2 Planning & Research
 nd

    Presentation
Soundtrack Research
 A soundtrack can be recorded music which then accompanies or is
  synchronised with the suitable images of a piece of action, a TV programme or
  even a video game. It can also include a commercially released soundtrack
  album of music, featuring the soundtrack of a film or TV show; or the physical
  area of a film that contains the harmonised recorded sound.
 Saba and I decided that throughout the trailer we wanted to have a mixture of
  diegetic and non diegetic as we want to have some of the characters talking as
  well as having non diegetic sound which will hopefully be music that creates
  suspense and a thrilling sound as this can relate to the husband’s chase
  against time to save his wife.
 From looking at freemusicplay.com, I thought that is was very useful and easy
  and simple to find what type of music genre and the subgenres because for
  example there was the ‘Style’ of music as well as the ‘Feel’ of the track as I
  thought that the feel of suspense/terror would fit with the genre of our trailer
  the most.
http://soundcloud.com/tags/Suspenseful
 From looking at Soundcloud.com, I found two demos of songs called “Jupiter
System” and “This is the End” both these songs were effective because they added
suspense and the “thrill” side of our trailer and also fits in with the storyline and
the genre.
 However, Saba and I will need to research more into this because there might be
other styles of music we can try as we want the music to perfectly fit with our
trailer as we want the music to highlight the scary part of the film as well as the
thrilling part of the film as the husband will be racing against time and so this
would hopefully be perfect for our horror/thriller film trailer. I also like the idea of
using diegetic sound in the trailer because the audience will be able to understand
the film and the storyline and it can also give the audience the chance to see how
the characters are and how they act.
Vox Pop Research…
1. Do you enjoy watching Horror-Thrillers?
2. What thrills you the most about Horror-Thrillers?
3. How often do you watch Horror-Thrillers?
4. What particular element do you like about Horror-Thrillers?
5. Are you drawn more towards Horror’s or Thrillers?
6. What makes Horror-Thrillers appeal to you the most?
7. Do you find that the Mise-en-scene in a Horror-Thriller is important?
8. What do you like the most about the Horror-Thriller genre? (Hero/Villain)
9. Do you like a film that shows symbolism and iconography?
10. Do you like answers being revealed in a Horror-Thriller trailer, or do you believe that it gives too much
    away?
11. Do you like trailers that build up suspense and leave you on a cliff-hanger? Or do you think that it is
    more interesting and intriguing to be left not knowing so that you can go and watch the movie?
12. In the opening of a Horror-Thriller, how much of the plot do you think should be revealed?
13. Should the film have its story unfolded quickly, slowly or not at all
14. Do you think the name “Hostage” for a film is effective or too cliché?
15. Out of the following, which is the scariest?
     1. The Woman in Black
     2. Hostel
     3. Fright Night
     4. 7500
     5. Hostage
BBFC Research
 The British Board of Film Classification (BBFC), originally British Board of Film
  Censors, is a non-governmental organisation, funded by the film industry and
  responsible for the national classification and censorship of films within the United
  Kingdom. It has a statutory requirement to classify videos, DVDs and some video
  games under the Video Recordings Act 2010.

                                          The BBFC continues to be sensitive to the
                                         public’s views about strong language. The Board
                                         no longer relies upon a list of swear words
                                         simply rated by offence, but instead takes into
                                         account the strength, context and tone of the
                                         words used.

                                          The Board takes care to ensure that language
                                         does not exceed audience expectations at any
                                         category. More offensive terms are removed
                                         from junior categories, while the strongest
                                         sexual expletives are restricted to the upper
                                         categories and, where used aggressively, to ‘18’.
Our Certificate Rating…
       Saba and I decided that we want the certificate of
       our film to be a 15. This was because we wanted to
       have emphasis on the horror side of our film also as
       our genre is a horror/thriller we then decided that
       we don’t want the film to be too frightening as this
       would not fit with our target audience as we want
       our target audience to be able to watch the film and
       trailer. As our target audience is aimed at male and
       females aged 17-30 this then shows that a 15
       certificate will be more suitable because we will
       want to use the conventions of a certificate 15
       because the film will have swearing and violence in
       but not to the extent where only over 18s can watch
       it.
Project Plan:
•Monday 12th November – Clarification of shots, location and props

•Friday 16th November – 5.00pm shoot scenes with husband in Duke Street
and shoot around that area

•Friday 23rd November – 5.00pm shoot scenes with wife and killer in
library

•Friday 30th November – Shoot any additional shots that are missing

•Friday 7th December – Edit

•Friday 14th December – Edit
Location Shots
 During the half term, I decided that I should take on the responsibility of
  taking pictures of one of our location shots as this was near where I live so I
  thought it would be easier for me to do this instead of Saba.

