Agile and Scrum Masterclass
Agile and Scrum Masterclas
Complete Agile and Scrum Video Course for Product Owner and
Scrum Master Things I Learned From
10 Years of Agile Project Management and Scrum
Benefits for Agile and Scrum Masterclass Students:
1. This is one of the most comprehensive video courses for Agile and Scrum on the market
today, that walks you through every step of the Agile and Scrum framework, from A to Z
2. Students will have a strong understanding of the Scrum framework and Agile Practices.
3. Students will be prepared to take any Scrum certification exam.
4. Students will know how to deliver significant value quickly and throughout sprints!
5. Students will be able to prioritize tasks and the job to be done properly.
6. Students will understand how to Plan and Execute the perfect Sprints in Scrum.
7. Students will know how Scrum Events work in practice.
8. Students will understand what steps should be taken if this is their first job as a Product
Owner or Scrum Master.
9. Students will know how to guide the organizational transformation from Waterfall
development to Agile and Scrum.
10. Students will have skills needed for Agile and Scrum testing.
11. Students will be able to demonstrate their competencies in delivering Scrum projects
successfully.
12. Students will have all the tools to anticipate issues related to the practical implementation
of Scrum.
13. Students will understand how Scrum works in real life with Practical Case Studies
applying Agile and Scrum in real life.
Benefits for companies from Agile and Scrum Masterclass:
Create a minimum viable product (MVP) fast.
Quicker release of a usable product to users and customers.
Reduced risks and continuous improvement.
Higher quality, productivity, and lower costs.
Greater ability to incorporate changes as they occur.
More relevant metrics.
Improved employee morale, and Higher customer satisfaction
Being able to complete complex projects that previously could not be done.
Help companies to complete projects faster and more successfully.
Help companies to increase ROI.
Increased collaboration and ownership
Consequences if you don't use this Masterclass:
TikTok Mastery for Business
You may not understand your optimal learning path,
You will not know what skills you need to become a successful PO or SM,
You will not know how Planning in Agile and Scrum works,
You will not know how to create a Safe Environment,
Roadblocks will often remain unsolved,
The whole process of development will become ineffective,
You will not know how to avoid conflicts,
You will not know how to implement different Scrum techniques in practice
You will not know how to deal with different types of risks,
You will not understand how Scrum works in real-live,
You will fail the Scrum Certification again and again, and much more …
YouTube Manifestation
Exactly What You're Getting:
Introduction to Course
Lesson 1: This is an introduction to this Masterclass training. Students will have a brief overview
of what will be talking about and what they will learn.
Lesson 2: The Scrum Guide 2020 - What has been changed? Let’s walk through the list of the
majority of changed elements. Scrum AUDIO Guide INCLUDED.
Module 2 - Beginner
What is Agile software development?
Lesson 1: Introduction to Agile, Why Agile?
Lesson 2: The Values and Principles of the Agile Manifesto
Lesson 3: Difference Between Agile and Scrum
Lesson 4: Why Agile Rocks?
Lesson 5: Agile Mythbusters: 13 Myths in details.
Module 3 - Beginner
What is the Product?
Lesson 1: Product introduction
Lesson 2: Product Goal Introduction (2020)
Lesson 3: Product Vision
Lesson 4: Product Strategy
Lesson 5: Product Roadmap
Module 4 - Beginner
The Three Pillars of Empiricism
Lesson 1: Introduction to the three pillars of Empiricism
Lesson 2: Challenges and examples of Empiricism
After the Agile and Scrum Masterclass, you will have a strong
understanding of the Scrum framework!
Digital Entrepreneur Bootcamp
Module 5 - Beginner
Scrum Framework
Lesson 1: Introduction to Scrum Framework
Lesson 2: Scrum team
Lesson 3: The Product Owner
Lesson 4: The Scrum Master
Lesson 5: Changes for the Scrum Masters concerning Scrum Guide 2020
Lesson 6: Developers in Scrum
Lesson 7: Stakeholders
Module 6 - Beginner
Scrum timeboxing, Scrum Events, and more...
