs to review
  and prioritise the Product Backlog.
• Scrum Team familiarise themselves
  with materials available:
       • Pens
       • Paper
       • Magazines
       • Glue
       • Scissors




                             Dept. / Author / Date
Sprint and Release Planning
                            15 Minutes




1. Scrum Team work with Product
   Owner to agree which Product Backlog
   items are added to which sprint.
2. Understand from the Product Owner their
   acceptance criteria for each item.
3. Scrum Team create the tasks required to delivery
   the Product Backlog items for the 1st Sprint.

                              Dept. / Author / Date
Sprint 1




Dept. / Author / Date
Sprint 1: Day 1 Daily Scrum Stand-Up
                             3 Minutes

• All Scrum Team members and Scrum Master answer:
        • What have I done yesterday
        • What will I do today
        • Impediments blocking me.
• Opportunity for team members to volunteer for tasks.
• Scrum Master updates the
  Progress Chart and Burn Down
  Chart.
• Have new tasks been identified
  that are required to be added to
  the sprint?




                              Dept. / Author / Date
Sprint 1: Day 1 Work
                             5 Minutes

• Scrum Team work on delivering their chosen tasks.
• If they complete tasks, choose new ones.
• Product Owner be available to answer questions from the
  Scrum Team if needed.




                              Dept. / Author / Date
Sprint 1: Day 2 Daily Scrum Stand-Up
                             3 Minutes

• All Scrum Team members and Scrum Master answer:
        • What have I done yesterday
        • What will I do today
        • Impediments blocking me.
• Opportunity for team members to volunteer for tasks.
• Scrum Master updates the
  Progress Chart
• Have new tasks been identified
  that are required to be added to
  the sprint?




                              Dept. / Author / Date
Sprint 1: Day 2 Work
                             5 Minutes

• Scrum Team work on delivering their chosen tasks.
• If they complete tasks, choose new ones.
• Product Owner be available to answer questions from the
  Scrum Team if needed.




                              Dept. / Author / Date
Sprint 1: Review and Retrospective
                            10 Minutes

1. Review
      • Conduct a demonstration of what has been delivered to the
        Product Owner.
      • Product Owner needs to either accept or reject the delivered
        Product Backlog items.

2. Retrospective
       • What do we do well?
       • What needs to improve?
       • Is there any process change?
       • Should we start doing something?




                              Dept. / Author / Date
Sprint Planning
                             10 Minutes




1. Where there any Product Backlog
   items that need moving to Sprint 2
   as they were not delivered in Sprint 1?
2. Scrum Team create the tasks required to
   delivery the Product Backlog items for
   the 2nd Sprint.



                             Dept. / Author / Date
Sprint 2




Dept. / Author / Date
Sprint 2: Day 1 Daily Scrum Stand-Up
                             3 Minutes

• All Scrum Team members and Scrum Master answer:
        • What have I done yesterday
        • What will I do today
        • Impediments blocking me.
• Opportunity for team members to volunteer for tasks.
• Scrum Master updates the
  Progress Chart and Burn Down
  Chart.
• Have new tasks been identified
  that are required to be added to
  the sprint?




                              Dept. / Author / Date
Sprint 2: Day 1 Work
                             5 Minutes

• Scrum Team work on delivering their chosen tasks.
• If they complete tasks, choose new ones.
• Product Owner be available to answer questions from the
  Scrum Team if needed.




                              Dept. / Author / Date
Sprint 2: Day 2 Daily Scrum Stand-Up
                             3 Minutes

• All Scrum Team members and Scrum Master answer:
        • What have I done yesterday
        • What will I do today
        • Impediments blocking me.
• Opportunity for team members to volunteer for tasks.
• Scrum Master updates the
  Progress Chart and Burn Down
  Chart.
• Have new tasks been identified
  that are required to be added to
  the sprint?




                              Dept. / Author / Date
Sprint 2: Day 2 Work
                             5 Minutes

• Scrum Team work on delivering their chosen tasks.
• If they complete tasks, choose new ones.
• Product Owner be available to answer questions from the
  Scrum Team if needed.




                              Dept. / Author / Date
Sprint 2: Review and Retrospective
                            10 Minutes

1. Review
      • Conduct a demonstration of what has been delivered to the
        Product Owner.
      • Product Owner needs to either accept or reject the delivered
        Product Backlog items.

2. Retrospective
       • What do we do well?
       • What needs to improve?
       • Is there any process change?
       • Should we start doing something?




                              Dept. / Author / Date
Resort Brochure Game

Do you think you delivered more value
working like this than having one
12 minute work period?




