Erkki KASANEN
Business Development Manager
AW-Energy Oy
AW-ENERGY LTD
WAVEROLLER PRESENTATION
May 2015 / Erkki Kasanen
WaveRoller – near-shore oscillating wave surge converter
4
Prototypes 2002 - 2014
Finland
EMEC
Portugal
Portugal
WaveRoller 300 kW demonstration
power plant (2012-2014)
• Funded by EU FP7 program
• Three units, 100 kW each
• Grid connected
• Located in NATURA 2000 area
• Performance validated by DNV-GL
6
First in the industry to obtain external performance verification
“The results demonstrate AW-Energy’s adherence to the industry best
practices. This positions the WaveRoller technology at the forefront of
the wave energy industry.”
Joao Cruz, Head of Wave and
Tidal Energy at DNV GL
Recent success in Technology demonst-
ration, validation and commercialization
06/2013 // Fortum, DCNS, AW-Energy and
Bretagne Region cooperate on wave power
demonstration project in France
12/2013// AW-Energy to invest in 1.5MW dry
test facility. Test facility in operation in
June/2015
02/ 2014 // AW-Energy to release
independent performance validation
prepared by DNV-GL. Results are well in line
with all the expectations
08/2014 // WaveRoller named among top 2
technologies and selected as finalist in ESBi’s
West wave project
12/2014// WaveRoller™ Aces Atlantic
Challenge
AW Energy has received a clean bill of health
for its prototype WaveRoller converter
following a detailed inspection by Lloyd’s
Register after being trialled at a test site off
Peniche, Portugal
2/2015// WaveRoller technology certification
program progressing as planned, Statement of
Feasibility issued by Lloyd’s Register
36   erkki kasanen - awe

36 erkki kasanen - awe

  • 1.
  • 2.
  • 3.
    WaveRoller – near-shoreoscillating wave surge converter
  • 4.
    4 Prototypes 2002 -2014 Finland EMEC Portugal Portugal
  • 5.
    WaveRoller 300 kWdemonstration power plant (2012-2014) • Funded by EU FP7 program • Three units, 100 kW each • Grid connected • Located in NATURA 2000 area • Performance validated by DNV-GL
  • 6.
    6 First in theindustry to obtain external performance verification “The results demonstrate AW-Energy’s adherence to the industry best practices. This positions the WaveRoller technology at the forefront of the wave energy industry.” Joao Cruz, Head of Wave and Tidal Energy at DNV GL
  • 7.
    Recent success inTechnology demonst- ration, validation and commercialization 06/2013 // Fortum, DCNS, AW-Energy and Bretagne Region cooperate on wave power demonstration project in France 12/2013// AW-Energy to invest in 1.5MW dry test facility. Test facility in operation in June/2015 02/ 2014 // AW-Energy to release independent performance validation prepared by DNV-GL. Results are well in line with all the expectations
  • 8.
    08/2014 // WaveRollernamed among top 2 technologies and selected as finalist in ESBi’s West wave project 12/2014// WaveRoller™ Aces Atlantic Challenge AW Energy has received a clean bill of health for its prototype WaveRoller converter following a detailed inspection by Lloyd’s Register after being trialled at a test site off Peniche, Portugal 2/2015// WaveRoller technology certification program progressing as planned, Statement of Feasibility issued by Lloyd’s Register