ADR Tank-Vehicle Inspection Checklist
General Specification
1 Place of Check Engro Polymers & Chemical (EPCL)
2 Vehicle Registration Number TLL – 340
3 Trailer Registration Number Not Available
4 Driver abc
5 Consigner, Address, Place of loading Engro Vopak Terminal ( EVT)
6 Consignee, Address, Place of Unloading Engro Polymers & Chemical (EPCL)
7 Total Quantity of Dangerous Goods per
Transport Unit
630 Kg
8 ADR 1.1.3.6 Quantity Limit Exceeded Yes No
9 Mode of Transport In Bulk Package Tank
Documents On Board Inspected Not Available Comments
10 Transport Document Yes See Remarks
11 Instructions In Writing Yes
12 Bilateral/Multilateral Agreement/National
Authorization
Yes
13 Certificate of Approval for Vehicles Yes
14 Driver’s Training Certificate Yes See Remarks
Transport Operations
15 Goods authorized for Transport Yes
16 Vehicles authorized For Goods Carried Yes
17 Provisions Related to The Mode of Transport Yes
18 Tank /Vehicle Placarding (ADR 5.3.1) Yes See Remarks
19 Vehicle / Transport Unit Marking
(Orange Plate (ADR 5.3.2-3)
Yes See Remarks
Equipment On Board
20 General Purpose Safety Equipment Specified
In ADR
Yes
21 Equipment According To The Goods Carried Yes
22 Other Equipment Specified In The Instructions
In Writing
Yes
23 Fire Extinguisher(s) Yes
Vehicle Requirements
Vehicle Comments
ADR
Clause
Technical Specifications AT FL
24 9.2.2 Electrical Equipment
25 9.2.2.2 Wiring X X
Vehicle Comments
ADR
Clause
Technical Specifications AT FL
26 9.2.2.3.1 A switch for breaking the electrical
circuits shall be placed as close to
the battery as practicable.
X
27 9.2.2.3.2
A control device to facilitate the
disconnecting and reconnecting
functions of the switch shall be
installed in the driver's cab. Shall be
readily accessible to the driver and
be distinctively marked.
X
28 9.2.2.3.3
Switch shall in accordance with
IEC Standard 529.
X
29 9.2.2.3.4
Cable connections on the switch
shall have protection degree IP 54.
X
30 9.2.2.4 Batteries X
31 9.2.2.5.1 Permanently energized circuits. X
32 9.2.2.6 Electrical installation at rear of cab X See Remarks
33 9.2.3 Braking Equipment
34 9.2.3.1 General provisions X X
35 Anti-lock braking system X X See Remarks
36 Endurance braking system X X See Remarks
37 9.2.4 Prevention of fire risks
38 9.2.4.3 Fuel tanks X
39 9.2.4.4 Engine X
40 9.2.4.5 Exhaust system X
41 9.2.4.6 Vehicle endurance braking X See Remarks
42 9.2.4.7 Combustion heaters Not Applicable
43
9.2.4.7.1
9.2.4.7.2
9.2.4.7.5
- Shall comply technical
requirement of ECE Regulation 122
- Heaters & their exhaust gas
routing shall be designed, located,
protected or covered to prevent any
unacceptable ignition of load.
- Shall switched on manually,
programming devices are prohibited
X X -Do-
44
9.2.4.7.3
9.2.4.7.4
- shall be put out of operation by at
least the following methods:
(a) Intentional manual switching off
from the driver's cab;
(b) in this case the heating device may
be restarted manually by the driver;
(c) Start up of a feed pump on the
motor vehicle.
- Afterrunning is permitted after the
combustion heaters have been put out
of operation
X -Do-
Vehicle Comments
ADR
Clause
Technical Specifications AT FL
45 9.2.5 Speed limitation device X X
See Remarks
46 9.2.6 Coupling device of trailer X X
Tank Requirement
ADR
Clause
Technical Specifications Inspected
Not
Available
Comments
6.8.2.1 Construction
47 6.8.2.1.8
Material of shell:
Shells shall be made of suitable metallic
materials which, unless other temperature
ranges are prescribed in the various classes,
shall be resistant to brittle fracture and to stress
corrosion cracking between -20 °C and +50 °C.
48 6.8.2.1.9
The materials of shells or of their protective
linings which are in contact with the contents
shall not contain substances liable to react
dangerously.
49
6.8.2.1.17
to
6.8.2.1.21
Minimum shell thickness:
The shell thickness shall not be less than the
greater of the values determined by the following
formulae:
E = PT D
2σλ
Diameter of shell
≤1.80
m
>1.80
m
Minimum
shell
thickness
Stainless austenitic
steels
2.5
mm
3 mm
Other steels 3 mm 4 mm
Aluminum alloys 4 mm 5 mm
Pure aluminum of
99.80%
6 mm 8 mm
Yes
Thickness
monitoring
report is
attached
50 6.8.2.1.23
Welding and inspection of welds:
The manufacturer's qualification for performing
welding operations shall be one recognized by
the competent authority. Welding shall be
performed by skilled welders using a welding
process whose effectiveness (including any heat
treatments required) has been demonstrated by
test. Non-destructive tests shall be carried out by
N/A See Remarks
ADR
Clause
Technical Specifications Inspected
Not
Available
Comments
radiography or by ultrasound and must confirm
that the quality of the welding is appropriate to
the stresses.
51 6.8.2.2
Items of equipment:
Tank (Condition/Capacity)
Tank Supports Clamp Bolts, Trusses ,Liner
Ladder
Discharge Outlet
Hatches/ Manhole & Cover
Tank Safety Valve /Vent
Protective Coating (Internal/External)
Yes See Remarks
Inspections and tests:
See Remarks:
Item No. 10: Means of identification, which include a photograph was not available at the time of
Inspection (Clause 8.1.2).
Item No. 14: Driver was not trained for particular hazardous class at the time of inspection (Clause
8.2.1 & 2).
Item No. 18: Placarding was not according to ADR (Clause 5.3.1) at the time of inspection.
Item No. 19: Orange plate marking was not according to ADR (Clause 5.3.2-3) at the time of
Inspection.
Item No. 35: Anti lock braking system was not installed at the time of inspection (Clause 9.2.3).
Item No. 36: Endurance braking system was not installed at the time of inspection (Clause 9.2.3).
Item No. 41: Endurance braking system was not installed.
Item No. 45: Speed limitation device was not installed at the time of inspection (Clause 9.2.5).
Item No. 50: Qualification & skills of welder, and inspection tests results were not observed at the
time of inspection (Claus 6.8.2.1.23).
Item No. 51: Internal inspection was not carried due to filled tank.
Item No. 52: Internal condition was not observed at the time of inspection due to filled tanks.
Item No. 54: Inspection certificates were not available at the time of inspection.
Item No. 55: Marking plate of tank specification was not observed at the time of inspection
(Clause 6.8.2.5.1).
INSPECTION PERFORMED BY:
URS Industrial Assessor
VALIDATED BY:
EPCL Representative

