SlideShare a Scribd company logo
1 of 58
AUGIER S.AAUGIER S.A
FRANCEFRANCE
AUGIER
HISTORYHISTORY
Manufacturer of Airfield Lighting system since 40Manufacturer of Airfield Lighting system since 40
yearsyears
40 years in Power Distribution (Public Lighting)40 years in Power Distribution (Public Lighting)
First Installation of Medium Voltage distributionFirst Installation of Medium Voltage distribution
inin 19681968 – Rungis Market Lighting, Paris– Rungis Market Lighting, Paris
Roissy Charles De Gaulle (Paris Airport) MVRoissy Charles De Gaulle (Paris Airport) MV
installation ininstallation in 19711971 – Road Lighting– Road Lighting
First Middle east installation –First Middle east installation – 19851985 (Ruwais)(Ruwais)
More than 400 Installations – through out theMore than 400 Installations – through out the
world.world.
synopsis
CHINA…CHINA…
JIANGYINJIANGYIN bridgebridge(land of Jiangsu, 18 Km)(land of Jiangsu, 18 Km)
Nanjing YANTSE bridgeNanjing YANTSE bridge (Nanjing town, 21,6(Nanjing town, 21,6
Km)Km)
MV majorMV major
referencesreferences
AFRICA…AFRICA…
OUAGADOUGOU airportOUAGADOUGOU airport
M’WENGUE airportM’WENGUE airport
MIDDLE-EAST…MIDDLE-EAST…
Ruwais industrial complex - UAERuwais industrial complex - UAE
Training Center in SAUDI ARABIATraining Center in SAUDI ARABIA
Janadria Home Prince SAUDI ARABIAJanadria Home Prince SAUDI ARABIA
EUROPA…EUROPA…
Tunnel of Gran’Sasso - ITALYTunnel of Gran’Sasso - ITALY
Tunnel of Oviedo - SPAINTunnel of Oviedo - SPAIN
Dourges Project - FRANCEDourges Project - FRANCE
Normandie bridge - FRANCENormandie bridge - FRANCE
Few Augier ProjectsFew Augier Projects
AUGIER ACTIVITIESAUGIER ACTIVITIES
1.1. MEDIUM VOLTAGE DISTRIBUTIONMEDIUM VOLTAGE DISTRIBUTION
2.2. ENERGY SAVING SYSTEMENERGY SAVING SYSTEM
3.3. REMOTE MONITORING SYSTEMREMOTE MONITORING SYSTEM
4.AIR FIELD LIGHTING4.AIR FIELD LIGHTING
DISTRIBUTIONDISTRIBUTION
MEDIUM VOLTAGE DISTRIBUTIONMEDIUM VOLTAGE DISTRIBUTION
CONCEPTCONCEPT
ConventionalConventional MV systemMV system
HV
(11kV)
LV
415V
Lighting
command
HV
(11kV)
MV
(6.6kV)
LV
415V
Lighting
command
PRESENT example in Middle eastPRESENT example in Middle east
HIGH WAY LIGHTING – SHK ZAYED ROADHIGH WAY LIGHTING – SHK ZAYED ROAD
ABUDHBAI Border to JEBEL ALIABUDHBAI Border to JEBEL ALI
AUH
border
Jebel
Ali
11 KV
source
11 KV
O/h line11 KV/415 V
Transformer
Big size LV cable – 500 M
Road Intersection every KM
20 KM
• COST for 18 P/S Substation
• COST for Big LV Cable
• Obstruction to road work
• Local Lighting control
- Switching ON by Photocell
- Fault status of any
substation not reported
immediately
• No Energy Savings
possible
AUGIER solutionAUGIER solution
AUH
border Jebel
Ali
11KV/6.6 KV
substation
6.6 KV cable
3C x 25Sq.mm 6.6 KV/230V
Underground IP 68
Transformer
• Only 1 substation
- RMU
- 11KV / 6.6 KV Tr.
- 6.6KV Sw.Gear
• Smaller 3C x 25 sq.mm
7.2KV class cable
• Buriable – IP68 tr.
- Medium Voltage Fuse
- LV breaker
- Overload protection
• 2C x 16sq.mm LV cable
• No Protruding Feeder
Pillar / Lighting cabinet
• Centralized Lighting
control.
- ON / OFF by Astrn.clock
& by Photo cell
- All Parameters recorded
MV CONCEPTMV CONCEPT
Sectionator
Contactor
Contactor
CELLS
5500 V
PRINCIPLE OF DIAGRAM MV - STEP-DOWN STATION
HV
MV
Transfo
Variator
Transfo
TED
Cable BT 2 x 25 mm²
10 Poles10 Poles
5500 V 3 x 35 mm² cable
Transfo
TED
CELL
33 kV / 11kV
Doc MC 041020/3
Fujairah AirportFujairah Airport
Boundary wall lighting distribution systemBoundary wall lighting distribution system
A REAL TIME EXAMPLEA REAL TIME EXAMPLE
Project for Dept of Military Works UAEProject for Dept of Military Works UAE
Project Name : Fujairah Airport Boundary wall lighting
Contractor : Capriole construction (Year 2008-2009)
RUNWAY
16 KM
ONLY ONE
LV power source,
400V, 300 kVA
Max 2 KM each way (400V)
4C x 185+ sq.mm
BEYOND 4 KM????? With Low voltage (400V)
!!!NO WAY TO LIGHT!!!
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting
ContractorContractor :: Capriole constructionCapriole construction
RUNWAY
SOLUTION 1
SOLAR POWERED LIGHTS
ISSUES
LESS POWERFUL LIGHTS
HIGH MAINTENANCE
QUICKER REPLACEMENTS
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting
ContractorContractor :: Capriole constructionCapriole construction
RUNWAY
SOLUTION 2SOLUTION 2
HELLO AUGIER!
URGENT PLEASE!!
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting
ContractorContractor :: Capriole constructionCapriole construction
RUNWAY
MAIN STATION
400V/5500V – 630kVA transformer
5500V switchgear – 1 incomer & 3 outgoings
Lighting control cabinet
5500 V cable
3C x 16 sq.mm cable
OD – 35mm
DMW projectDMW project
Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting
ContractorContractor :: Capriole constructionCapriole construction
Mafraq to Gweifhat HighwayMafraq to Gweifhat Highway
Street lighting distributionStreet lighting distribution
systemsystem
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
Highlights of the HighwayHighlights of the Highway
• One of the longest Highway in UAEOne of the longest Highway in UAE