Lesson 1: Scrum Timeboxing and Scrum Events
Lesson 2: The Sprint
Lesson 3: The Sprint Goal
Lesson 4: First Scrum event: Sprint Planning
Lesson 5: Second Scrum event: Daily Scrum
Lesson 6: Third Scrum event: Sprint Review
Lesson 7: Fourth Scrum event: Sprint Retrospective
Lesson 8: Product Backlog refinement
Lesson 9: Introduction to Release Planning
Module 7 - Beginner
The Theme, Epics, User Stories, and Tasks
Lesson 1: Introduction
Lesson 2: Themes
Lesson 3: Epics
Lesson 4: User stories
Lesson 5: User Story Mapping
Lesson 6: Tasks
Learn multiplication tables with innovative method
Module 8 - Beginner
Scrum Artifacts
Lesson 1: Introduction to Scrum Artifacts
Lesson 2: Product Backlog
Lesson 3: Sprint Backlog
Lesson 4: Scrum Board - DEMO
Lesson 5: The Increment
Module 9 - Advanced
Master Burndown Charts
Lesson 1: Course INTRO
Lesson 2: What is Burndown Chart in Scrum
Lesson 3: Types of burndown charts
Lesson 4: Work remaining vs Work completed burndown chart
Lesson 5: Adjustable Floor burndown chart
Lesson 6: Creating a Release burndown chart from scratch Step-By-Step Guide
Lesson 7: Assignment
Lesson 8: Online tools for burndown charts - Jira
Lesson 9: Pros, Cons, and Common Burndown Chart Mistakes
Lesson 10: Final words and Congratulations
Module 10 - Beginner
Definition of Ready, Definition of Done, and Acceptance criteria
Lesson 1: Definition of Ready (DoR)
Lesson 2: Definition of Done (DoD)
Lesson 3: Acceptance criteria (AC)
Module 11 - Beginner
Introduction to Evidence-Based Management 2020
Lesson 1: Introduction to evidence-based management (EBM)
Lesson 2: The benefits of evidence-based management
After Agile and Scrum Masterclass, you can take any Scrum certification exam,
and obtain the highly valued credential!
Module 12 - Beginner
Scrum Certification
Lesson 1: Introduction to Scrum Certification
Lesson 2: General details about Scrum.org Certifications
Lesson 3: Tips for all those who want to prepare for the exam on their own
Lesson 4: General details about Scrum Alliance Certifications
Lesson 5: Which Scrum Certification Do I Choose?
Lesson 6: 100 Carefully Selected Questions and Answers for Scrum certification. (+ 106 exam
questions and answers for PO & SM)
Certified Agile Transformation Professional Course
Module 13 - Advanced
Your first job as a Product owner - where to start?
Lesson 1: You get your first job as a PO - where to start - Introduction
Lesson 2: Where to start building an existing product?
Lesson 3: Where to start if you are going to build a new product from scratch?
Agile and Scrum Masterclass provides an overview of Scrum which is
an adaptive, iterative, and flexible framework designed to deliver
significant value quickly and throughout a project!
Module 14 - Advanced
Risk Management in Agile and Scrum
Lesson 1: Risk Management in Scrum INTRO
Lesson 2: Types of Project Risks
Lesson 3: Risk Assessment - Likelihood, and Impact
Lesson 4: Risk Strategies, Contingency, Mitigation
Lesson 5: Group Anti-Patterns PART 1 and PART 2
Lesson 6: Individual Anti-Patterns PART 1 and PART 2
Lesson 7: Contingency Plan vs Fallback Plan
Lesson 8: The Risk Assessment Meeting
Lesson 9: Creating a Risk Plan
Lesson 10: Risk monitoring
Lesson 11: FAQ for Risk management
Lesson 12: Final Words and Congratulations
Learn French by speaking!
