Empower Teams © Jurgen Appelo version 0.99 management30.com
story
Management 3.0
View #2: Empower Teams Teams can self-organize, and this requires empowerment, authorization, and trust from management.
Agile software development works because of self-organizing teams
management self-organization self-organizationis often complex, not chaotic Sometimes it needs a littlemanagement
Managers are like gardeners They let self-organization (anarchy) do useful work while steering the system toward valuable results
But HOWdo we grow a valuable self-organizing system?
Well, NOTby putting a control center on top of a living system
Distributed being A complex system is more than the sum of its parts, and the “extra” stuff is distributed over the system. It cannot be attributed to any single authoritative part.  Control from the bottom up In a complex system, everything happens at once, and problems ignore any central authority. Therefore overall governance must be spread among all the parts. Kelly, Kevin. Out of Control. Boston: Addison-Wesley, 1994, page 469
Authorization
We distribute authorization with... Empowerment Yes, there is that buzzword again...
Empowerment is implementing distributed control by delegating authority
Delegation “Delegation (or deputation) is the assignment of authority and responsibility to another person (normally from a manager to a subordinate) to carry out specific activities.” http://en.wikipedia.org/wiki/Delegation
Managers empower people,and distribute control,to prevent the system itselffrom breaking down.
Question: Does handing over power to others make you powerless?
Answer: NO Non-Zero-Sum Zero-Sum Free markets Social networks Teamwork … We all win! Football Elections Judiciary … I win and you lose http://en.wikipedia.org/wiki/Zero-sum
Non-Zero-Sum Powerful teams make their managers more powerful.
Trust your people(communicate this clearly)
2)	Earn trust from your people(consistent behavior)
Help people to trust each other(mingle, don’t meddle)
4)	Trust yourself(stay true to your own values)
The four types of trust
Techniques for delegation
Key Decision Areas Make explicit list with“areas of authorization” Prepare project schedules Select key technologies Set documentation standards Etc… People should not walk into“invisible electric fences” Reinertsen, Donald. Managing the Design Factory. New York: Free Press, 1997, page 107.
Key Decision Areas However… Authorization per key decision area is not a “binary” thing Reinertsen, Donald. Managing the Design Factory. New York: Free Press, 1997, page 107.
Situational Leadership Four different “leadership styles” Telling Selling Participating Delegation Work your way to level 4 http://en.wikipedia.org/wiki/Situational_leadership_theory
Situational Leadership However… It might be good to distinguish between informing people (push your opinion) vs. consulting them (pull their opinions)
RACI Matrix Involvement depends on tasks Responsible Accountable Consulted Informed Make explicit what people can expect from whom http://en.wikipedia.org/wiki/Responsibility_assignment_matrix
RACI Matrix However… Key decision areas are better than tasks, and there should be no separation of accountable versus responsible in Agile teams
We will now mergethe ideas behind the previous examples...
The Seven Levels of Authority Tell: make decision as the manager Sell: convince people about decision Consult: get input from team before decision Agree: make decision together with team Advise: influence decision made by the team Inquire: ask feedback after decision by team Delegate: no influence, let team work it out
Relocate to other office building Replace waterfall with Scrum Select new team members Choose logo for business unit Select architecture or component Sprint length and deliveries Coding guidelines and pairing EXAMPLE
The optimal level of authority depends on people’s competenceand the organizational impactof decisions
Authority Boards
Seven Levels of Authority
Key Decision Areas
teams or people
flow from left to right
Authority boards are controlled by the manager
Treat delegation as an investment
The ultimate goal is a self-directed team (but usually not attainable)
Game: Delegation Poker Find Delegation Poker Cards, and Delegation Poker Stories One person picks a story and reads it out loudOR tell a story from personal experience Everyone choose (privately) one of the 7 cards After everyone has decided, show all cards Everyone earn points except the highest minority(see examples…)
Game: Delegation Poker Keep track of the points people earned (optional) Let both highest and lowest motivate their choices Play it again for the same topic (optional) 30 minutes
Tell: make decision as the manager Sell: convince people about decision Consult: get input from team before decision Agree: make decision together with team Advise: influence decision made by the team Inquire: ask feedback after decision by team Delegate: no influence, let team work it out
Debrief
Challenges
Practices

