Career Objective: A Mechanical Engineer presently works as a AutoCAD Designer with
excellent communication, organization and co-ordination skills. Possessing a proven track record
of preparing and executing projects plans and programs, ensuring that work is carried out in
accordance with the companies procedures and clients satisfaction. Able to ensure timely, safe
and cost effective design and implementation during the life cycle of projects from conception till
completion. Ensuring that all engineering work is carried out in accordance with specifications,
statutory requirements, laws, rules, regulations and other contractual requirements with due
regards to safety, operability and maintainability.
Education/Qualification
HND: Mechanical Engineering, Auchi Polytechnic Auchi, Edo State 2006-2008
Courses: Communication skills, Theory of Machines, Machine Installations and
Assembly, Mathematics, Automotives and AutoCad.
ND: Mechanical Engineering, Auchi Polytechnic Auchi, Edo State 2004-2005
SSCE: Igbide Grammar School, Igbide, Delta State 1996-2002
3SSCE O’Level: Mathematics (B), Physics (B) and Chemistry(C)
Computer Skills
Proficient in the use of AutoCAD, Microsoft Office, Internet Explorer, Corel draw
and enjoy learning new programs.
Work experience
(1)Project/AutoCAD Engineer. (Present designation) December 2011- Till date
CHRISCO MULTI-LINKS LIMITED – (Electrical & Instrumentation)
A servicing company to Chevron.
Block 4,1st
floor Edewor Shopping Complex, WarrI/Sapele road Delta State.
Job description:
• Involved in job planning and scheduling
• Involved in management of manpower and equipment
• Provide technical support for onsite crew
• Communicated with Client’s representatives on daily project progress report
• Carried out drawing on electrical designs description.
• Carried out electrical schematic drawings on electrical installations.
• Carried out instrumentation and piping installations drawings.
• Carried out all engineering design
(2)AutoCAD Engineer
Meji Living Quarters Power Hook Up Project
Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Oct. 2013, Ongoin
A servicing company to Chevron, Blk 4, 1st
floor Edewor Shopping Center,
Warri,Delta State.
Job description:
• Responsible for complete designing life-cycle from concept to integration implemented to
Design Best Practices.
• Handle the tasks of creating and designing the electrical, structural, mechanical,
architectural, piping and instrumentation drawings by making use of various software tools.
• Carried out drawing on electrical distribution board power description.
• Carried out electrical schematic diagram on building electrical installations.
(3)Project Engineer.
Installation of Cable for Cathodic Protection for Nine Piles at the Pig trap, Gas Plant-CNL
Escravos.
Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Jan 2012-Mar. 2012
Job description:
• Involved in Project bid and evaluation,
• Involved in Job Planning and scheduling
• Involved in Management of manpower and equipment
• Provide Technical support for onsite crew
• Communicated with Client’s representative on daily progress report
(4)Project Engineer
EGP3B Offshore Project (Modification of Parabe and Meren 1&2 PP)
Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Sept.2011-Dec.2011
A servicing company to Chevron, Blk 4, 1st
floor Edewor Shopping Center,
Warri, Delta State.
Job description:
• Managing projects from conception, preproduction through to completion.
• Providing technical support to the project team.
• Responsible for overseeing the review, initiation and execution of contracts.
• Overseeing the maintenance of projects after completions.
• Responsible for the completion of all documentation.
• Producing Test Plans and reports.
• Prepare contract documentation for procurement services and materials.
• Evaluating tenders and providing recommendations.
• Liaising with customers on a regular basis to ensure the successful design
and manufacture of products to agreed budgets and time frames.
(5)AutoCAD Engineer
Electrical Distribution Board Integrity Inspection (Tank Farm, Escravos Terminal)
Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Jan.-May, 2011
A servicing company to Chevron, Blk 4, 1st
floor Edewor Shopping Center,
Warri, Delta State.
Job description:
• Responsible for complete designing life-cycle from concept to integration implemented to
Design Best Practices.
• Handle the tasks of creating and designing the electrical, structural, mechanical and
architectural drawings by making use of various software tools.
• Carried out drawing on electrical distribution board power description.
• Carried out electrical schematic diagram on building electrical installations.
• Carried out as built diagram on electrical renovations of various buildings.
(6)Technician
Marlum Nigeria limited, Plot IBB link Road, Emene industrial Layout, 2009-2010
Enugu (NYSC).
Achievements:
• Assisted in repairs of heavy duty trucks.
• Assisted in troubleshooting and detecting the errors in faulty machines.
