Why Improve Power Factor?
Power Factor Considerations
The lower the power factor, the more reactive power the
Utilities need to provide. This can result in:




System capacity problems due to inefficient loading of
incoming transformers



© ABB Group

Larger equipment (i.e. poles and wires) required to supply
power

Higher operating costs due to maximum demand charges –
kvar (kVA) tariff, local generation costs and energy loss
Example

kW

kVA

kvar1

A consumer using 500kW at 0.5 power factor compared
with a similar 500kW consumer at 0.98 power factor would
require 33% more system capacity to meet requirements

© ABB Group
November 4, 2013 | Slide 3
Power Factor Improvement
1000kW
Power Factor
= 0.9
1428kVA
1250kVA
1111kVA

1009kvar
750kvar
482kvar

1500kVA Transformer

Recovered Capacity
= 317kVA (22.19%)

© ABB Group
November 4, 2013 | Slide 4
ABBACUS
Low Voltage Power Factor Correction


LV ABBACUS



Rated to 415V



Indoor and Outdoor



Standard Step Sizes




Automatic Operation




© ABB Group
November 4, 2013 | Slide 5

12.5kvar, 25kvar,
50kvar

RVC & RVT controllers

Harmonic Protection
ABBACUS
MV Metal Enclosed Capacitor Bank




Inrush and detuned reactors, up to 36kV



© ABB Group
November 4, 2013 | Slide 6

Range of outdoor & indoor aluminium designs to IP55
Switched and fixed options
Metal Enclosed Capacitor Bank Concept

Maintaining a target PF by switching capacitor stages
automatically based on load profile


Typical mining operations have a load profile which
varies according to



Day of the week




Time of day

Time of the year

Metal Enclosed APFC banks are energised on
demand


© ABB Group
November 4, 2013 | Slide 7

No under or overcompensation
Metal Enclosed Capacitor Bank
Benefits to the Mining Industry


One Stop Shop




Compact Footprint


© ABB Group
November 4, 2013 | Slide 8

System Integration of
primary and secondary
components

Metal Enclosed APFC
occupies 60% of the
floor space of and
equivalent open bank
Metal Enclosed Capacitor Bank
Benefits to the Mining Industry
Incomer module

Power module(s):

Detuned design

Control and protection

Inrush design
© ABB Group
November 4, 2013 | Slide 9
Metal Enclosed Capacitor Bank
Safety Features
Operator Safety


Live parts enclosed



Interlocking system


Bank de-energised



Capacitors discharged





© ABB Group
November 4, 2013 | Slide 10

Q-ACT Arc fault
Containment Technology
Ceiling over pressure vents
Metal Enclosed Capacitor Bank
Q-ACT Arc Containment Technology
Key Benefits



Solution is type tested to IEC 62271-200 : 2003 Clause 6.106



Increase system and process availability



Minimise repair costs after a fault event has occurred



© ABB Group
November 4, 2013 | Slide 11

Increase public and operator safety

Limit system down time
Metal Enclosed Capacitor Bank
Case Study
Introduction


Australian gold mine





Minimise power charges
Comply with regulation

Load




DOL motors, variable
speed drives

Load Details



PF 0.73



© ABB Group
November 4, 2013 | Slide 12

11kV

MD 8492kVA
Metal Enclosed Capacitor Bank
Case Study Continued…
Analysis


Target PF 0.9



Bank Design



3 Stages



Step size 1000kvar



Sequence 1:1:1



© ABB Group
November 4, 2013 | Slide 13

3000kvar

Detuned
Metal Enclosed Capacitor Bank
Case Study Continued…


Protection




© ABB Group
November 4, 2013 | Slide 14

Unbalance

Over current / earth fault
Metal Enclosed Capacitor Bank
Case Study Continued…
Metal Enclosed Capacitor
Bank Specifications

Result : reduced 1680 KVA

© ABB Group
November 4, 2013 | Slide 15

Transformer – Generators $$
Metal Enclosed Capacitor Bank
Case Study Conclusion

Whether a cable car or a coal mine…the implementation of
reactive compensation can reduce



Transformer and cable sizing, and carbon emission reduction



Fuel saving when generating locally



© ABB Group
November 4, 2013 | Slide 16

kVA demand charges from Utility (kW PF penalties)

Generally a conservative 2-3 year payback
Metal Enclosed Capacitor Bank
Case Study Conclusion
Metal Enclosed Capacitor Bank (MECB)


Proven design



Factory tested



Fully Integrated



Modular



Arc Containment Technology (Q-ACT)