• Serves as a strategic road link between UAEServes as a strategic road link between UAE
and Saudi Arabiaand Saudi Arabia
• Serves as the only road linking the Ruwais -Serves as the only road linking the Ruwais -
UAE’s prominent Industrial HUB with the Capital.UAE’s prominent Industrial HUB with the Capital.
• Serves as the only road to thousands of HaJServes as the only road to thousands of HaJ
PilgrimsPilgrims
• Traffic movement is expected to increase withTraffic movement is expected to increase with
more developments on the western regionmore developments on the western region
Initial condition of the HighwayInitial condition of the Highway
• Total Length of 320KMSTotal Length of 320KMS
• Two lanes – Dual carriage wayTwo lanes – Dual carriage way
• NO Street LightingNO Street Lighting
SOLUTIONS FOR STREET LIGHTINGSOLUTIONS FOR STREET LIGHTING
(Conventional Method)(Conventional Method)
2 KM
4C x 25 sq.mm cable 4C x 25 sq.mm cable
4C x70 sq.mm cable
4C x 120 sq.mm
Cable
LCC LCC
ST
Package Substation
500 KVA or
Pole Mounted Transformer
11KV or 22KV Overhead Line / Underground cable
11KV or 22KV Overhead Line / Underground cable
ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7 ST-8 ST-9 ST-10
LV to MVLV to MV
11KV or 22KV Overhead Line / Underground cable
ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7 ST-8 ST-9 ST-10
ST-1
Mafraq – Gweifhat HighwayMafraq – Gweifhat Highway
Constraints in Providing Street lightingConstraints in Providing Street lighting
• Power supply required all along the highwayPower supply required all along the highway
• Insufficient power sourcesInsufficient power sources
• Trespassing others properties.Trespassing others properties.
• Trouble crossing industrial hazards.Trouble crossing industrial hazards.
• Table waterTable water
• Power consumption of closer to 10MWPower consumption of closer to 10MW
• Requires very High Maintenance.Requires very High Maintenance.
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
PHASE 1 – RUWAIS BYPASS 78KM
Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
New Ruwais BypassNew Ruwais Bypass
Mafraq – Gweihat RoadMafraq – Gweihat Road
Phase 1Phase 1
Proposed SchemeProposed Scheme
MAIN SUBSTATIONMAIN SUBSTATION
High voltage Switch board 33 KVHigh voltage Switch board 33 KV
HV / MV (33KV / 6.6KV) TransformerHV / MV (33KV / 6.6KV) Transformer
6.6 kV switchgear6.6 kV switchgear
Lighting control cabinetLighting control cabinet
6.6kV Dimmer6.6kV Dimmer
HV / MV TransformerHV / MV Transformer
Outdoor typeOutdoor type
1000 KVA KVA1000 KVA KVA
Oil cooledOil cooled
Offload tap changersOffload tap changers
DGPT2 protection relayDGPT2 protection relay
MV SwitchgearMV Switchgear
Indoor typeIndoor type
Incoming IsolatingIncoming Isolating
switchswitch
Draw out type feederDraw out type feeder
Control by User-friendlyControl by User-friendly
Keypad interfaceKeypad interface
MeasurementsMeasurements
-- Output currentOutput current
- MV voltage- MV voltage
- Active power- Active power
- Reactive power- Reactive power
- Power factor- Power factor
- Consumed Energy- Consumed Energy
ProtectionProtection
-- MV protection – FusesMV protection – Fuses
- Under voltage- Under voltage
- Overcurrent- Overcurrent
- Earth Fault- Earth Fault
- Short circuit- Short circuit
- Control supply failure- Control supply failure
- Frequency Imbalance- Frequency Imbalance
Control & MonitoringControl & Monitoring
-- Manual & Auto ModeManual & Auto Mode
-- PhotocellPhotocell
- Fixed Timer- Fixed Timer
- Astronomical Clock- Astronomical Clock
- Volt free contacts- Volt free contacts
- RS 232 port- RS 232 port
- J Bus (Serial communication)- J Bus (Serial communication)
MV NetworkMV Network
6.6KV / 0.4kV Underground transformer6.6KV / 0.4kV Underground transformer
32kVA transformer32kVA transformer
3C x 35 Sq.mm Direct burial cable3C x 35 Sq.mm Direct burial cable
1 c x 25 sq.mm Network earthing1 c x 25 sq.mm Network earthing
7.2 KV insulation class cable7.2 KV insulation class cable
Plug in Cable termination or directPlug in Cable termination or direct
terminationtermination
Transformer installed inside the pitTransformer installed inside the pit
Underground TransformerUnderground Transformer
MV / LV transformerMV / LV transformer
IP 68 transformerIP 68 transformer
Installation in PitInstallation in Pit
MV fusible protectionMV fusible protection
Thermal ProtectionThermal Protection
LV ProtectionLV Protection
Offload tap changerOffload tap changer
LV NetworkLV Network
LV IP 67 distributionLV IP 67 distribution
box (Inside the pit)box (Inside the pit)
600V / 1000 V cable600V / 1000 V cable
4C x 25 Sq.mm4C x 25 Sq.mm
Street Lighting polesStreet Lighting poles
COMPARISION (MV to LV)COMPARISION (MV to LV)
TechnicalTechnical
Description LV System MV System
System Well Known New to ADDC
Power Source Many Places Few Places
Control Local control Centralized
Maintenance More manpower Simple and less
Reliability Moderate Very good
Installation Longer Quick
