Cpcb hp ii final supervision mission

  1. 1. HYDROLOGY PROJECT -II CPCB COMPONENT WATER QUALITY DOMAIN CENTRAL POLLUTION CONTROL BOARD
  2. 2. Major Activities and Achievements •Real Time Water Quality Monitoring- Installation of 10 stations on river Ganga (8 Stations) and Yamuna (2 Stations) •Renovation of CPCB Water Laboratory covering an area of about 660 square meter and procurement of laboratory and seating furniture •Development of GIS based Web Portal on Water Quality- Visualisation of existing and historical water quality data modules are being developed. •Development of Water Quality Criteria and Standards on surface, water, ground water and marine water. •Development of Decision Support System (DSS) Planning-Water Quality domain for River Bhima. •Development of specifications of Water Quality Lab Equipment/Instruments. • Organised 30 Trainings / Workshops on different aspects of Water Quality for Implementing Agencies. Each training programme was attended by 25 laboratory persons involved in water quality monitoring.
  3. 3. Real Time Water Quality Monitoring of River Ganga and Yamuna Real Time Water Quality Monitoring of River Ganga (at Haridwar- Upper Ganga Barrage-BhimGoda), Kannauj (Nanamau Bridge), Downstream, Kanpur (Jajmau Bridge Kanpur), Allahabad (Shastri Bridge), Upstream, Varanasi, Upstream, Varanasi, Downstream, Gandhi Ghat, Patna (floating platform), Garden Reach, Kolkata ) and River Yamuna (at Delhi Upstream, Wazirabad and Delhi Downstream Okhla) at 10 locations. Monitoring system is sensor based System functioning for a period of 12 months System have telecommunication system Data transmission through telemetry in server installed in CPCB Delhi Office Monitoring data is under going verification through manual monitoring System has strengths and weaknesses Possibilities of improvement is being explored
  4. 4. Monitoring Location
  5. 5. Real Time Water Quality Monitoring of River Ganga and Yamuna
  6. 6. Limitations/Achievements of Monitoring System •Site selection and Timely clearance/permission for installation • Frequent calibration is required • Security in remote areas a cause of concern • Wide variation in real time values in respect of some parameters (BOD,COD and Nitrate) however relatively reliable observations in respect of other parameters (pH, DO, Temperature, Colour, Conductivity, Turbidity, Chloride and Ammonia) •System is workable however drop time observed invariably due to communication failure or power disruption •Data used during Maha Kumbh Event 2013/Magh Mela 2014 and issues with water quality intake point of Delhi on Yamuna for instant reporting •Direction issued to SPCB for corrective action on water quality deterioration at water intake point of Delhi and regularly used during Maha Kumbh event.
  7. 7. Development of GIS based Web Portal on Water Quality PROJECT TIME SCHEDULE GIS BASED WEB PORTAL ON WATER QUALITY FRAMEWORK GEOGRAPHIC INFORMATION SYSTEM(GIS) LOGIN CREDENTIALS GIS PAGE VISUALIZATION GIS MAP WITH MAP SERVICE AUTOMATIC MONITORING STATION VISUALIZATION MAP TOOLS LAYER MANAGEMENT INFORMATION TOOL WITH TREND ANALYSIS CUSTOM DATA RETRIEVAL PROXIMITY INFORMATION BASIN ANALYSIS RIVER WISE MONITORING STATIONS OFFLINE ANALYSIS TOOLS USER MANAGEMENT INFORMATION SYSTEM(UMIS) FINANCIAL MANAGEMENT INFORMATION SYSTEM(FMIS) REMOTE SENSING DATA PROCESSING (RSDP) 8
  8. 8. 9 Project Time Schedule Stocktaking, Initial consultation - Inception ReportSystems Requirement SpecificationsDevelopment of UMIS,FMIS & GIS Water Quality Frameworks and presentationProcurrment of Software and HardwareDeployment, Testing of Web PortalFinal Deployment on Main ServerMaintenance Planned 30 120 180 210 360 420 30 120 180 210 360 420 0 100 200 300 400 500 D a y s Project Milestone Planned # Project Milestone Status 1 Stocktaking, Initial consultation - Inception Report 2 Systems Requirement Specifications 3 Development of UMIS,FMIS & GIS Water Quality Frameworks and presentation 4 Procurrment of Software and Hardware 5 Deployment, Testing of Web Portal 6 Final Deployment on Main Server 7 Maintenance Milestone Completed In-Process Process yet to start INTRODUCTION GIS UMIS FMIS RSDP