Module 15 - Advanced
How do Scrum Events work in practice?
Lesson 1: Introduction to module
Lesson 2: Introduction to Scrum Events
Lesson 3: Why Should You Run A Sprint Planning Meeting?
Lesson 4: How Sprint Planning is Done?
Lesson 5: How to run a Daily Scrum meeting?
Lesson 6: The Daily Scrum Challenges
Lesson 7: How to run a successful Sprint Review Meeting?
Lesson 8: Introduction to Sprint Review Techniques
Lesson 9: How to implement the SOFTWARE WALKTHROUGHS Technique?
Lesson 10: How to implement the SOFTWARE TECHNICAL REVIEW Technique?
Lesson 11: How to implement the SOFTWARE INSPECTIONS Technique?
Lesson 12: The requirements technical review and inspection technique
Lesson 13: Introduction to Retrospectives
Lesson 14: Create a Safe Environment as a common Retrospectives Issue
Lesson 15: Positive Leadership is a common Retrospectives Issue
Lesson 16: Desirable properties of Retrospectives
Lesson 17: How to carry out a successful Sprint Retrospective?
Lesson 18: Introduction to Retrospective Exercises
Lesson 19: Retrospective Exercises – Reading course exercises
Lesson 20: Retrospective Exercises – The Main course exercises
Lesson 21: Retrospective Exercises – Future course exercises
Lesson 22: Tips and Tricks to run better Scrum events – PART 1
Lesson 23: Tips and Tricks to run better Scrum events – PART 2
Lesson 24: Tips and Tricks to run better Scrum events – PART 3
Lesson 25: Final Words
Agile and Scrum Masterclass was developed as a means to create a necessary guide for
organizations and project management practitioners who want to implement Scrum.
Module 16 - Advanced
Plan and Execute the perfect Sprints
Lesson 1: Introduction to Planning
Lesson 2: Uncertainty Space
Lesson 3: Work Breakdown Structure
Lesson 4: Estimates, Targets, and Commitments
Lesson 5: ASSIGNMENT No 1.
Lesson 6: Story points Estimation
Lesson 7: Challenges in Story Point Estimation
Lesson 8: Velocity Estimates
Lesson 9: Timeboxing in
Lesson10: Release Planning
Lesson 11: Handling risks
Lesson 12: ASSIGNMENT No 2.
Lesson 13: Estimating Task Duration (PART 1)
Lesson 14: Estimating Task Duration (PART 2)
Lesson 15: Task dependencies
Lesson 16: Critical Path Method chart or CPM Chart
Lesson 17: Sprint Planning
Lesson 18: ASSIGNMENT No 3.
Lesson 19: Final word season
Agile and Scrum Masterclass help individuals and organizations
complete projects faster and more successfully.
Module 17 - Advanced
The Transition from Traditional to Agile
Lesson 1: Introduction to module
Lesson 2: We need evidence of success – A Case Study
Lesson 3: Differences in project management - Agile vs. Waterfall
Lesson 4: Habits from traditional environments you need to watch out for
Lesson 5: Why traditional project management techniques are still so prevalent
Lesson 6: Differences between traditional and agile on how to maintain your teams
Lesson 7: Rewards for traditional Project Managers working with Agile projects
Lesson 8: SIMILARITIES - the Traditional World and the Agile
Lesson 9: Project manager characteristics who is going to be successful with agile
Lesson 10: Productive thinking, advances, and challenges about agile
Lesson 11: The State of Agility - Benefits of organizational Agility
Lesson 12: TIPS to Manage a Transition from Waterfall to Agile
Lesson 13: TIPS for transitioning Clients to an Agile Process
Lesson 14: 4 Ways to Ease the Transition from Waterfall to Agile
Lesson 15: TIPS to Increase Agility in your organization
Lesson 16: How to Choose the Right Agile Framework
Lesson 17: Conclusion
Module 18
Recap and Last Words
Lesson 1: Short animated presentation
Lesson 2: All right, we've reached the end of this course. Congratulations!!!
