SlideShare a Scribd company logo
1 of 1
Download to read offline
LiftStation1
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
0.0000.000
10.000
20.000
30.000
40.000
50.000
60.000
70.000
80.000
90.000
100.000
110.000
120.000
130.000
140.000
150.000
160.000
170.000
180.000
190.000
200.000
220.000
230.000
240.000
250.000
260.000
280.000
290.000
300.000
310.000
320.000
330.000
340.000
350.000
360.000
370.000
380.000
385.500
11.64
11.33
11.11
10.58
10.86
11.21
11.40
11.24
10.82
10.69
10.70
11.64
11.85
11.68
11.48
11.63
11.72
11.82
12.12
12.36
12.33
12.23
11.98
11.71
11.33
10.88
10.61
10.43
10.24
10.01
9.77
9.75
9.79
9.76
9.95
10.40
10.48
10.57
10.64
10.49
10.02
9.82
9.60
9.39
9.17
9.00
8.88
8.72
8.49
8.33
8.33
0.99
0.51
1.02
2.09
2.22
2.90
1.94
1.40
0.85
1.74
2.15
2.15
1.35% 0.48%
35.000
75.000
120.000
165.000
210.000
245.000
270.000
302.000
349.500
383.500
12.23
11.85
11.76
11.84
11.09
11.48
11.57
10.63
10.62
10.43
10.39
10.40
MH4
MH2
MH3
MH5
MH1
MH6
MH7
MH8
Area to be filled
MH9
MH10
MH11
Area to be filled
Scale: H 1:1000
V 1:100
CHAINAGE (m)
GROUND LEVEL (m)
INVERT LEVEL (m)
COVER TO PIPE (m)
PIPE GRADES
PIPE DETAILS
LONGSECTION ALONG SEWER LINE
1
10,000m0.60x0
.6
Manho
le
D
4
D
3
C 16
C 15
C 14
C 13
C 12
C 11
C 10
LS2
-54
51.4
22
-51
51.0
78
LS1
-54
52.8
94
-51
48.6
96
LS3
-545
3.03
8
-51
52.0
77
LS4
-54
54.5
10
Co
-or
din
ate
sofLiftSta
tion7
Poi
nt
X
Y
-514
9.69
5
Boat Parking
Unloading
Bay
12m
x3m
Station Office
ExistingHousetoRemain
C 17
C 18
10.5
11.0
11.5
12.5
13.0
13.5
9
9
9.5
10.5
11.0
11.5
12.5
13.0
9.5
14.0
12.0
10.0
10.0
8
9.5
9.0
8.5
7.5
7.0
11.5
11.5
10.0
8.0
12.0
14.0
12.0
13.50
dd
N
13.5
11.0
10.0
10.0
Lift Station 1
2.0m
Servitude
12.5 13.0
Road 4
11.5
12.0
Existing Road
Cart Path
MH 4
MH 5
MH 6.
MH 7
MH 10
MH 8
MH 9.
MH 11
MH 3
MH 2
MH 1
Access 1
Road 4
Existing Road
Existing Road
STP
E=-5532.605
N=-4948.762E=-5532.615
N=-4950.762
E=-5533.139
N=-4984.758
E=-5574.590
N=-5007.954
E=-5596.290
N=-5031.473
E=-5601.490
N=-5055.926
E=-5592.261
N=-5089.687
E=-5575.063
N=-5131.272
E=-5559.927
N=-5173.650
E=-5546.726
N=-5216.670
E=-5534.984
N=-5254.908
E=-5537.428
N=-5289.822
Existing
Lift Station Existing
Manhole
Existing Road
10.5
A B C D E F G H I J K L M N
Do not scale
Rev
Job No
Drawing Status
Discipline
Scale at A1
Drawing No Rev
Drawing Title
Job Title
Client
Date By Chkd Appd
A1
1
2
3
4
5
6
7
8
9
10
11
SW-101 C22759
1:750
FOR CONSTRUCTION
Civil
SEWER NETWORK
LONGSECTION ALONG
SEWER LINE
/ /C1 19 08 11 Reza B. P.G P.G
ISSUED FOR CONSTRUCTION
/ /C2 13 09 11 Reza B. P.G P.G
CLOUDED AREA MODIFIED

More Related Content

Viewers also liked

2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELSReza Bassawon
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTIONReza Bassawon
 
2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORKReza Bassawon
 
2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKINGReza Bassawon
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILSReza Bassawon
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTIONReza Bassawon
 

Viewers also liked (6)

2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
2878-CR-404 FUTURE ACCESS FINISHED ROAD LEVELS
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION
 
2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK2878-CD-001 STORMWATER NETWORK
2878-CD-001 STORMWATER NETWORK
 
2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING2878-CR-002 ROAD MARKING
2878-CR-002 ROAD MARKING
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 