Applications


Mining, Water Pumping , Petro Chemical, Airports




© ABB Group
November 4, 2013 | Slide 17

Flexible concept suiting wide range of applications
Cost effective answer to reactive compensation needs
in industry
ABB The importance of power quality in mining by Rob Symonds

More Related Content

What's hot

A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option bA quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
CALMAC Manufacturing Corporation
 
Thermal energy storage in nyc: A winning proposition
Thermal energy storage in nyc:  A winning propositionThermal energy storage in nyc:  A winning proposition
Thermal energy storage in nyc: A winning proposition
CALMAC Manufacturing Corporation
 
A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...
A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...
A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...
IISTech2015
 
ABB retrofit by Alberto DeAlmeida
ABB retrofit by Alberto DeAlmeidaABB retrofit by Alberto DeAlmeida
ABB retrofit by Alberto DeAlmeida
Keren Meers
 
Prof. Omar Hegazy, MOBI at University of Brussels
Prof. Omar Hegazy, MOBI at University of BrusselsProf. Omar Hegazy, MOBI at University of Brussels
Prof. Omar Hegazy, MOBI at University of Brussels
cwiemeexpo
 
Flyer 4 page
Flyer 4 pageFlyer 4 page
Flyer 4 page
Timothy Otto
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
Amitesh Kumar
 
SIP Project Presentation - Copy
SIP Project Presentation - CopySIP Project Presentation - Copy
SIP Project Presentation - CopyKashif Amanat
 
Developing a 66 kV infrastructure
Developing a 66 kV infrastructureDeveloping a 66 kV infrastructure
Developing a 66 kV infrastructure
Sandra Himmeldirk
 
Engage with...Electrified Automation
Engage with...Electrified AutomationEngage with...Electrified Automation
Engage with...Electrified Automation
KTN
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Ashish Verma
 
How to save money on your electric bill with the PG&E E-20S rate
How to save money on your electric bill with the PG&E E-20S rateHow to save money on your electric bill with the PG&E E-20S rate
How to save money on your electric bill with the PG&E E-20S rate
CALMAC Manufacturing Corporation
 
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Invest Northern Ireland
 
How to save money on your electric bill with the SDG&E Al-TOU rate
How to save money on your electric bill with the SDG&E Al-TOU rateHow to save money on your electric bill with the SDG&E Al-TOU rate
How to save money on your electric bill with the SDG&E Al-TOU rate
CALMAC Manufacturing Corporation
 
Vacon case study. Optimized flow at Gestamp Biomass in Spain
Vacon case study. Optimized flow at Gestamp Biomass in SpainVacon case study. Optimized flow at Gestamp Biomass in Spain
Vacon case study. Optimized flow at Gestamp Biomass in Spain
Vacon Plc
 
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Michael Willemot, Msc, MBA
 
ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...
ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...
ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...
Thorne & Derrick International
 
Tarrif and load curves
Tarrif and load curvesTarrif and load curves
Tarrif and load curves
GPERI
 
Load curve
Load curveLoad curve
Load curveboromama
 

What's hot (20)

A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option bA quick Review of SCE TOU-8 rate, 2-50 kv service, option b
A quick Review of SCE TOU-8 rate, 2-50 kv service, option b
 
Thermal energy storage in nyc: A winning proposition
Thermal energy storage in nyc:  A winning propositionThermal energy storage in nyc:  A winning proposition
Thermal energy storage in nyc: A winning proposition
 
A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...
A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...
A Multi-Input Bridgeless Resonant AC-DC Converter for Electromagnetic Energy ...
 
ABB retrofit by Alberto DeAlmeida
ABB retrofit by Alberto DeAlmeidaABB retrofit by Alberto DeAlmeida
ABB retrofit by Alberto DeAlmeida
 
Prof. Omar Hegazy, MOBI at University of Brussels
Prof. Omar Hegazy, MOBI at University of BrusselsProf. Omar Hegazy, MOBI at University of Brussels
Prof. Omar Hegazy, MOBI at University of Brussels
 
Flyer 4 page
Flyer 4 pageFlyer 4 page
Flyer 4 page
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
SIP Project Presentation - Copy
SIP Project Presentation - CopySIP Project Presentation - Copy
SIP Project Presentation - Copy
 
Developing a 66 kV infrastructure
Developing a 66 kV infrastructureDeveloping a 66 kV infrastructure
Developing a 66 kV infrastructure
 
Engage with...Electrified Automation
Engage with...Electrified AutomationEngage with...Electrified Automation
Engage with...Electrified Automation
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
 
underground mining
underground miningunderground mining
underground mining
 
How to save money on your electric bill with the PG&E E-20S rate
How to save money on your electric bill with the PG&E E-20S rateHow to save money on your electric bill with the PG&E E-20S rate
How to save money on your electric bill with the PG&E E-20S rate
 
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
Energy Storage Solutions for an Intelligent Future, David Surplus, Energy Sto...
 
