Product Portfolio
- Team AdroitLogic -
Product Catalog
• UltraESB-X - Enterprise Service Bus
• UltraStudio - IDE for integration flow designing
• IMonitor-X - Monitor your UltraESB-X servers / clusters
• IPS - Containerized Integration (deployment) Platform
• AS2Gateway / AS2Station - B2B electronic message
exchange as a service / on-premise
UltraESB-X
Enterprise Service Bus
which deploys
Integration Solutions
built by
UltraStudio
Why Integration?
• Systems need to intercommunicate
• Point-to-point interactions of heterogeneous systems is a nightmare
• Becomes spaghetti style over the time with many inherent issues
• Maintenance
• Scalability
• Tightly coupled
• Extremely hard system provisioning
• Lack of governance
Spaghetti style point-to-point integration
UltraESB-X to the Rescue
What is UltraESB-X?
• A lean, stable, high performance engine with 100s of built-in connectors
and processors
• Facilitates integration requirements of systems
• Loosely coupled systems with better scalability
• Service orchestration and location transparency
• Transport and protocol negotiation with data transformation
• Availability guarantees with load balancing and failover
• Centralized auditing, metrics, statistics and governance
• Many other mediations..
Gaining an edge in
performance
• Extreme level of performance using Non-Blocking I/O with
Zero Copy and Ram Disk for non heap storage
As measured by a giant retailer
• Performed up-to 3.5 times faster than the competitor
• 100% reliability and stability
• Under heavy multi-day stress tests
• In production since 2014
• Through out multiple holiday seasons
• Used on a ~200 node cluster targeting 6 million TPS
Trusted by Industry Leads
• Finance
• Retail
• Travel & Leisure
• Media
• Restaurent
UltraStudio
IDE for designing, testing
and debugging
Integration Solutions
to be deployed in
UltraESB-X and IPS
Why UltraStudio?
• We believe in developing state of the art integration
solutions which,
• Saves a tone of development time
• Singularly agile
• Blatantly fast and optimized
• Smoothly maintainable
• Cost effective
The most advanced
Integration Solution Development Environment
• Consolidated with the world’s best IDE, IntelliJ IDEA 

to make development seamless and familiar to developers
• Contains dozens of sample projects in various domains to quick
start your integration solution without any hassle
• Various in-build clients and tools to easily test debug integration
solutions to save a huge amount of development time



















• The intuitive and beautiful user interface helps developers to build complex
integration flows in few simple mouse clicks
• Developers can use hundreds of existing components (including SAP and
SalesForce) to integrate multiple systems without writing a single line of
code
• Drag and drop the components, specify the required properties and
connect the components. Integration is simple as that!

















• With the in-built flow validation tool, developers can guarantee the
correctness of the overall solution
• Developers can easily write their own integration logic utilizing the
Project-X framework an incorporate it into integration solutions
• Maven integration makes managing dependencies, and project
artifacts painless and increase the solution’s maintainability

