Energy Saving Very High CAPEX Less CAPEX
Network voltage Unstable Stable
COMPARISION (MV to LV)COMPARISION (MV to LV)
CommercialCommercial
MV System
Description Quantity Material
cost
Installation
Cost
Substation 20 60,000,000 10,000,000
6,000,000HV (33 or 11kV)
cables
60KM 24,000,000
Road Duct 20 50,000
5,000,000
Pit transformer 500 18,000,000
MV cable
3C x 35 sq.mm
370 KM 35,733,000
8,510,000
LV cable
4C x 25 sq.mm
370 KM 29,600,000
Earthing cable
1C x 25 sq.mm
370 KM 3,700,000 3,700,000
Remote monit &
Energy saver
20 8,000,000 included in
s/s installation
Commissioning 1 lot 1,000,000
LV System
Description Quantity Material
cost
Installation
Cost
Substation 200 56,000,000 4,000,0004,000,000
11kV cables 320KM 120,000,00
0
32,000,00032,000,000
Road Duct 200 500,000
Service Turret 200 1,200,000 400,000400,000
Control cabinet 400 4,600,000 800,000800,000
LV cable
4C x 120 Sq.mm
20 KM 5,000,000 420,000
LV cable
4C x 70 sq.mm
185 KM 29,600,000 3,330,000
LV cable
4C x 25 Sq.mm
370 KM 29,600,000 5,920,000
Earthing 370 KM370 KM 3,700,0003,700,000 3,700,0003,700,000
Remote monit &
Energy saver
400400 16,000,00016,000,000 1,000,000
Commissioning 2,000,000
Total cost – AED
319,770,000
Total cost – AED
213,293,000
CAPITAL COST SAVING – 50 %
ENERGY SAVERENERGY SAVER
DIMMING SYSTEM FOR STREET LIGHTINGDIMMING SYSTEM FOR STREET LIGHTING
ENERGY CONSUMPTION IN PUBLIC LIGHTINGENERGY CONSUMPTION IN PUBLIC LIGHTING
Abudhabi to Al-Ain road – 160 KMAbudhabi to Al-Ain road – 160 KM
For 1 KM - 10 Light polesFor 1 KM - 10 Light poles
Each pole – 6 x 1000W lampsEach pole – 6 x 1000W lamps
1 pole consumes 6KWH(6 units) per hr1 pole consumes 6KWH(6 units) per hr
For 1 night (avg 10 hours) – 60 unitsFor 1 night (avg 10 hours) – 60 units
For 1 KM – 600 units for 1 nightFor 1 KM – 600 units for 1 night
For the highway –For the highway – 96,000 units / night96,000 units / night
Average consumption of Power at home – 300Average consumption of Power at home – 300
units per month.units per month.
Possible Energy Saving – 30% to 40%
Abudhabi to Al ain – 96,000 x 30% =
28,800 units / night
For a Month ?????
AUGIER DIMMERAUGIER DIMMER
Vary the voltage to the group of lampsVary the voltage to the group of lamps
Control the power consumptionControl the power consumption
160v 180v 200v 220v 240v
%
ENERGY SAVEDENERGY SAVED
Consumed
Energy
Energy saved
230V
Voltage on network
6 pm 10 pm 5 am 6 am
210V
180V
240V
AdvantagesAdvantages
Energy savingEnergy saving
Stable network voltageStable network voltage
Lesser stress to the lamps hence longer lifeLesser stress to the lamps hence longer life
of lampsof lamps
Smooth ramping of light intensity (NoSmooth ramping of light intensity (No
distraction to drivers)distraction to drivers)
Power ON & OFF by Astronmical clockPower ON & OFF by Astronmical clock
Immediate fault notificationsImmediate fault notifications
CompactoCompacto
Compact dimmerCompact dimmer
Easy installation in LDBEasy installation in LDB
Single phase : 3 - 12 KVASingle phase : 3 - 12 KVA
Programmable by PC (only atProgrammable by PC (only at
initial installation)initial installation)
Serial communicationSerial communication
Indication led’s for normal working,Indication led’s for normal working,
fault, economyfault, economy
EconomicalEconomical
Easy to incorporate to existingEasy to incorporate to existing
street lighting networkstreet lighting network
MEDIUM VOLTAGE DIMMERMEDIUM VOLTAGE DIMMER
ONE DIMMER TO CONTROLONE DIMMER TO CONTROL
THE COMPLETE CIRCUIT OFTHE COMPLETE CIRCUIT OF
LAMPSLAMPS
COST EFFECTIVECOST EFFECTIVE
FULLY ELECTRICALFULLY ELECTRICAL
6.6kV
AUTOMATIONAUTOMATION
REMOTE MONITORINGREMOTE MONITORING
Remote MonitoringRemote Monitoring
 Ready to Install in existing Lighting Control Cabinet
 Communication options by GSM/GPRS/Serial/Fiber optic
 Monitors Lighting Circuit ON/OFF
 Monitors Power consumption from existing kWH meter
 Monitors voltage fluctuations if any
 Monitors time of fault and rectification
 Monitors Open contactor
 Monitors Cable fault
 Monitors state of lamps
 Monitors Over consumption in case of theft
Monitors Open door of Lighting control cabinet.
Example
Remote MonitoringRemote Monitoring
Substation Monitoring - STEPIISubstation Monitoring - STEPII
Remote MonitoringRemote Monitoring
Substation Monitoring - STEPIISubstation Monitoring - STEPII
Remote MonitoringRemote Monitoring
Substation Monitoring - STEPIISubstation Monitoring - STEPII
ENERGY SAVING in C.C.V.EENERGY SAVING in C.C.V.E
(Community of communes in the Esteron Valley)(Community of communes in the Esteron Valley)
Remote control and monitoring of street lighting networks with AUGIER systems
Charles-Albert bridge
THE ESTERON VALLEYTHE ESTERON VALLEY
Provence Alpes Côte d’Azur (French Riviera) AreaProvence Alpes Côte d’Azur (French Riviera) Area
135 km2 - 10 Villages
60 Street Lighting Cabinets and 2600 street lights
Gilette
TargetTarget
Put in safety the streetPut in safety the street
lighting installationslighting installations