How to save money on your electric bill with the SDG&E Al-TOU rate
How to save money on your electric bill with the SDG&E Al-TOU rateHow to save money on your electric bill with the SDG&E Al-TOU rate
How to save money on your electric bill with the SDG&E Al-TOU rate
 
Vacon case study. Optimized flow at Gestamp Biomass in Spain
Vacon case study. Optimized flow at Gestamp Biomass in SpainVacon case study. Optimized flow at Gestamp Biomass in Spain
Vacon case study. Optimized flow at Gestamp Biomass in Spain
 
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
 
ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...
ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...
ABB Case Study - Helping Severn Trent Water Eliminate Power Factor Charges - ...
 
Tarrif and load curves
Tarrif and load curvesTarrif and load curves
Tarrif and load curves
 
Load curve
Load curveLoad curve
Load curve
 

Similar to ABB The importance of power quality in mining by Rob Symonds

ABB optimised solutions electrification by Jonathan Maher
ABB optimised solutions electrification by Jonathan MaherABB optimised solutions electrification by Jonathan Maher
ABB optimised solutions electrification by Jonathan Maher
Keren Meers
 
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Alberto Vázquez Garea
 
1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt
Nafir Anas
 
Energy Storage Systems and Technology
Energy Storage Systems and TechnologyEnergy Storage Systems and Technology
Energy Storage Systems and Technology
Bushveld Energy
 
4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf
SriGayatriDSR
 
Reactive_Power_Compensation.pdf
Reactive_Power_Compensation.pdfReactive_Power_Compensation.pdf
Reactive_Power_Compensation.pdf
ChandrashekharKhambe
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
Wärtsilä Corporation
 
Abb rmu
Abb rmuAbb rmu
Delta ia pq-all_c_en_20160307
Delta ia pq-all_c_en_20160307Delta ia pq-all_c_en_20160307
Delta ia pq-all_c_en_20160307
Gus (NZIND) Electric Co
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE코리아
 
PowerGen Europe v4.ppt
PowerGen Europe v4.pptPowerGen Europe v4.ppt
PowerGen Europe v4.ppt
JillellaPranay
 
Distributed Generation By Roland Desouza
Distributed Generation By Roland DesouzaDistributed Generation By Roland Desouza
Distributed Generation By Roland Desouza
IEEEP Karachi
 
Q Cell 285w Q.Prime G5 Mono Black
Q Cell 285w Q.Prime G5 Mono BlackQ Cell 285w Q.Prime G5 Mono Black
Q Cell 285w Q.Prime G5 Mono Black
Optimus Energy Philippines
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
milestoneseng
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
Aravind Panasa
 
ABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMDABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMD
Thorne & Derrick International
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design
Marcep Inc.
 
Checkout single phase induction motor catalogue and price list.
Checkout single phase induction motor catalogue and price list.Checkout single phase induction motor catalogue and price list.
Checkout single phase induction motor catalogue and price list.
twinkleerai
 

Similar to ABB The importance of power quality in mining by Rob Symonds (20)

ABB optimised solutions electrification by Jonathan Maher
ABB optimised solutions electrification by Jonathan MaherABB optimised solutions electrification by Jonathan Maher
ABB optimised solutions electrification by Jonathan Maher
 
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
 
1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt1VGA671004 - UniGear ZVC Standard Product.ppt
1VGA671004 - UniGear ZVC Standard Product.ppt
 
Energy Storage Systems and Technology
Energy Storage Systems and TechnologyEnergy Storage Systems and Technology
Energy Storage Systems and Technology
 
4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf4-josé-matias---reactive-power-compensation.pdf
4-josé-matias---reactive-power-compensation.pdf
 
Reactive_Power_Compensation.pdf
Reactive_Power_Compensation.pdfReactive_Power_Compensation.pdf
Reactive_Power_Compensation.pdf
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
 
Abb rmu
Abb rmuAbb rmu
Abb rmu
 
Delta ia pq-all_c_en_20160307
Delta ia pq-all_c_en_20160307Delta ia pq-all_c_en_20160307
Delta ia pq-all_c_en_20160307
 
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
GE LV5 1500V 태양광 인버터(LV5 1500V Solar Inverter)
 
PowerGen Europe v4.ppt
PowerGen Europe v4.pptPowerGen Europe v4.ppt
PowerGen Europe v4.ppt
 
