SlideShare a Scribd company logo
LNG & LPG TERMINALS
40 YEARS EXPERIENCE IN EPC CONTRACTS
FOR LNG & LPG PROJECTS
NG N NG:
Our engineering division participates in the development of all major engineering projects, from defining initial specifications
to final commissioning. Throughout the design process, we analyse each decision and its impact on every aspect of the project.
P O N :
We proactively manage supplies and logistics as a key factor to meet the project’s schedule. Our extensive international experience
enables us to operate in very challenging environments, such as remote locations and extreme climates.
ON ON:
We provide in-house world-class project management teams, committed to provide a safe working environment while meeting
the client’s expectations. Focusing on our values, we implement win-win partnerships with local companies and communities.
Our dedicated division within VINCI Construction Grands Projets efficiently coordinates
the resources of the VINCI group in one project team to satisfy Oil & Gas companies’ needs.
Thanks to our multidisciplinary skills and technical expertise, we are the partner you need
to secure the delivery of your EPC projects.
MARINE WORKS
LNG & LPG TANKS
SITE PREPARATION
OUR CORPORATE SOCIAL
RESPONSIBILITY
& SUSTAINABLE
DEVELOPMENT POLICY
Since 2012, Skill up has operated as
a mobile training school for workers
around the world. Project managers
identify tasks on which local workers need
to be trained (knowledge and skills), in order
to achieve our quality and safety criteria.
• 697 workers attended Skill up training
(on site).
• 12 Skill up trainers.
The Safety First policy applies to
everyone within the organization, at
every level, to ensure that worksites remain
safe and that each and every person’s
well-being is respected.
Safety is also a source of progress, as it
fosters work quality and contributes to our
know-how, experience and competence.
VINCI signed on with the principles
of the Global Compact in April 2003
(a UN initiative).
The company is committed to respecting
the 10 principles of the Global Compact,
in the areas of human and labor rights,
environmental protection, and
anti-corruption e orts.
VINCI is committed to protecting
the environment at its worksites through
the protection of natural sites, plants and
wildlife on all its worksites, active pollution
prevention, improvement to the comfort
level of neighboring populations, better
communication with stakeholders,
and more.
VINCI Construction Grands Projets is certified:
Costa Azul (Mexico)
as La an (Qatar)
Yamal (North Siberia, Russia)
Skikda (Algeria)
Wheatstone Project (Western Australia)
OUR IN-HOUSE ENGINEERING CREATES
A RELIABLE AND OPTIMIZED SOLUTION
ADAPTED TO VARIOUS AND DIFFICULT PROJECT CONDITIONS
• Design adapted to all international technical standards.
• Solutions for high seismic activity such as base isolation and anti-liquefaction soil
treatment.
• Foundation solutions for any type of soil conditions, with experience of both deep
and shallow systems.
• Construction methodologies adapted to the project’s constraints, with experience
of modularization to reduce the schedule, warm weather concreting in the desert
(beyond +40°C), self-climbing formwork for a hurricane-sensitive area with scarce labor,
sliding formwork and cold weather concreting in arctic conditions (down to -45°C).
For each project, our internal design office conducts basic and detailed design for LNG & LPG
tanks and marine works. We have capitalized an exceptional know-how from FEED to execution,
which enables us to perform an efficient construction-oriented design.
Wall slip-forming in arctic “summer”Innovative pile design in the permafrost Self-climbing formwork in remote warm region
• Structural engineering: linear, non-linear and dynamic analyses.
• Geotechnical engineering: soil survey definition and interpretation, conceptual
and detailed design for foundations, earthworks, soil improvement, hydrogeology, etc.
• Concrete: project requirements, supplier specifications, material selection, batching plant
definition, mix design, testing, production monitoring, training.
Using dedicated software such as: RM 2006, CESAR-LCPC, RGB/ICW, GP 3D, PLAXIS,
SOFISTIK, HERCULE, LS DYNA, ANSYS, RIDO, TALREN, EFFEL.
Our main fields of expertise:
Thermal analysis in a LNG spillage case
Concrete
temperature in °C:
-168
-147
-125
-104
-82
-61
-39
-18
3
25
Safety is driving the design and construction methodology
from the beginning of the engineering phase
3D modelization with "Pendulum"
foundation system
VINCI Construction Grands Projets
LNG Department
5, cours Ferdinand-de-Lesseps - 92851 Rueil-Malmaison Cedex, France
Phone: (+33) 1 47 16 38 44
E-mail: lng@vinci-construction.com
Designandrealization:PJC,2015.Photocredits:VINCIConstructionGrandsProjetsandChevronphotolibraries.
www.vinci-construction-projects.com
WORLDWIDE PRESENCE OF VINCI CONSTRUCTION GRANDS PROJETS
AND REFERENCES IN THE LNG & LPG SECTOR
In Europe
Rotterdam (The Netherlands, 2007-2011)*
Brindisi (Italy, 2005-2008)*
Huelva 2 (Spain, 1990-1991)*
Montoir de Bretagne (France, 1981-1983)*
Terneuzen (The Netherlands, 1980-1982)*
Fos-sur-Mer (France, 1976-1978)*
Around the world
Yamal (Russia, from 2013)
Wheatstone (Australia, from 2012)
Skikda (Algeria, 2008-2012)*
Costa Azul (Mexico, 2005-2007)*
Ras Laffan (Qatar, 2004-2007)*
Idku (Egypt, 2002-2005)*
Bonny Island (Nigeria, 1996-1999)*
Ras Laffan (Qatar, 1995-2000)*
Das Island (United Arab Emirates, 1982-1986)*
Ruwais (United Arab Emirates, 1979-1981)*
Our projects underway & presence (subsidiaries)
LNG & LPG sector: projects
underway & references*