More Related Content

What's hot

Leadership Skills: Scaling Organizational Structure
Leadership Skills: Scaling Organizational StructureLeadership Skills: Scaling Organizational Structure
Leadership Skills: Scaling Organizational StructureManagement 3.0
 
The Dolt's Guide To Self-Organization
The Dolt's Guide To Self-OrganizationThe Dolt's Guide To Self-Organization
The Dolt's Guide To Self-OrganizationJurgen Appelo
 
Self-Organization and Empowerment in Agile
Self-Organization and Empowerment in AgileSelf-Organization and Empowerment in Agile
Self-Organization and Empowerment in AgilebeLithe
 
Management 3.0
Management 3.0Management 3.0
Management 3.0netmind
 
Management 3.0 - Complexity Thinking
Management 3.0 - Complexity ThinkingManagement 3.0 - Complexity Thinking
Management 3.0 - Complexity ThinkingJurgen Appelo
 
Management 3.0 - How to Energize People
Management 3.0 - How to Energize PeopleManagement 3.0 - How to Energize People
Management 3.0 - How to Energize PeopleStefan Nüsperling
 
Management 3.0 overview
Management 3.0 overviewManagement 3.0 overview
Management 3.0 overviewAlexandre Cuva
 
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...AgileNZ Conference
 
The 5 Things You Need to Know About Resistance
The 5 Things You Need to Know About ResistanceThe 5 Things You Need to Know About Resistance
The 5 Things You Need to Know About ResistanceLuc Galoppin
 
How your culture is shaping your Agile
How your culture is shaping your AgileHow your culture is shaping your Agile
How your culture is shaping your AgileRowan Bunning
 
ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...
ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...
ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...Agile Montréal
 
Leadership agility 360™ presentation
Leadership agility 360™ presentationLeadership agility 360™ presentation
Leadership agility 360™ presentationSARGIA Partners
 
Neuro Based Leadershing Coaching by Coach Eval Wari, ACC
Neuro Based Leadershing Coaching by Coach Eval Wari, ACCNeuro Based Leadershing Coaching by Coach Eval Wari, ACC
Neuro Based Leadershing Coaching by Coach Eval Wari, ACCEval Wari
 
The Five Dysfunctions of a Team
The Five Dysfunctions of a TeamThe Five Dysfunctions of a Team
The Five Dysfunctions of a TeamEllie Dixon
 
ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...
ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...
ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...Agile Montréal
 

What's hot (20)

Leadership Skills: Scaling Organizational Structure
Leadership Skills: Scaling Organizational StructureLeadership Skills: Scaling Organizational Structure
Leadership Skills: Scaling Organizational Structure
 
The Dolt's Guide To Self-Organization
The Dolt's Guide To Self-OrganizationThe Dolt's Guide To Self-Organization
The Dolt's Guide To Self-Organization
 
Agile Leadership
Agile LeadershipAgile Leadership
Agile Leadership
 
Self-Organization and Empowerment in Agile
Self-Organization and Empowerment in AgileSelf-Organization and Empowerment in Agile
Self-Organization and Empowerment in Agile
 
Agile Leadership introduction
Agile Leadership introductionAgile Leadership introduction
Agile Leadership introduction
 
Management 3.0
Management 3.0Management 3.0
Management 3.0
 
Agility Scales
Agility ScalesAgility Scales
Agility Scales
 
Management 3.0 - Complexity Thinking
Management 3.0 - Complexity ThinkingManagement 3.0 - Complexity Thinking
Management 3.0 - Complexity Thinking
 
Management 3.0 - How to Energize People
Management 3.0 - How to Energize PeopleManagement 3.0 - How to Energize People
Management 3.0 - How to Energize People
 
Management 3.0 overview
Management 3.0 overviewManagement 3.0 overview
Management 3.0 overview
 
Agile leadership
Agile leadershipAgile leadership
Agile leadership
 
Webinar: Introdução ao Management 3.0 | Coletivo Ação
Webinar: Introdução ao Management 3.0 | Coletivo AçãoWebinar: Introdução ao Management 3.0 | Coletivo Ação
Webinar: Introdução ao Management 3.0 | Coletivo Ação
 
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
 
The 5 Things You Need to Know About Resistance
The 5 Things You Need to Know About ResistanceThe 5 Things You Need to Know About Resistance
The 5 Things You Need to Know About Resistance
 
How your culture is shaping your Agile
How your culture is shaping your AgileHow your culture is shaping your Agile
How your culture is shaping your Agile
 
ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...
ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...
ATMTL23 - Remettre l'humain au coeur de l'agilité avec le Mind Mapping par Re...
 