Distributed Generation By Roland Desouza
Distributed Generation By Roland DesouzaDistributed Generation By Roland Desouza
Distributed Generation By Roland Desouza
 
Customer magazine insider october 2012 final
Customer magazine insider october 2012 finalCustomer magazine insider october 2012 final
Customer magazine insider october 2012 final
 
Q Cell 285w Q.Prime G5 Mono Black
Q Cell 285w Q.Prime G5 Mono BlackQ Cell 285w Q.Prime G5 Mono Black
Q Cell 285w Q.Prime G5 Mono Black
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
 
Azadar_Training
Azadar_TrainingAzadar_Training
Azadar_Training
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 
ABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMDABB Low Voltage LV Capacitors, ABB CLMD
ABB Low Voltage LV Capacitors, ABB CLMD
 
Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design Electrical Plan Electrical System Electrical Design
Electrical Plan Electrical System Electrical Design
 
Checkout single phase induction motor catalogue and price list.
Checkout single phase induction motor catalogue and price list.Checkout single phase induction motor catalogue and price list.
Checkout single phase induction motor catalogue and price list.
 

More from Keren Meers

ABB enhanced availability, online monitoring by Ramy Hajjar
ABB enhanced availability, online monitoring by Ramy HajjarABB enhanced availability, online monitoring by Ramy Hajjar
ABB enhanced availability, online monitoring by Ramy Hajjar
Keren Meers
 
ABB passive & active arc fault protection by David Stonebridge
ABB passive & active arc fault protection by David Stonebridge ABB passive & active arc fault protection by David Stonebridge
ABB passive & active arc fault protection by David Stonebridge
Keren Meers
 
ABB Future of mining; automating mining processes by Llewellyn Best
ABB Future of mining; automating mining processes by Llewellyn BestABB Future of mining; automating mining processes by Llewellyn Best
ABB Future of mining; automating mining processes by Llewellyn Best
Keren Meers
 
ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...
Keren Meers
 
ABB safer HV substation by Mira Gorma
ABB safer HV substation by Mira GormaABB safer HV substation by Mira Gorma
ABB safer HV substation by Mira Gorma
Keren Meers
 
ABB equipment availability, reduced resources by Don Etheridge
ABB equipment availability, reduced resources by Don EtheridgeABB equipment availability, reduced resources by Don Etheridge
ABB equipment availability, reduced resources by Don Etheridge
Keren Meers
 
ABB safe start, optimised solution for mining by David Stonebridge
ABB safe start, optimised solution for mining by David StonebridgeABB safe start, optimised solution for mining by David Stonebridge
ABB safe start, optimised solution for mining by David Stonebridge
Keren Meers
 

More from Keren Meers (7)

ABB enhanced availability, online monitoring by Ramy Hajjar
ABB enhanced availability, online monitoring by Ramy HajjarABB enhanced availability, online monitoring by Ramy Hajjar
ABB enhanced availability, online monitoring by Ramy Hajjar
 
ABB passive & active arc fault protection by David Stonebridge
ABB passive & active arc fault protection by David Stonebridge ABB passive & active arc fault protection by David Stonebridge
ABB passive & active arc fault protection by David Stonebridge
 
ABB Future of mining; automating mining processes by Llewellyn Best
ABB Future of mining; automating mining processes by Llewellyn BestABB Future of mining; automating mining processes by Llewellyn Best
ABB Future of mining; automating mining processes by Llewellyn Best
 
ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB switchgear safety hazards passive & active arc fault protection by David ...
 
ABB safer HV substation by Mira Gorma
ABB safer HV substation by Mira GormaABB safer HV substation by Mira Gorma
ABB safer HV substation by Mira Gorma
 
ABB equipment availability, reduced resources by Don Etheridge
ABB equipment availability, reduced resources by Don EtheridgeABB equipment availability, reduced resources by Don Etheridge
ABB equipment availability, reduced resources by Don Etheridge
 
ABB safe start, optimised solution for mining by David Stonebridge
ABB safe start, optimised solution for mining by David StonebridgeABB safe start, optimised solution for mining by David Stonebridge
ABB safe start, optimised solution for mining by David Stonebridge
 

Recently uploaded

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 

Recently uploaded (20)