Agile and Scrum Masterclass will help you demonstrate your
competency in delivering Scrum projects successfully.
BONUS Module 19 - Advanced
Testing Mastery in Agile and Scrum
Lesson 1: Introduction to Agile and Scrum Testing
Lesson 2: Introduction to the Agile Software Development
Lesson 3: Traditional vs. Agile Testing
Lesson 4: What are an agile tester and Management expectations
Lesson 5: The agile testing mindset
Lesson 6: What is Agile Testing and Agile Test Plan
Lesson 7: Agile Testing Strategies
Lesson 8: Agile Metrics
Lesson 9: Agile Testing Quadrant 1
Lesson 10: Agile Testing Quadrant 2
Lesson 11: Agile Testing Quadrant 3
Lesson 12: Agile Testing Quadrant 4
Lesson 13: Important guidelines before you start testing
Lesson 14: Testing Documents and Documentation
Lesson 15: QA challenges with agile software development
Lesson 16: Testing in Scrum
Lesson 17: Test Reporting
Lesson 18: Agile Automation Testing
Lesson 19: How to automate in Agile Methodology
Lesson 20: Risks of Automation in Agile
Lesson 21: Barriers to successful agile adoption by test teams
Lesson 22: Testing Toolkit
Lesson 23: Agile Open-Source Test Tools
Lesson 24: Tips and Tricks for testers
Lesson 25: Agile Testing Interview Questions and Answers
Lesson 26: Agile Testing Conclusion
Agile and Scrum Masterclass help organizations with an improved level of
project management and delivery that leads to increased ROI.
BONUS Module 20 - Advanced
The Scrum in Real Life
Lesson 1: INTRO (Practical Case Studies applying Agile and Scrum in Real Life)
Lesson 2: Introduction
Lesson 3: Let’s meet OUR Product Owner
Lesson 4: A day in the Life of the Product Owner
Lesson 5: Let’s meet our Scrum Master
Lesson 6: A day in the life of the Scrum Master
Lesson 7: Two-Week Sprint in Real Life - Sprint 1-Day 1
Lesson 8: Two-Week Sprint in Real Life - Sprint 1-Day 2
Lesson 9: Two-Week Sprint in Real Life - Sprint 1-Day 3
Lesson 10: Two-Week Sprint in Real Life - Sprint 1-Day 6
Lesson 11: Two-Week Sprint in Real Life - Sprint 1-Day 10
Lesson 12: Two-Week Sprint in Real Life - Sprint 2-Day 1
Lesson 13: Release Planning and Initial Product Backlog Refinement
Lesson 14: Tips and Best Practices for Scrum at Work 1 and 2
Lesson 15: Tips and Best Practices for Scrum at Work 3 and 4
Lesson 16: Tips and Best Practices for Scrum at Work 5 and 6
Lesson 17: Tips and Best Practices for Scrum at Work 7 and 8
Lesson 18: Final thoughts
This Masterclass will make you more valuable. Build skills that deliver
results!!!
Who are target students?
Product Owners, Scrum Masters and Release Engineers who want to increase the efficiency and
effectiveness of Agile to lead high performing teams
People who are preparing for Scrum Certifications, exams PSPO, PSM...
People who got their first Scrum job and don't know where to start
People who want to learn Scrum, Agile, and Agile Software development
Senior executives who wish to actively promote agile concepts across business teams and to link
those concepts directly to business-related outcomes
Product Stakeholders who want to understand how to highlight key performance indicators at any
point in the development cycle
Agile team members who manage epics, stories, bugs, and tasks
Project Managers, Programmers, Testers, analysts, product managers..
Hello everyone, my name is Dejan. I am a Master of Computer Science and Information
Technologies. Product Owner, Scrum Master, and Agile Coach. I am also a Trainer of trainers
and author of this Masterclass.