Leadership agility 360™ presentation
Leadership agility 360™ presentationLeadership agility 360™ presentation
Leadership agility 360™ presentation
 
Neuro Based Leadershing Coaching by Coach Eval Wari, ACC
Neuro Based Leadershing Coaching by Coach Eval Wari, ACCNeuro Based Leadershing Coaching by Coach Eval Wari, ACC
Neuro Based Leadershing Coaching by Coach Eval Wari, ACC
 
The Five Dysfunctions of a Team
The Five Dysfunctions of a TeamThe Five Dysfunctions of a Team
The Five Dysfunctions of a Team
 
ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...
ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...
ATMTL23 - Réussir sa transformation agile c'est d’abord changer son état d'es...
 

Similar to Management 3.0 - Empower Teams

Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11
Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11
Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11AgileSparks
 
Андрій Павлюков: “Self-organization and delegation” (10.03.2018)
Андрій Павлюков: “Self-organization and delegation” (10.03.2018)Андрій Павлюков: “Self-organization and delegation” (10.03.2018)
Андрій Павлюков: “Self-organization and delegation” (10.03.2018)Lviv Startup Club
 
Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...
Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...
Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...Lviv Startup Club
 
Empowering Agile Self-Organized Teams with Design Thinking
Empowering Agile Self-Organized Teams with Design ThinkingEmpowering Agile Self-Organized Teams with Design Thinking
Empowering Agile Self-Organized Teams with Design ThinkingC4Media
 
Empowering Agile Self-Organized Teams With Design Thinking
Empowering Agile Self-Organized Teams With Design ThinkingEmpowering Agile Self-Organized Teams With Design Thinking
Empowering Agile Self-Organized Teams With Design ThinkingWilliam Evans
 
AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...
AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...
AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...AOE
 
Chapter 10 Summary
Chapter 10 SummaryChapter 10 Summary
Chapter 10 Summaryajithsrc
 
2011 dialogue the language of complex systems v.2
2011 dialogue   the language of complex systems v.22011 dialogue   the language of complex systems v.2
2011 dialogue the language of complex systems v.2herbisoj
 
Ceo Fusion Teams
Ceo Fusion   TeamsCeo Fusion   Teams
Ceo Fusion Teamsjimlove
 
Scrum: Leading a Self-Organizing Team
Scrum: Leading a Self-Organizing TeamScrum: Leading a Self-Organizing Team
Scrum: Leading a Self-Organizing TeamMike Cohn
 
Organizational structures, Conflicts and Negotiation in Project Management
Organizational structures, Conflicts and Negotiation in Project ManagementOrganizational structures, Conflicts and Negotiation in Project Management
Organizational structures, Conflicts and Negotiation in Project ManagementShikhaj Jakhete
 
Introduction to Holacracy
Introduction to HolacracyIntroduction to Holacracy
Introduction to HolacracyEnergized.org
 
Lecture4 Group Decision Support And Groupware Technologies
Lecture4 Group Decision Support And Groupware TechnologiesLecture4 Group Decision Support And Groupware Technologies
Lecture4 Group Decision Support And Groupware TechnologiesKodok Ngorex
 

Similar to Management 3.0 - Empower Teams (20)

Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11
Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11
Jurgen Appelo - The dolt's guide to self-organization @ AgileIL11
 
Андрій Павлюков: “Self-organization and delegation” (10.03.2018)
Андрій Павлюков: “Self-organization and delegation” (10.03.2018)Андрій Павлюков: “Self-organization and delegation” (10.03.2018)
Андрій Павлюков: “Self-organization and delegation” (10.03.2018)
 
Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...
Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...
Андрій Павлюков "Self-organization and delegation" Kharkiv Project Management...
 
02 vdj jamie gotch
02 vdj jamie gotch02 vdj jamie gotch
02 vdj jamie gotch
 
Management 3.0 : how to lead agile teams?
Management 3.0 : how to lead agile teams?Management 3.0 : how to lead agile teams?
Management 3.0 : how to lead agile teams?
 
