The production schedule action plan outlines tasks needed to complete a book, including the deadline dates and persons responsible for each task. By January 16th, the creator needs to design basic layouts for the cover, contents, and double page spreads. From January 20th to 21st, photography tasks like taking images of models and locations must be done, and the images edited. The cover, contents, and first double page spread must all be finalized in InDesign and Photoshop by February 4th.
Upgrades to the Dominion Transmission pipeline system (mostly compressor station upgrades) that will increase capacity to deliver more natural gas to NY's Capital District and to downstate areas.
Upgrades to the Dominion Transmission pipeline system (mostly compressor station upgrades) that will increase capacity to deliver more natural gas to NY's Capital District and to downstate areas.
1. PROCUCTION SCHEDULE ACTION PLANNING SHEET
TASK THINGS TO DO TO ACHIEVE BY WHEN? BY
THE TASK WHOM
?
Complete drafts for Use publisher to design basic 16/1/13 Me
cover, contents and layout and image of each
double page spread page
Take images Book camera 20/1/13 Me
Find models
Decide location
Decide costume
Edit images Upload images to computer 21/1/13 Me
Choose final images
Edit images on photoshop for
final view
Create cover page Using photoshop 4/2/13 Me
Add image
Add masthead, barcode,
date/info, sell lines and
anchor line
Refer back to draft for layout
Decide colour scheme and
add text
Create contents page Using photoshop 4/2/13 Me
Add correct image
Look at draft for layout and
design
Follow colour scheme of
cover page
Insert text and information
Create double page Using InDesign 4/2/13 Me
spread Add images and put in place
Add finished article
Refer back to draft for layout
and design
Add title and headings