•   Location Shot 1: Husband outside hotel on phone with wife
•   Location Shot 2: Husband running through streets to get to wife
•   Location Shot 3: Main site Library in basement
•   Photos of Killer
•   Photos of Husband
•   Photos of Wife
•   Photo of Clock and wedding ring (Props)
2nd Planning & Research Presentation
2nd Planning & Research Presentation
2nd Planning & Research Presentation

2nd Planning & Research Presentation

  • 1.
    2 Planning &Research nd Presentation
  • 2.
    Soundtrack Research  Asoundtrack can be recorded music which then accompanies or is synchronised with the suitable images of a piece of action, a TV programme or even a video game. It can also include a commercially released soundtrack album of music, featuring the soundtrack of a film or TV show; or the physical area of a film that contains the harmonised recorded sound.  Saba and I decided that throughout the trailer we wanted to have a mixture of diegetic and non diegetic as we want to have some of the characters talking as well as having non diegetic sound which will hopefully be music that creates suspense and a thrilling sound as this can relate to the husband’s chase against time to save his wife.  From looking at freemusicplay.com, I thought that is was very useful and easy and simple to find what type of music genre and the subgenres because for example there was the ‘Style’ of music as well as the ‘Feel’ of the track as I thought that the feel of suspense/terror would fit with the genre of our trailer the most.
  • 3.
    http://soundcloud.com/tags/Suspenseful  From lookingat Soundcloud.com, I found two demos of songs called “Jupiter System” and “This is the End” both these songs were effective because they added suspense and the “thrill” side of our trailer and also fits in with the storyline and the genre.  However, Saba and I will need to research more into this because there might be other styles of music we can try as we want the music to perfectly fit with our trailer as we want the music to highlight the scary part of the film as well as the thrilling part of the film as the husband will be racing against time and so this would hopefully be perfect for our horror/thriller film trailer. I also like the idea of using diegetic sound in the trailer because the audience will be able to understand the film and the storyline and it can also give the audience the chance to see how the characters are and how they act.
  • 4.
    Vox Pop Research… 1.Do you enjoy watching Horror-Thrillers? 2. What thrills you the most about Horror-Thrillers? 3. How often do you watch Horror-Thrillers? 4. What particular element do you like about Horror-Thrillers? 5. Are you drawn more towards Horror’s or Thrillers? 6. What makes Horror-Thrillers appeal to you the most? 7. Do you find that the Mise-en-scene in a Horror-Thriller is important? 8. What do you like the most about the Horror-Thriller genre? (Hero/Villain) 9. Do you like a film that shows symbolism and iconography? 10. Do you like answers being revealed in a Horror-Thriller trailer, or do you believe that it gives too much away? 11. Do you like trailers that build up suspense and leave you on a cliff-hanger? Or do you think that it is more interesting and intriguing to be left not knowing so that you can go and watch the movie? 12. In the opening of a Horror-Thriller, how much of the plot do you think should be revealed? 13. Should the film have its story unfolded quickly, slowly or not at all 14. Do you think the name “Hostage” for a film is effective or too cliché? 15. Out of the following, which is the scariest? 1. The Woman in Black 2. Hostel 3. Fright Night 4. 7500 5. Hostage
  • 5.
    BBFC Research  TheBritish Board of Film Classification (BBFC), originally British Board of Film Censors, is a non-governmental organisation, funded by the film industry and responsible for the national classification and censorship of films within the United Kingdom. It has a statutory requirement to classify videos, DVDs and some video games under the Video Recordings Act 2010.  The BBFC continues to be sensitive to the public’s views about strong language. The Board no longer relies upon a list of swear words simply rated by offence, but instead takes into account the strength, context and tone of the words used.  The Board takes care to ensure that language does not exceed audience expectations at any category. More offensive terms are removed from junior categories, while the strongest sexual expletives are restricted to the upper categories and, where used aggressively, to ‘18’.
  • 6.
    Our Certificate Rating… Saba and I decided that we want the certificate of our film to be a 15. This was because we wanted to have emphasis on the horror side of our film also as our genre is a horror/thriller we then decided that we don’t want the film to be too frightening as this would not fit with our target audience as we want our target audience to be able to watch the film and trailer. As our target audience is aimed at male and females aged 17-30 this then shows that a 15 certificate will be more suitable because we will want to use the conventions of a certificate 15 because the film will have swearing and violence in but not to the extent where only over 18s can watch it.
  • 7.
    Project Plan: •Monday 12thNovember – Clarification of shots, location and props •Friday 16th November – 5.00pm shoot scenes with husband in Duke Street and shoot around that area •Friday 23rd November – 5.00pm shoot scenes with wife and killer in library •Friday 30th November – Shoot any additional shots that are missing •Friday 7th December – Edit •Friday 14th December – Edit
  • 8.
    Location Shots  Duringthe half term, I decided that I should take on the responsibility of taking pictures of one of our location shots as this was near where I live so I thought it would be easier for me to do this instead of Saba. • Location Shot 1: Husband outside hotel on phone with wife • Location Shot 2: Husband running through streets to get to wife • Location Shot 3: Main site Library in basement • Photos of Killer • Photos of Husband • Photos of Wife • Photo of Clock and wedding ring (Props)