Empowering Agile Self-Organized Teams with Design Thinking
Empowering Agile Self-Organized Teams with Design ThinkingEmpowering Agile Self-Organized Teams with Design Thinking
Empowering Agile Self-Organized Teams with Design Thinking
 
Decision Making
Decision MakingDecision Making
Decision Making
 
Empowering Agile Self-Organized Teams With Design Thinking
Empowering Agile Self-Organized Teams With Design ThinkingEmpowering Agile Self-Organized Teams With Design Thinking
Empowering Agile Self-Organized Teams With Design Thinking
 
AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...
AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...
AOEconf17: Management 3.0 - the secret to happy, performing and motivated sel...
 
Chapter 6.pptx
Chapter 6.pptxChapter 6.pptx
Chapter 6.pptx
 
Chapter 10 Summary
Chapter 10 SummaryChapter 10 Summary
Chapter 10 Summary
 
2011 dialogue the language of complex systems v.2
2011 dialogue   the language of complex systems v.22011 dialogue   the language of complex systems v.2
2011 dialogue the language of complex systems v.2
 
Ceo Fusion Teams
Ceo Fusion   TeamsCeo Fusion   Teams
Ceo Fusion Teams
 
Example Of Platform Iot
Example Of Platform IotExample Of Platform Iot
Example Of Platform Iot
 
Halocracy: The New Business Management Model
Halocracy: The New Business Management ModelHalocracy: The New Business Management Model
Halocracy: The New Business Management Model
 
Scrum: Leading a Self-Organizing Team
Scrum: Leading a Self-Organizing TeamScrum: Leading a Self-Organizing Team
Scrum: Leading a Self-Organizing Team
 
Organizational structures, Conflicts and Negotiation in Project Management
Organizational structures, Conflicts and Negotiation in Project ManagementOrganizational structures, Conflicts and Negotiation in Project Management
Organizational structures, Conflicts and Negotiation in Project Management
 
Introduction to Holacracy
Introduction to HolacracyIntroduction to Holacracy
Introduction to Holacracy
 
Decision making report
Decision making reportDecision making report
Decision making report
 
Lecture4 Group Decision Support And Groupware Technologies
Lecture4 Group Decision Support And Groupware TechnologiesLecture4 Group Decision Support And Groupware Technologies
Lecture4 Group Decision Support And Groupware Technologies
 

More from Jurgen Appelo

35 Best Quotes from Management for Happiness
35 Best Quotes from Management for Happiness35 Best Quotes from Management for Happiness
35 Best Quotes from Management for HappinessJurgen Appelo
 
The Zen of Scrum - Russian
The Zen of Scrum - RussianThe Zen of Scrum - Russian
The Zen of Scrum - RussianJurgen Appelo
 
Management 3.0 - Brochure
Management 3.0 - BrochureManagement 3.0 - Brochure
Management 3.0 - BrochureJurgen Appelo
 
Jurgen Appelo - Brochure
Jurgen Appelo - BrochureJurgen Appelo - Brochure
Jurgen Appelo - BrochureJurgen Appelo
 
SketchKeynote Example
SketchKeynote ExampleSketchKeynote Example
SketchKeynote ExampleJurgen Appelo
 
Happy Melly Videos (General Instructions)
Happy Melly Videos (General Instructions)Happy Melly Videos (General Instructions)
Happy Melly Videos (General Instructions)Jurgen Appelo
 
Blueprint for a Tribal Business
Blueprint for a Tribal BusinessBlueprint for a Tribal Business
Blueprint for a Tribal BusinessJurgen Appelo
 
The 7 Duties of Great Software Professionals (Reworked)
The 7 Duties of Great Software Professionals (Reworked)The 7 Duties of Great Software Professionals (Reworked)
The 7 Duties of Great Software Professionals (Reworked)Jurgen Appelo
 
How to Change the World
How to Change the WorldHow to Change the World
How to Change the WorldJurgen Appelo
 
What Is Agile Management?
What Is Agile Management?What Is Agile Management?
What Is Agile Management?Jurgen Appelo
 
The 7 Duties of Great Software Professionals
The 7 Duties of Great Software ProfessionalsThe 7 Duties of Great Software Professionals
The 7 Duties of Great Software ProfessionalsJurgen Appelo
 
Agile Application Lifecycle Management (ALM)
Agile Application Lifecycle Management (ALM)Agile Application Lifecycle Management (ALM)
Agile Application Lifecycle Management (ALM)Jurgen Appelo
 