• Assisted in adjustment of brakes and overhauled of engines.
• Able to drain used oil and top the engine with oil.
• Assisted in dismantling and coupling of tractors and trailers trucks.
(7)Trainee
Vugson Holding Nigeria limited, 5 Ogbeide lane, oil field road, Effurun, 2006
Delta State (One year Industrial Training)
Achievements:
• Trained in the repairs of Caterpillars/Perkins engines.
• Trained in troubleshooting and detecting the errors in Caterpillars/Perkins
engines.
• Trained in the art of dismantling and coupling of engines.
• Trained on how to maintain transmission systems.
• Assisted in draining used oil and topping the engine with oil.
(8)Trainee
Power Holding Company of Nigeria, Ughelli, Delta State (4 Months I.T) 2004
Achievements:
• Trained in the control of gas and air into the combustion chamber of the gas plant.
• Trained in the repairs of vehicles in the company’s Auto-workshop.
• Trained on how to maintain an excellent safety record in all working conditions.
Skills and abilities
• Extensive experience of planning, project management, design & client liaison.
• Experience of interpreting specifications and preparing technical propels.
• Ability to multi-task in a demanding engineering environment.
• A strong track record in delivering projects on time and within budget.
• Able to ensure that all HSE procedures are met and maintained.
• Resolving complex technical issues and coming up with fast efficient solutions.
COURSES/TRAINING ATTENDED:
• Project Management 2013
• Operational Excellence(OE) EGP 3B PP Modifications – Offshore
Project (Meren 1 & Parabe) 2011
• Incident and injury free(IIF)EGP 3B PP Modifications – Offshore
Project (Meren 1& Parabe) 2011
• Permit To Work training(PTW).Chevron Nigeria Limited, Warri 2012
• Water Survival Training. EGTL project 2012
Award Received/Obtained
Federal Road Safety Commission (FRSC), Road Safety NYSC Club 2010
(Certificate of Membership)
Center For Entrepreneur Development; Auchi Polytechnic, Auchi 2008
(Certificate of Participation).
Hobbies
I enjoy reading, playing chess and scrabble.
References
Available on request.

ADHOZAKPO STANLEY EDITOR cvsr1

  • 1.
    ADHOZAKPO STANLEY EDITOR No.4Osiobe Street,off Warri/Ughelli Road, Agbaro, Delta State. Born on: 23rd Nov. 1983 sadhozakpo@yahoo.com, adhostan@gmail.com 08037536832, 08074240940 Born on: 23rd Nov. 1983 Career Objective: A Mechanical Engineer presently works as a AutoCAD Designer with excellent communication, organization and co-ordination skills. Possessing a proven track record of preparing and executing projects plans and programs, ensuring that work is carried out in accordance with the companies procedures and clients satisfaction. Able to ensure timely, safe and cost effective design and implementation during the life cycle of projects from conception till completion. Ensuring that all engineering work is carried out in accordance with specifications, statutory requirements, laws, rules, regulations and other contractual requirements with due regards to safety, operability and maintainability. Education/Qualification HND: Mechanical Engineering, Auchi Polytechnic Auchi, Edo State 2006-2008 Courses: Communication skills, Theory of Machines, Machine Installations and Assembly, Mathematics, Automotives and AutoCad. ND: Mechanical Engineering, Auchi Polytechnic Auchi, Edo State 2004-2005 SSCE: Igbide Grammar School, Igbide, Delta State 1996-2002 3SSCE O’Level: Mathematics (B), Physics (B) and Chemistry(C) Computer Skills Proficient in the use of AutoCAD, Microsoft Office, Internet Explorer, Corel draw and enjoy learning new programs. Work experience (1)Project/AutoCAD Engineer. (Present designation) December 2011- Till date CHRISCO MULTI-LINKS LIMITED – (Electrical & Instrumentation) A servicing company to Chevron. Block 4,1st floor Edewor Shopping Complex, WarrI/Sapele road Delta State. Job description: • Involved in job planning and scheduling • Involved in management of manpower and equipment • Provide technical support for onsite crew • Communicated with Client’s representatives on daily project progress report • Carried out drawing on electrical designs description. • Carried out electrical schematic drawings on electrical installations. • Carried out instrumentation and piping installations drawings. • Carried out all engineering design (2)AutoCAD Engineer Meji Living Quarters Power Hook Up Project Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Oct. 2013, Ongoin A servicing company to Chevron, Blk 4, 1st floor Edewor Shopping Center, Warri,Delta State. Job description:
  • 2.