35% of energy saving35% of energy saving..
Limitations of maintenance,Limitations of maintenance,
repair and operations.repair and operations.
Remote supervision andRemote supervision and
control of lighting network.control of lighting network.
Before
After
Technical meansTechnical means
Installation ofInstallation of Compacto dimmerCompacto dimmer in eachin each
cabinet in order to reduce the energycabinet in order to reduce the energy
consumption of the street lighting networkconsumption of the street lighting network
during the night .during the night .
Installation ofInstallation of Augier BoxAugier Box programmableprogrammable
Logic Controller to analyse the faults andLogic Controller to analyse the faults and
breakdowns, to remote control the lightingbreakdowns, to remote control the lighting
(astronomical clock) and to modify the setting(astronomical clock) and to modify the setting
of compacto from the PC.of compacto from the PC...
A software used by the customer (CCVE)A software used by the customer (CCVE)
displays the faults and the consumption of thedisplays the faults and the consumption of the
lighting network, day by day.lighting network, day by day.
Street lighting overviewStreet lighting overview
A software installed at the
customer displays an
overview of the Esteron
Valley..
Each color point
symbolizes a commune.
The laptop receives
automatically the network
status once a day by
GSM data.
It is possible to
communicate with a
cabinet whenever you
want.
A green point indicates the lack of fault in a commune.
A red point indicates a warning.
OVERVIEW - MappingOVERVIEW - Mapping
A zoom on the map
allows the display of
all street lights
associated to a
cabinet.
All the lighting
cabinets and points
are supervised by
GPS.
OVERVIEW – LightingOVERVIEW – Lighting
substationsubstation
A cabinet is
symbolized by a
leaflet containing all
the information
concerning working,
status, faults and
consumptions history.
The leaflet can also
contain the picture of
the installation.
Energy savingEnergy saving
Lighting at nominal power rating Lighting at reduced power rating
There is 50% of energy saving between the lights at full power and the
Lights in reduced mode.
Connection example on the substation GIL31
Other ReferencesOther References
Some examples of customer using our material as Compacto and Augier BoxSome examples of customer using our material as Compacto and Augier Box
Toulouse cityToulouse city
Alès cityAlès city
Albi cityAlbi city
Mende cityMende city
Brignoles cityBrignoles city
Puget sur Argens cityPuget sur Argens city
Evian cityEvian city
Limoges cityLimoges city
MontMélian cityMontMélian city
Carros cityCarros city
Quimper cityQuimper city
Reims cityReims city
Rennes cityRennes city
Martigne sur Mayenne cityMartigne sur Mayenne city
Mans cityMans city
Douarnenez cityDouarnenez city
Ugine cityUgine city
MontRigaud cityMontRigaud city
Romans sur Isère cityRomans sur Isère city
Thonon les Bains cityThonon les Bains city
Chartres cityChartres city
Nimes cityNimes city
Blois cityBlois city
Toury cityToury city
Fleury les Aubrais cityFleury les Aubrais city
Cagnes sur Mer cityCagnes sur Mer city
Strasbourg cityStrasbourg city
Angoulême cityAngoulême city
Marmande cityMarmande city
Jussecourt cityJussecourt city
Mareuil cityMareuil city
Aulnay cityAulnay city
Commune of St Pierre (La Réunion)Commune of St Pierre (La Réunion)
Industrial area of Beau séjour (la Réunion)Industrial area of Beau séjour (la Réunion)
Pru of St Marie (la Réunion)Pru of St Marie (la Réunion)
Nice airportNice airport
Marseille airportMarseille airport
Lyon airportLyon airport
Paris airportParis airport
Hospital of GrasseHospital of Grasse
Texas Instrument (Villeneuve-Loubet)Texas Instrument (Villeneuve-Loubet)
AUGIER STRENGTHAUGIER STRENGTH
REPUTATION & EXPERIENCEREPUTATION & EXPERIENCE
 Sauveur Beninati – Commerical DirectorSauveur Beninati – Commerical Director -- 31 years31 years
 Raymond Grenneiser – Technical DirectorRaymond Grenneiser – Technical Director -- 27 years27 years
 Yannick Pied – Production DirectorYannick Pied – Production Director -- 20 years20 years
 Pascal Disdier – MV System design Incharge -Pascal Disdier – MV System design Incharge - 22 years22 years
 Thien Vudo - Airport system InchargeThien Vudo - Airport system Incharge -- 10 years10 years
 Pierre girin – Dimmer system & salesPierre girin – Dimmer system & sales -- 15 years15 years
 Murielle Deweist – Sales & SupportMurielle Deweist – Sales & Support -- 15 years15 years
 Gil Daver – Sales & SupportGil Daver – Sales & Support -- 13 years13 years
 Gilbert Grec – Test & Comm Airfield systemsGilbert Grec – Test & Comm Airfield systems -- 20 years20 years
 Jean Louis Tardy – Test & comm MV & dimm -Jean Louis Tardy – Test & comm MV & dimm - 14 years14 years
 Serge villa – Technical incharge – DimmerSerge villa – Technical incharge – Dimmer -- 5 years5 years
AUGIER S.AAUGIER S.A
TO LIGHT THE WORLD BETTERTO LIGHT THE WORLD BETTER
THANK YOUTHANK YOU