TikTok Mastery for Business
I have earned 60+ international certificates in different areas of IT. I have 20+ years of IT
experience, and 10+ years of experience in Agile project management and Scrum.
All the Elements that I have been lacking from my professional development, make this program
so special and unique.
That is why I fill all these gaps for me and make them available to you.

Agile and scrum masterclass

  • 1.
    Agile and ScrumMasterclass Agile and Scrum Masterclas Complete Agile and Scrum Video Course for Product Owner and Scrum Master Things I Learned From 10 Years of Agile Project Management and Scrum Benefits for Agile and Scrum Masterclass Students: 1. This is one of the most comprehensive video courses for Agile and Scrum on the market today, that walks you through every step of the Agile and Scrum framework, from A to Z 2. Students will have a strong understanding of the Scrum framework and Agile Practices. 3. Students will be prepared to take any Scrum certification exam. 4. Students will know how to deliver significant value quickly and throughout sprints! 5. Students will be able to prioritize tasks and the job to be done properly. 6. Students will understand how to Plan and Execute the perfect Sprints in Scrum. 7. Students will know how Scrum Events work in practice. 8. Students will understand what steps should be taken if this is their first job as a Product Owner or Scrum Master. 9. Students will know how to guide the organizational transformation from Waterfall development to Agile and Scrum. 10. Students will have skills needed for Agile and Scrum testing.
  • 2.
    11. Students willbe able to demonstrate their competencies in delivering Scrum projects successfully. 12. Students will have all the tools to anticipate issues related to the practical implementation of Scrum. 13. Students will understand how Scrum works in real life with Practical Case Studies applying Agile and Scrum in real life. Benefits for companies from Agile and Scrum Masterclass: Create a minimum viable product (MVP) fast. Quicker release of a usable product to users and customers. Reduced risks and continuous improvement. Higher quality, productivity, and lower costs. Greater ability to incorporate changes as they occur. More relevant metrics. Improved employee morale, and Higher customer satisfaction Being able to complete complex projects that previously could not be done. Help companies to complete projects faster and more successfully. Help companies to increase ROI. Increased collaboration and ownership Consequences if you don't use this Masterclass: TikTok Mastery for Business You may not understand your optimal learning path, You will not know what skills you need to become a successful PO or SM, You will not know how Planning in Agile and Scrum works, You will not know how to create a Safe Environment, Roadblocks will often remain unsolved, The whole process of development will become ineffective,
  • 3.
    You will notknow how to avoid conflicts, You will not know how to implement different Scrum techniques in practice You will not know how to deal with different types of risks, You will not understand how Scrum works in real-live, You will fail the Scrum Certification again and again, and much more … YouTube Manifestation Exactly What You're Getting: Introduction to Course Lesson 1: This is an introduction to this Masterclass training. Students will have a brief overview of what will be talking about and what they will learn. Lesson 2: The Scrum Guide 2020 - What has been changed? Let’s walk through the list of the majority of changed elements. Scrum AUDIO Guide INCLUDED. Module 2 - Beginner What is Agile software development? Lesson 1: Introduction to Agile, Why Agile? Lesson 2: The Values and Principles of the Agile Manifesto Lesson 3: Difference Between Agile and Scrum Lesson 4: Why Agile Rocks? Lesson 5: Agile Mythbusters: 13 Myths in details. Module 3 - Beginner What is the Product? Lesson 1: Product introduction Lesson 2: Product Goal Introduction (2020) Lesson 3: Product Vision Lesson 4: Product Strategy Lesson 5: Product Roadmap Module 4 - Beginner The Three Pillars of Empiricism Lesson 1: Introduction to the three pillars of Empiricism Lesson 2: Challenges and examples of Empiricism
  • 4.
