SlideShare a Scribd company logo
OSHA Office of Training & Education 1
Safety Standards for Material Handling and
Rigging
Only standards cited 5 times were
included
MATERIALS STORED TO PREVENT SLIDING FALLING, OR COLLAPSE
9
9
10
17
18
251(a)(2)(i)
250(a)(1)
251(b)(1)
251(a)(1)
252(a)
Materials Handling, Storage, Use & Disposal
[1926.250 – 252]
2
GENERAL RIGGING EQUIPMENT IDENTIFICATION
EXTERIOR DROP CHUTES
RIGGING EQUIPMENT INSPECTION & REMOVAL FROM SERVICE
WELDED ALLOY STEEL CHAIN SLING IDENTIFICATION
SUBPARTH
General
• All materials stored in tiers shall
be stacked, racked, blocked,
interlocked, or otherwise
secured to prevent sliding, falling
or collapse
1926.250(a)(1)
Rigging
• Rigging equipment for material
handling shall be inspected prior
to use on each shift and as
necessary during its use to
ensure that it is safe.
• Defective rigging equipment
shall be removed from service.
1926.251(a)(1)
Rigging
• Not be loaded in excess of its
recommended safe working load
as prescribed on the
identification markings by the
manufacturer;
1926.251(a)(2)(ii)
Rigging
• Each day before being used, the sling
and all fastenings and attachments
shall be inspected for damage or
defects by a competent person
designated by the employer.
• Damaged or defective slings shall be
immediately removed from service
1926.251(a)(6)
Rigging
• Welded alloy steel chain slings
shall have permanently affixed
durable identification stating
size, grade, rated capacity, and
sling manufacturer.
1926.251(b)(1)
Rigging
• The employer shall make and
maintain a record of the most
recent month in which each alloy
steel chain sling was thoroughly
inspected, and shall make such
record available for examination
1926.251(b)(6)(ii)
Rigging
• Wire rope slings shall have
permanently affixed, legible
identification markings stating size,
rated capacity for the type(s) of
hitch(es) used and the angle upon
which it is based, and the number
of legs if more than one.
1926.251(c)(16)
Disposal
• Whenever materials are dropped
more than 20 feet to any point
lying outside the exterior walls of
the building, an enclosed chute of
wood, or equivalent material, shall
be used.
1926.252(a)
510 material handling rigging 2015

More Related Content

More from John Newquist

Lockout Minor Servicing Exceptions
Lockout Minor Servicing ExceptionsLockout Minor Servicing Exceptions
Lockout Minor Servicing Exceptions
John Newquist
 

More from John Newquist (20)

Respirators 2018
Respirators 2018Respirators 2018
Respirators 2018
 
Silica 2018 construction
Silica 2018 constructionSilica 2018 construction
Silica 2018 construction
 
Gi 2017 loto seven hour
Gi 2017 loto seven hourGi 2017 loto seven hour
Gi 2017 loto seven hour
 
Combustible Dust Safety 2017
Combustible Dust Safety 2017Combustible Dust Safety 2017
Combustible Dust Safety 2017
 
Hepatitis c
Hepatitis cHepatitis c
Hepatitis c
 
Gi 2017 lockout 503
Gi 2017 lockout 503Gi 2017 lockout 503
Gi 2017 lockout 503
 
Safety Training Techniques 2017
Safety Training Techniques 2017Safety Training Techniques 2017
Safety Training Techniques 2017
 
Outreach Training Requirements 2017 new
Outreach Training Requirements 2017 newOutreach Training Requirements 2017 new
Outreach Training Requirements 2017 new
 
Safety and Health Training
Safety and Health Training Safety and Health Training
Safety and Health Training
 
Swimming Pool Safety 2017
Swimming Pool Safety 2017 Swimming Pool Safety 2017
Swimming Pool Safety 2017
 
Pesticide safety
Pesticide safetyPesticide safety
Pesticide safety
 
Lockout Minor Servicing Exceptions
Lockout Minor Servicing ExceptionsLockout Minor Servicing Exceptions
Lockout Minor Servicing Exceptions
 
Osha Update 2017 July 2017
Osha Update 2017 July 2017Osha Update 2017 July 2017
Osha Update 2017 July 2017
 
Extreme Weather 2017
Extreme Weather 2017Extreme Weather 2017
Extreme Weather 2017
 
Health and Safety Apps 2017
Health and Safety Apps 2017Health and Safety Apps 2017
Health and Safety Apps 2017
 
Trenching 8 hour 2017
Trenching 8 hour 2017Trenching 8 hour 2017
Trenching 8 hour 2017
 
Gi 2017 recordkeeping four hour
Gi 2017 recordkeeping four hourGi 2017 recordkeeping four hour
Gi 2017 recordkeeping four hour
 
Industrial safety management
Industrial safety management Industrial safety management
Industrial safety management
 
Employee Engagement
Employee Engagement Employee Engagement
Employee Engagement
 
Death on the job 2017
Death on the job 2017Death on the job 2017
Death on the job 2017
 

Recently uploaded

CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.ppt
Asashukla6
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 

Recently uploaded (20)

CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.ppt
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
 
Presentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantagePresentation on RBI and its functions , advantage and disadvantage
Presentation on RBI and its functions , advantage and disadvantage
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 

510 material handling rigging 2015

  • 1. OSHA Office of Training & Education 1 Safety Standards for Material Handling and Rigging Only standards cited 5 times were included
  • 2. MATERIALS STORED TO PREVENT SLIDING FALLING, OR COLLAPSE 9 9 10 17 18 251(a)(2)(i) 250(a)(1) 251(b)(1) 251(a)(1) 252(a) Materials Handling, Storage, Use & Disposal [1926.250 – 252] 2 GENERAL RIGGING EQUIPMENT IDENTIFICATION EXTERIOR DROP CHUTES RIGGING EQUIPMENT INSPECTION & REMOVAL FROM SERVICE WELDED ALLOY STEEL CHAIN SLING IDENTIFICATION SUBPARTH
  • 3. General • All materials stored in tiers shall be stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling or collapse 1926.250(a)(1)
  • 4. Rigging • Rigging equipment for material handling shall be inspected prior to use on each shift and as necessary during its use to ensure that it is safe. • Defective rigging equipment shall be removed from service. 1926.251(a)(1)
  • 5. Rigging • Not be loaded in excess of its recommended safe working load as prescribed on the identification markings by the manufacturer; 1926.251(a)(2)(ii)
  • 6. Rigging • Each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a competent person designated by the employer. • Damaged or defective slings shall be immediately removed from service 1926.251(a)(6)
  • 7. Rigging • Welded alloy steel chain slings shall have permanently affixed durable identification stating size, grade, rated capacity, and sling manufacturer. 1926.251(b)(1)
  • 8. Rigging • The employer shall make and maintain a record of the most recent month in which each alloy steel chain sling was thoroughly inspected, and shall make such record available for examination 1926.251(b)(6)(ii)
  • 9. Rigging • Wire rope slings shall have permanently affixed, legible identification markings stating size, rated capacity for the type(s) of hitch(es) used and the angle upon which it is based, and the number of legs if more than one. 1926.251(c)(16)
  • 10. Disposal • Whenever materials are dropped more than 20 feet to any point lying outside the exterior walls of the building, an enclosed chute of wood, or equivalent material, shall be used. 1926.252(a)