More Related Content

What's hot

The Walking Dead volume 5
The Walking Dead volume 5The Walking Dead volume 5
The Walking Dead volume 5
dmxallen
 
The walking dead vol 14
The walking dead vol 14The walking dead vol 14
The walking dead vol 14
jhyeconnor
 
The walking dead vol 19
The walking dead vol 19The walking dead vol 19
The walking dead vol 19
jhyeconnor
 
5.Джазовые и эстрадные темы
5.Джазовые и эстрадные темы5.Джазовые и эстрадные темы
5.Джазовые и эстрадные темы
jazz child
 
دعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلمين
دعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلميندعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلمين
دعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلمين
DR. NAJEEB ALREFAE
 
The walking dead vol 15
The walking dead vol 15The walking dead vol 15
The walking dead vol 15
jhyeconnor
 
The walking dead vol 8
The walking dead vol 8The walking dead vol 8
The walking dead vol 8
jhyeconnor
 
Zagor VC-106- Pobuna Kangaeirosa
Zagor VC-106- Pobuna KangaeirosaZagor VC-106- Pobuna Kangaeirosa
Zagor VC-106- Pobuna Kangaeirosa
Stripovizijacom
 
ADNOC Approval Letter
ADNOC Approval LetterADNOC Approval Letter
ADNOC Approval LetterEmad Said
 
Siemens certificates
Siemens certificatesSiemens certificates
Siemens certificates
Thomas G. Pasos
 