                         Dept. / Author / Date

More Related Content

What's hot

Scrum Process
Scrum ProcessScrum Process
Scrum Process
Rodrigo Paolucci
 
The Scrum Guide 2020.pptx
The Scrum Guide 2020.pptxThe Scrum Guide 2020.pptx
The Scrum Guide 2020.pptx
LN Mishra CBAP
 
Scrum training
Scrum trainingScrum training
Scrum training
Thatsintelligence
 
Understanding Scrum in 30 Minutes
Understanding Scrum in 30 MinutesUnderstanding Scrum in 30 Minutes
Understanding Scrum in 30 Minutes
Altaf Najvani
 
Introducing scrum
Introducing scrumIntroducing scrum
Introducing scrum
Andreas Hägglund
 
Backlog Refinement 101 & 202
Backlog Refinement 101 & 202Backlog Refinement 101 & 202
Backlog Refinement 101 & 202
David Hanson
 
Scrum & Sprint Planning.pptx
Scrum & Sprint Planning.pptxScrum & Sprint Planning.pptx
Scrum & Sprint Planning.pptx
Md. Rakib Trofder
 
How to facilitate product backlog refinement sessions
How to facilitate product backlog refinement sessionsHow to facilitate product backlog refinement sessions
How to facilitate product backlog refinement sessions
LuxoftAgilePractice
 
Scrumban
ScrumbanScrumban
Retrospectives
RetrospectivesRetrospectives
Retrospectives
Jim Brisson
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
Sriram Srinivasan
 
Scrum in 15 Minutes
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 Minutes
Serge Rehem
 
Agile Scrum software methodology
Agile Scrum software methodologyAgile Scrum software methodology
Agile Scrum software methodology
Abdullah Raza
 
Scrum Master - Ejercicios 1 Udemy
Scrum Master - Ejercicios 1 UdemyScrum Master - Ejercicios 1 Udemy
Scrum Master - Ejercicios 1 Udemy
Andy Juan Sarango Veliz
 
Fundamentals of Agile Methodologies - Part II
Fundamentals of Agile Methodologies - Part IIFundamentals of Agile Methodologies - Part II
Fundamentals of Agile Methodologies - Part II
Gopinath Ramakrishnan, Ph.D, CSM
 
Lego For Extended Scrum Simulation
Lego For Extended Scrum SimulationLego For Extended Scrum Simulation
Lego For Extended Scrum Simulation
Alexey Krivitsky
 
Agile stories, estimating and planning
Agile stories, estimating and planningAgile stories, estimating and planning
Agile stories, estimating and planning
Dimitri Ponomareff
 
enterprise scrum simulation with lego
enterprise scrum simulation with legoenterprise scrum simulation with lego
enterprise scrum simulation with legoAlexey Krivitsky
 
SCRUM Estimation
SCRUM EstimationSCRUM Estimation
SCRUM Estimation
Kristen Varona
 
Scrum Master Handbook
Scrum Master HandbookScrum Master Handbook
Scrum Master Handbook
Pradeep Papanna
 

What's hot (20)

Scrum Process
Scrum ProcessScrum Process
Scrum Process
 
The Scrum Guide 2020.pptx
The Scrum Guide 2020.pptxThe Scrum Guide 2020.pptx
The Scrum Guide 2020.pptx
 
Scrum training
Scrum trainingScrum training
Scrum training
 
Understanding Scrum in 30 Minutes
Understanding Scrum in 30 MinutesUnderstanding Scrum in 30 Minutes
Understanding Scrum in 30 Minutes
 
Introducing scrum
Introducing scrumIntroducing scrum
Introducing scrum
 
Backlog Refinement 101 & 202
Backlog Refinement 101 & 202Backlog Refinement 101 & 202
Backlog Refinement 101 & 202
 
Scrum & Sprint Planning.pptx
Scrum & Sprint Planning.pptxScrum & Sprint Planning.pptx
Scrum & Sprint Planning.pptx
 
How to facilitate product backlog refinement sessions
How to facilitate product backlog refinement sessionsHow to facilitate product backlog refinement sessions
How to facilitate product backlog refinement sessions
 
Scrumban
ScrumbanScrumban
Scrumban
 
Retrospectives
RetrospectivesRetrospectives
Retrospectives
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
 
Scrum in 15 Minutes
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 Minutes
 
Agile Scrum software methodology
Agile Scrum software methodologyAgile Scrum software methodology
Agile Scrum software methodology
 