    • Responsible forcomplete designing life-cycle from concept to integration implemented to Design Best Practices. • Handle the tasks of creating and designing the electrical, structural, mechanical, architectural, piping and instrumentation drawings by making use of various software tools. • Carried out drawing on electrical distribution board power description. • Carried out electrical schematic diagram on building electrical installations. (3)Project Engineer. Installation of Cable for Cathodic Protection for Nine Piles at the Pig trap, Gas Plant-CNL Escravos. Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Jan 2012-Mar. 2012 Job description: • Involved in Project bid and evaluation, • Involved in Job Planning and scheduling • Involved in Management of manpower and equipment • Provide Technical support for onsite crew • Communicated with Client’s representative on daily progress report (4)Project Engineer EGP3B Offshore Project (Modification of Parabe and Meren 1&2 PP) Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Sept.2011-Dec.2011 A servicing company to Chevron, Blk 4, 1st floor Edewor Shopping Center, Warri, Delta State. Job description: • Managing projects from conception, preproduction through to completion. • Providing technical support to the project team. • Responsible for overseeing the review, initiation and execution of contracts. • Overseeing the maintenance of projects after completions. • Responsible for the completion of all documentation. • Producing Test Plans and reports. • Prepare contract documentation for procurement services and materials. • Evaluating tenders and providing recommendations. • Liaising with customers on a regular basis to ensure the successful design and manufacture of products to agreed budgets and time frames. (5)AutoCAD Engineer Electrical Distribution Board Integrity Inspection (Tank Farm, Escravos Terminal) Chrisco Multi-Links Nigeria Limited (Elect. & Instrumentation Installations) Jan.-May, 2011 A servicing company to Chevron, Blk 4, 1st floor Edewor Shopping Center, Warri, Delta State. Job description: • Responsible for complete designing life-cycle from concept to integration implemented to Design Best Practices. • Handle the tasks of creating and designing the electrical, structural, mechanical and architectural drawings by making use of various software tools. • Carried out drawing on electrical distribution board power description. • Carried out electrical schematic diagram on building electrical installations. • Carried out as built diagram on electrical renovations of various buildings. (6)Technician Marlum Nigeria limited, Plot IBB link Road, Emene industrial Layout, 2009-2010 Enugu (NYSC).
  • 3.
    Achievements: • Assisted inrepairs of heavy duty trucks. • Assisted in troubleshooting and detecting the errors in faulty machines. • Assisted in adjustment of brakes and overhauled of engines. • Able to drain used oil and top the engine with oil. • Assisted in dismantling and coupling of tractors and trailers trucks. (7)Trainee Vugson Holding Nigeria limited, 5 Ogbeide lane, oil field road, Effurun, 2006 Delta State (One year Industrial Training) Achievements: • Trained in the repairs of Caterpillars/Perkins engines. • Trained in troubleshooting and detecting the errors in Caterpillars/Perkins engines. • Trained in the art of dismantling and coupling of engines. • Trained on how to maintain transmission systems. • Assisted in draining used oil and topping the engine with oil. (8)Trainee Power Holding Company of Nigeria, Ughelli, Delta State (4 Months I.T) 2004 Achievements: • Trained in the control of gas and air into the combustion chamber of the gas plant. • Trained in the repairs of vehicles in the company’s Auto-workshop. • Trained on how to maintain an excellent safety record in all working conditions. Skills and abilities • Extensive experience of planning, project management, design & client liaison. • Experience of interpreting specifications and preparing technical propels. • Ability to multi-task in a demanding engineering environment. • A strong track record in delivering projects on time and within budget. • Able to ensure that all HSE procedures are met and maintained. • Resolving complex technical issues and coming up with fast efficient solutions. COURSES/TRAINING ATTENDED: • Project Management 2013 • Operational Excellence(OE) EGP 3B PP Modifications – Offshore Project (Meren 1 & Parabe) 2011 • Incident and injury free(IIF)EGP 3B PP Modifications – Offshore Project (Meren 1& Parabe) 2011 • Permit To Work training(PTW).Chevron Nigeria Limited, Warri 2012 • Water Survival Training. EGTL project 2012 Award Received/Obtained Federal Road Safety Commission (FRSC), Road Safety NYSC Club 2010 (Certificate of Membership) Center For Entrepreneur Development; Auchi Polytechnic, Auchi 2008 (Certificate of Participation). Hobbies I enjoy reading, playing chess and scrabble. References Available on request.