More Related Content

What's hot

Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelPaul Snyder
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soq
dignagni
 
DMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure BrochureDMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure Brochure
DMT GROUP
 
CV Ferguson 11-Jun-15 SAL
CV Ferguson 11-Jun-15 SALCV Ferguson 11-Jun-15 SAL
CV Ferguson 11-Jun-15 SALGavin Ferguson
 
Subsurface Utility Engineering
Subsurface Utility EngineeringSubsurface Utility Engineering
Subsurface Utility EngineeringT-Rex Services
 
NauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsNauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsAga Manhao
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT BrochureAga Manhao
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisorshaikh haroon
 
Dubai Resume_Subin.T.M
Dubai Resume_Subin.T.MDubai Resume_Subin.T.M
Dubai Resume_Subin.T.MSUBIN T M
 
Project Portfoilio
Project PortfoilioProject Portfoilio
Project PortfoilioNavu Memafu
 
Boucher Andrew Cv 2010 Linked In 2
Boucher Andrew Cv 2010   Linked In 2Boucher Andrew Cv 2010   Linked In 2
Boucher Andrew Cv 2010 Linked In 2Andrew_Boucher
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae limFilemon Lim
 
cv1.docx short
cv1.docx shortcv1.docx short
cv1.docx shortnoel sison
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_enDenis Cremin
 
Jonathan Betts CV 2015
Jonathan Betts CV 2015Jonathan Betts CV 2015
Jonathan Betts CV 2015Jonathan Betts
 

What's hot (20)

Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
 
Nuprecon Soq
Nuprecon SoqNuprecon Soq
Nuprecon Soq
 
DMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure BrochureDMT Civil Engineering & Infrastructure Brochure
DMT Civil Engineering & Infrastructure Brochure
 
CV Ferguson 11-Jun-15 SAL
CV Ferguson 11-Jun-15 SALCV Ferguson 11-Jun-15 SAL
CV Ferguson 11-Jun-15 SAL
 
Subsurface Utility Engineering
Subsurface Utility EngineeringSubsurface Utility Engineering
Subsurface Utility Engineering
 
NauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsNauticAWT Subsurface & Wells
NauticAWT Subsurface & Wells
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
 
JVB_Resume_2016-7-6
JVB_Resume_2016-7-6JVB_Resume_2016-7-6
JVB_Resume_2016-7-6
 
cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
hudgensresume0915
hudgensresume0915hudgensresume0915
hudgensresume0915
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Dubai Resume_Subin.T.M
Dubai Resume_Subin.T.MDubai Resume_Subin.T.M
Dubai Resume_Subin.T.M
 
Project Portfoilio
Project PortfoilioProject Portfoilio
Project Portfoilio
 
Boucher Andrew Cv 2010 Linked In 2
Boucher Andrew Cv 2010   Linked In 2Boucher Andrew Cv 2010   Linked In 2
Boucher Andrew Cv 2010 Linked In 2
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
cv1.docx short
cv1.docx shortcv1.docx short
cv1.docx short
 
brochure-oil-gas_en
brochure-oil-gas_enbrochure-oil-gas_en
brochure-oil-gas_en
 
joy S resume
joy S resumejoy S resume
joy S resume
 
cv1
cv1cv1
cv1
 
Jonathan Betts CV 2015
Jonathan Betts CV 2015Jonathan Betts CV 2015
Jonathan Betts CV 2015
 