Scrum Master - Ejercicios 1 Udemy
Scrum Master - Ejercicios 1 UdemyScrum Master - Ejercicios 1 Udemy
Scrum Master - Ejercicios 1 Udemy
 
Fundamentals of Agile Methodologies - Part II
Fundamentals of Agile Methodologies - Part IIFundamentals of Agile Methodologies - Part II
Fundamentals of Agile Methodologies - Part II
 
Lego For Extended Scrum Simulation
Lego For Extended Scrum SimulationLego For Extended Scrum Simulation
Lego For Extended Scrum Simulation
 
Agile stories, estimating and planning
Agile stories, estimating and planningAgile stories, estimating and planning
Agile stories, estimating and planning
 
enterprise scrum simulation with lego
enterprise scrum simulation with legoenterprise scrum simulation with lego
enterprise scrum simulation with lego
 
SCRUM Estimation
SCRUM EstimationSCRUM Estimation
SCRUM Estimation
 
Scrum Master Handbook
Scrum Master HandbookScrum Master Handbook
Scrum Master Handbook
 

Similar to Agile Resort Brochure Game July 2011

Learn scrum in half an hour
Learn scrum in half an hourLearn scrum in half an hour
Learn scrum in half an hour
Abhay Kumar
 
Scrum
Scrum Scrum
Scrum (software development)
Scrum (software development)Scrum (software development)
Scrum (software development)
Vignesh D
 
Agile – scrum +
Agile – scrum +Agile – scrum +
Agile – scrum +
Alon Lahav
 
Agile Methodology
Agile MethodologyAgile Methodology
Agile Methodology
AnveshPatel7
 
Scrum meetings
Scrum meetingsScrum meetings
Scrum meetings
Juan Banda
 
Agile scrum
Agile scrumAgile scrum
Agile scrum
VenkateshPai14
 
Scrum At Firmhouse
Scrum At FirmhouseScrum At Firmhouse
Scrum At Firmhouse
Michiel Sikkes
 
Agile with scrum methodology
Agile with scrum methodologyAgile with scrum methodology
Agile with scrum methodology
Abhishek Srivastava
 
2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...
2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...
2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...
GIS in the Rockies
 
Agile-Scrum Methodology-An Introduction
Agile-Scrum Methodology-An IntroductionAgile-Scrum Methodology-An Introduction
Agile-Scrum Methodology-An Introduction
XBOSoft
 
Scrum methodology
Scrum methodologyScrum methodology
Scrum methodology
Bunlong Van
 
scrummethodology-151002092252-lva1-app6891
scrummethodology-151002092252-lva1-app6891scrummethodology-151002092252-lva1-app6891
scrummethodology-151002092252-lva1-app6891
Bunlong Van
 
Mujeebur rahmansaher introduction-to-scrum_v2
Mujeebur rahmansaher introduction-to-scrum_v2Mujeebur rahmansaher introduction-to-scrum_v2
Mujeebur rahmansaher introduction-to-scrum_v2
Mujeebur Rahmansaher
 
SCRUM and Poker Game In Agile Project
SCRUM and Poker Game In Agile ProjectSCRUM and Poker Game In Agile Project
SCRUM and Poker Game In Agile Project
Nhan Nguyen
 
What is scrum
What is scrumWhat is scrum
What is scrum
Aaron Corcoran
 
aa.pdf
aa.pdfaa.pdf
aa.pdf
MANYAGOEL14
 
Scrum, agile process
Scrum, agile processScrum, agile process
ScrumInTenSlides
ScrumInTenSlidesScrumInTenSlides
ScrumInTenSlides
Learning Tree International
 
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
duhitha2
 

Similar to Agile Resort Brochure Game July 2011 (20)

Learn scrum in half an hour
Learn scrum in half an hourLearn scrum in half an hour
Learn scrum in half an hour
 
Scrum
Scrum Scrum
Scrum
 
Scrum (software development)
Scrum (software development)Scrum (software development)
Scrum (software development)
 
Agile – scrum +
Agile – scrum +Agile – scrum +
Agile – scrum +
 
Agile Methodology
Agile MethodologyAgile Methodology
Agile Methodology
 
Scrum meetings
Scrum meetingsScrum meetings
Scrum meetings
 
Agile scrum
Agile scrumAgile scrum
Agile scrum
 
Scrum At Firmhouse
Scrum At FirmhouseScrum At Firmhouse
Scrum At Firmhouse
 
Agile with scrum methodology
Agile with scrum methodologyAgile with scrum methodology
Agile with scrum methodology
 
2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...
2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...
2013 Enterprise Track, Getting GIS done using the Scrum Methodology Jonathan ...
 