原理講論 要約訓読チャート 1時間用
原理講論 要約訓読チャート 1時間用原理講論 要約訓読チャート 1時間用
原理講論 要約訓読チャート 1時間用Paul Shizuo Fukuzaki
 
Laso nova serija 627 rex hayes - posljednji metak (rampa & folpi & ...
Laso nova serija 627   rex hayes - posljednji metak (rampa & folpi & ...Laso nova serija 627   rex hayes - posljednji metak (rampa & folpi & ...
Laso nova serija 627 rex hayes - posljednji metak (rampa & folpi & ...
zoran radovic
 
shin kanzen masuta n2 goi JLPT
shin kanzen masuta n2 goi JLPTshin kanzen masuta n2 goi JLPT
shin kanzen masuta n2 goi JLPT
Charbak Mukherjee
 
BTC Daily Report Nov 14 Ar.pdf
BTC Daily Report Nov 14 Ar.pdfBTC Daily Report Nov 14 Ar.pdf
BTC Daily Report Nov 14 Ar.pdf
BTC
 
Zagor Ludens 232 - Sjeme zla
Zagor Ludens 232 - Sjeme zlaZagor Ludens 232 - Sjeme zla
Zagor Ludens 232 - Sjeme zla
Stripovizijacom
 
Vajat erp 137
Vajat erp 137Vajat erp 137
Vajat erp 137
zoran radovic
 

What's hot (20)

The Walking Dead volume 5
The Walking Dead volume 5The Walking Dead volume 5
The Walking Dead volume 5
 
The walking dead vol 14
The walking dead vol 14The walking dead vol 14
The walking dead vol 14
 
The walking dead vol 19
The walking dead vol 19The walking dead vol 19
The walking dead vol 19
 
SAFETY MANAGEMENT DIPLOMA
SAFETY MANAGEMENT DIPLOMASAFETY MANAGEMENT DIPLOMA
SAFETY MANAGEMENT DIPLOMA
 
Certificate of Employment SUN
Certificate of Employment SUNCertificate of Employment SUN
Certificate of Employment SUN
 
5.Джазовые и эстрадные темы
5.Джазовые и эстрадные темы5.Джазовые и эстрадные темы
5.Джазовые и эстрадные темы
 
دعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلمين
دعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلميندعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلمين
دعاء ختم القران لعبدالعزيز السلمان غفر الله له و لوالديه و المسلمين
 
The walking dead vol 15
The walking dead vol 15The walking dead vol 15
The walking dead vol 15
 
aramco employment cert.2
aramco employment cert.2aramco employment cert.2
aramco employment cert.2
 
The walking dead vol 8
The walking dead vol 8The walking dead vol 8
The walking dead vol 8
 
Zagor VC-106- Pobuna Kangaeirosa
Zagor VC-106- Pobuna KangaeirosaZagor VC-106- Pobuna Kangaeirosa
Zagor VC-106- Pobuna Kangaeirosa
 
ADNOC Approval Letter
ADNOC Approval LetterADNOC Approval Letter
ADNOC Approval Letter
 
Siemens certificates
Siemens certificatesSiemens certificates
Siemens certificates
 
原理講論 要約訓読チャート 1時間用
原理講論 要約訓読チャート 1時間用原理講論 要約訓読チャート 1時間用
原理講論 要約訓読チャート 1時間用
 
Laso nova serija 627 rex hayes - posljednji metak (rampa & folpi & ...
Laso nova serija 627   rex hayes - posljednji metak (rampa & folpi & ...Laso nova serija 627   rex hayes - posljednji metak (rampa & folpi & ...
Laso nova serija 627 rex hayes - posljednji metak (rampa & folpi & ...
 
