HYDROLOGY PROJECT I
HYDROLOGY PROJECT II
HYDROLOGY PROJECT
Project Period
1996 to 2004
Total Outlay
12.5 Crores
Project Pe...
Financial Details
Total Project outlay as per Original PIP Rs.10.80 CR
Revised Cost Table-2013 Rs.16.70 CR
Total Expenditu...
Reimbursement Status
Year Expenditure Eligible Claim
Reimbursed
Amount
Remarks
2006-07 72.7 67.63 67.63
2007-08 106.97 79....
PHYSICAL PROGRESS
CONSOLIDATION OF HPI ACTIVITIES
Monitoring of
Groundwater level
Quality
FCS
Periodic interagency
validat...
PHYSICAL PROGRESS Contd…
INSTITUTIONAL STRENGTHENING
Posts created
5 Nos
Retained Posts created during HP I
14 Nos
Partici...
PHYSICAL PROGRESS Contd…
PROCUREMENT
Computer Hardware
Arc Gis Software
Vehicles
Laboratory Equipments
AAS, UV-VIS Spectro...
PHYSICAL PROGRESS Contd…
BUILDING CONSTRUCTION
Building at Ernakulam, Kerala
To house
Regional Data Processing
Centre
Anal...
PHYSICAL PROGRESS Contd…
ESTABLISHED…..
State data dissemination
Centre
State Centre for DSS
Decision Support System (Planning)
Bharathapuzha as pilot basin…..
DSS activities are being done jointly by both surface w...
1
Applications Developed (In Pilot Basin)
2
5
4
2
3
8
7
6
Conjunctive Use
Artificial Recharge Viability Analysis
Inter Sub...
1
Applications Developed (Other Basins)
5
4
2
3
7
6
Dam release study for meeting the domestic water supply in Trivandrum
...
Purpose Driven Studies (PDS)
A Comprehensive Assessment of Water Quality Status of Kerala State
Investigators:- Kerala GW,...
Lessons learnt
Scientific approach to resolve water sector issues
Acquainted with modern techniques for effective and rapi...
Application of HIS
GEC Report W Quality maps
Specific Reports
Groundwater prospect maps Water Level Fluctuation
maps
Data dissemination and awareness raising
HDUG Meeting convened at Idukki District, Kerala
Data disseminated to
Disaster Ma...
Post Project Plan
Sustainability of the achievement of Hydrology Project activities
Water budgeting on water shed basis
...
Gratitude and Hope
Kerala ground water
Kerala ground water
Upcoming SlideShare
Loading in …5
×

Kerala ground water

481 views

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
481
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
11
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kerala ground water

  1. 1. HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total Outlay 16.7 Crores
  2. 2. Financial Details Total Project outlay as per Original PIP Rs.10.80 CR Revised Cost Table-2013 Rs.16.70 CR Total Expenditure from June 2006 to March 2014 Rs.13.73 CR Likely Expenditure for the FY 2014-15 (upto May 2014) Rs. 16.00 CR Hydrology Project II
  3. 3. Reimbursement Status Year Expenditure Eligible Claim Reimbursed Amount Remarks 2006-07 72.7 67.63 67.63 2007-08 106.97 79.02 79.02 2008-09 120.97 95.44 95.44 2009-10 166.66 139.35 139.35 2010-11 149.29 116.32 116.32 2011-12 141.32 111.17 111.17 2012-13 254.95 212.41 212.41 2013-14 359.91 306.11 193.52 submitted claim for Rs.112.59 lakhs Total 1372.77 1127.45 1014.86
  4. 4. PHYSICAL PROGRESS CONSOLIDATION OF HPI ACTIVITIES Monitoring of Groundwater level Quality FCS Periodic interagency validation (CGWB, IMD) Upgraded computer hardware Maintenance of Website
  5. 5. PHYSICAL PROGRESS Contd… INSTITUTIONAL STRENGTHENING Posts created 5 Nos Retained Posts created during HP I 14 Nos Participated in almost all the trainings /Workshops Conducted by DHI (International & National), NIH, CGWB, NWA Conducted various inhouse trainings /workshops
  6. 6. PHYSICAL PROGRESS Contd… PROCUREMENT Computer Hardware Arc Gis Software Vehicles Laboratory Equipments AAS, UV-VIS Spectrophotometer, Flame Photometer, Ion Meter etc
  7. 7. PHYSICAL PROGRESS Contd… BUILDING CONSTRUCTION Building at Ernakulam, Kerala To house Regional Data Processing Centre Analytical Laboratory Level II District Office, Ernakulam
  8. 8. PHYSICAL PROGRESS Contd… ESTABLISHED….. State data dissemination Centre State Centre for DSS
  9. 9. Decision Support System (Planning) Bharathapuzha as pilot basin….. DSS activities are being done jointly by both surface water and ground water Departments.
  10. 10. 1 Applications Developed (In Pilot Basin) 2 5 4 2 3 8 7 6 Conjunctive Use Artificial Recharge Viability Analysis Inter Sub Basin Transfer Inter basin transfer with Hydropower module Water Quality module Water Availability of Bharathapuzha Basin Inter Basin transfer Inter sub basin transfer- Silent Valley to Malampuzha reservoir 10 Reservoir Operation Irrigation module 9
  11. 11. 1 Applications Developed (Other Basins) 5 4 2 3 7 6 Dam release study for meeting the domestic water supply in Trivandrum Viability analysis of proposed Pattissery Dam in Pambar basin Feasibility of 7 check dam locations - Meenachil Basin Reconnaissance study for storage locations - Chalakudy BasinFeasibility of check dam locations in Pampar Basin Analysing the feasibility of a dam at Murinjapuzha – Manimala Basin Integrated operation of proposed reservoirs in Vamanapuram Basin
  12. 12. Purpose Driven Studies (PDS) A Comprehensive Assessment of Water Quality Status of Kerala State Investigators:- Kerala GW, Kerala SW and NIH Belgaum Draft report prepared Final report will be published by May 15th 2014 Regional Seminar conducted
  13. 13. Lessons learnt Scientific approach to resolve water sector issues Acquainted with modern techniques for effective and rapid decision making Integrated approach of Surface and Groundwater for sustainable management Adopting feasible methods and practices from other agencies through interaction. Exposure to latest technologies in water sector for problem solving Evolution of methods for project management in a cost and time effective manner
  14. 14. Application of HIS GEC Report W Quality maps Specific Reports Groundwater prospect maps Water Level Fluctuation maps
  15. 15. Data dissemination and awareness raising HDUG Meeting convened at Idukki District, Kerala Data disseminated to Disaster Management (HVRA Cell) which has been formulated in the state for drought prediction and management is a permanent user of HIS Data
  16. 16. Post Project Plan Sustainability of the achievement of Hydrology Project activities Water budgeting on water shed basis Up gradation of Hydrological Network stations throughout the state especially in coastal terrains of understanding different aquifer parameters in the basin for groundwater developmental activities Modeling of 43 river basins Knowledge sharing and awareness rising.
  17. 17. Gratitude and Hope

×