Agile-Scrum Methodology-An Introduction
Agile-Scrum Methodology-An IntroductionAgile-Scrum Methodology-An Introduction
Agile-Scrum Methodology-An Introduction
 
Scrum methodology
Scrum methodologyScrum methodology
Scrum methodology
 
scrummethodology-151002092252-lva1-app6891
scrummethodology-151002092252-lva1-app6891scrummethodology-151002092252-lva1-app6891
scrummethodology-151002092252-lva1-app6891
 
Mujeebur rahmansaher introduction-to-scrum_v2
Mujeebur rahmansaher introduction-to-scrum_v2Mujeebur rahmansaher introduction-to-scrum_v2
Mujeebur rahmansaher introduction-to-scrum_v2
 
SCRUM and Poker Game In Agile Project
SCRUM and Poker Game In Agile ProjectSCRUM and Poker Game In Agile Project
SCRUM and Poker Game In Agile Project
 
What is scrum
What is scrumWhat is scrum
What is scrum
 
aa.pdf
aa.pdfaa.pdf
aa.pdf
 
Scrum, agile process
Scrum, agile processScrum, agile process
Scrum, agile process
 
ScrumInTenSlides
ScrumInTenSlidesScrumInTenSlides
ScrumInTenSlides
 
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
FALLSEM2022-23_SWE2029_TH_VL2022230101289_Reference_Material_I_26-09-2022_Scr...
 

Recently uploaded

HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
Javier Junquera
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Alpen-Adria-Universität
 
Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)
Jakub Marek
 
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their MainframeDigital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Precisely
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
DianaGray10
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
Antonios Katsarakis
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
DianaGray10
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Neo4j
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
Jason Yip
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
DanBrown980551
 
Essentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation ParametersEssentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation Parameters
Safe Software
 
“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...
“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...
“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...
Edge AI and Vision Alliance
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
Zilliz
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
Miro Wengner
 

Recently uploaded (20)

HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
Artificial Intelligence and Electronic Warfare
Artificial Intelligence and Electronic WarfareArtificial Intelligence and Electronic Warfare
Artificial Intelligence and Electronic Warfare
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
 
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing InstancesEnergy Efficient Video Encoding for Cloud and Edge Computing Instances
Energy Efficient Video Encoding for Cloud and Edge Computing Instances
 
Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)Main news related to the CCS TSI 2023 (2023/1695)
Main news related to the CCS TSI 2023 (2023/1695)
 
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their MainframeDigital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
Digital Banking in the Cloud: How Citizens Bank Unlocked Their Mainframe
 
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectorsConnector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
Connector Corner: Seamlessly power UiPath Apps, GenAI with prebuilt connectors
 
Dandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity serverDandelion Hashtable: beyond billion requests per second on a commodity server
Dandelion Hashtable: beyond billion requests per second on a commodity server
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
 
Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024Northern Engraving | Nameplate Manufacturing Process - 2024
Northern Engraving | Nameplate Manufacturing Process - 2024
 
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and BioinformaticiansBiomedical Knowledge Graphs for Data Scientists and Bioinformaticians
Biomedical Knowledge Graphs for Data Scientists and Bioinformaticians
 
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides5th LF Energy Power Grid Model Meet-up Slides
5th LF Energy Power Grid Model Meet-up Slides
 
Essentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation ParametersEssentials of Automations: Exploring Attributes & Automation Parameters
Essentials of Automations: Exploring Attributes & Automation Parameters
 
“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...
“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...
“How Axelera AI Uses Digital Compute-in-memory to Deliver Fast and Energy-eff...
 
Fueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte WebinarFueling AI with Great Data with Airbyte Webinar
Fueling AI with Great Data with Airbyte Webinar
 
JavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green MasterplanJavaLand 2024: Application Development Green Masterplan
JavaLand 2024: Application Development Green Masterplan
 