More Related Content

What's hot

Zte macro bts introduction
Zte macro bts  introductionZte macro bts  introduction
Zte macro bts introductionRamanuj Kumar
 
Typical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load loggerTypical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load loggerAjeesh Joseph
 
Ricardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIRicardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIFrank Warnes
 
Mitsubishi low voltage acb world super ae dienhathe.org
Mitsubishi low voltage acb world super ae dienhathe.orgMitsubishi low voltage acb world super ae dienhathe.org
Mitsubishi low voltage acb world super ae dienhathe.orgDien Ha The
 
Product: UPS: UniStar V
Product: UPS: UniStar VProduct: UPS: UniStar V
Product: UPS: UniStar VStaco Energy
 
MGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDFMGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDFFrank Warnes
 
Cell d dapd product presentation
Cell d dapd product presentationCell d dapd product presentation
Cell d dapd product presentationcurrentautomation
 
Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish BhattacharyaVarun Chandra
 
Product: UPS: UniStar VP
Product: UPS: UniStar VPProduct: UPS: UniStar VP
Product: UPS: UniStar VPStaco Energy
 
CS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft ManufacturerCS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft ManufacturerGuy Black
 
1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...
1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...
1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...Jacton Electromechanical Co.,Ltd
 
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Anatolijs Krjucenkovs
 
2009 zte sdr 8840 international workshop -zte
2009 zte sdr 8840 international workshop -zte2009 zte sdr 8840 international workshop -zte
2009 zte sdr 8840 international workshop -zteOlivier Rostaing
 

What's hot (17)

Pannel antenna
Pannel antennaPannel antenna
Pannel antenna
 
Thông số kĩ thuật mitsubishi thiet bi dien acb
Thông số kĩ thuật mitsubishi thiet bi dien acbThông số kĩ thuật mitsubishi thiet bi dien acb
Thông số kĩ thuật mitsubishi thiet bi dien acb
 
Zte macro bts introduction
Zte macro bts  introductionZte macro bts  introduction
Zte macro bts introduction
 
Typical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load loggerTypical applications for mirrin ll400 load logger
Typical applications for mirrin ll400 load logger
 
Ricardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIRicardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMI
 
Mitsubishi low voltage acb world super ae dienhathe.org
Mitsubishi low voltage acb world super ae dienhathe.orgMitsubishi low voltage acb world super ae dienhathe.org
Mitsubishi low voltage acb world super ae dienhathe.org
 
Product: UPS: UniStar V
Product: UPS: UniStar VProduct: UPS: UniStar V
Product: UPS: UniStar V
 
MGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDFMGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDF
 
Cell d dapd product presentation
Cell d dapd product presentationCell d dapd product presentation
Cell d dapd product presentation
 
Debashish Bhattacharya
Debashish  BhattacharyaDebashish  Bhattacharya
Debashish Bhattacharya
 
Load break switch
Load break switchLoad break switch
Load break switch
 
Product: UPS: UniStar VP
Product: UPS: UniStar VPProduct: UPS: UniStar VP
Product: UPS: UniStar VP
 
CS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft ManufacturerCS0012 - Creep Crane for Large Aircraft Manufacturer
CS0012 - Creep Crane for Large Aircraft Manufacturer
 
ABB PVI
ABB PVIABB PVI
ABB PVI
 
1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...
1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...
1 ton weight water barrier with the pressure is hoisted by double 20 ton worm...
 
Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014Posh-Endurance-Endeavour-Specs-13Oct2014
Posh-Endurance-Endeavour-Specs-13Oct2014
 
2009 zte sdr 8840 international workshop -zte
2009 zte sdr 8840 international workshop -zte2009 zte sdr 8840 international workshop -zte
2009 zte sdr 8840 international workshop -zte
 

Similar to Presenting AUGIER Energy

Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Sarthak Panigrahi
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986sheik syedali
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the futureemmaroche
 
it-lecture-distribution-rev-3-dec-2013.pdf
it-lecture-distribution-rev-3-dec-2013.pdfit-lecture-distribution-rev-3-dec-2013.pdf
it-lecture-distribution-rev-3-dec-2013.pdfssuser6c7f421
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smarter Grid Solutions
 
Crown micro corporate profile energy & solar products ( l )
Crown micro corporate profile   energy & solar products ( l ) Crown micro corporate profile   energy & solar products ( l )
Crown micro corporate profile energy & solar products ( l ) Syed Khursheed Abbas
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report imkanhaiyalal
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Avirup Ghosh
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG Muneeb Amin Khan
 
CURRICULUM VITAE FOR WILLIAM KAMTUNGA
CURRICULUM VITAE FOR WILLIAM KAMTUNGACURRICULUM VITAE FOR WILLIAM KAMTUNGA
CURRICULUM VITAE FOR WILLIAM KAMTUNGAwilliam kamtunga
 

Similar to Presenting AUGIER Energy (20)

Rourkela Steel Pant Power System
Rourkela Steel Pant Power System Rourkela Steel Pant Power System
Rourkela Steel Pant Power System
 
metro naveen
metro naveenmetro naveen
metro naveen
 
Basics of hvdc
Basics of hvdc Basics of hvdc
Basics of hvdc
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
Engineering the power system of the future
Engineering the power system of the futureEngineering the power system of the future
Engineering the power system of the future
 
it-lecture-distribution-rev-3-dec-2013.pdf
it-lecture-distribution-rev-3-dec-2013.pdfit-lecture-distribution-rev-3-dec-2013.pdf
it-lecture-distribution-rev-3-dec-2013.pdf
 
220kv substation
220kv substation220kv substation
220kv substation
 
Status of hvdc links
Status of hvdc linksStatus of hvdc links
Status of hvdc links
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
Crown micro corporate profile energy & solar products ( l )
Crown micro corporate profile   energy & solar products ( l ) Crown micro corporate profile   energy & solar products ( l )
Crown micro corporate profile energy & solar products ( l )
 
transmission&distribution.ppt
transmission&distribution.ppttransmission&distribution.ppt
transmission&distribution.ppt
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
 
CURRICULUM VITAE FOR WILLIAM KAMTUNGA
CURRICULUM VITAE FOR WILLIAM KAMTUNGACURRICULUM VITAE FOR WILLIAM KAMTUNGA
CURRICULUM VITAE FOR WILLIAM KAMTUNGA
 
MCB & RCCB
MCB & RCCBMCB & RCCB
MCB & RCCB
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Presenting AUGIER Energy

