What is Smartphone
 A Smartphone is a mobile phone
with highly advanced features. A
typical Smartphone has a high-
resolution touch screen display, Wi-Fi
connectivity, Web browsing
capabilities, and the ability to
accept sophisticated applications.
The majority of these devices run on
“mobile operating system”
History of Smartphone OS
2000
 Symbian becomes the first modern mobile
OS on a smartphone with the launch of
the Ericsson R380.
2007
 Apple iPhone with iOS is introduced as
an iPhone, "mobile phone" and "internet
communicator
2008
 OHA releases Android 1.0 with the HTC
Dream as the first Android phone.
 Windows Phone OS phones are released
 In my last four slides I mentioned the history
of Smartphone's operating system. Now I
want to show the position of those operating
system.
Android
ANDROID
 Android is an operating system based
on the Linux kernel, and designed
primarily for touch screen mobile
devices such
as smartphones and tablet computers.
Initially developed by Android, Inc.,
which Google backed financially and
later bought in 2005, Android was
unveiled in 2007 along with the
founding of the Open Handset.
 AppleOS
 iOS (previously iPhone OS) is a mobile
operating system developed and
distributed by Apple Inc. Originally
unveiled in 2007 for the iPhone, it has
been extended to support other
Apple devices such as the iPod
Touch (September
2007), iPad (January 2010), iPad
Mini (November 2012) and second-
generation Apple TV (September
2010)
 Windows Phone
Windows phone
 Windows Mobile is an operating
system supported by Microsoft.
Windows Mobile is based on Microsoft
Win32 API. Windows mobile works on
some devices including Pocket PC,
smartphones, communicators. Most
versions of Windows Mobile have a set
of standard features such as
multitasking and the ability to
navigate a file system and it comes
bundled with a set of applications.
Other OS
 Blackberry :-
It is closed source and proprietary.
BlackBerry 10 was the next
generation platform for BlackBerry
smartphones and tablets. One OS
was planned for both Blackberry
smartphones and tablets going
forward.
Comparision of Mobile OS
Current version
IOS 7.04 // Release Date: November 2013
Andoid 4.4 //Relase Date:November 2013
Windows 8 // Release Date: October 2013
Application and Program
Information
Programmed in:
C,C++,
Objectice-C
7.000.000+ Apps
(Mostly Free)
Programmed in:
C,C++,Java
7 .000.000+ Apss
(Mostly Free)
Programmed in:
C,C++
1.700.000+ Apps
(50% are Free)
 So, In the end I want to say that’s all about
operating system of Smartphone.
Thank you Everybody…….
ThE EnD

About Smartphone

  • 1.
    WELCOME TO MYPRESENTATION MY TOPIC IS THE OPARETING SYSTEM OF SMARTPHONE Mohammad Ashraful Islam ID#14103161 Program# BCSE
  • 2.
    What is Smartphone A Smartphone is a mobile phone with highly advanced features. A typical Smartphone has a high- resolution touch screen display, Wi-Fi connectivity, Web browsing capabilities, and the ability to accept sophisticated applications. The majority of these devices run on “mobile operating system”
  • 3.
  • 4.
    2000  Symbian becomesthe first modern mobile OS on a smartphone with the launch of the Ericsson R380.
  • 5.
    2007  Apple iPhonewith iOS is introduced as an iPhone, "mobile phone" and "internet communicator
  • 6.
    2008  OHA releasesAndroid 1.0 with the HTC Dream as the first Android phone.
  • 7.
     Windows PhoneOS phones are released
  • 8.
     In mylast four slides I mentioned the history of Smartphone's operating system. Now I want to show the position of those operating system.
  • 9.
  • 10.
    ANDROID  Android isan operating system based on the Linux kernel, and designed primarily for touch screen mobile devices such as smartphones and tablet computers. Initially developed by Android, Inc., which Google backed financially and later bought in 2005, Android was unveiled in 2007 along with the founding of the Open Handset.
  • 11.
  • 12.
     iOS (previouslyiPhone OS) is a mobile operating system developed and distributed by Apple Inc. Originally unveiled in 2007 for the iPhone, it has been extended to support other Apple devices such as the iPod Touch (September 2007), iPad (January 2010), iPad Mini (November 2012) and second- generation Apple TV (September 2010)
  • 13.
  • 14.
    Windows phone  WindowsMobile is an operating system supported by Microsoft. Windows Mobile is based on Microsoft Win32 API. Windows mobile works on some devices including Pocket PC, smartphones, communicators. Most versions of Windows Mobile have a set of standard features such as multitasking and the ability to navigate a file system and it comes bundled with a set of applications.
  • 15.
    Other OS  Blackberry:- It is closed source and proprietary. BlackBerry 10 was the next generation platform for BlackBerry smartphones and tablets. One OS was planned for both Blackberry smartphones and tablets going forward.
  • 16.
  • 17.
    Current version IOS 7.04// Release Date: November 2013 Andoid 4.4 //Relase Date:November 2013 Windows 8 // Release Date: October 2013
  • 18.
    Application and Program Information Programmedin: C,C++, Objectice-C 7.000.000+ Apps (Mostly Free) Programmed in: C,C++,Java 7 .000.000+ Apss (Mostly Free) Programmed in: C,C++ 1.700.000+ Apps (50% are Free)
  • 19.
     So, Inthe end I want to say that’s all about operating system of Smartphone. Thank you Everybody……. ThE EnD