    After the Agileand Scrum Masterclass, you will have a strong understanding of the Scrum framework! Digital Entrepreneur Bootcamp Module 5 - Beginner Scrum Framework Lesson 1: Introduction to Scrum Framework Lesson 2: Scrum team Lesson 3: The Product Owner Lesson 4: The Scrum Master Lesson 5: Changes for the Scrum Masters concerning Scrum Guide 2020 Lesson 6: Developers in Scrum Lesson 7: Stakeholders Module 6 - Beginner Scrum timeboxing, Scrum Events, and more... Lesson 1: Scrum Timeboxing and Scrum Events Lesson 2: The Sprint Lesson 3: The Sprint Goal Lesson 4: First Scrum event: Sprint Planning Lesson 5: Second Scrum event: Daily Scrum Lesson 6: Third Scrum event: Sprint Review Lesson 7: Fourth Scrum event: Sprint Retrospective Lesson 8: Product Backlog refinement Lesson 9: Introduction to Release Planning Module 7 - Beginner The Theme, Epics, User Stories, and Tasks Lesson 1: Introduction Lesson 2: Themes Lesson 3: Epics Lesson 4: User stories Lesson 5: User Story Mapping Lesson 6: Tasks
  • 5.
    Learn multiplication tableswith innovative method Module 8 - Beginner Scrum Artifacts Lesson 1: Introduction to Scrum Artifacts Lesson 2: Product Backlog Lesson 3: Sprint Backlog Lesson 4: Scrum Board - DEMO Lesson 5: The Increment Module 9 - Advanced Master Burndown Charts Lesson 1: Course INTRO Lesson 2: What is Burndown Chart in Scrum Lesson 3: Types of burndown charts Lesson 4: Work remaining vs Work completed burndown chart Lesson 5: Adjustable Floor burndown chart Lesson 6: Creating a Release burndown chart from scratch Step-By-Step Guide Lesson 7: Assignment Lesson 8: Online tools for burndown charts - Jira Lesson 9: Pros, Cons, and Common Burndown Chart Mistakes Lesson 10: Final words and Congratulations Module 10 - Beginner Definition of Ready, Definition of Done, and Acceptance criteria Lesson 1: Definition of Ready (DoR)
  • 6.
    Lesson 2: Definitionof Done (DoD) Lesson 3: Acceptance criteria (AC) Module 11 - Beginner Introduction to Evidence-Based Management 2020 Lesson 1: Introduction to evidence-based management (EBM) Lesson 2: The benefits of evidence-based management After Agile and Scrum Masterclass, you can take any Scrum certification exam, and obtain the highly valued credential! Module 12 - Beginner Scrum Certification Lesson 1: Introduction to Scrum Certification Lesson 2: General details about Scrum.org Certifications Lesson 3: Tips for all those who want to prepare for the exam on their own Lesson 4: General details about Scrum Alliance Certifications Lesson 5: Which Scrum Certification Do I Choose? Lesson 6: 100 Carefully Selected Questions and Answers for Scrum certification. (+ 106 exam questions and answers for PO & SM) Certified Agile Transformation Professional Course Module 13 - Advanced Your first job as a Product owner - where to start? Lesson 1: You get your first job as a PO - where to start - Introduction Lesson 2: Where to start building an existing product? Lesson 3: Where to start if you are going to build a new product from scratch? Agile and Scrum Masterclass provides an overview of Scrum which is an adaptive, iterative, and flexible framework designed to deliver significant value quickly and throughout a project!
  • 7.
    Module 14 -Advanced Risk Management in Agile and Scrum Lesson 1: Risk Management in Scrum INTRO Lesson 2: Types of Project Risks Lesson 3: Risk Assessment - Likelihood, and Impact Lesson 4: Risk Strategies, Contingency, Mitigation Lesson 5: Group Anti-Patterns PART 1 and PART 2 Lesson 6: Individual Anti-Patterns PART 1 and PART 2 Lesson 7: Contingency Plan vs Fallback Plan Lesson 8: The Risk Assessment Meeting Lesson 9: Creating a Risk Plan Lesson 10: Risk monitoring Lesson 11: FAQ for Risk management Lesson 12: Final Words and Congratulations Learn French by speaking! Module 15 - Advanced How do Scrum Events work in practice? Lesson 1: Introduction to module Lesson 2: Introduction to Scrum Events Lesson 3: Why Should You Run A Sprint Planning Meeting? Lesson 4: How Sprint Planning is Done? Lesson 5: How to run a Daily Scrum meeting? Lesson 6: The Daily Scrum Challenges Lesson 7: How to run a successful Sprint Review Meeting?
