For DPRK 300,000 Ton Per Annum Coal Washing Plant
EPs Proposal
2014.11.25
MES is a sub-brand of HOT Mining and focuses on small-middle size processing projects
Content
Technical Supports & Commitment for Colombia Clients................................................................................. 1
Package Comparison & Suggestion............................................................................................................... 4
Price comparing table................................................................................................................................. 5
Package 1-Tranditional Jigging Process Technology ......................................................................................... 7
Package 2-Simplified Jigging Process Technology.......................................................................................... 20
Training Plan _ Coal Washing Plant ............................................................................................................. 22
About HOT Mining ................................................................................................................................... 23
About MES Process .................................................................................................................................. 24
1
Technical Supports & Commitment for DPRK Project
HOT Mining / MES
Two Brands of Beijing HOT Mining Tech Co.,Ltd
Reference only, details shall discuss later
1. Parts sourcing supports
We would also provide supports for parts sourcing for clients.
2. Consignment Sales Cooperation (Spare Parts)
If possible, we’d like to discuss the possibility of consignment sales cooperation for spare parts. This
could help our client to reduce cash cost as well as parts cost.
3. Remote Technical Supports
If possible and internet are available in DPRK? We’re not sure.
Basis on agreement between client and our technical support team, we will provide a remote support
intelligent system for site management purpose. Certainly, our technical team will also inspect the
equipment’s status in China and will provide real time technical supports by internet.
HOT Condition Monitoring (HCM)
HCM is one major part of intelligent system that can monitor machine health at real time. By leveraging
machine operating and health information, our technical team provides customer maintenance and repair
suggestion timely, so as to prevent catastrophic failure, reduce owning and operating cost, maximize
machine uptime. --- This is an additional system, just for optional.
2
Package Comparison & Suggestion
The recommendedpackage - Package 1, Jigging Process Solution.
Secondary optional package
Package 2, Simple Jigging Processing Solution (‘SJPT’ Solution).
Reasons & Comparisons as below
[1] Capacity
The required capacity is 300,000 tons per annual. If we choose DMS processing technology, we shall choose a very
small dense medium cyclone. The smallest cyclone even can process about 450,000 tons raw coal per annual
(much more expensive).
And we have also looked the raw coal, most of them are a little big (25mm~50mm), so we cannot choose the
smallest cyclone. For this capacity requirement, jigging process is best choice.
[2] Clean Coal Yield
Surely, the simple jigging processing technology cannot recovery all the clean coal from raw coal. This would have
many loss of margin.
3
Price comparing table
Key Process
Technology
Package# EP Project Cost
USD (FOB Price)
Capacity ton
per annum
Clean Coal Sales
Income
Clean Coal Yield Operational Cost, Basis on Feeding ROM Coal (Ton)
HMC EPC CWC SPMC
TJPT Package1 300,000 t/a Reasonable 0 280KWh ≤10L/t
SJPT Package2 300,000 t/a Not acceptable, ≥4.5%
loss
0 196KW/h ≈21.5L/t
Note for Abbreviation
Heavy Medium Consumption HMC Please note
Clean coal sales income
is just estimation, for
reference only. Because
we haven't coal
washability report.
Electrical Power Consumption EPC
Clean Water Consumption CWC
(3 Years)Spare Parts & Maintenance Consumption SPMC
TJPT Tranditional Jigging Process Technology
SJPT Simplified Jigging Process Technology
Please Pay Attention:
1. The ROE shall be fixed by 6.1412 (1 USD = 6.1412CNY); Considering currency exchange rate would be changed, thus, we would adjust the price for each 90 days,
it would be floating ±5%.
2. MES Process is a SUB brand of HOT Mining.
[3] Operation Cost
Jigging process is a little higher than DMS technology. And the water consumption is also bigger than
DMS.
[4] Clean Coal Recovery & Yield
DMS is the best technology for maximum the clean coal recovery. Basis on our experiences, for same
raw coal, if plant uses DMS technology, it would get additional 2%~ 3.5% clean coals more than
jigging technology.
Above all, because of capacity and project cost, we recommend the jigging technology
for first choice.
Package 1-Traditional Jigging Process Technology
Content
1. Design basis ........................................................................................................................ 1
2. Design content .................................................................................................................... 1
3. Product solution .................................................................................................................. 1
4. Process Flow Introduction..................................................................................................... 2
5. Design features.................................................................................................................... 3
6. Equipment list and price ....................................................................................................... 4
7. Covers ................................................................................................................................ 7
8. The total installed capacity.................................................................................................. 12
9. Water consumption per ton of coal ...................................................................................... 12
Attachments
1
1. Design basis
1. 1, in accordance with the "coal washing engineering design specifications"
(GB50359-2005) and other relevant provisions of the design.
2. 3, production capacity: annual design production capacity of processing
250,000 tons of coal, 32 tons of raw coal into the wash-hour.
3. 4, the working system: Work 330 days, 16 hours work day.
4. 5, coal and products with a car transport; coal used by coal by coal scuttle;
product directly after the election stockpiling dry ground in the yard.
2. Design content
1. Coal Preparation Plant Design says:Coal by coal, washed coal belt into the
bridge, crushing and screening, jigging, concentrate, coal filter press and
other production facilities, as well as the corresponding production systems
for power distribution, lighting and other facilities.
2. Slime-plant recycling, closed water circuit.
3. CPP clean water to the pond by the owner, the owner is responsible for the
power lead to the main plant transformer.
4. After the slurry was concentrated by filter recycling alone stockpiling.
3. Product solution
1. 1 # 40 coal-30mm 2 # coal 30-8mm 3 # coal 0.5-8mm
2. Coal (return processing system)
3. gangue
4. Slime
2
4. Process Flow Introduction
See attached flow chart.
1. coal preparation and coal by coal
Coal preparation plant coal from the car shipped to the coal yard, through the
subject under the coal hopper feeder conveyor fed with raw coal sizing screen (coal
conveyor head with a magnetic separator to remove the iron mixed with coal), mesh of
40mm, the material on the sieve materials are mixed into the jig after washing and
crushing to 40mm under the following screen.
2. coal sorting
After screening the crushed coal belt to enter selected CNC Jig sub-elected coal,
coal gangue and three products. After dewatering waste rock products by bucket
elevator to dehydration in the field of coal and waste rock stockpiles. After coal products
by bucket elevator dehydration dehydration to the coal pile storage, processing can also
be returned to the system. Jig coal and coal overflow via a fixed sieve sieve dehydration
dehydration grading into 40-30mm,30-8mm and 8-0.5mm three kinds of grain size. After
these three products to reprint belt stockpiling coal field.
3. slime water system
Coal Dewatering Sieve-0.5mmAfter the sieve into the slime pool water, pumped to