  • 2. HISTORYHISTORY Manufacturer of Airfield Lighting system since 40Manufacturer of Airfield Lighting system since 40 yearsyears 40 years in Power Distribution (Public Lighting)40 years in Power Distribution (Public Lighting) First Installation of Medium Voltage distributionFirst Installation of Medium Voltage distribution inin 19681968 – Rungis Market Lighting, Paris– Rungis Market Lighting, Paris Roissy Charles De Gaulle (Paris Airport) MVRoissy Charles De Gaulle (Paris Airport) MV installation ininstallation in 19711971 – Road Lighting– Road Lighting First Middle east installation –First Middle east installation – 19851985 (Ruwais)(Ruwais) More than 400 Installations – through out theMore than 400 Installations – through out the world.world.
  • 3. synopsis CHINA…CHINA… JIANGYINJIANGYIN bridgebridge(land of Jiangsu, 18 Km)(land of Jiangsu, 18 Km) Nanjing YANTSE bridgeNanjing YANTSE bridge (Nanjing town, 21,6(Nanjing town, 21,6 Km)Km) MV majorMV major referencesreferences AFRICA…AFRICA… OUAGADOUGOU airportOUAGADOUGOU airport M’WENGUE airportM’WENGUE airport MIDDLE-EAST…MIDDLE-EAST… Ruwais industrial complex - UAERuwais industrial complex - UAE Training Center in SAUDI ARABIATraining Center in SAUDI ARABIA Janadria Home Prince SAUDI ARABIAJanadria Home Prince SAUDI ARABIA EUROPA…EUROPA… Tunnel of Gran’Sasso - ITALYTunnel of Gran’Sasso - ITALY Tunnel of Oviedo - SPAINTunnel of Oviedo - SPAIN Dourges Project - FRANCEDourges Project - FRANCE Normandie bridge - FRANCENormandie bridge - FRANCE
  • 4. Few Augier ProjectsFew Augier Projects
  • 5. AUGIER ACTIVITIESAUGIER ACTIVITIES 1.1. MEDIUM VOLTAGE DISTRIBUTIONMEDIUM VOLTAGE DISTRIBUTION 2.2. ENERGY SAVING SYSTEMENERGY SAVING SYSTEM 3.3. REMOTE MONITORING SYSTEMREMOTE MONITORING SYSTEM 4.AIR FIELD LIGHTING4.AIR FIELD LIGHTING
  • 7. CONCEPTCONCEPT ConventionalConventional MV systemMV system HV (11kV) LV 415V Lighting command HV (11kV) MV (6.6kV) LV 415V Lighting command
  • 8. PRESENT example in Middle eastPRESENT example in Middle east HIGH WAY LIGHTING – SHK ZAYED ROADHIGH WAY LIGHTING – SHK ZAYED ROAD ABUDHBAI Border to JEBEL ALIABUDHBAI Border to JEBEL ALI AUH border Jebel Ali 11 KV source 11 KV O/h line11 KV/415 V Transformer Big size LV cable – 500 M Road Intersection every KM 20 KM • COST for 18 P/S Substation • COST for Big LV Cable • Obstruction to road work • Local Lighting control - Switching ON by Photocell - Fault status of any substation not reported immediately • No Energy Savings possible
  • 9. AUGIER solutionAUGIER solution AUH border Jebel Ali 11KV/6.6 KV substation 6.6 KV cable 3C x 25Sq.mm 6.6 KV/230V Underground IP 68 Transformer • Only 1 substation - RMU - 11KV / 6.6 KV Tr. - 6.6KV Sw.Gear • Smaller 3C x 25 sq.mm 7.2KV class cable • Buriable – IP68 tr. - Medium Voltage Fuse - LV breaker - Overload protection • 2C x 16sq.mm LV cable • No Protruding Feeder Pillar / Lighting cabinet • Centralized Lighting control. - ON / OFF by Astrn.clock & by Photo cell - All Parameters recorded
  • 10. MV CONCEPTMV CONCEPT Sectionator Contactor Contactor CELLS 5500 V PRINCIPLE OF DIAGRAM MV - STEP-DOWN STATION HV MV Transfo Variator Transfo TED Cable BT 2 x 25 mm² 10 Poles10 Poles 5500 V 3 x 35 mm² cable Transfo TED CELL 33 kV / 11kV Doc MC 041020/3
  • 11. Fujairah AirportFujairah Airport Boundary wall lighting distribution systemBoundary wall lighting distribution system
  • 12. A REAL TIME EXAMPLEA REAL TIME EXAMPLE Project for Dept of Military Works UAEProject for Dept of Military Works UAE Project Name : Fujairah Airport Boundary wall lighting Contractor : Capriole construction (Year 2008-2009) RUNWAY 16 KM ONLY ONE LV power source, 400V, 300 kVA Max 2 KM each way (400V) 4C x 185+ sq.mm BEYOND 4 KM????? With Low voltage (400V) !!!NO WAY TO LIGHT!!!
  • 13. DMW projectDMW project Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction RUNWAY SOLUTION 1 SOLAR POWERED LIGHTS ISSUES LESS POWERFUL LIGHTS HIGH MAINTENANCE QUICKER REPLACEMENTS
  • 14. DMW projectDMW project Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction RUNWAY SOLUTION 2SOLUTION 2 HELLO AUGIER! URGENT PLEASE!!
  • 15. DMW projectDMW project Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction RUNWAY MAIN STATION 400V/5500V – 630kVA transformer 5500V switchgear – 1 incomer & 3 outgoings Lighting control cabinet 5500 V cable 3C x 16 sq.mm cable OD – 35mm
  • 16. DMW projectDMW project Project Name :Project Name : Fujairah Airport Boundary wall lightingFujairah Airport Boundary wall lighting ContractorContractor :: Capriole constructionCapriole construction
  • 17. Mafraq to Gweifhat HighwayMafraq to Gweifhat Highway Street lighting distributionStreet lighting distribution systemsystem
  • 18. Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
  • 19. Highlights of the HighwayHighlights of the Highway • One of the longest Highway in UAEOne of the longest Highway in UAE • Serves as a strategic road link between UAEServes as a strategic road link between UAE and Saudi Arabiaand Saudi Arabia • Serves as the only road linking the Ruwais -Serves as the only road linking the Ruwais - UAE’s prominent Industrial HUB with the Capital.UAE’s prominent Industrial HUB with the Capital. • Serves as the only road to thousands of HaJServes as the only road to thousands of HaJ PilgrimsPilgrims • Traffic movement is expected to increase withTraffic movement is expected to increase with more developments on the western regionmore developments on the western region
  • 20. Initial condition of the HighwayInitial condition of the Highway • Total Length of 320KMSTotal Length of 320KMS • Two lanes – Dual carriage wayTwo lanes – Dual carriage way • NO Street LightingNO Street Lighting