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 

ABB The importance of power quality in mining by Rob Symonds

  • 1. address Rob Symonds, Power Products Division, Oct 2013 Metal Enclosed Capacitor Banks for Mining Power Quality Applications © ABB Group November 4, 2013 | Slide 1
  • 2. Why Improve Power Factor? Power Factor Considerations The lower the power factor, the more reactive power the Utilities need to provide. This can result in:   System capacity problems due to inefficient loading of incoming transformers  © ABB Group Larger equipment (i.e. poles and wires) required to supply power Higher operating costs due to maximum demand charges – kvar (kVA) tariff, local generation costs and energy loss
  • 3. Example kW kVA kvar1 A consumer using 500kW at 0.5 power factor compared with a similar 500kW consumer at 0.98 power factor would require 33% more system capacity to meet requirements © ABB Group November 4, 2013 | Slide 3
  • 4. Power Factor Improvement 1000kW Power Factor = 0.9 1428kVA 1250kVA 1111kVA 1009kvar 750kvar 482kvar 1500kVA Transformer Recovered Capacity = 317kVA (22.19%) © ABB Group November 4, 2013 | Slide 4
  • 5. ABBACUS Low Voltage Power Factor Correction  LV ABBACUS  Rated to 415V  Indoor and Outdoor  Standard Step Sizes   Automatic Operation   © ABB Group November 4, 2013 | Slide 5 12.5kvar, 25kvar, 50kvar RVC & RVT controllers Harmonic Protection
  • 6. ABBACUS MV Metal Enclosed Capacitor Bank   Inrush and detuned reactors, up to 36kV  © ABB Group November 4, 2013 | Slide 6 Range of outdoor & indoor aluminium designs to IP55 Switched and fixed options
  • 7. Metal Enclosed Capacitor Bank Concept Maintaining a target PF by switching capacitor stages automatically based on load profile  Typical mining operations have a load profile which varies according to   Day of the week   Time of day Time of the year Metal Enclosed APFC banks are energised on demand  © ABB Group November 4, 2013 | Slide 7 No under or overcompensation
  • 8. Metal Enclosed Capacitor Bank Benefits to the Mining Industry  One Stop Shop   Compact Footprint  © ABB Group November 4, 2013 | Slide 8 System Integration of primary and secondary components Metal Enclosed APFC occupies 60% of the floor space of and equivalent open bank
  • 9. Metal Enclosed Capacitor Bank Benefits to the Mining Industry Incomer module Power module(s): Detuned design Control and protection Inrush design © ABB Group November 4, 2013 | Slide 9
  • 10. Metal Enclosed Capacitor Bank Safety Features Operator Safety  Live parts enclosed  Interlocking system  Bank de-energised  Capacitors discharged   © ABB Group November 4, 2013 | Slide 10 Q-ACT Arc fault Containment Technology Ceiling over pressure vents
  • 11. Metal Enclosed Capacitor Bank Q-ACT Arc Containment Technology Key Benefits   Solution is type tested to IEC 62271-200 : 2003 Clause 6.106  Increase system and process availability  Minimise repair costs after a fault event has occurred  © ABB Group November 4, 2013 | Slide 11 Increase public and operator safety Limit system down time
  • 12. Metal Enclosed Capacitor Bank Case Study Introduction  Australian gold mine    Minimise power charges Comply with regulation Load   DOL motors, variable speed drives Load Details   PF 0.73  © ABB Group November 4, 2013 | Slide 12 11kV MD 8492kVA
  • 13. Metal Enclosed Capacitor Bank Case Study Continued… Analysis  Target PF 0.9  Bank Design   3 Stages  Step size 1000kvar  Sequence 1:1:1  © ABB Group November 4, 2013 | Slide 13 3000kvar Detuned
  • 14. Metal Enclosed Capacitor Bank Case Study Continued…  Protection   © ABB Group November 4, 2013 | Slide 14 Unbalance Over current / earth fault
  • 15. Metal Enclosed Capacitor Bank Case Study Continued… Metal Enclosed Capacitor Bank Specifications Result : reduced 1680 KVA © ABB Group November 4, 2013 | Slide 15 Transformer – Generators $$
  • 16. Metal Enclosed Capacitor Bank Case Study Conclusion Whether a cable car or a coal mine…the implementation of reactive compensation can reduce   Transformer and cable sizing, and carbon emission reduction  Fuel saving when generating locally  © ABB Group November 4, 2013 | Slide 16 kVA demand charges from Utility (kW PF penalties) Generally a conservative 2-3 year payback
  • 17. Metal Enclosed Capacitor Bank Case Study Conclusion Metal Enclosed Capacitor Bank (MECB)  Proven design  Factory tested  Fully Integrated  Modular  Arc Containment Technology (Q-ACT)  Applications  Mining, Water Pumping , Petro Chemical, Airports   © ABB Group November 4, 2013 | Slide 17 Flexible concept suiting wide range of applications Cost effective answer to reactive compensation needs in industry