NATIONAL DIPLOMA - INFORMATION TECHNOLOGY
NATIONAL DIPLOMA - INFORMATION TECHNOLOGYNATIONAL DIPLOMA - INFORMATION TECHNOLOGY
NATIONAL DIPLOMA - INFORMATION TECHNOLOGY
 
shin kanzen masuta n2 goi JLPT
shin kanzen masuta n2 goi JLPTshin kanzen masuta n2 goi JLPT
shin kanzen masuta n2 goi JLPT
 
BTC Daily Report Nov 14 Ar.pdf
BTC Daily Report Nov 14 Ar.pdfBTC Daily Report Nov 14 Ar.pdf
BTC Daily Report Nov 14 Ar.pdf
 
Zagor Ludens 232 - Sjeme zla
Zagor Ludens 232 - Sjeme zlaZagor Ludens 232 - Sjeme zla
Zagor Ludens 232 - Sjeme zla
 
Vajat erp 137
Vajat erp 137Vajat erp 137
Vajat erp 137
 

Similar to ADDDDR

Cordex TC7000 Infrared Camera ATEX Certificate
Cordex TC7000 Infrared Camera ATEX CertificateCordex TC7000 Infrared Camera ATEX Certificate
Cordex TC7000 Infrared Camera ATEX Certificate
abbeygonzalezrqv
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
Vara Prasad
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
sridharGowda20
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
sridharGowda20
 
Manhole reinstatement system_bba_certificate
Manhole reinstatement system_bba_certificateManhole reinstatement system_bba_certificate
Manhole reinstatement system_bba_certificate
tdlongvra
 
Welkin p2 instructions
Welkin p2 instructionsWelkin p2 instructions
Welkin p2 instructions
LeoneTang
 
Mst326 9 Pl Rcd
Mst326 9 Pl RcdMst326 9 Pl Rcd
Mst326 9 Pl Rcd
FNian
 
Vision Extrusions - Exova Report
Vision Extrusions - Exova ReportVision Extrusions - Exova Report
Vision Extrusions - Exova Report
Juan Ignacio Bravin Bauco
 
MANUAL.pdf
MANUAL.pdfMANUAL.pdf
MANUAL.pdf
MahmoudAli66277
 
236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL
236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL
236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL
Manual Labs
 
BW Technologies Portable Gas Detectors Product Brochure
BW Technologies Portable Gas Detectors Product BrochureBW Technologies Portable Gas Detectors Product Brochure
BW Technologies Portable Gas Detectors Product Brochure
Thorne & Derrick International
 
242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX
242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX
242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX
Manual Labs
 
Lithium Battery Regulations and How They Affect OEM’s
Lithium Battery Regulations and How They Affect OEM’sLithium Battery Regulations and How They Affect OEM’s
Lithium Battery Regulations and How They Affect OEM’s
Epec Engineered Technologies
 
Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]
George Teriakidis
 
DNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringDNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkering
George Teriakidis
 
Paxton Access 921-161-US Instruction Manual
Paxton Access 921-161-US Instruction ManualPaxton Access 921-161-US Instruction Manual
Paxton Access 921-161-US Instruction Manual
JMAC Supply
 
CERTIFICATE-E-MARK-E11-10R-048662
CERTIFICATE-E-MARK-E11-10R-048662CERTIFICATE-E-MARK-E11-10R-048662
CERTIFICATE-E-MARK-E11-10R-048662
RAJA KHAWAR
 
246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6
246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6
246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6
Manual Labs
 
262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2
262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2
262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2
Manual Labs
 
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
Mohammud Hanif Dewan M.Phil.
 

Similar to ADDDDR (20)

Cordex TC7000 Infrared Camera ATEX Certificate
Cordex TC7000 Infrared Camera ATEX CertificateCordex TC7000 Infrared Camera ATEX Certificate
Cordex TC7000 Infrared Camera ATEX Certificate
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
 
GRSP-49-28e.ppt
GRSP-49-28e.pptGRSP-49-28e.ppt
GRSP-49-28e.ppt
 
Manhole reinstatement system_bba_certificate
Manhole reinstatement system_bba_certificateManhole reinstatement system_bba_certificate
Manhole reinstatement system_bba_certificate
 
Welkin p2 instructions
Welkin p2 instructionsWelkin p2 instructions
Welkin p2 instructions
 
Mst326 9 Pl Rcd
Mst326 9 Pl RcdMst326 9 Pl Rcd
Mst326 9 Pl Rcd
 
Vision Extrusions - Exova Report
Vision Extrusions - Exova ReportVision Extrusions - Exova Report
Vision Extrusions - Exova Report
 
MANUAL.pdf
MANUAL.pdfMANUAL.pdf
MANUAL.pdf
 
236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL
236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL
236D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KXL
 