  • 21. SOLUTIONS FOR STREET LIGHTINGSOLUTIONS FOR STREET LIGHTING (Conventional Method)(Conventional Method) 2 KM 4C x 25 sq.mm cable 4C x 25 sq.mm cable 4C x70 sq.mm cable 4C x 120 sq.mm Cable LCC LCC ST Package Substation 500 KVA or Pole Mounted Transformer 11KV or 22KV Overhead Line / Underground cable 11KV or 22KV Overhead Line / Underground cable ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7 ST-8 ST-9 ST-10
  • 22. LV to MVLV to MV 11KV or 22KV Overhead Line / Underground cable ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 ST-7 ST-8 ST-9 ST-10 ST-1
  • 23. Mafraq – Gweifhat HighwayMafraq – Gweifhat Highway Constraints in Providing Street lightingConstraints in Providing Street lighting • Power supply required all along the highwayPower supply required all along the highway • Insufficient power sourcesInsufficient power sources • Trespassing others properties.Trespassing others properties. • Trouble crossing industrial hazards.Trouble crossing industrial hazards. • Table waterTable water • Power consumption of closer to 10MWPower consumption of closer to 10MW • Requires very High Maintenance.Requires very High Maintenance.
  • 24. Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway
  • 25. Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway PHASE 1 – RUWAIS BYPASS 78KM
  • 26. Mafraq – Ghweifhat HighwayMafraq – Ghweifhat Highway New Ruwais BypassNew Ruwais Bypass
  • 27. Mafraq – Gweihat RoadMafraq – Gweihat Road Phase 1Phase 1 Proposed SchemeProposed Scheme
  • 28. MAIN SUBSTATIONMAIN SUBSTATION High voltage Switch board 33 KVHigh voltage Switch board 33 KV HV / MV (33KV / 6.6KV) TransformerHV / MV (33KV / 6.6KV) Transformer 6.6 kV switchgear6.6 kV switchgear Lighting control cabinetLighting control cabinet 6.6kV Dimmer6.6kV Dimmer
  • 29. HV / MV TransformerHV / MV Transformer Outdoor typeOutdoor type 1000 KVA KVA1000 KVA KVA Oil cooledOil cooled Offload tap changersOffload tap changers DGPT2 protection relayDGPT2 protection relay
  • 30. MV SwitchgearMV Switchgear Indoor typeIndoor type Incoming IsolatingIncoming Isolating switchswitch Draw out type feederDraw out type feeder Control by User-friendlyControl by User-friendly Keypad interfaceKeypad interface MeasurementsMeasurements -- Output currentOutput current - MV voltage- MV voltage - Active power- Active power - Reactive power- Reactive power - Power factor- Power factor - Consumed Energy- Consumed Energy ProtectionProtection -- MV protection – FusesMV protection – Fuses - Under voltage- Under voltage - Overcurrent- Overcurrent - Earth Fault- Earth Fault - Short circuit- Short circuit - Control supply failure- Control supply failure - Frequency Imbalance- Frequency Imbalance Control & MonitoringControl & Monitoring -- Manual & Auto ModeManual & Auto Mode -- PhotocellPhotocell - Fixed Timer- Fixed Timer - Astronomical Clock- Astronomical Clock - Volt free contacts- Volt free contacts - RS 232 port- RS 232 port - J Bus (Serial communication)- J Bus (Serial communication)
  • 31. MV NetworkMV Network 6.6KV / 0.4kV Underground transformer6.6KV / 0.4kV Underground transformer 32kVA transformer32kVA transformer 3C x 35 Sq.mm Direct burial cable3C x 35 Sq.mm Direct burial cable 1 c x 25 sq.mm Network earthing1 c x 25 sq.mm Network earthing 7.2 KV insulation class cable7.2 KV insulation class cable Plug in Cable termination or directPlug in Cable termination or direct terminationtermination Transformer installed inside the pitTransformer installed inside the pit
  • 32. Underground TransformerUnderground Transformer MV / LV transformerMV / LV transformer IP 68 transformerIP 68 transformer Installation in PitInstallation in Pit MV fusible protectionMV fusible protection Thermal ProtectionThermal Protection LV ProtectionLV Protection Offload tap changerOffload tap changer
  • 33. LV NetworkLV Network LV IP 67 distributionLV IP 67 distribution box (Inside the pit)box (Inside the pit) 600V / 1000 V cable600V / 1000 V cable 4C x 25 Sq.mm4C x 25 Sq.mm Street Lighting polesStreet Lighting poles
  • 34. COMPARISION (MV to LV)COMPARISION (MV to LV) TechnicalTechnical Description LV System MV System System Well Known New to ADDC Power Source Many Places Few Places Control Local control Centralized Maintenance More manpower Simple and less Reliability Moderate Very good Installation Longer Quick Energy Saving Very High CAPEX Less CAPEX Network voltage Unstable Stable
  • 35. COMPARISION (MV to LV)COMPARISION (MV to LV) CommercialCommercial MV System Description Quantity Material cost Installation Cost Substation 20 60,000,000 10,000,000 6,000,000HV (33 or 11kV) cables 60KM 24,000,000 Road Duct 20 50,000 5,000,000 Pit transformer 500 18,000,000 MV cable 3C x 35 sq.mm 370 KM 35,733,000 8,510,000 LV cable 4C x 25 sq.mm 370 KM 29,600,000 Earthing cable 1C x 25 sq.mm 370 KM 3,700,000 3,700,000 Remote monit & Energy saver 20 8,000,000 included in s/s installation Commissioning 1 lot 1,000,000 LV System Description Quantity Material cost Installation Cost Substation 200 56,000,000 4,000,0004,000,000 11kV cables 320KM 120,000,00 0 32,000,00032,000,000 Road Duct 200 500,000 Service Turret 200 1,200,000 400,000400,000 Control cabinet 400 4,600,000 800,000800,000 LV cable 4C x 120 Sq.mm 20 KM 5,000,000 420,000 LV cable 4C x 70 sq.mm 185 KM 29,600,000 3,330,000 LV cable 4C x 25 Sq.mm 370 KM 29,600,000 5,920,000 Earthing 370 KM370 KM 3,700,0003,700,000 3,700,0003,700,000 Remote monit & Energy saver 400400 16,000,00016,000,000 1,000,000 Commissioning 2,000,000 Total cost – AED 319,770,000 Total cost – AED 213,293,000 CAPITAL COST SAVING – 50 %
  • 36. ENERGY SAVERENERGY SAVER DIMMING SYSTEM FOR STREET LIGHTINGDIMMING SYSTEM FOR STREET LIGHTING