Similar to 3 LNG & LPG terminals_VINCI Construction Grands Projets_2015

Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure
structerreci
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
FairFASST
 
Rafatahmed resume 2013
Rafatahmed resume 2013Rafatahmed resume 2013
Rafatahmed resume 2013Rafat Ahmed
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
siavashn
 
Socotec Company Profile VN - 2022.pdf
Socotec Company Profile VN - 2022.pdfSocotec Company Profile VN - 2022.pdf
Socotec Company Profile VN - 2022.pdf
Berlin Love Vietnam
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
ContourMC
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowresAustin Antony
 
Arup in Spain
Arup in SpainArup in Spain
Arup in Spain
marinamiceli
 
Arup in Spain
Arup in SpainArup in Spain
Arup in Spain
marinamiceli
 
Zinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate BrochureZinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate Brochure
Zinfra Group
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_VishakVishak Nambiar
 
Braun Intertec Company Overview
Braun Intertec Company OverviewBraun Intertec Company Overview
Braun Intertec Company OverviewKarl Burkum
 
Vinaconex EC profile
Vinaconex EC profileVinaconex EC profile
Vinaconex EC profile
Tru Cong
 
Uretek uk brochure_2016
Uretek uk brochure_2016Uretek uk brochure_2016
Uretek uk brochure_2016
Uretek.co.uk
 
Hydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_HighresHydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_HighresMatthew Hopkins
 
1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_BrochureHieu Phan Trung
 
RINA@WORK 3/2015
RINA@WORK 3/2015RINA@WORK 3/2015
RINA@WORK 3/2015
RINA GROUP
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileShamima Mulla
 

Similar to 3 LNG & LPG terminals_VINCI Construction Grands Projets_2015 (20)

Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure
 
Proven project management.docx
Proven project management.docxProven project management.docx
Proven project management.docx
 
Rafatahmed resume 2013
Rafatahmed resume 2013Rafatahmed resume 2013
Rafatahmed resume 2013
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Socotec Company Profile VN - 2022.pdf
Socotec Company Profile VN - 2022.pdfSocotec Company Profile VN - 2022.pdf
Socotec Company Profile VN - 2022.pdf
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Arup in Spain
Arup in SpainArup in Spain
Arup in Spain
 
Arup in Spain
Arup in SpainArup in Spain
Arup in Spain
 
Zinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate BrochureZinfra Group Australia: Corporate Brochure
Zinfra Group Australia: Corporate Brochure
 
Internship Report_Vishak
Internship Report_VishakInternship Report_Vishak
Internship Report_Vishak
 
Braun Intertec Company Overview
Braun Intertec Company OverviewBraun Intertec Company Overview
Braun Intertec Company Overview
 
Vinaconex EC profile
Vinaconex EC profileVinaconex EC profile
Vinaconex EC profile
 
Uretek uk brochure_2016
Uretek uk brochure_2016Uretek uk brochure_2016
Uretek uk brochure_2016
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Hydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_HighresHydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_Highres
 
CV
CVCV
CV
 
1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure1-Wind Energy RHDHV_Brochure
1-Wind Energy RHDHV_Brochure
 
RINA@WORK 3/2015
RINA@WORK 3/2015RINA@WORK 3/2015
RINA@WORK 3/2015
 
Zindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company ProfileZindzi Mining & Engineering Company Profile
Zindzi Mining & Engineering Company Profile
 