BW Technologies Portable Gas Detectors Product Brochure
BW Technologies Portable Gas Detectors Product BrochureBW Technologies Portable Gas Detectors Product Brochure
BW Technologies Portable Gas Detectors Product Brochure
 
242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX
242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX
242D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL HSX
 
Lithium Battery Regulations and How They Affect OEM’s
Lithium Battery Regulations and How They Affect OEM’sLithium Battery Regulations and How They Affect OEM’s
Lithium Battery Regulations and How They Affect OEM’s
 
Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]Emsa --final-report-bunkering-lng op-06_2012_b[1]
Emsa --final-report-bunkering-lng op-06_2012_b[1]
 
DNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkeringDNV GL emsa report on LNG bunkering
DNV GL emsa report on LNG bunkering
 
Paxton Access 921-161-US Instruction Manual
Paxton Access 921-161-US Instruction ManualPaxton Access 921-161-US Instruction Manual
Paxton Access 921-161-US Instruction Manual
 
CERTIFICATE-E-MARK-E11-10R-048662
CERTIFICATE-E-MARK-E11-10R-048662CERTIFICATE-E-MARK-E11-10R-048662
CERTIFICATE-E-MARK-E11-10R-048662
 
246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6
246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6
246D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL KC6
 
262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2
262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2
262D3 CATERPILLAR SKID STEER LOADER SERVICE REPAIR MANUAL ZB2
 
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
MARPOL Annex VI Chapter 1-3: “Air Pollution and GHG Emissions from Internati...
 

Recently uploaded

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
Aditya Rajan Patra
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 

Recently uploaded (20)

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
Recycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part IIRecycled Concrete Aggregate in Construction Part II
Recycled Concrete Aggregate in Construction Part II
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 

