The document proposes a 500 ton per day manganese ore sinter plant with a 32 square meter belt sintering machine. It would include a sintering machine and auxiliary facilities like water supply, power supply, gas, heating, and roads. The plant would have an annual sintering capacity of 172,000 tons. It provides technical specifications and process details for the sintering operation and equipment. The total estimated budget for supplying and installing the sintering line is $10 million, excluding civil construction and laboratory expenses.