Similar to 2759-SW-101 LS Along Sewer Line

ANEXO II (ábacos, severidad - densidad, método PCI).pdf
ANEXO II (ábacos, severidad - densidad, método PCI).pdfANEXO II (ábacos, severidad - densidad, método PCI).pdf
ANEXO II (ábacos, severidad - densidad, método PCI).pdfalvaromuruchirojas2
 
Taller de excel
Taller de excelTaller de excel
Taller de exceladrirocio
 
P R O M E D I O P R U E B A
P R O M E D I O  P R U E B AP R O M E D I O  P R U E B A
P R O M E D I O P R U E B Abustillos
 
Promedio Prueba
Promedio PruebaPromedio Prueba
Promedio Pruebabustillos
 
(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1Juliana Hincapié Rojo
 
Apresentacao teleconferencia 3_t14-vfinal
Apresentacao teleconferencia 3_t14-vfinalApresentacao teleconferencia 3_t14-vfinal
Apresentacao teleconferencia 3_t14-vfinalCelesc
 
Loteamento recanto dos deuses layout1
Loteamento recanto dos deuses layout1Loteamento recanto dos deuses layout1
Loteamento recanto dos deuses layout1wesley santana
 
Revit bachlor working project (ncp bank)
Revit bachlor working project (ncp bank)Revit bachlor working project (ncp bank)
Revit bachlor working project (ncp bank)Yasmin Alaa El Din
 
Vayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdfVayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdfAmoghA13
 
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...Thorne & Derrick International
 

Similar to 2759-SW-101 LS Along Sewer Line (20)

ANEXO II (ábacos, severidad - densidad, método PCI).pdf
ANEXO II (ábacos, severidad - densidad, método PCI).pdfANEXO II (ábacos, severidad - densidad, método PCI).pdf
ANEXO II (ábacos, severidad - densidad, método PCI).pdf
 
Taller de excel
Taller de excelTaller de excel
Taller de excel
 
P R O M E D I O P R U E B A
P R O M E D I O  P R U E B AP R O M E D I O  P R U E B A
P R O M E D I O P R U E B A
 
Promedio Prueba
Promedio PruebaPromedio Prueba
Promedio Prueba
 
(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1(597922903) trabajo sobre aguas residuales 1
(597922903) trabajo sobre aguas residuales 1
 
Apresentacao teleconferencia 3_t14-vfinal
Apresentacao teleconferencia 3_t14-vfinalApresentacao teleconferencia 3_t14-vfinal
Apresentacao teleconferencia 3_t14-vfinal
 
The growth of Real Estate
The growth of Real Estate The growth of Real Estate
The growth of Real Estate
 
Loteamento recanto dos deuses layout1
Loteamento recanto dos deuses layout1Loteamento recanto dos deuses layout1
Loteamento recanto dos deuses layout1
 
Revit bachlor working project (ncp bank)
Revit bachlor working project (ncp bank)Revit bachlor working project (ncp bank)
Revit bachlor working project (ncp bank)
 
02 cuadros hidrologia
02 cuadros hidrologia02 cuadros hidrologia
02 cuadros hidrologia
 
Taxi Tariff Card
Taxi Tariff CardTaxi Tariff Card
Taxi Tariff Card
 
Life Tables
Life TablesLife Tables
Life Tables
 
Life Tables
Life TablesLife Tables
Life Tables
 
Abs&ep
Abs&epAbs&ep
Abs&ep
 
Vayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdfVayuvajra Form-3 (23.06.2022).pdf
Vayuvajra Form-3 (23.06.2022).pdf
 
Huaura_pdf.pdf
Huaura_pdf.pdfHuaura_pdf.pdf
Huaura_pdf.pdf
 
Micro drill
Micro drillMicro drill
Micro drill
 
Part ii
Part iiPart ii
Part ii
 
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
ABB POLIM-K High Voltage Surge Arresters AC up to 52 kV - AC Surge Arresters ...
 
Conductos
ConductosConductos
Conductos
 

More from Reza Bassawon

2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELSReza Bassawon
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROADReza Bassawon
 
2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUT2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUTReza Bassawon
 
2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUTReza Bassawon
 

More from Reza Bassawon (6)

Bagatelle Earthwork
Bagatelle EarthworkBagatelle Earthwork
Bagatelle Earthwork
 
Choisy Platform
Choisy PlatformChoisy Platform
Choisy Platform
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD
 
2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUT2878-CC-002 COORDINATED SERVICES LAYOUT
2878-CC-002 COORDINATED SERVICES LAYOUT
 
2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT
 

2759-SW-101 LS Along Sewer Line