a thickener concentrate, concentrate recovered by the end of the stream with a filter to
the slurry scraper conveyor field stockpiling. Slime thickener overflow filter filtrate and
pooling of recycled water for the whole plant production water.
In addition, the plant accident outside the sedimentation tank, turn on the water to
deal with the accident. Production systems run, run, drip, drain and clean the floor after
the water into the drainage pond, pumped to jigger recycling.
3
5. Design features
1. using sophisticated air chamber under the screen CNC Jig sorting, sub-elect
qualified and high-ash coal gangue, improve the quality of clean coal. Investment, low
operating cost, simple operation, covering less.
2. the process is simple, a small number of production processes and equipment
units, high efficiency, low consumption, coal sorting rate, to meet the needs of users.
3. the design is 250,000 tons / year coal preparation plant jigging with coal storage,
coal by coal, screening crushing, jigging, concentration, pressure filtration, such as slime
production processes to meet the requirements of sorting the various aspects .
4. the design uses high-precision CNC process parameters automatic control system,
improve sorting accuracy jigging.
5. due to the filter press is intermittent work, in order to ensure continuity of
production, the design of the filter is configured with two slime to form a closed loop, ie
a filter discharge, then another filter are feeding, to ensure that production is not
interrupted.
6. slime water system uses efficient inclined plate concentrator, which has a small
footprint, large capacity, low operating costs, investment costs Province characteristics.
No power equipment while the concentrator, there is no pressure equipment problem,
trouble-free operation.
7. the design uses electronic belt right into the washing of coal, coal products for
immediate and incremental measurement, and control room through the host PLC to
achieve plant-wide networking of various parameters, technical indicators show the
process of production, editing, printing function, so that the whole plant production
technology management to achieve standardization and scientific.
8. equipment selection priority equipment advanced, reliable, mature technology
of choice new, highly efficient, energy-saving electrical and mechanical equipment.
9. the design of local conditions set accident sedimentation tank, when equipment
maintenance or failure, can be saved to an accident slime water pool, and afterwards
4
they can be returned to the factory slime water processing, recycling plant slime,
washing closed loop to ensure that the environment from pollution and meet
environmental requirements.
6. Equipment list and price
5
Item Equipment Specification Unit Qty Note
1 ROM Screen ZDM1225 Φ=40mm
Set 1
MES Process
Motor N=5.5KW 380V
2 Crusher
2PCM4050
Discharging<40mm Set 1
MES Process
Motor N=15KW 380V
3 Vibrating Feeder DZ5 N=0.55KW 380V Set 1 MES Process
4
NC BatacJig SKT3.5 F=3.5m2
Set
1 MES Process
Discharging Motor N=2.2KW 380V 2
Cycloidal Planetary Gear
Speed Reducer
2
5
Air Compressor VF—3/7 Q=3m3 /min Set 1 From China
P=0.7MPa
Motor N=18.5KW 380V 1
6
Dewatering Bucket
Elevator - For Rejects
T2430 Q=20t/h t=240mm
Set
1
MES Process
B=300mm L=12.24m
V=0.16m/s а=60o
Motor N=3KW 380V 1
7
Dewatering Bucket
Elevator - For Middlings
T1228 Q=9t/h t=120mm
Set
1
MES Process
B=280mm L=12.24m
V=0.16m/s а=60o
Motor N=2.2KW 380V 1
8
Clean Coal Dewatering
Screen
ZJS1248 Φ=0.5mm
Set
1 MES Process
N=5.5KW 380V 2
9
Clean Coal Centrifuge TLL700
Set
1 MES Process
Main Motor Y180L-6-V1 N=15KW 1
Oil Pump Motor Y801-4 N=0.55KW 1
Clean Coal Sizing Screen
2ZDM1236 Φ1=30mm
Φ2=8mm Set 1
MES Process
Motor N=5.5KW 380V
10
Fan L53 Q=33m3/min
Set
1 From China
P=0.039Mpa n=1240r·pm
Motor N=30KW 380V 1
11 Silencer Two set for input and output Pic 2 Price Includedin Fan
12 Air Chamber φ=1600 V=4.5m³ Set 1 From China
13
Slurry Pump 100ZJ—33 Q=150m3/h
Set
1 Shijiazhuang
H=24m DC Drive
Motor N=30KW 380V 1
14 Vibrating Sieve Bend -Slime B=2400 Ф=0.40mm Set 1 MES Process
6
Motor N=0.75KW 380V 1
15
Draining Pump - Water
65ZJL Q=40m3/h
H=14m
Set
1 Shijiazhuang
Motor
Y132S--4 N=7.5KW
380V
1
16
Agitator - Flocculating
Agent
Φ1200 Set 1 MES Process
Motor N=5.5KW 380V Set 1
17 Flocculating Box 2000×1200×1000 Set 1 MES Process
18
Water Circulating Pump 100ZJ—A46 Q=150m3/h
Set
1 Shijiazhuang
H=30m
Motor
N=30KW 380V DC
Drive
1
19
High Efficient Inclined Tube
Thickener
Φ8m Steel Structure Set 1 MES Process
20
Feeding Pump - Filter Press 65ZJR-Ⅱ Q=56--169m3/h Set 1 Shijiazhuang
H=73--44m
Motor N=55KW 380V Set 1
21
Draining Pump - Water
65ZJL-SP Q=40m3/h
H=14m
Set 1 Shijiazhuang
Motor N=5.5KW 380V Set 1
22
Press Filter XMY120/1250 F=120m² Set 2 Hebei
Motor N=4KW 380V Set 2
23
Scraper Conveyer
B=600mm L=7.7m
α=3º
Set
2
MES Process
V=0.48m/s Q=10t/h
Motor N=5.5KW 2
24
Engineering & Others
All project related travel
will be paid by client, such
as air tickets between
DPRK and China, domestic
traffic cost in DPRK, meals
and hotel in DPRK, medical
treatment in DPRK
Steel Structure & Civil Job Client's Scope in DPRK
Fabricated Metallic structure Client's Scope in DPRK
Valves & Pipework
Power supply&Productive
control system
Design cost
Transport from Plants to China
Port
Port and Related Cost
Technical Services (On-site
only,Installation Guide &
Commissioning Guide)
Estimated Rate
Reference only
Will be charged by real working
days.
7
MES PROCESS layout -1
8
MES PROCESS layout -2
9
MES PROCESS layout -3
10
MES PROCESS layout -4
11
MES PROCESS layout -5
12
7. Covers
CPP industrial site area of approximately 1.11 hm2.
8. The total installed capacity
The total installed capacity of 280KW coal preparation equipment.
9. Water consumption per ton of coal
Water consumption per ton coal 0.1m3 / t.
13
Package 2 -Simplified Jigging Process Technology
Content
1. JXT6-three sets of segment type Coal processing equipment list......................................... 14
2. Investment estimate..................................................................................................... 18
3. Brief introduction ......................................................................................................... 18
4. Schematic diagram ....................................................................................................... 19
14
1. JXT6-three sets of segment type Coal processing equipment list
Sequence
No.
Set up Equipment Name
Call
Regulation Grid Power Quantity Brand Equipment Note
101 By coal hopper 3500 × 3000 1Item Fabricated Big mouth width: 3500mm *
3000mm, Plate
thickness6mm,Material GB capacity
Jigang
Stoker K-OReciprocating feeder 4 1Taiwan MES Pro Yield:100-170t / h,Material Jigang
GB capacity, long life, energy-saving
than traditional70%Greatly reduce
equipment wear.
Coal feeder device MetalSteel 1Set MES Pro Supporting
102 Coal belt feeding B = 650 L = 22Rice A = 17 ° 5.5 1Set MES Pro Q = 100T / h V = 1.6m / S
Electric drum N = 5.5KW 380V 1Set MES Pro Oil-cooled electric drum
Belt bracket MetalSteel 1Set Fabricated
Collection chute MetalSteel 1Set Fabricated 6mmGB steel production site
No. Name Call Regulation Grid PowerKW Quantity Place of
origin
Equipment Note
201 Coal feed a dilution tank ZG2030 Fabricated Plate thickness8mm, GB Jinan Iron
and Steel production, uniform
feeding
202
Multifunctional sieve jigger
measure air
Jig coal production conditions
in accordancewith
SC6M-3d-6SChoice6Room
16.5 1Taiwan MES Pro
The country of leading technology,
high processing accuracy. The main
raw material GB tablet
thickness10mm. Yield≤ 60T / h.
Bucket elevatorT2040,
15
T2035
Host steel bracket Metal Steel
1Set Fabricated
GB beams, channels, pipe, steel
assembly
Jig platform and ladder,
guardrail
Metal Steel 1Set Fabricated GB12 #Channel,
pedals4mmDiamond Plate, steel
angles, finished parts factory.
Gangue, coal chute 3Item Fabricated GB 8mm Plate
204 Low air bag Φ900 * 1100 1Set MES Pro And models supporting
Air hose 1Set MES Pro And models supporting
Roots blower R200 Q = 48m ³ P39.2Kpa 37 1Taiwan Zhangqiu Domestic famous brands, including
wind network muffler joints
205 Pump2SH-13ADouble-suction
centrifugal pump
Y360S-4 380V
Q = 260 ㎥/ H H = 18m
18.5 1 set Zibo Domestic professional
manufacturers Zibo pump chemical
pump capacity, good service,
reliable quality.
206 Curved dewatering screen B = 1150R1160 1 set MES Pro GB 8mm thick material, stainless
steel sieve, sieve slit 0.75mm,
adjustable
Curved screen bracket Metal Steel 1 set Fabricated 16 # channel,