  9. 9. 10 Home Page INTRODUCTION GIS UMIS FMIS RSDP
  10. 10. 11 GIS Based Web Portal on Water Quality Framework Parameter wise Online Analysis Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  11. 11. 12 Data Visualization Dissolved Oxygen (mg/L) Visualization for 2011 Data considered at minimum value Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  12. 12. 13 Login For Secure Site Basin wise Login or Login for all basin at National Level Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  13. 13. 14 GIS River Basin Data Visualization National Level Login for all basins visualization Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  14. 14. 15 GIS Ganga Basin Visualization Ganga basins visualization Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  15. 15. 16 Map with Map Service View ESRI Hybrid Map Service Bhuvan Map Service Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  16. 16. 17 Automatic Water Quality Monitoring Station Integration Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  17. 17. 18 Layer Management Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  18. 18. 19 Information Tool with Trend Analysis Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  19. 19. 20 Custom Data Retrieval Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  20. 20. 21 Proximity Information Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  21. 21. 22 Sub-Basin Analysis Geographic Information System INTRODUCTION GIS UMIS FMIS RSDP
  22. 22. 23 User Management Information System User Management Information System - UMIS INTRODUCTION GIS UMIS FMIS RSDP
  23. 23. 24 User Management User Management Information System - UMIS INTRODUCTION GIS UMIS FMIS RSDP
  24. 24. 25 Password Management Change Password Reset Password User Management Information System - UMIS INTRODUCTION GIS UMIS FMIS RSDP
  25. 25. Physical and Financial Status Activities Project Cost Physical status Financial Status Real Time Water Quality Monitoring Network of 10 stations Rs. 561 Lacs INSTALLED & COMMISSIONE D Rs 261 Lacs released. Rs. 112 Lacs are under processing for release. Rs 188 Lacs as two year AMC to be borne under CPCB Funds/HP-III Renovation of CPCB Water Laboratory Rs. 152 Lacs COMPLETED PAYMENT RELEASED Development of GIS based Web Portal on Water Quality Rs.280 Lacs ONGOING 50% payment shall be released by 31st May,14, 20% payment by September 14, Three years AMC to be borne under CPCB Funds/ HP-III Training / Workshops Officials of Implementing agencies trained Pending payment of Rs. 6.50 lacs to be released Development of Water Quality Criteria and Rs 21 Lacs COMPLETED Committee constituted to finalise the process for publication.
  26. 26. Overall Expenditure Status Allocation under the project as per PIP (Rs Crores) Expenditure up to March 2014 (Rs Crores) Likely expenditure by May 31,2014 (Rs. Crores) 16.70 crores Rs 6,47,07,729/- Rs 2,12,00,000/-
  27. 27. Continuation of HP 2 activities….. • Annual Maintenance Services Contract for Real Time Water Quality Monitoring Network of 10 stations - Annual maintenance contract is up to 2017 (Rs.2.0 Crore). • Consultancy on GIS based Web Portal on Water Quality – continuation of activity on development and hosting of website including Annual maintenance contract up to 2017 (Rs. 0.84 Crore).
  28. 28. Proposed Activities for HP-III Activities Amount (in Crore) 1. Consultancy services on development of software for Integration of Water Quality Monitoring Networks and data sharing protocol (Project for a period of 5 year along with AMC) Rs.2.0 Crore. 2. Consultancy services on preparation of nationwide compendium based on Basin Sub Basin Inventory of Water Pollution & Development of Hardcopy Atlas and Web based System Rs.15 Crore. 3. Consultancy services for Analytical Quality Assurance and Control to existing laboratories developed under Hydrology Project–I and II. (Project for a period of 5 year along with AMC) Rs. 2 Crore.
  29. 29. Total project cost for HP-III shall be Rs 28 Crore including manpower component.
  30. 30. Thank You for Patience

×