Agile Management: Leading Teams with a Complex Mind
Agile Management: Leading Teams with a Complex MindAgile Management: Leading Teams with a Complex Mind
Agile Management: Leading Teams with a Complex MindJurgen Appelo
 
Complexity versus Lean
Complexity versus LeanComplexity versus Lean
Complexity versus LeanJurgen Appelo
 
The Big-Ass View on Competence (and Communication)
The Big-Ass View on Competence (and Communication)The Big-Ass View on Competence (and Communication)
The Big-Ass View on Competence (and Communication)Jurgen Appelo
 

More from Jurgen Appelo (20)

Champfrogs
ChampfrogsChampfrogs
Champfrogs
 
35 Best Quotes from Management for Happiness
35 Best Quotes from Management for Happiness35 Best Quotes from Management for Happiness
35 Best Quotes from Management for Happiness
 
The Zen of Scrum - Russian
The Zen of Scrum - RussianThe Zen of Scrum - Russian
The Zen of Scrum - Russian
 
Management 3.0 - Brochure
Management 3.0 - BrochureManagement 3.0 - Brochure
Management 3.0 - Brochure
 
Jurgen Appelo - Brochure
Jurgen Appelo - BrochureJurgen Appelo - Brochure
Jurgen Appelo - Brochure
 
I Can't Draw
I Can't DrawI Can't Draw
I Can't Draw
 
SketchKeynote Example
SketchKeynote ExampleSketchKeynote Example
SketchKeynote Example
 
Happy Melly Videos (General Instructions)
Happy Melly Videos (General Instructions)Happy Melly Videos (General Instructions)
Happy Melly Videos (General Instructions)
 
Blueprint for a Tribal Business
Blueprint for a Tribal BusinessBlueprint for a Tribal Business
Blueprint for a Tribal Business
 
Stoos and Stuff
Stoos and StuffStoos and Stuff
Stoos and Stuff
 
Stoos Gathering
Stoos GatheringStoos Gathering
Stoos Gathering
 
The 7 Duties of Great Software Professionals (Reworked)
The 7 Duties of Great Software Professionals (Reworked)The 7 Duties of Great Software Professionals (Reworked)
The 7 Duties of Great Software Professionals (Reworked)
 
Complexity Thinking
Complexity ThinkingComplexity Thinking
Complexity Thinking
 
How to Change the World
How to Change the WorldHow to Change the World
How to Change the World
 
What Is Agile Management?
What Is Agile Management?What Is Agile Management?
What Is Agile Management?
 
The 7 Duties of Great Software Professionals
The 7 Duties of Great Software ProfessionalsThe 7 Duties of Great Software Professionals
The 7 Duties of Great Software Professionals
 
Agile Application Lifecycle Management (ALM)
Agile Application Lifecycle Management (ALM)Agile Application Lifecycle Management (ALM)
Agile Application Lifecycle Management (ALM)
 
Agile Management: Leading Teams with a Complex Mind
Agile Management: Leading Teams with a Complex MindAgile Management: Leading Teams with a Complex Mind
Agile Management: Leading Teams with a Complex Mind
 
Complexity versus Lean
Complexity versus LeanComplexity versus Lean
Complexity versus Lean
 
The Big-Ass View on Competence (and Communication)
The Big-Ass View on Competence (and Communication)The Big-Ass View on Competence (and Communication)
The Big-Ass View on Competence (and Communication)
 

Recently uploaded

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Recently uploaded (20)