IMonitor-X
Web console
to monitor and manage
the UltraESB-X
servers / clusters
Why IMonitor-X?
• When you have multiple UltraESB-X instances that,
• Spread over multiple servers
• Belong to different cluster spaces
• Deploying different integration solutions
• Managing and monitoring all these will become a tedious task for
the system administrator
• The unified web interface that IMonitor-X provides will simplify this
task by incorporating all the required administration facilities under
a single application
Deployment
• Single IMonitor-X instance can
manage and monitor any
number of UltraESB-X
instances / clusters
• Connects to UltraESB-X
instances via its secure REST
management API
• Retrieves statistics and
metrics from ElasticSearch
server / cluster
Manage all UltraESB-X instances with ease
Seamless project lifecycle management
with independent project and integration flow monitoring
Hassle free log monitoring with aggregated logs
and guaranteed transparency with audit trails
All organizational users with different privileges and
permissions under different groups managing different
IPS
Containerized
Deployment Platform
for Integration Solutions
built by
UltraStudio
Why IPS?
• Maintaining a typical home grown integration solution is much
more complex than it’s development cycle
• 24x7 infrastructure monitoring
• Failure tolerance
• Handling high-availability
• Scaling the solution according to the demands
• Most of the time with an added virtual machine maintenance
Integration on Containers
• IPS is a private cloud based integration platform
• Powered-by lightweight Docker container technology
• Together with Google’s Kubernetes platform
• Fast deployment from the UltraStudio development
environment
• Comprises of effective monitoring
Develop and test your integration solution using UltraStudio
and deploy to IPS straightaway!
Highly available integration solutions!
All you have say is the level of availability you want, IPS will take care of the rest.
Change fast - Deploy faster!
Sync up your downstream changes into the production
environment within few seconds.
Statistics and Monitoring at your fingertips!
Visualization of statistics and monitoring all your platform
resource has never been easier.
Self healing clusters!
Detecting and recovering the failed instances in the platform
without any human intervention.
Special attention to Troubleshooting!
Investigate issues using comprehensive set of features through the IPS.
Cost Advantage
• Reduces your infrastructure, security and virtualization
overhead and the cost
• Offers both public and private cloud approaches
• Containers to simplify the deployment
• Optimized resource utilization with low latency
• Better user experience and ease of use
AS2Gateway
Hosted service
which facilities
electronic message
exchange
over AS2 protocol
AS2?
• AS2 is an application level protocol for business data
interchange with security and reliability over internet
• Typically used by EDI (Financial messaging such as Invoices
and Purchase Orders)
• Large organizations such as Walmart, Amazon, Microsoft,
Auchan and Carrefour uses AS2 to trade with their business
partners
AS2Gateway simplifies the
business
• Conceals complexities of the protocol by providing sensible
defaults
• Yet all advance configurations are supported for advance
users
• Hosted as a service so that users can easily get started by
subscribing with an account
• Infrastructure management and technical competency in AS2
is made optional
Intuitive Message Box View
Web based email client like view for ease of browsing, sent/received
financial messages
Certificate Management
One of the main complexities of AS2 protocol is the use of certificates for
the digital signatures and encryption, which is nicely concealed by the certificate
management module of AS2Gateway by using self-signed
certificates where applicable.
AS2Station
AS2Station is the single station,
on-premise version of the
AS2Gateway that can be deployed
with other integrations to
automate AS2 processing
Q&A

AdroitLogic Product Portfolio

  • 1.
  • 2.
    Product Catalog • UltraESB-X- Enterprise Service Bus • UltraStudio - IDE for integration flow designing • IMonitor-X - Monitor your UltraESB-X servers / clusters • IPS - Containerized Integration (deployment) Platform • AS2Gateway / AS2Station - B2B electronic message exchange as a service / on-premise
  • 3.
    UltraESB-X Enterprise Service Bus whichdeploys Integration Solutions built by UltraStudio
  • 4.
    Why Integration? • Systemsneed to intercommunicate • Point-to-point interactions of heterogeneous systems is a nightmare • Becomes spaghetti style over the time with many inherent issues • Maintenance • Scalability • Tightly coupled • Extremely hard system provisioning • Lack of governance
  • 5.
  • 6.
  • 7.
    What is UltraESB-X? •A lean, stable, high performance engine with 100s of built-in connectors and processors • Facilitates integration requirements of systems • Loosely coupled systems with better scalability • Service orchestration and location transparency • Transport and protocol negotiation with data transformation • Availability guarantees with load balancing and failover • Centralized auditing, metrics, statistics and governance • Many other mediations..
  • 8.
    Gaining an edgein performance • Extreme level of performance using Non-Blocking I/O with Zero Copy and Ram Disk for non heap storage
  • 9.
    As measured bya giant retailer • Performed up-to 3.5 times faster than the competitor • 100% reliability and stability • Under heavy multi-day stress tests • In production since 2014 • Through out multiple holiday seasons • Used on a ~200 node cluster targeting 6 million TPS
  • 10.
    Trusted by IndustryLeads • Finance • Retail • Travel & Leisure • Media • Restaurent
  • 11.
    UltraStudio IDE for designing,testing and debugging Integration Solutions to be deployed in UltraESB-X and IPS
  • 12.
    Why UltraStudio? • Webelieve in developing state of the art integration solutions which, • Saves a tone of development time • Singularly agile • Blatantly fast and optimized • Smoothly maintainable • Cost effective
  • 13.
    The most advanced IntegrationSolution Development Environment
  • 14.
    • Consolidated withthe world’s best IDE, IntelliJ IDEA 
 to make development seamless and familiar to developers • Contains dozens of sample projects in various domains to quick start your integration solution without any hassle • Various in-build clients and tools to easily test debug integration solutions to save a huge amount of development time
 
 
 
 
 
 
 
 
 

  • 15.
    • The intuitiveand beautiful user interface helps developers to build complex integration flows in few simple mouse clicks • Developers can use hundreds of existing components (including SAP and SalesForce) to integrate multiple systems without writing a single line of code • Drag and drop the components, specify the required properties and connect the components. Integration is simple as that!
 
