This document contains the resume of Lawanson Olwasanmi Abdulaizeez. It summarizes his professional experience including roles as an Area Engineer for Con Oil from 2015 to present, a Quality Assurance Engineer for LM Ericsson from 2014 to 2015, and a Field Maintenance Engineer also for LM Ericsson from January to June 2014. It also lists his education credentials including a B.Eng in Electrical/Electronic Engineering from the University of Ado-Ekiti obtained in 2010. Relevant skills, training, and professional memberships are also included.