207 Coal dewatering screen ZKB1748 straight 15 1 set MES Pro 16mm quality original flat steel,
Harbin Bearing, high-quality
stainless steel sieve, universal
rotating shaft.
208 Sieve dehydration tanks and
steel bracket
Metal Steel 1 set Fabricated Jinan Iron and Steel production
6mm GB plate, beams, channels
Sieve side platforms and
guardrails
Metal Steel 1 set Fabricated 120 channel and 4mm Diamond
Plate Production
16
Sieve sideladder,guardrail Metal Steel 1 set Fabricated 120 channel and 4mm Diamond
Plate Production
Sieve dehydration motor
bracket
Metal Steel 1 set Fabricated GB 16 # mm steel production Jigang,
GB 16 # channel,
Sieve dehydration coal chute Metal Steel 1 set Fabricated GB 6mm plate
End coal sievecoal chute Metal Steel 6 Fabricated GB 6mm plate
Dewatering screen lump chute Metal Steel 1 set Fabricated GB 6mm plate
209 Double lump Sieve ZE1230 4 1 set MES Pro
Sieve and chute bracket Metal Steel 1 set Fabricated
210 Lump coal belt B = 600 Q = 100T 8 2 sets MES Pro
Belt bracket Metal Steel 2 sets Fabricated
211 Effects of new pulverized coal
sieve
(Efficientenergy-saving)
ZY1040 9 6 units MES Pro
GB 6mm steel bracket for the
seamless penetration welding,
eccentric vibration, dewatering
vibrating motor assembly efficiency
higher than 40%, the absolute
energy efficient. Save floor space.
212 Coal belt 1 B = 600 Q = 100T 4 13 m MES Pro By GB production, oil-cooled electric
drum Boshan,
Belt bracket Metal Steel 1 set Fabricated Angle 8cm
213 Collectcoal belt2 B = 600 Q = 100T 4 15 m MES Pro By GB production, oil-cooled electric
drum Boshan,
Belt bracket Metal Steel 1 set Fabricated Angle 8cm
Coal block device 6 sets Fabricated Supporting
No. Name Specification Power Unit Brand Remarks
301 Efficient pyramidal
concentrator
Φ7 segment cone 8mm steel
straight section 8mm, outside
1 set MES Pro Deep cone efficiency, energy saving
and environmental protection, no
17
with reinforcingribs, power, advanced dual-energy
overflow tank design
Slime filter R250 5.5 1 set Hebei Hebei
Filter tank 1 set Fabricated Plate assembly
Filter feed pump P65-45-117m³ / h 45 1 set Henan Henan
Concentrator steel platform Metal Steel 1 set Fabricated GB steel, energy efficient
Concentrator steel inclined
ladder
Metal Steel 1 set Fabricated GB Laiwu Steel production, angle
iron, steel and other weldments
Concentrator steady flow
system
Metal Steel 1 set Fabricated GB Laiwu Steel production, channel
steel, steel weldments, etc.
Concentrator steel structure Metal Steel 2 sets Fabricated 160 I-beam, GB Laiwu Steel
production, angles, steel weldments,
etc.
Mixingdrum 1.5 2 Fabricated 4mm steel barrel, Harbin Bearing,
Submersible sewage pumps
installed pipelinevalves
1 set MES Pro 6-inch steel pipe, standard parts
Sewage pumps Y15S-4 380V
Q = 260 ㎥/ H H = 18m
18.5 1 set Zibo Domestic professional
manufacturers Zibo pump chemical
pump capacity, good service,
reliable quality.
501 Mounting Accessories 1 set Supporting
502 Split cabinet portfolio 1 set MES Pro Deli Western Electric, 30KW or more
motors equipped with self-dual
step-down start
Installation fee Site workers on-site installation
18
2. Investment estimate
Please noteice as below
1 This simplified jigging process system need one shovel car, client need to buy it. It’s not in our package;
2 This is a FOB EPs Price, engineering + equipment supply + technical services;
3 Currency, USD. We also accept the equivalent amount in Chinese Yuan (RMB);All Price basis on 1 USD = 6.15RMB
4 All needed business travelfrom China to Colombia, trafficin Colombia, meals, hotel and medical treatment in Colombia belong to client's scope;
5 Translator cost is estimated on 30 days job. If he/her works more than 30 days, the cost will be added basis on 149.93 USD/day.
Certainly, this job could be client's scope, and remove it from our cost. For your kind reference.
6 All training in China is for free.
3. Brief introduction
First, the area of Including raw materials needed venue 10000 (meters)
The total area of
installation
About 600 m2
A cement floor need to build 2 pool covers Tank capacity
500 m2 100 m2 400 m3
Second, the
production costs
24 hours 1400 t 3 class
guide (8 hours / day
480 tons)
Power Staff Water Consumption Forklift oil
Other
Maintenance
196KW / h Class 4
Japanese consume 30
cubic meters
150 l
This cost is based on local prices standard.
19
4. Schematic diagram
Third, the construction
period
30-52 days Manufacture of 30 days, 15 days of installation, commissioning of 7 days
20
Training Plan _ Coal Washing Plant
21
Stage
Place Training Purpose Requirements
Training
Methods
People shall join Time Cost
Before Delivery
Chengdu City
& Dazhou
In China
Basic skills and coal washing
knowledge, experiences
Indoor Training
Coal washing plants
Visiting
PPT & Handbook
Coal Washing
Plants
Washing Plant Managers
and Engineers
5 days
Free
Client pay own people’s travel
cost, hotel. Meals provide by
HOT.
Before Delivery
Chengdu,
In China
Basic knowledge of
processing equipment,
plants’ visiting
KeyEquipment Inspection
Indoor Training PPT
Washing Plant Managers
and Engineers
5 days
Free
Client pay own people’s travel
cost, hotel. Meals provide by
HOT.
Pre –
Commission
DKRP
Know how to operate and
control equipment
Indoor Training PPT, Vedio
Washing Plant Engineers,
key staff, technical
workers
7 days
Free
Client pay our people’s travel
cost, & hotel, meals, medical
care in DPRK.
Pre –
Commission
DPRK
Know how to operate
electrical equipment and
management
Indoor Training PPT
Washing Plant Engineers,
key staff, technical
workers
5 days
Free
Client pay our people’s travel
cost, & hotel, meals, medical
care in DPRK.
22
Training and
guide job for
Commissioning
On-Site
Know how to
commissioning
& guide for commissioning
Indoor Training
On-site training
Washing Plant Engineers,
key staff, technical
workers
5~30
days
If commissioning job finished
within 5 days, for free.
Client pay our people’s travel
cost, & hotel, meals, medical
care in DPRK.
If client needmore than5 days for commissioning job, our engineers andtranslator’s cost as below, we alsoaccept the equivalent amount in USDor RMB.
Total Engineer, 5 people (2 processengineers, 2 mechanicalengineers, 1 electricalengineer), 208.23 USD / Day foreach one, this will be chargedbyreal workingdays, andit
billedonce a week.
Translator, 1 people, 149.93 USD / Day, all this people can be provided by client, it’s alsoOK(Good at English, andChinese Mandarin).
Maintenance DPRK
Basic skills and experiences
of maintenance
PPT
Washing Plant Engineers,
key staff, technical
workers
5 days
Free
Client pay our people’s travel
cost, & hotel, meals, medical
care in DPRK.
After –
Commission
Chengdu
In China
Know how to manage coal
washing plant, how to
reduce operational cost,
experiences share
PPT
Seminar
Client Managers and
Engineers
5 days
Free
Client pay own people’s travel
cost, hotel. Meals provide by
HOT.
23
About HOT Mining
HOT Mining (Group Companies) provides integratedengineering solutions to coal and mineral.
Our services include underground mining, open cut mining, mineral processing and materials handling. We
provide engineering, equipment, project delivery and operations services for coal, iron ore, copper, gold, zinc,
silver and other base metals.
Innovation
HOT is leading in 3D engineering and intelligent operation in coal preparation, as well as cloud-computing based
intelligent operation system.
Our engineering capability has been recognized by mining giants. Our clients are Anglo Gold Ashanti, Worley
Pasons, China Shenhua, Caledon (Xstrata Coal – GRAM China),etc.
HOT has an already set up branch / Agents in India, Colombia (Agent), Australia (Branch) and Mongolia (Branch).
Underground Mining Open Cut Mining
Engineering /All Equipment Supply / Technical Services Engineering / Major Equipment Supply
Mineral Processing / Sands Washing Coal Washing (Coal Preparation Plant)
Engineering / Major Equipment Supply / Engineering /All Equipment Supply / Maintenance /
Technical Services / Operations Technical Services / Operations
Project Delivery: EPs only Project Delivery: EPC / EPCM / EPs / FEED / LSTK
24
About MES Process
Our sub-brand, MES Process (hereafter “MES”) focuses on small projects, both for mining and processing. Basis on
HOT Mining’s engineering capability; MES can delivery good quality projects with reasonable cost as well as fast
delivery. This can help our client to share more margins within short period.
MES is managed by one of our group companies, Chengdu HOT Mining Co.,Ltd.