Agile Resort Brochure Game July 2011

  • 1. Resort Brochure Game Dept. / Author / Date
  • 2. Resort Brochure Game • In two teams, each team will create a Holiday Resort Brochure. • We shall assign the Product Owner and Scrum Master roles for each team. • The Product Owner will prioritise the Product Backlog. • We shall conduct Sprint and Release Planning • There will be two sprints. • Each sprint will be made up of two “days”. • Each day will start with a Daily Scrum Stand-up lasting 3 minutes. The Scrum Master will be responsible for updating the Progress Chart. • Each day’s work will last another 5 minutes. • Each sprint will end with a Review and Retrospective lasting 10 minutes in total. Dept. / Author / Date
  • 3. Resort Brochure Game Dept. / Author / Date
  • 4. Role Assignment & Product Backlog Prioritisation 3 Minutes • Each team needs a volunteer for the Product Owner and a Scrum Master. • The Product Owner needs to review and prioritise the Product Backlog. • Scrum Team familiarise themselves with materials available: • Pens • Paper • Magazines • Glue • Scissors Dept. / Author / Date
  • 5. Sprint and Release Planning 15 Minutes 1. Scrum Team work with Product Owner to agree which Product Backlog items are added to which sprint. 2. Understand from the Product Owner their acceptance criteria for each item. 3. Scrum Team create the tasks required to delivery the Product Backlog items for the 1st Sprint. Dept. / Author / Date
  • 6. Sprint 1 Dept. / Author / Date
  • 7. Sprint 1: Day 1 Daily Scrum Stand-Up 3 Minutes • All Scrum Team members and Scrum Master answer: • What have I done yesterday • What will I do today • Impediments blocking me. • Opportunity for team members to volunteer for tasks. • Scrum Master updates the Progress Chart and Burn Down Chart. • Have new tasks been identified that are required to be added to the sprint? Dept. / Author / Date
  • 8. Sprint 1: Day 1 Work 5 Minutes • Scrum Team work on delivering their chosen tasks. • If they complete tasks, choose new ones. • Product Owner be available to answer questions from the Scrum Team if needed. Dept. / Author / Date
  • 9. Sprint 1: Day 2 Daily Scrum Stand-Up 3 Minutes • All Scrum Team members and Scrum Master answer: • What have I done yesterday • What will I do today • Impediments blocking me. • Opportunity for team members to volunteer for tasks. • Scrum Master updates the Progress Chart • Have new tasks been identified that are required to be added to the sprint? Dept. / Author / Date
  • 10. Sprint 1: Day 2 Work 5 Minutes • Scrum Team work on delivering their chosen tasks. • If they complete tasks, choose new ones. • Product Owner be available to answer questions from the Scrum Team if needed. Dept. / Author / Date
  • 11. Sprint 1: Review and Retrospective 10 Minutes 1. Review • Conduct a demonstration of what has been delivered to the Product Owner. • Product Owner needs to either accept or reject the delivered Product Backlog items. 2. Retrospective • What do we do well? • What needs to improve? • Is there any process change? • Should we start doing something? Dept. / Author / Date
  • 12. Sprint Planning 10 Minutes 1. Where there any Product Backlog items that need moving to Sprint 2 as they were not delivered in Sprint 1? 2. Scrum Team create the tasks required to delivery the Product Backlog items for the 2nd Sprint. Dept. / Author / Date
  • 13. Sprint 2 Dept. / Author / Date
  • 14. Sprint 2: Day 1 Daily Scrum Stand-Up 3 Minutes • All Scrum Team members and Scrum Master answer: • What have I done yesterday • What will I do today • Impediments blocking me. • Opportunity for team members to volunteer for tasks. • Scrum Master updates the Progress Chart and Burn Down Chart. • Have new tasks been identified that are required to be added to the sprint? Dept. / Author / Date
  • 15. Sprint 2: Day 1 Work 5 Minutes • Scrum Team work on delivering their chosen tasks. • If they complete tasks, choose new ones. • Product Owner be available to answer questions from the Scrum Team if needed. Dept. / Author / Date
  • 16. Sprint 2: Day 2 Daily Scrum Stand-Up 3 Minutes • All Scrum Team members and Scrum Master answer: • What have I done yesterday • What will I do today • Impediments blocking me. • Opportunity for team members to volunteer for tasks. • Scrum Master updates the Progress Chart and Burn Down Chart. • Have new tasks been identified that are required to be added to the sprint? Dept. / Author / Date
  • 17. Sprint 2: Day 2 Work 5 Minutes • Scrum Team work on delivering their chosen tasks. • If they complete tasks, choose new ones. • Product Owner be available to answer questions from the Scrum Team if needed. Dept. / Author / Date
  • 18. Sprint 2: Review and Retrospective 10 Minutes 1. Review • Conduct a demonstration of what has been delivered to the Product Owner. • Product Owner needs to either accept or reject the delivered Product Backlog items. 2. Retrospective • What do we do well? • What needs to improve? • Is there any process change? • Should we start doing something? Dept. / Author / Date
  • 19. Resort Brochure Game Do you think you delivered more value working like this than having one 12 minute work period? Dept. / Author / Date