Allard VAN HOEKEN
Head of New Energy
Blue Water Services
BlueTEC in remote locations
Ir. Allard van Hoeken MBA
Head of New Energy
Over 35 years of marine
engineering and operations of
permanently moored systems
• FPSOs: Design, Build,
Own and Operate
• SPM: Single Point
Moorings
• Tidal Energy
Bluewater Energy Services BV
Bluetec Texel Tidal platform: modular
Fully transportable by
container transport
BlueTEC Modular complete package
2014-2015 Texel
Modular 100 kW
50-200-400 kW
BlueTEC 2-3 MW
Own&Operate farms
BlueTEC Modular 200 KW
EPC Remote locations
BlueTEC Modular complete package
Bluewater offers the complete system as standard package:
platform, turbine, controls, power cable, mooring system,
transport to any container port worldwide
Thank You!

51 allard van hoeken - bluewater

  • 1.
    Allard VAN HOEKEN Headof New Energy Blue Water Services
  • 2.
    BlueTEC in remotelocations Ir. Allard van Hoeken MBA Head of New Energy
  • 3.
    Over 35 yearsof marine engineering and operations of permanently moored systems • FPSOs: Design, Build, Own and Operate • SPM: Single Point Moorings • Tidal Energy Bluewater Energy Services BV
  • 6.
    Bluetec Texel Tidalplatform: modular Fully transportable by container transport
  • 8.
  • 10.
    2014-2015 Texel Modular 100kW 50-200-400 kW BlueTEC 2-3 MW Own&Operate farms BlueTEC Modular 200 KW EPC Remote locations
  • 11.
    BlueTEC Modular completepackage Bluewater offers the complete system as standard package: platform, turbine, controls, power cable, mooring system, transport to any container port worldwide
  • 12.