More Related Content

What's hot

Calcinacion
CalcinacionCalcinacion
Calcinacion
Carolay Melgarejo
 
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...Khalid Nawaz
 
A review on stamped charging of coals
A review on stamped charging of coalsA review on stamped charging of coals
A review on stamped charging of coals
Jorge Madias
 
Cementformulae handbook v2
Cementformulae handbook v2Cementformulae handbook v2
Cementformulae handbook v2
cesar hernandez
 
Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016
Muhammad Rashid Usman
 
Best cement-handbook-final-pdf
Best cement-handbook-final-pdfBest cement-handbook-final-pdf
Best cement-handbook-final-pdf
mkpq pasha
 
Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Nofiar Rachman
 
TCTM Oil
TCTM OilTCTM Oil
TCTM Oil
Howard Rokofsky
 
The project of oil refinery
The project of oil refineryThe project of oil refinery
The project of oil refinerysergio014
 
Program Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhProgram Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, Sindh
Rana Ahtisham
 
Modular Gold Plant - Presentation by Resources Gold Technology
Modular Gold Plant - Presentation by Resources Gold TechnologyModular Gold Plant - Presentation by Resources Gold Technology
Modular Gold Plant - Presentation by Resources Gold Technology
stuartturner
 
About Oriental Nicco - EPC Service Providers
About Oriental Nicco - EPC Service ProvidersAbout Oriental Nicco - EPC Service Providers
About Oriental Nicco - EPC Service Providers
Jigar Patel
 
PRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLPRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLAnkit Devatwal
 
Oil Refinery
Oil Refinery Oil Refinery
Oil Refinery
kifayat shahani
 
Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10
Salah Tantawy
 
Steel mill services for integrated steelmakers
Steel mill services for integrated steelmakersSteel mill services for integrated steelmakers
Steel mill services for integrated steelmakers
Steve Baines
 
Technical Paper About Refinery Hydroprocessing Technology Selection.Pdf
Technical Paper About Refinery Hydroprocessing Technology Selection.PdfTechnical Paper About Refinery Hydroprocessing Technology Selection.Pdf
Technical Paper About Refinery Hydroprocessing Technology Selection.Pdf
Alpesh Gurjar
 

What's hot (20)

Calcinacion
CalcinacionCalcinacion
Calcinacion
 
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
Wauquier, j. p._-_petroleum_refining_i_crude_oil_-_petroleum_products_-_proce...
 
A review on stamped charging of coals
A review on stamped charging of coalsA review on stamped charging of coals
A review on stamped charging of coals
 
Cementformulae handbook v2
Cementformulae handbook v2Cementformulae handbook v2
Cementformulae handbook v2
 
Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016Petroleum Refinery Engineering-Part-2-30-July-2016
Petroleum Refinery Engineering-Part-2-30-July-2016
 
Best cement-handbook-final-pdf
Best cement-handbook-final-pdfBest cement-handbook-final-pdf
Best cement-handbook-final-pdf
 
Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0Presentasi oil-refinery-process-rev0
Presentasi oil-refinery-process-rev0
 
Petroleum Intro-Rev 4
Petroleum Intro-Rev 4Petroleum Intro-Rev 4
Petroleum Intro-Rev 4
 
TCTM Oil
TCTM OilTCTM Oil
TCTM Oil
 
The project of oil refinery
The project of oil refineryThe project of oil refinery
The project of oil refinery
 
Program Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhProgram Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, Sindh
 
Modular Gold Plant - Presentation by Resources Gold Technology
Modular Gold Plant - Presentation by Resources Gold TechnologyModular Gold Plant - Presentation by Resources Gold Technology
Modular Gold Plant - Presentation by Resources Gold Technology
 
Internship_13BCH0001
Internship_13BCH0001Internship_13BCH0001
Internship_13BCH0001
 
About Oriental Nicco - EPC Service Providers
About Oriental Nicco - EPC Service ProvidersAbout Oriental Nicco - EPC Service Providers
About Oriental Nicco - EPC Service Providers
 
Coal liquefaction
Coal liquefactionCoal liquefaction
Coal liquefaction
 
PRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPLPRESENTATION ON INPLANT TRAINING AT MRPL
PRESENTATION ON INPLANT TRAINING AT MRPL
 
Oil Refinery
Oil Refinery Oil Refinery
Oil Refinery
 
Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10Presentation 1-2-3-4-5-6-7-8-9-10
Presentation 1-2-3-4-5-6-7-8-9-10
 
Steel mill services for integrated steelmakers
Steel mill services for integrated steelmakersSteel mill services for integrated steelmakers
Steel mill services for integrated steelmakers
 
Technical Paper About Refinery Hydroprocessing Technology Selection.Pdf
Technical Paper About Refinery Hydroprocessing Technology Selection.PdfTechnical Paper About Refinery Hydroprocessing Technology Selection.Pdf
Technical Paper About Refinery Hydroprocessing Technology Selection.Pdf
 

Similar to 300000TPA-Coal Washing Plant-DPRK_HOT Mining20141125.rev

Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)
LMM GROUP CO., LTD.
 
