[INC 281 MULTIDISCIPLINARY WORKSHOP WEEKLY REPORT]                        May 9, 2012

   Name-Surname PanuwatSangketkit
       Student ID. 54261520
      Group Name Conthai
 Engineering Team 2A: Bank, Golf, June, Benz, Champ
         Members 2B: Chai, Rin, Golf, Kung, Tum, Dew

   Product Design
                  Dukdik, Ake, L, Friend
   Team Members

Weekly Progress
 From comment in the previous week. This week, We have adopted the modified circuit by
 adding speakers and edit program code. We installed all circuit again because we want to
 arrange the wires and all circuits suitable.
 For ID team, We have change from button switches to touch switches. For LED we change
 to use RGB LED. We edited program code and wiring DC fan.




       Figure 1.Circuit arrange not completed            Figure 2. Circuit arrange completed

Engineering Analysis
Strong Point
   -    Project is completed and can use all the functions.
Week Point
   -    Touch circuit may be error because noise from power line.

Next Week Job
   - Documentation to complete.
   - Prepare presentation.




                                     Department of Control System and Instrumentation Engineering
                                        KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI

54261520 may9

  • 1.
    [INC 281 MULTIDISCIPLINARYWORKSHOP WEEKLY REPORT] May 9, 2012 Name-Surname PanuwatSangketkit Student ID. 54261520 Group Name Conthai Engineering Team 2A: Bank, Golf, June, Benz, Champ Members 2B: Chai, Rin, Golf, Kung, Tum, Dew Product Design Dukdik, Ake, L, Friend Team Members Weekly Progress From comment in the previous week. This week, We have adopted the modified circuit by adding speakers and edit program code. We installed all circuit again because we want to arrange the wires and all circuits suitable. For ID team, We have change from button switches to touch switches. For LED we change to use RGB LED. We edited program code and wiring DC fan. Figure 1.Circuit arrange not completed Figure 2. Circuit arrange completed Engineering Analysis Strong Point - Project is completed and can use all the functions. Week Point - Touch circuit may be error because noise from power line. Next Week Job - Documentation to complete. - Prepare presentation. Department of Control System and Instrumentation Engineering KING MONGKUT’s UNIVERSITY OF TECHNOLOGY THONBURI