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

Management 3.0 - Empower Teams

  • 1. Empower Teams © Jurgen Appelo version 0.99 management30.com
  • 4. View #2: Empower Teams Teams can self-organize, and this requires empowerment, authorization, and trust from management.
  • 5. Agile software development works because of self-organizing teams
  • 6. management self-organization self-organizationis often complex, not chaotic Sometimes it needs a littlemanagement
  • 7. Managers are like gardeners They let self-organization (anarchy) do useful work while steering the system toward valuable results
  • 8. But HOWdo we grow a valuable self-organizing system?
  • 9. Well, NOTby putting a control center on top of a living system
  • 10. Distributed being A complex system is more than the sum of its parts, and the “extra” stuff is distributed over the system. It cannot be attributed to any single authoritative part. Control from the bottom up In a complex system, everything happens at once, and problems ignore any central authority. Therefore overall governance must be spread among all the parts. Kelly, Kevin. Out of Control. Boston: Addison-Wesley, 1994, page 469
  • 12. We distribute authorization with... Empowerment Yes, there is that buzzword again...
  • 13. Empowerment is implementing distributed control by delegating authority
  • 14. Delegation “Delegation (or deputation) is the assignment of authority and responsibility to another person (normally from a manager to a subordinate) to carry out specific activities.” http://en.wikipedia.org/wiki/Delegation
  • 15. Managers empower people,and distribute control,to prevent the system itselffrom breaking down.
  • 16. Question: Does handing over power to others make you powerless?
  • 17. Answer: NO Non-Zero-Sum Zero-Sum Free markets Social networks Teamwork … We all win! Football Elections Judiciary … I win and you lose http://en.wikipedia.org/wiki/Zero-sum
  • 18. Non-Zero-Sum Powerful teams make their managers more powerful.
  • 20. 2) Earn trust from your people(consistent behavior)
  • 21. Help people to trust each other(mingle, don’t meddle)
  • 22. 4) Trust yourself(stay true to your own values)
  • 23. The four types of trust
  • 25. Key Decision Areas Make explicit list with“areas of authorization” Prepare project schedules Select key technologies Set documentation standards Etc… People should not walk into“invisible electric fences” Reinertsen, Donald. Managing the Design Factory. New York: Free Press, 1997, page 107.
  • 26. Key Decision Areas However… Authorization per key decision area is not a “binary” thing Reinertsen, Donald. Managing the Design Factory. New York: Free Press, 1997, page 107.
  • 27. Situational Leadership Four different “leadership styles” Telling Selling Participating Delegation Work your way to level 4 http://en.wikipedia.org/wiki/Situational_leadership_theory
  • 28. Situational Leadership However… It might be good to distinguish between informing people (push your opinion) vs. consulting them (pull their opinions)
  • 29. RACI Matrix Involvement depends on tasks Responsible Accountable Consulted Informed Make explicit what people can expect from whom http://en.wikipedia.org/wiki/Responsibility_assignment_matrix
  • 30. RACI Matrix However… Key decision areas are better than tasks, and there should be no separation of accountable versus responsible in Agile teams
  • 31. We will now mergethe ideas behind the previous examples...
  • 32. The Seven Levels of Authority Tell: make decision as the manager Sell: convince people about decision Consult: get input from team before decision Agree: make decision together with team Advise: influence decision made by the team Inquire: ask feedback after decision by team Delegate: no influence, let team work it out
  • 33. Relocate to other office building Replace waterfall with Scrum Select new team members Choose logo for business unit Select architecture or component Sprint length and deliveries Coding guidelines and pairing EXAMPLE
  • 34. The optimal level of authority depends on people’s competenceand the organizational impactof decisions
  • 36. Seven Levels of Authority
  • 39. flow from left to right
  • 40. Authority boards are controlled by the manager
  • 41. Treat delegation as an investment
  • 42. The ultimate goal is a self-directed team (but usually not attainable)
  • 43. Game: Delegation Poker Find Delegation Poker Cards, and Delegation Poker Stories One person picks a story and reads it out loudOR tell a story from personal experience Everyone choose (privately) one of the 7 cards After everyone has decided, show all cards Everyone earn points except the highest minority(see examples…)
  • 44.
  • 45.
  • 46.
  • 47.
  • 48. Game: Delegation Poker Keep track of the points people earned (optional) Let both highest and lowest motivate their choices Play it again for the same topic (optional) 30 minutes
  • 49. Tell: make decision as the manager Sell: convince people about decision Consult: get input from team before decision Agree: make decision together with team Advise: influence decision made by the team Inquire: ask feedback after decision by team Delegate: no influence, let team work it out
  • 51.