78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project
Bruno Mileto Dias de Assunção
 
Application of Cyclonic separator in CBM field to eliminate coal fines
Application of Cyclonic separator in CBM field to eliminate coal finesApplication of Cyclonic separator in CBM field to eliminate coal fines
Application of Cyclonic separator in CBM field to eliminate coal finesDhaval Patel
 
Senior Process Design Capstone Final Report Part 1& 2
Senior Process Design Capstone Final Report Part 1& 2Senior Process Design Capstone Final Report Part 1& 2
Senior Process Design Capstone Final Report Part 1& 2
Jonah Spielman
 
Satyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfSatyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdf
BhawnaRighteous
 
AAC Block Plant Consultant
AAC Block Plant ConsultantAAC Block Plant Consultant
AAC Block Plant Consultant
gubbiseo
 
09.02.2012 Modern coking coal technology, Peter Long
09.02.2012 Modern coking coal technology, Peter Long09.02.2012 Modern coking coal technology, Peter Long
09.02.2012 Modern coking coal technology, Peter Long
The Business Council of Mongolia
 
Design And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineDesign And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineAlbin Cherian
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
Venkata Swamy
 
Sepl mixing plant presentation
Sepl mixing plant presentationSepl mixing plant presentation
Sepl mixing plant presentation
ramprasad89
 
INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT psTarab Wasi
 
Department Of Chemical
Department Of ChemicalDepartment Of Chemical
Department Of ChemicalSamuel Essien
 
InternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffffInternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffff
thewebseries17th
 
Sufg clean coal technologies report
Sufg clean coal technologies reportSufg clean coal technologies report
Sufg clean coal technologies reportDickdick Maulana
 
Slotted anodes project
Slotted anodes projectSlotted anodes project
Slotted anodes projectsrvrulz
 
STM Environment
STM EnvironmentSTM Environment
STM EnvironmentJoe Riley
 

Similar to 300000TPA-Coal Washing Plant-DPRK_HOT Mining20141125.rev (20)

Jonathan Mulosa ET'Al
Jonathan Mulosa ET'AlJonathan Mulosa ET'Al
Jonathan Mulosa ET'Al
 
Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)Coal preparation Plant(www.lmmgroupcn.com)
Coal preparation Plant(www.lmmgroupcn.com)
 
78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project78218645 hammer-mill-design-mini-project
78218645 hammer-mill-design-mini-project
 
Application of Cyclonic separator in CBM field to eliminate coal fines
Application of Cyclonic separator in CBM field to eliminate coal finesApplication of Cyclonic separator in CBM field to eliminate coal fines
Application of Cyclonic separator in CBM field to eliminate coal fines
 
Ch3
Ch3Ch3
Ch3
 
Senior Process Design Capstone Final Report Part 1& 2
Senior Process Design Capstone Final Report Part 1& 2Senior Process Design Capstone Final Report Part 1& 2
Senior Process Design Capstone Final Report Part 1& 2
 
Satyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdfSatyamurty_Coal_Beneficiation_21_8_07.pdf
Satyamurty_Coal_Beneficiation_21_8_07.pdf
 
AAC Block Plant Consultant
AAC Block Plant ConsultantAAC Block Plant Consultant
AAC Block Plant Consultant
 
09.02.2012 Modern coking coal technology, Peter Long
09.02.2012 Modern coking coal technology, Peter Long09.02.2012 Modern coking coal technology, Peter Long
09.02.2012 Modern coking coal technology, Peter Long
 
Design And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering MachineDesign And Fabrication Of Iron Ore Sintering Machine
Design And Fabrication Of Iron Ore Sintering Machine
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
 
Sepl mixing plant presentation
Sepl mixing plant presentationSepl mixing plant presentation
Sepl mixing plant presentation
 
INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT ps
 
Department Of Chemical
Department Of ChemicalDepartment Of Chemical
Department Of Chemical
 
InternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffffInternshipReport.pdf fffffffffffffffffffff
InternshipReport.pdf fffffffffffffffffffff
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Sufg clean coal technologies report
Sufg clean coal technologies reportSufg clean coal technologies report
Sufg clean coal technologies report
 
Slotted anodes project
Slotted anodes projectSlotted anodes project
Slotted anodes project
 