 
 
 
 
 
 
 

  • 16.
    • With thein-built flow validation tool, developers can guarantee the correctness of the overall solution • Developers can easily write their own integration logic utilizing the Project-X framework an incorporate it into integration solutions • Maven integration makes managing dependencies, and project artifacts painless and increase the solution’s maintainability
 
 
 
 
 
 
 
 

  • 17.
    IMonitor-X Web console to monitorand manage the UltraESB-X servers / clusters
  • 18.
    Why IMonitor-X? • Whenyou have multiple UltraESB-X instances that, • Spread over multiple servers • Belong to different cluster spaces • Deploying different integration solutions • Managing and monitoring all these will become a tedious task for the system administrator • The unified web interface that IMonitor-X provides will simplify this task by incorporating all the required administration facilities under a single application
  • 19.
    Deployment • Single IMonitor-Xinstance can manage and monitor any number of UltraESB-X instances / clusters • Connects to UltraESB-X instances via its secure REST management API • Retrieves statistics and metrics from ElasticSearch server / cluster
  • 20.
    Manage all UltraESB-Xinstances with ease
  • 21.
    Seamless project lifecyclemanagement with independent project and integration flow monitoring
  • 22.
    Hassle free logmonitoring with aggregated logs and guaranteed transparency with audit trails
  • 23.
    All organizational userswith different privileges and permissions under different groups managing different
  • 24.
  • 25.
    Why IPS? • Maintaininga typical home grown integration solution is much more complex than it’s development cycle • 24x7 infrastructure monitoring • Failure tolerance • Handling high-availability • Scaling the solution according to the demands • Most of the time with an added virtual machine maintenance
  • 26.
    Integration on Containers •IPS is a private cloud based integration platform • Powered-by lightweight Docker container technology • Together with Google’s Kubernetes platform • Fast deployment from the UltraStudio development environment • Comprises of effective monitoring
  • 27.
    Develop and testyour integration solution using UltraStudio and deploy to IPS straightaway!
  • 28.
    Highly available integrationsolutions! All you have say is the level of availability you want, IPS will take care of the rest.
  • 29.
    Change fast -Deploy faster! Sync up your downstream changes into the production environment within few seconds.
  • 30.
    Statistics and Monitoringat your fingertips! Visualization of statistics and monitoring all your platform resource has never been easier.
  • 31.
    Self healing clusters! Detectingand recovering the failed instances in the platform without any human intervention.
  • 32.
    Special attention toTroubleshooting! Investigate issues using comprehensive set of features through the IPS.
  • 33.
    Cost Advantage • Reducesyour infrastructure, security and virtualization overhead and the cost • Offers both public and private cloud approaches • Containers to simplify the deployment • Optimized resource utilization with low latency • Better user experience and ease of use
  • 34.
  • 35.
    AS2? • AS2 isan application level protocol for business data interchange with security and reliability over internet • Typically used by EDI (Financial messaging such as Invoices and Purchase Orders) • Large organizations such as Walmart, Amazon, Microsoft, Auchan and Carrefour uses AS2 to trade with their business partners
  • 36.
    AS2Gateway simplifies the business •Conceals complexities of the protocol by providing sensible defaults • Yet all advance configurations are supported for advance users • Hosted as a service so that users can easily get started by subscribing with an account • Infrastructure management and technical competency in AS2 is made optional
  • 37.
    Intuitive Message BoxView Web based email client like view for ease of browsing, sent/received financial messages
  • 38.
    Certificate Management One ofthe main complexities of AS2 protocol is the use of certificates for the digital signatures and encryption, which is nicely concealed by the certificate management module of AS2Gateway by using self-signed certificates where applicable.
  • 39.
    AS2Station AS2Station is thesingle station, on-premise version of the AS2Gateway that can be deployed with other integrations to automate AS2 processing
  • 40.