  • 8.
    Lesson 8: Introductionto Sprint Review Techniques Lesson 9: How to implement the SOFTWARE WALKTHROUGHS Technique? Lesson 10: How to implement the SOFTWARE TECHNICAL REVIEW Technique? Lesson 11: How to implement the SOFTWARE INSPECTIONS Technique? Lesson 12: The requirements technical review and inspection technique Lesson 13: Introduction to Retrospectives Lesson 14: Create a Safe Environment as a common Retrospectives Issue Lesson 15: Positive Leadership is a common Retrospectives Issue Lesson 16: Desirable properties of Retrospectives Lesson 17: How to carry out a successful Sprint Retrospective? Lesson 18: Introduction to Retrospective Exercises Lesson 19: Retrospective Exercises – Reading course exercises Lesson 20: Retrospective Exercises – The Main course exercises Lesson 21: Retrospective Exercises – Future course exercises Lesson 22: Tips and Tricks to run better Scrum events – PART 1 Lesson 23: Tips and Tricks to run better Scrum events – PART 2 Lesson 24: Tips and Tricks to run better Scrum events – PART 3 Lesson 25: Final Words Agile and Scrum Masterclass was developed as a means to create a necessary guide for organizations and project management practitioners who want to implement Scrum. Module 16 - Advanced Plan and Execute the perfect Sprints Lesson 1: Introduction to Planning Lesson 2: Uncertainty Space Lesson 3: Work Breakdown Structure Lesson 4: Estimates, Targets, and Commitments Lesson 5: ASSIGNMENT No 1. Lesson 6: Story points Estimation Lesson 7: Challenges in Story Point Estimation Lesson 8: Velocity Estimates Lesson 9: Timeboxing in Lesson10: Release Planning Lesson 11: Handling risks
  • 9.
    Lesson 12: ASSIGNMENTNo 2. Lesson 13: Estimating Task Duration (PART 1) Lesson 14: Estimating Task Duration (PART 2) Lesson 15: Task dependencies Lesson 16: Critical Path Method chart or CPM Chart Lesson 17: Sprint Planning Lesson 18: ASSIGNMENT No 3. Lesson 19: Final word season Agile and Scrum Masterclass help individuals and organizations complete projects faster and more successfully. Module 17 - Advanced The Transition from Traditional to Agile Lesson 1: Introduction to module Lesson 2: We need evidence of success – A Case Study Lesson 3: Differences in project management - Agile vs. Waterfall Lesson 4: Habits from traditional environments you need to watch out for Lesson 5: Why traditional project management techniques are still so prevalent Lesson 6: Differences between traditional and agile on how to maintain your teams Lesson 7: Rewards for traditional Project Managers working with Agile projects Lesson 8: SIMILARITIES - the Traditional World and the Agile Lesson 9: Project manager characteristics who is going to be successful with agile Lesson 10: Productive thinking, advances, and challenges about agile Lesson 11: The State of Agility - Benefits of organizational Agility Lesson 12: TIPS to Manage a Transition from Waterfall to Agile Lesson 13: TIPS for transitioning Clients to an Agile Process Lesson 14: 4 Ways to Ease the Transition from Waterfall to Agile Lesson 15: TIPS to Increase Agility in your organization Lesson 16: How to Choose the Right Agile Framework Lesson 17: Conclusion Module 18 Recap and Last Words Lesson 1: Short animated presentation Lesson 2: All right, we've reached the end of this course. Congratulations!!!
  • 10.