2
22
2
 
STM Environment
STM EnvironmentSTM Environment
STM Environment
 

300000TPA-Coal Washing Plant-DPRK_HOT Mining20141125.rev

  • 1. For DPRK 300,000 Ton Per Annum Coal Washing Plant EPs Proposal 2014.11.25 MES is a sub-brand of HOT Mining and focuses on small-middle size processing projects
  • 2. Content Technical Supports & Commitment for Colombia Clients................................................................................. 1 Package Comparison & Suggestion............................................................................................................... 4 Price comparing table................................................................................................................................. 5 Package 1-Tranditional Jigging Process Technology ......................................................................................... 7 Package 2-Simplified Jigging Process Technology.......................................................................................... 20 Training Plan _ Coal Washing Plant ............................................................................................................. 22 About HOT Mining ................................................................................................................................... 23 About MES Process .................................................................................................................................. 24
  • 3. 1 Technical Supports & Commitment for DPRK Project HOT Mining / MES Two Brands of Beijing HOT Mining Tech Co.,Ltd Reference only, details shall discuss later 1. Parts sourcing supports We would also provide supports for parts sourcing for clients. 2. Consignment Sales Cooperation (Spare Parts) If possible, we’d like to discuss the possibility of consignment sales cooperation for spare parts. This could help our client to reduce cash cost as well as parts cost. 3. Remote Technical Supports If possible and internet are available in DPRK? We’re not sure. Basis on agreement between client and our technical support team, we will provide a remote support intelligent system for site management purpose. Certainly, our technical team will also inspect the equipment’s status in China and will provide real time technical supports by internet. HOT Condition Monitoring (HCM) HCM is one major part of intelligent system that can monitor machine health at real time. By leveraging machine operating and health information, our technical team provides customer maintenance and repair suggestion timely, so as to prevent catastrophic failure, reduce owning and operating cost, maximize machine uptime. --- This is an additional system, just for optional.
  • 4. 2 Package Comparison & Suggestion The recommendedpackage - Package 1, Jigging Process Solution. Secondary optional package Package 2, Simple Jigging Processing Solution (‘SJPT’ Solution). Reasons & Comparisons as below [1] Capacity The required capacity is 300,000 tons per annual. If we choose DMS processing technology, we shall choose a very small dense medium cyclone. The smallest cyclone even can process about 450,000 tons raw coal per annual (much more expensive). And we have also looked the raw coal, most of them are a little big (25mm~50mm), so we cannot choose the smallest cyclone. For this capacity requirement, jigging process is best choice. [2] Clean Coal Yield Surely, the simple jigging processing technology cannot recovery all the clean coal from raw coal. This would have many loss of margin.
  • 5. 3 Price comparing table Key Process Technology Package# EP Project Cost USD (FOB Price) Capacity ton per annum Clean Coal Sales Income Clean Coal Yield Operational Cost, Basis on Feeding ROM Coal (Ton) HMC EPC CWC SPMC TJPT Package1 300,000 t/a Reasonable 0 280KWh ≤10L/t SJPT Package2 300,000 t/a Not acceptable, ≥4.5% loss 0 196KW/h ≈21.5L/t Note for Abbreviation Heavy Medium Consumption HMC Please note Clean coal sales income is just estimation, for reference only. Because we haven't coal washability report. Electrical Power Consumption EPC Clean Water Consumption CWC (3 Years)Spare Parts & Maintenance Consumption SPMC TJPT Tranditional Jigging Process Technology SJPT Simplified Jigging Process Technology Please Pay Attention: 1. The ROE shall be fixed by 6.1412 (1 USD = 6.1412CNY); Considering currency exchange rate would be changed, thus, we would adjust the price for each 90 days, it would be floating ±5%. 2. MES Process is a SUB brand of HOT Mining.
  • 6. [3] Operation Cost Jigging process is a little higher than DMS technology. And the water consumption is also bigger than DMS. [4] Clean Coal Recovery & Yield DMS is the best technology for maximum the clean coal recovery. Basis on our experiences, for same raw coal, if plant uses DMS technology, it would get additional 2%~ 3.5% clean coals more than jigging technology. Above all, because of capacity and project cost, we recommend the jigging technology for first choice.
  • 7. Package 1-Traditional Jigging Process Technology Content 1. Design basis ........................................................................................................................ 1 2. Design content .................................................................................................................... 1 3. Product solution .................................................................................................................. 1 4. Process Flow Introduction..................................................................................................... 2 5. Design features.................................................................................................................... 3 6. Equipment list and price ....................................................................................................... 4 7. Covers ................................................................................................................................ 7 8. The total installed capacity.................................................................................................. 12 9. Water consumption per ton of coal ...................................................................................... 12 Attachments
  • 8. 1 1. Design basis 1. 1, in accordance with the "coal washing engineering design specifications" (GB50359-2005) and other relevant provisions of the design. 2. 3, production capacity: annual design production capacity of processing 250,000 tons of coal, 32 tons of raw coal into the wash-hour. 3. 4, the working system: Work 330 days, 16 hours work day. 4. 5, coal and products with a car transport; coal used by coal by coal scuttle; product directly after the election stockpiling dry ground in the yard. 2. Design content 1. Coal Preparation Plant Design says:Coal by coal, washed coal belt into the bridge, crushing and screening, jigging, concentrate, coal filter press and other production facilities, as well as the corresponding production systems for power distribution, lighting and other facilities. 2. Slime-plant recycling, closed water circuit. 3. CPP clean water to the pond by the owner, the owner is responsible for the power lead to the main plant transformer. 4. After the slurry was concentrated by filter recycling alone stockpiling. 3. Product solution 1. 1 # 40 coal-30mm 2 # coal 30-8mm 3 # coal 0.5-8mm 2. Coal (return processing system) 3. gangue 4. Slime
  • 9. 2 4. Process Flow Introduction See attached flow chart. 1. coal preparation and coal by coal Coal preparation plant coal from the car shipped to the coal yard, through the subject under the coal hopper feeder conveyor fed with raw coal sizing screen (coal conveyor head with a magnetic separator to remove the iron mixed with coal), mesh of 40mm, the material on the sieve materials are mixed into the jig after washing and crushing to 40mm under the following screen. 2. coal sorting After screening the crushed coal belt to enter selected CNC Jig sub-elected coal, coal gangue and three products. After dewatering waste rock products by bucket elevator to dehydration in the field of coal and waste rock stockpiles. After coal products by bucket elevator dehydration dehydration to the coal pile storage, processing can also be returned to the system. Jig coal and coal overflow via a fixed sieve sieve dehydration dehydration grading into 40-30mm,30-8mm and 8-0.5mm three kinds of grain size. After these three products to reprint belt stockpiling coal field. 3. slime water system Coal Dewatering Sieve-0.5mmAfter the sieve into the slime pool water, pumped to a thickener concentrate, concentrate recovered by the end of the stream with a filter to the slurry scraper conveyor field stockpiling. Slime thickener overflow filter filtrate and pooling of recycled water for the whole plant production water. In addition, the plant accident outside the sedimentation tank, turn on the water to deal with the accident. Production systems run, run, drip, drain and clean the floor after the water into the drainage pond, pumped to jigger recycling.