3 LNG & LPG terminals_VINCI Construction Grands Projets_2015

  • 1. LNG & LPG TERMINALS
  • 2. 40 YEARS EXPERIENCE IN EPC CONTRACTS FOR LNG & LPG PROJECTS NG N NG: Our engineering division participates in the development of all major engineering projects, from defining initial specifications to final commissioning. Throughout the design process, we analyse each decision and its impact on every aspect of the project. P O N : We proactively manage supplies and logistics as a key factor to meet the project’s schedule. Our extensive international experience enables us to operate in very challenging environments, such as remote locations and extreme climates. ON ON: We provide in-house world-class project management teams, committed to provide a safe working environment while meeting the client’s expectations. Focusing on our values, we implement win-win partnerships with local companies and communities. Our dedicated division within VINCI Construction Grands Projets efficiently coordinates the resources of the VINCI group in one project team to satisfy Oil & Gas companies’ needs. Thanks to our multidisciplinary skills and technical expertise, we are the partner you need to secure the delivery of your EPC projects. MARINE WORKS LNG & LPG TANKS SITE PREPARATION
  • 3. OUR CORPORATE SOCIAL RESPONSIBILITY & SUSTAINABLE DEVELOPMENT POLICY Since 2012, Skill up has operated as a mobile training school for workers around the world. Project managers identify tasks on which local workers need to be trained (knowledge and skills), in order to achieve our quality and safety criteria. • 697 workers attended Skill up training (on site). • 12 Skill up trainers. The Safety First policy applies to everyone within the organization, at every level, to ensure that worksites remain safe and that each and every person’s well-being is respected. Safety is also a source of progress, as it fosters work quality and contributes to our know-how, experience and competence. VINCI signed on with the principles of the Global Compact in April 2003 (a UN initiative). The company is committed to respecting the 10 principles of the Global Compact, in the areas of human and labor rights, environmental protection, and anti-corruption e orts. VINCI is committed to protecting the environment at its worksites through the protection of natural sites, plants and wildlife on all its worksites, active pollution prevention, improvement to the comfort level of neighboring populations, better communication with stakeholders, and more. VINCI Construction Grands Projets is certified: Costa Azul (Mexico) as La an (Qatar) Yamal (North Siberia, Russia) Skikda (Algeria) Wheatstone Project (Western Australia)
  • 4. OUR IN-HOUSE ENGINEERING CREATES A RELIABLE AND OPTIMIZED SOLUTION ADAPTED TO VARIOUS AND DIFFICULT PROJECT CONDITIONS • Design adapted to all international technical standards. • Solutions for high seismic activity such as base isolation and anti-liquefaction soil treatment. • Foundation solutions for any type of soil conditions, with experience of both deep and shallow systems. • Construction methodologies adapted to the project’s constraints, with experience of modularization to reduce the schedule, warm weather concreting in the desert (beyond +40°C), self-climbing formwork for a hurricane-sensitive area with scarce labor, sliding formwork and cold weather concreting in arctic conditions (down to -45°C). For each project, our internal design office conducts basic and detailed design for LNG & LPG tanks and marine works. We have capitalized an exceptional know-how from FEED to execution, which enables us to perform an efficient construction-oriented design. Wall slip-forming in arctic “summer”Innovative pile design in the permafrost Self-climbing formwork in remote warm region • Structural engineering: linear, non-linear and dynamic analyses. • Geotechnical engineering: soil survey definition and interpretation, conceptual and detailed design for foundations, earthworks, soil improvement, hydrogeology, etc. • Concrete: project requirements, supplier specifications, material selection, batching plant definition, mix design, testing, production monitoring, training. Using dedicated software such as: RM 2006, CESAR-LCPC, RGB/ICW, GP 3D, PLAXIS, SOFISTIK, HERCULE, LS DYNA, ANSYS, RIDO, TALREN, EFFEL. Our main fields of expertise: Thermal analysis in a LNG spillage case Concrete temperature in °C: -168 -147 -125 -104 -82 -61 -39 -18 3 25 Safety is driving the design and construction methodology from the beginning of the engineering phase 3D modelization with "Pendulum" foundation system
  • 5. VINCI Construction Grands Projets LNG Department 5, cours Ferdinand-de-Lesseps - 92851 Rueil-Malmaison Cedex, France Phone: (+33) 1 47 16 38 44 E-mail: lng@vinci-construction.com Designandrealization:PJC,2015.Photocredits:VINCIConstructionGrandsProjetsandChevronphotolibraries. www.vinci-construction-projects.com WORLDWIDE PRESENCE OF VINCI CONSTRUCTION GRANDS PROJETS AND REFERENCES IN THE LNG & LPG SECTOR In Europe Rotterdam (The Netherlands, 2007-2011)* Brindisi (Italy, 2005-2008)* Huelva 2 (Spain, 1990-1991)* Montoir de Bretagne (France, 1981-1983)* Terneuzen (The Netherlands, 1980-1982)* Fos-sur-Mer (France, 1976-1978)* Around the world Yamal (Russia, from 2013) Wheatstone (Australia, from 2012) Skikda (Algeria, 2008-2012)* Costa Azul (Mexico, 2005-2007)* Ras Laffan (Qatar, 2004-2007)* Idku (Egypt, 2002-2005)* Bonny Island (Nigeria, 1996-1999)* Ras Laffan (Qatar, 1995-2000)* Das Island (United Arab Emirates, 1982-1986)* Ruwais (United Arab Emirates, 1979-1981)* Our projects underway & presence (subsidiaries) LNG & LPG sector: projects underway & references*