    Agile and ScrumMasterclass will help you demonstrate your competency in delivering Scrum projects successfully. BONUS Module 19 - Advanced Testing Mastery in Agile and Scrum Lesson 1: Introduction to Agile and Scrum Testing Lesson 2: Introduction to the Agile Software Development Lesson 3: Traditional vs. Agile Testing Lesson 4: What are an agile tester and Management expectations Lesson 5: The agile testing mindset Lesson 6: What is Agile Testing and Agile Test Plan Lesson 7: Agile Testing Strategies Lesson 8: Agile Metrics Lesson 9: Agile Testing Quadrant 1 Lesson 10: Agile Testing Quadrant 2 Lesson 11: Agile Testing Quadrant 3 Lesson 12: Agile Testing Quadrant 4 Lesson 13: Important guidelines before you start testing Lesson 14: Testing Documents and Documentation Lesson 15: QA challenges with agile software development Lesson 16: Testing in Scrum Lesson 17: Test Reporting Lesson 18: Agile Automation Testing Lesson 19: How to automate in Agile Methodology Lesson 20: Risks of Automation in Agile Lesson 21: Barriers to successful agile adoption by test teams Lesson 22: Testing Toolkit Lesson 23: Agile Open-Source Test Tools Lesson 24: Tips and Tricks for testers Lesson 25: Agile Testing Interview Questions and Answers Lesson 26: Agile Testing Conclusion Agile and Scrum Masterclass help organizations with an improved level of project management and delivery that leads to increased ROI. BONUS Module 20 - Advanced The Scrum in Real Life Lesson 1: INTRO (Practical Case Studies applying Agile and Scrum in Real Life) Lesson 2: Introduction Lesson 3: Let’s meet OUR Product Owner Lesson 4: A day in the Life of the Product Owner Lesson 5: Let’s meet our Scrum Master Lesson 6: A day in the life of the Scrum Master
  • 11.
    Lesson 7: Two-WeekSprint in Real Life - Sprint 1-Day 1 Lesson 8: Two-Week Sprint in Real Life - Sprint 1-Day 2 Lesson 9: Two-Week Sprint in Real Life - Sprint 1-Day 3 Lesson 10: Two-Week Sprint in Real Life - Sprint 1-Day 6 Lesson 11: Two-Week Sprint in Real Life - Sprint 1-Day 10 Lesson 12: Two-Week Sprint in Real Life - Sprint 2-Day 1 Lesson 13: Release Planning and Initial Product Backlog Refinement Lesson 14: Tips and Best Practices for Scrum at Work 1 and 2 Lesson 15: Tips and Best Practices for Scrum at Work 3 and 4 Lesson 16: Tips and Best Practices for Scrum at Work 5 and 6 Lesson 17: Tips and Best Practices for Scrum at Work 7 and 8 Lesson 18: Final thoughts This Masterclass will make you more valuable. Build skills that deliver results!!! Who are target students? Product Owners, Scrum Masters and Release Engineers who want to increase the efficiency and effectiveness of Agile to lead high performing teams People who are preparing for Scrum Certifications, exams PSPO, PSM... People who got their first Scrum job and don't know where to start People who want to learn Scrum, Agile, and Agile Software development Senior executives who wish to actively promote agile concepts across business teams and to link those concepts directly to business-related outcomes Product Stakeholders who want to understand how to highlight key performance indicators at any point in the development cycle Agile team members who manage epics, stories, bugs, and tasks Project Managers, Programmers, Testers, analysts, product managers.. Hello everyone, my name is Dejan. I am a Master of Computer Science and Information Technologies. Product Owner, Scrum Master, and Agile Coach. I am also a Trainer of trainers and author of this Masterclass. TikTok Mastery for Business
  • 12.
    I have earned60+ international certificates in different areas of IT. I have 20+ years of IT experience, and 10+ years of experience in Agile project management and Scrum. All the Elements that I have been lacking from my professional development, make this program so special and unique. That is why I fill all these gaps for me and make them available to you.