  • 10. 3 5. Design features 1. using sophisticated air chamber under the screen CNC Jig sorting, sub-elect qualified and high-ash coal gangue, improve the quality of clean coal. Investment, low operating cost, simple operation, covering less. 2. the process is simple, a small number of production processes and equipment units, high efficiency, low consumption, coal sorting rate, to meet the needs of users. 3. the design is 250,000 tons / year coal preparation plant jigging with coal storage, coal by coal, screening crushing, jigging, concentration, pressure filtration, such as slime production processes to meet the requirements of sorting the various aspects . 4. the design uses high-precision CNC process parameters automatic control system, improve sorting accuracy jigging. 5. due to the filter press is intermittent work, in order to ensure continuity of production, the design of the filter is configured with two slime to form a closed loop, ie a filter discharge, then another filter are feeding, to ensure that production is not interrupted. 6. slime water system uses efficient inclined plate concentrator, which has a small footprint, large capacity, low operating costs, investment costs Province characteristics. No power equipment while the concentrator, there is no pressure equipment problem, trouble-free operation. 7. the design uses electronic belt right into the washing of coal, coal products for immediate and incremental measurement, and control room through the host PLC to achieve plant-wide networking of various parameters, technical indicators show the process of production, editing, printing function, so that the whole plant production technology management to achieve standardization and scientific. 8. equipment selection priority equipment advanced, reliable, mature technology of choice new, highly efficient, energy-saving electrical and mechanical equipment. 9. the design of local conditions set accident sedimentation tank, when equipment maintenance or failure, can be saved to an accident slime water pool, and afterwards
  • 11. 4 they can be returned to the factory slime water processing, recycling plant slime, washing closed loop to ensure that the environment from pollution and meet environmental requirements. 6. Equipment list and price
  • 12. 5 Item Equipment Specification Unit Qty Note 1 ROM Screen ZDM1225 Φ=40mm Set 1 MES Process Motor N=5.5KW 380V 2 Crusher 2PCM4050 Discharging<40mm Set 1 MES Process Motor N=15KW 380V 3 Vibrating Feeder DZ5 N=0.55KW 380V Set 1 MES Process 4 NC BatacJig SKT3.5 F=3.5m2 Set 1 MES Process Discharging Motor N=2.2KW 380V 2 Cycloidal Planetary Gear Speed Reducer 2 5 Air Compressor VF—3/7 Q=3m3 /min Set 1 From China P=0.7MPa Motor N=18.5KW 380V 1 6 Dewatering Bucket Elevator - For Rejects T2430 Q=20t/h t=240mm Set 1 MES Process B=300mm L=12.24m V=0.16m/s а=60o Motor N=3KW 380V 1 7 Dewatering Bucket Elevator - For Middlings T1228 Q=9t/h t=120mm Set 1 MES Process B=280mm L=12.24m V=0.16m/s а=60o Motor N=2.2KW 380V 1 8 Clean Coal Dewatering Screen ZJS1248 Φ=0.5mm Set 1 MES Process N=5.5KW 380V 2 9 Clean Coal Centrifuge TLL700 Set 1 MES Process Main Motor Y180L-6-V1 N=15KW 1 Oil Pump Motor Y801-4 N=0.55KW 1 Clean Coal Sizing Screen 2ZDM1236 Φ1=30mm Φ2=8mm Set 1 MES Process Motor N=5.5KW 380V 10 Fan L53 Q=33m3/min Set 1 From China P=0.039Mpa n=1240r·pm Motor N=30KW 380V 1 11 Silencer Two set for input and output Pic 2 Price Includedin Fan 12 Air Chamber φ=1600 V=4.5m³ Set 1 From China 13 Slurry Pump 100ZJ—33 Q=150m3/h Set 1 Shijiazhuang H=24m DC Drive Motor N=30KW 380V 1 14 Vibrating Sieve Bend -Slime B=2400 Ф=0.40mm Set 1 MES Process
  • 13. 6 Motor N=0.75KW 380V 1 15 Draining Pump - Water 65ZJL Q=40m3/h H=14m Set 1 Shijiazhuang Motor Y132S--4 N=7.5KW 380V 1 16 Agitator - Flocculating Agent Φ1200 Set 1 MES Process Motor N=5.5KW 380V Set 1 17 Flocculating Box 2000×1200×1000 Set 1 MES Process 18 Water Circulating Pump 100ZJ—A46 Q=150m3/h Set 1 Shijiazhuang H=30m Motor N=30KW 380V DC Drive 1 19 High Efficient Inclined Tube Thickener Φ8m Steel Structure Set 1 MES Process 20 Feeding Pump - Filter Press 65ZJR-Ⅱ Q=56--169m3/h Set 1 Shijiazhuang H=73--44m Motor N=55KW 380V Set 1 21 Draining Pump - Water 65ZJL-SP Q=40m3/h H=14m Set 1 Shijiazhuang Motor N=5.5KW 380V Set 1 22 Press Filter XMY120/1250 F=120m² Set 2 Hebei Motor N=4KW 380V Set 2 23 Scraper Conveyer B=600mm L=7.7m α=3º Set 2 MES Process V=0.48m/s Q=10t/h Motor N=5.5KW 2 24 Engineering & Others All project related travel will be paid by client, such as air tickets between DPRK and China, domestic traffic cost in DPRK, meals and hotel in DPRK, medical treatment in DPRK Steel Structure & Civil Job Client's Scope in DPRK Fabricated Metallic structure Client's Scope in DPRK Valves & Pipework Power supply&Productive control system Design cost Transport from Plants to China Port Port and Related Cost Technical Services (On-site only,Installation Guide & Commissioning Guide) Estimated Rate Reference only Will be charged by real working days.
  • 19. 12 7. Covers CPP industrial site area of approximately 1.11 hm2. 8. The total installed capacity The total installed capacity of 280KW coal preparation equipment. 9. Water consumption per ton of coal Water consumption per ton coal 0.1m3 / t.
  • 20. 13 Package 2 -Simplified Jigging Process Technology Content 1. JXT6-three sets of segment type Coal processing equipment list......................................... 14 2. Investment estimate..................................................................................................... 18 3. Brief introduction ......................................................................................................... 18 4. Schematic diagram ....................................................................................................... 19
  • 21. 14 1. JXT6-three sets of segment type Coal processing equipment list Sequence No. Set up Equipment Name Call Regulation Grid Power Quantity Brand Equipment Note 101 By coal hopper 3500 × 3000 1Item Fabricated Big mouth width: 3500mm * 3000mm, Plate thickness6mm,Material GB capacity Jigang Stoker K-OReciprocating feeder 4 1Taiwan MES Pro Yield:100-170t / h,Material Jigang GB capacity, long life, energy-saving than traditional70%Greatly reduce equipment wear. Coal feeder device MetalSteel 1Set MES Pro Supporting 102 Coal belt feeding B = 650 L = 22Rice A = 17 ° 5.5 1Set MES Pro Q = 100T / h V = 1.6m / S Electric drum N = 5.5KW 380V 1Set MES Pro Oil-cooled electric drum Belt bracket MetalSteel 1Set Fabricated Collection chute MetalSteel 1Set Fabricated 6mmGB steel production site No. Name Call Regulation Grid PowerKW Quantity Place of origin Equipment Note 201 Coal feed a dilution tank ZG2030 Fabricated Plate thickness8mm, GB Jinan Iron and Steel production, uniform feeding 202 Multifunctional sieve jigger measure air Jig coal production conditions in accordancewith SC6M-3d-6SChoice6Room 16.5 1Taiwan MES Pro The country of leading technology, high processing accuracy. The main raw material GB tablet thickness10mm. Yield≤ 60T / h. Bucket elevatorT2040,
  • 22. 15 T2035 Host steel bracket Metal Steel 1Set Fabricated GB beams, channels, pipe, steel assembly Jig platform and ladder, guardrail Metal Steel 1Set Fabricated GB12 #Channel, pedals4mmDiamond Plate, steel angles, finished parts factory. Gangue, coal chute 3Item Fabricated GB 8mm Plate 204 Low air bag Φ900 * 1100 1Set MES Pro And models supporting Air hose 1Set MES Pro And models supporting Roots blower R200 Q = 48m ³ P39.2Kpa 37 1Taiwan Zhangqiu Domestic famous brands, including wind network muffler joints 205 Pump2SH-13ADouble-suction centrifugal pump Y360S-4 380V Q = 260 ㎥/ H H = 18m 18.5 1 set Zibo Domestic professional manufacturers Zibo pump chemical pump capacity, good service, reliable quality. 206 Curved dewatering screen B = 1150R1160 1 set MES Pro GB 8mm thick material, stainless steel sieve, sieve slit 0.75mm, adjustable Curved screen bracket Metal Steel 1 set Fabricated 16 # channel, 207 Coal dewatering screen ZKB1748 straight 15 1 set MES Pro 16mm quality original flat steel, Harbin Bearing, high-quality stainless steel sieve, universal rotating shaft. 208 Sieve dehydration tanks and steel bracket Metal Steel 1 set Fabricated Jinan Iron and Steel production 6mm GB plate, beams, channels Sieve side platforms and guardrails Metal Steel 1 set Fabricated 120 channel and 4mm Diamond Plate Production