ADDDDR

  • 1. ADR Tank-Vehicle Inspection Checklist General Specification 1 Place of Check Engro Polymers & Chemical (EPCL) 2 Vehicle Registration Number TLL – 340 3 Trailer Registration Number Not Available 4 Driver abc 5 Consigner, Address, Place of loading Engro Vopak Terminal ( EVT) 6 Consignee, Address, Place of Unloading Engro Polymers & Chemical (EPCL) 7 Total Quantity of Dangerous Goods per Transport Unit 630 Kg 8 ADR 1.1.3.6 Quantity Limit Exceeded Yes No 9 Mode of Transport In Bulk Package Tank Documents On Board Inspected Not Available Comments 10 Transport Document Yes See Remarks 11 Instructions In Writing Yes 12 Bilateral/Multilateral Agreement/National Authorization Yes 13 Certificate of Approval for Vehicles Yes 14 Driver’s Training Certificate Yes See Remarks Transport Operations 15 Goods authorized for Transport Yes 16 Vehicles authorized For Goods Carried Yes 17 Provisions Related to The Mode of Transport Yes 18 Tank /Vehicle Placarding (ADR 5.3.1) Yes See Remarks 19 Vehicle / Transport Unit Marking (Orange Plate (ADR 5.3.2-3) Yes See Remarks Equipment On Board 20 General Purpose Safety Equipment Specified In ADR Yes
  • 2. 21 Equipment According To The Goods Carried Yes 22 Other Equipment Specified In The Instructions In Writing Yes 23 Fire Extinguisher(s) Yes Vehicle Requirements
  • 3.
  • 4. Vehicle Comments ADR Clause Technical Specifications AT FL 24 9.2.2 Electrical Equipment 25 9.2.2.2 Wiring X X Vehicle Comments ADR Clause Technical Specifications AT FL 26 9.2.2.3.1 A switch for breaking the electrical circuits shall be placed as close to the battery as practicable. X 27 9.2.2.3.2 A control device to facilitate the disconnecting and reconnecting functions of the switch shall be installed in the driver's cab. Shall be readily accessible to the driver and be distinctively marked. X 28 9.2.2.3.3 Switch shall in accordance with IEC Standard 529. X 29 9.2.2.3.4 Cable connections on the switch shall have protection degree IP 54. X 30 9.2.2.4 Batteries X 31 9.2.2.5.1 Permanently energized circuits. X 32 9.2.2.6 Electrical installation at rear of cab X See Remarks 33 9.2.3 Braking Equipment 34 9.2.3.1 General provisions X X 35 Anti-lock braking system X X See Remarks 36 Endurance braking system X X See Remarks 37 9.2.4 Prevention of fire risks 38 9.2.4.3 Fuel tanks X 39 9.2.4.4 Engine X 40 9.2.4.5 Exhaust system X 41 9.2.4.6 Vehicle endurance braking X See Remarks 42 9.2.4.7 Combustion heaters Not Applicable 43 9.2.4.7.1 9.2.4.7.2 9.2.4.7.5 - Shall comply technical requirement of ECE Regulation 122 - Heaters & their exhaust gas routing shall be designed, located, protected or covered to prevent any unacceptable ignition of load. - Shall switched on manually, programming devices are prohibited X X -Do- 44 9.2.4.7.3 9.2.4.7.4 - shall be put out of operation by at least the following methods: (a) Intentional manual switching off from the driver's cab; (b) in this case the heating device may be restarted manually by the driver; (c) Start up of a feed pump on the motor vehicle. - Afterrunning is permitted after the combustion heaters have been put out of operation X -Do-
  • 5.
  • 6. Vehicle Comments ADR Clause Technical Specifications AT FL 45 9.2.5 Speed limitation device X X See Remarks 46 9.2.6 Coupling device of trailer X X Tank Requirement ADR Clause Technical Specifications Inspected Not Available Comments 6.8.2.1 Construction 47 6.8.2.1.8 Material of shell: Shells shall be made of suitable metallic materials which, unless other temperature ranges are prescribed in the various classes, shall be resistant to brittle fracture and to stress corrosion cracking between -20 °C and +50 °C. 48 6.8.2.1.9 The materials of shells or of their protective linings which are in contact with the contents shall not contain substances liable to react dangerously. 49 6.8.2.1.17 to 6.8.2.1.21 Minimum shell thickness: The shell thickness shall not be less than the greater of the values determined by the following formulae: E = PT D 2σλ Diameter of shell ≤1.80 m >1.80 m Minimum shell thickness Stainless austenitic steels 2.5 mm 3 mm Other steels 3 mm 4 mm Aluminum alloys 4 mm 5 mm Pure aluminum of 99.80% 6 mm 8 mm Yes Thickness monitoring report is attached 50 6.8.2.1.23 Welding and inspection of welds: The manufacturer's qualification for performing welding operations shall be one recognized by the competent authority. Welding shall be performed by skilled welders using a welding process whose effectiveness (including any heat treatments required) has been demonstrated by test. Non-destructive tests shall be carried out by N/A See Remarks ADR Clause Technical Specifications Inspected Not Available Comments radiography or by ultrasound and must confirm that the quality of the welding is appropriate to the stresses. 51 6.8.2.2 Items of equipment: Tank (Condition/Capacity) Tank Supports Clamp Bolts, Trusses ,Liner Ladder Discharge Outlet Hatches/ Manhole & Cover Tank Safety Valve /Vent Protective Coating (Internal/External) Yes See Remarks Inspections and tests:
  • 7. See Remarks: Item No. 10: Means of identification, which include a photograph was not available at the time of Inspection (Clause 8.1.2). Item No. 14: Driver was not trained for particular hazardous class at the time of inspection (Clause 8.2.1 & 2). Item No. 18: Placarding was not according to ADR (Clause 5.3.1) at the time of inspection. Item No. 19: Orange plate marking was not according to ADR (Clause 5.3.2-3) at the time of Inspection. Item No. 35: Anti lock braking system was not installed at the time of inspection (Clause 9.2.3). Item No. 36: Endurance braking system was not installed at the time of inspection (Clause 9.2.3). Item No. 41: Endurance braking system was not installed. Item No. 45: Speed limitation device was not installed at the time of inspection (Clause 9.2.5). Item No. 50: Qualification & skills of welder, and inspection tests results were not observed at the time of inspection (Claus 6.8.2.1.23). Item No. 51: Internal inspection was not carried due to filled tank. Item No. 52: Internal condition was not observed at the time of inspection due to filled tanks. Item No. 54: Inspection certificates were not available at the time of inspection. Item No. 55: Marking plate of tank specification was not observed at the time of inspection (Clause 6.8.2.5.1).
  • 8. INSPECTION PERFORMED BY: URS Industrial Assessor VALIDATED BY: EPCL Representative