Editor's Notes

  1. My personal story here is that, after the introduction of Scrum in our organization, I was faced with decisions to be made concerning story points, meeting rooms, sprint lengths, etc. I left all those decisions to the teams. There was only one requirement I had for all teams: planning meetings would have to take place on Mondays. Because otherwise it would be very inefficient (at the organizational level).You will have to come up with your own personal story that reflects empowerment/delegation.
  2. Most Agile books seem to assume that organizations come from the ordered part of the spectrum, and have to “let go” over strict management. But many other organizations (like in my own experience) are in the chaotic part of the spectrum. They need a little bit more management. (I did that by imposing Scrum, and it worked.)See book: page 102-103
  3. See book: page 115-117
  4. See book: page 111-112
  5. Authorization usually starts with shareholders who authorize top managers to grow a business with their money. These top managers hire and authorize other people to do work. This leads, quite naturally, to a hierarchy. But that is the only thing a corporate hierarchy is good for: authorizing people and making sure each person has only one boss.
  6. I don’t know any other good word for empowerment, even though it has been overused in management literature. So I will stick to it for now.See book: page 112-114
  7. This is often the problem with managers: they fear they become powerless when they hand over authority to other people.See book: page 124-125
  8. I explain here that I became more powerful after introducing Scrum in the organization, because (despite plenty of issues) it seemed to work nicely. And because top management liked it and saw the results, I became more important in the eyes of top management for having changed the organization in such a positive way.
  9. Some managers forget to tell their teams that they trust them.If you explicitly tell people you trust them you may increase their commitment and loyalty.See book: page 138-139
  10. I have seen managers requiring certain behavior from employees (for example, “be more disciplined”) while they rarely showed such behavior themselves (for example, never being on time in meetings).You destroy trust if you don’t lead by example and show the behavior you also expect from others.See book: page 139-140
  11. Sometimes team members keep asking the manager to help them solve issues. This may be an indication that they don’t trust each other enough to make good decisions. You can increase trust between people in a team by not giving them solutions to their problems. Let them figure it out together first.See book: page 140
  12. This seems a bit cheesy. But I have it from a book by Scott Berkun. If you don’t trust your own behavior, if you don’t live up to your own value system, then how can you expect other people to trust you?Trust yourself first, before building trust relationships with others.See book: page 140-141
  13. So these are the four types of trust. A manager needs to work on all of them.
  14. Now we get more practical...
  15. See book: page 127-129
  16. Authority boards are a very new concept, not described in the book. I have received a few reports since I published the first articles about it of teams using them successfully, but it is far from a mainstream topic. Still, I want to show it because it nicely reflects the way of thinking of an Agile manager: delegate as much as possible by using some kind of information radiator.
  17. Put the 7 levels of authority horizontally on a board.
  18. List all key decision areas (only the ones that are worth communicating and discussing).
  19. Determine which teams or individuals are authorized to do what, and at what level.
  20. The nice thing about this approach is that there is an urge to make things flow from left to right, just like a regular task board.
  21. You must treat delegation as an investment. It doesn’t pay back for itself immediately. It takes a while...See book: page 133-134
  22. Like 100% code coverage a fully self-directed team (all key decision areas at level 7) is the ultimate goal that you will never reach.
  23. Hand out the playing cards to each table. Ask them to distribute sets of 7 cards among each other.Check that there are at least four people at every table. I don’t think the game works well with only tree people.Make it clear that it is more fun for people to come up with their own stories from personal experience.Some groups make it easy and simply read off the 10 stories from the paper.Maybe you can find a way to incentivize people to think of their own stories. 
  24. Make sure everyone pays attention to these examples. They make it quite clear how it works.Suppose 3 people at the table choose 6, the others choose 4 and 5.You always look at the highest number that was played, in this case 6.
  25. If the people with the highest number are not a minority, everybody wins points.But you only win points according to your card’s value.
  26. Another example: suppose only one person chooses 7.
  27. In that case everyone wins points except number 7, because 7 is now a minority at the table.Conclusion: in order to win points choose as high as possible, but without becoming a minority at the table.
  28. Make it clear that the most value in this game is achieved by discussing the lowest and highest card values that were chosen. The other stuff (calculating points and playing again for the same topic) is optional.
  29. I show this slide on screen while people are playing the game.
  30. Some possible questions:What effect did the points have?What effect did the discussions have?I usually point out that the game is actually skewed when people have different projects and teams. In that case it is hard to compare the choices for authorization, because such choices should be context-dependent.It is probably even more interesting to play the game with one team and its manager. Then they all have the same context.
  31. It is now time to discuss the most important challenges that were written on sticky notes earlier in the course.This is the 4th part of the course so we usually end the day after this module.
  32. I make a central action list on a wall, and I ask the group at the end of the module which concrete practices they think most managers should do regularly. They can be practices that I have suggested in this module or other practices they suggest themselves.We will review the entire list of practices at the end of the course.
  33. Once again I explicitly ask people to give feedback on the feedback door, before they leave the room to go home.