  • 23. 16 Sieve sideladder,guardrail Metal Steel 1 set Fabricated 120 channel and 4mm Diamond Plate Production Sieve dehydration motor bracket Metal Steel 1 set Fabricated GB 16 # mm steel production Jigang, GB 16 # channel, Sieve dehydration coal chute Metal Steel 1 set Fabricated GB 6mm plate End coal sievecoal chute Metal Steel 6 Fabricated GB 6mm plate Dewatering screen lump chute Metal Steel 1 set Fabricated GB 6mm plate 209 Double lump Sieve ZE1230 4 1 set MES Pro Sieve and chute bracket Metal Steel 1 set Fabricated 210 Lump coal belt B = 600 Q = 100T 8 2 sets MES Pro Belt bracket Metal Steel 2 sets Fabricated 211 Effects of new pulverized coal sieve (Efficientenergy-saving) ZY1040 9 6 units MES Pro GB 6mm steel bracket for the seamless penetration welding, eccentric vibration, dewatering vibrating motor assembly efficiency higher than 40%, the absolute energy efficient. Save floor space. 212 Coal belt 1 B = 600 Q = 100T 4 13 m MES Pro By GB production, oil-cooled electric drum Boshan, Belt bracket Metal Steel 1 set Fabricated Angle 8cm 213 Collectcoal belt2 B = 600 Q = 100T 4 15 m MES Pro By GB production, oil-cooled electric drum Boshan, Belt bracket Metal Steel 1 set Fabricated Angle 8cm Coal block device 6 sets Fabricated Supporting No. Name Specification Power Unit Brand Remarks 301 Efficient pyramidal concentrator Φ7 segment cone 8mm steel straight section 8mm, outside 1 set MES Pro Deep cone efficiency, energy saving and environmental protection, no
  • 24. 17 with reinforcingribs, power, advanced dual-energy overflow tank design Slime filter R250 5.5 1 set Hebei Hebei Filter tank 1 set Fabricated Plate assembly Filter feed pump P65-45-117m³ / h 45 1 set Henan Henan Concentrator steel platform Metal Steel 1 set Fabricated GB steel, energy efficient Concentrator steel inclined ladder Metal Steel 1 set Fabricated GB Laiwu Steel production, angle iron, steel and other weldments Concentrator steady flow system Metal Steel 1 set Fabricated GB Laiwu Steel production, channel steel, steel weldments, etc. Concentrator steel structure Metal Steel 2 sets Fabricated 160 I-beam, GB Laiwu Steel production, angles, steel weldments, etc. Mixingdrum 1.5 2 Fabricated 4mm steel barrel, Harbin Bearing, Submersible sewage pumps installed pipelinevalves 1 set MES Pro 6-inch steel pipe, standard parts Sewage pumps Y15S-4 380V Q = 260 ㎥/ H H = 18m 18.5 1 set Zibo Domestic professional manufacturers Zibo pump chemical pump capacity, good service, reliable quality. 501 Mounting Accessories 1 set Supporting 502 Split cabinet portfolio 1 set MES Pro Deli Western Electric, 30KW or more motors equipped with self-dual step-down start Installation fee Site workers on-site installation
  • 25. 18 2. Investment estimate Please noteice as below 1 This simplified jigging process system need one shovel car, client need to buy it. It’s not in our package; 2 This is a FOB EPs Price, engineering + equipment supply + technical services; 3 Currency, USD. We also accept the equivalent amount in Chinese Yuan (RMB);All Price basis on 1 USD = 6.15RMB 4 All needed business travelfrom China to Colombia, trafficin Colombia, meals, hotel and medical treatment in Colombia belong to client's scope; 5 Translator cost is estimated on 30 days job. If he/her works more than 30 days, the cost will be added basis on 149.93 USD/day. Certainly, this job could be client's scope, and remove it from our cost. For your kind reference. 6 All training in China is for free. 3. Brief introduction First, the area of Including raw materials needed venue 10000 (meters) The total area of installation About 600 m2 A cement floor need to build 2 pool covers Tank capacity 500 m2 100 m2 400 m3 Second, the production costs 24 hours 1400 t 3 class guide (8 hours / day 480 tons) Power Staff Water Consumption Forklift oil Other Maintenance 196KW / h Class 4 Japanese consume 30 cubic meters 150 l This cost is based on local prices standard.
  • 26. 19 4. Schematic diagram Third, the construction period 30-52 days Manufacture of 30 days, 15 days of installation, commissioning of 7 days
  • 27. 20 Training Plan _ Coal Washing Plant
  • 28. 21 Stage Place Training Purpose Requirements Training Methods People shall join Time Cost Before Delivery Chengdu City & Dazhou In China Basic skills and coal washing knowledge, experiences Indoor Training Coal washing plants Visiting PPT & Handbook Coal Washing Plants Washing Plant Managers and Engineers 5 days Free Client pay own people’s travel cost, hotel. Meals provide by HOT. Before Delivery Chengdu, In China Basic knowledge of processing equipment, plants’ visiting KeyEquipment Inspection Indoor Training PPT Washing Plant Managers and Engineers 5 days Free Client pay own people’s travel cost, hotel. Meals provide by HOT. Pre – Commission DKRP Know how to operate and control equipment Indoor Training PPT, Vedio Washing Plant Engineers, key staff, technical workers 7 days Free Client pay our people’s travel cost, & hotel, meals, medical care in DPRK. Pre – Commission DPRK Know how to operate electrical equipment and management Indoor Training PPT Washing Plant Engineers, key staff, technical workers 5 days Free Client pay our people’s travel cost, & hotel, meals, medical care in DPRK.
  • 29. 22 Training and guide job for Commissioning On-Site Know how to commissioning & guide for commissioning Indoor Training On-site training Washing Plant Engineers, key staff, technical workers 5~30 days If commissioning job finished within 5 days, for free. Client pay our people’s travel cost, & hotel, meals, medical care in DPRK. If client needmore than5 days for commissioning job, our engineers andtranslator’s cost as below, we alsoaccept the equivalent amount in USDor RMB. Total Engineer, 5 people (2 processengineers, 2 mechanicalengineers, 1 electricalengineer), 208.23 USD / Day foreach one, this will be chargedbyreal workingdays, andit billedonce a week. Translator, 1 people, 149.93 USD / Day, all this people can be provided by client, it’s alsoOK(Good at English, andChinese Mandarin). Maintenance DPRK Basic skills and experiences of maintenance PPT Washing Plant Engineers, key staff, technical workers 5 days Free Client pay our people’s travel cost, & hotel, meals, medical care in DPRK. After – Commission Chengdu In China Know how to manage coal washing plant, how to reduce operational cost, experiences share PPT Seminar Client Managers and Engineers 5 days Free Client pay own people’s travel cost, hotel. Meals provide by HOT.
  • 30. 23 About HOT Mining HOT Mining (Group Companies) provides integratedengineering solutions to coal and mineral. Our services include underground mining, open cut mining, mineral processing and materials handling. We provide engineering, equipment, project delivery and operations services for coal, iron ore, copper, gold, zinc, silver and other base metals. Innovation HOT is leading in 3D engineering and intelligent operation in coal preparation, as well as cloud-computing based intelligent operation system. Our engineering capability has been recognized by mining giants. Our clients are Anglo Gold Ashanti, Worley Pasons, China Shenhua, Caledon (Xstrata Coal – GRAM China),etc. HOT has an already set up branch / Agents in India, Colombia (Agent), Australia (Branch) and Mongolia (Branch). Underground Mining Open Cut Mining Engineering /All Equipment Supply / Technical Services Engineering / Major Equipment Supply Mineral Processing / Sands Washing Coal Washing (Coal Preparation Plant) Engineering / Major Equipment Supply / Engineering /All Equipment Supply / Maintenance / Technical Services / Operations Technical Services / Operations Project Delivery: EPs only Project Delivery: EPC / EPCM / EPs / FEED / LSTK
  • 31. 24 About MES Process Our sub-brand, MES Process (hereafter “MES”) focuses on small projects, both for mining and processing. Basis on HOT Mining’s engineering capability; MES can delivery good quality projects with reasonable cost as well as fast delivery. This can help our client to share more margins within short period. MES is managed by one of our group companies, Chengdu HOT Mining Co.,Ltd.