  • 37. ENERGY CONSUMPTION IN PUBLIC LIGHTINGENERGY CONSUMPTION IN PUBLIC LIGHTING Abudhabi to Al-Ain road – 160 KMAbudhabi to Al-Ain road – 160 KM For 1 KM - 10 Light polesFor 1 KM - 10 Light poles Each pole – 6 x 1000W lampsEach pole – 6 x 1000W lamps 1 pole consumes 6KWH(6 units) per hr1 pole consumes 6KWH(6 units) per hr For 1 night (avg 10 hours) – 60 unitsFor 1 night (avg 10 hours) – 60 units For 1 KM – 600 units for 1 nightFor 1 KM – 600 units for 1 night For the highway –For the highway – 96,000 units / night96,000 units / night Average consumption of Power at home – 300Average consumption of Power at home – 300 units per month.units per month. Possible Energy Saving – 30% to 40% Abudhabi to Al ain – 96,000 x 30% = 28,800 units / night For a Month ?????
  • 38. AUGIER DIMMERAUGIER DIMMER Vary the voltage to the group of lampsVary the voltage to the group of lamps Control the power consumptionControl the power consumption 160v 180v 200v 220v 240v %
  • 39. ENERGY SAVEDENERGY SAVED Consumed Energy Energy saved 230V Voltage on network 6 pm 10 pm 5 am 6 am 210V 180V 240V
  • 40. AdvantagesAdvantages Energy savingEnergy saving Stable network voltageStable network voltage Lesser stress to the lamps hence longer lifeLesser stress to the lamps hence longer life of lampsof lamps Smooth ramping of light intensity (NoSmooth ramping of light intensity (No distraction to drivers)distraction to drivers) Power ON & OFF by Astronmical clockPower ON & OFF by Astronmical clock Immediate fault notificationsImmediate fault notifications
  • 41. CompactoCompacto Compact dimmerCompact dimmer Easy installation in LDBEasy installation in LDB Single phase : 3 - 12 KVASingle phase : 3 - 12 KVA Programmable by PC (only atProgrammable by PC (only at initial installation)initial installation) Serial communicationSerial communication Indication led’s for normal working,Indication led’s for normal working, fault, economyfault, economy EconomicalEconomical Easy to incorporate to existingEasy to incorporate to existing street lighting networkstreet lighting network
  • 42. MEDIUM VOLTAGE DIMMERMEDIUM VOLTAGE DIMMER ONE DIMMER TO CONTROLONE DIMMER TO CONTROL THE COMPLETE CIRCUIT OFTHE COMPLETE CIRCUIT OF LAMPSLAMPS COST EFFECTIVECOST EFFECTIVE FULLY ELECTRICALFULLY ELECTRICAL 6.6kV
  • 44. Remote MonitoringRemote Monitoring  Ready to Install in existing Lighting Control Cabinet  Communication options by GSM/GPRS/Serial/Fiber optic  Monitors Lighting Circuit ON/OFF  Monitors Power consumption from existing kWH meter  Monitors voltage fluctuations if any  Monitors time of fault and rectification  Monitors Open contactor  Monitors Cable fault  Monitors state of lamps  Monitors Over consumption in case of theft Monitors Open door of Lighting control cabinet. Example
  • 45. Remote MonitoringRemote Monitoring Substation Monitoring - STEPIISubstation Monitoring - STEPII
  • 46. Remote MonitoringRemote Monitoring Substation Monitoring - STEPIISubstation Monitoring - STEPII
  • 47. Remote MonitoringRemote Monitoring Substation Monitoring - STEPIISubstation Monitoring - STEPII
  • 48. ENERGY SAVING in C.C.V.EENERGY SAVING in C.C.V.E (Community of communes in the Esteron Valley)(Community of communes in the Esteron Valley) Remote control and monitoring of street lighting networks with AUGIER systems Charles-Albert bridge
  • 49. THE ESTERON VALLEYTHE ESTERON VALLEY Provence Alpes Côte d’Azur (French Riviera) AreaProvence Alpes Côte d’Azur (French Riviera) Area 135 km2 - 10 Villages 60 Street Lighting Cabinets and 2600 street lights Gilette
  • 50. TargetTarget Put in safety the streetPut in safety the street lighting installationslighting installations 35% of energy saving35% of energy saving.. Limitations of maintenance,Limitations of maintenance, repair and operations.repair and operations. Remote supervision andRemote supervision and control of lighting network.control of lighting network. Before After
  • 51. Technical meansTechnical means Installation ofInstallation of Compacto dimmerCompacto dimmer in eachin each cabinet in order to reduce the energycabinet in order to reduce the energy consumption of the street lighting networkconsumption of the street lighting network during the night .during the night . Installation ofInstallation of Augier BoxAugier Box programmableprogrammable Logic Controller to analyse the faults andLogic Controller to analyse the faults and breakdowns, to remote control the lightingbreakdowns, to remote control the lighting (astronomical clock) and to modify the setting(astronomical clock) and to modify the setting of compacto from the PC.of compacto from the PC... A software used by the customer (CCVE)A software used by the customer (CCVE) displays the faults and the consumption of thedisplays the faults and the consumption of the lighting network, day by day.lighting network, day by day.
  • 52. Street lighting overviewStreet lighting overview A software installed at the customer displays an overview of the Esteron Valley.. Each color point symbolizes a commune. The laptop receives automatically the network status once a day by GSM data. It is possible to communicate with a cabinet whenever you want. A green point indicates the lack of fault in a commune. A red point indicates a warning.
  • 53. OVERVIEW - MappingOVERVIEW - Mapping A zoom on the map allows the display of all street lights associated to a cabinet. All the lighting cabinets and points are supervised by GPS.
  • 54. OVERVIEW – LightingOVERVIEW – Lighting substationsubstation A cabinet is symbolized by a leaflet containing all the information concerning working, status, faults and consumptions history. The leaflet can also contain the picture of the installation.
  • 55. Energy savingEnergy saving Lighting at nominal power rating Lighting at reduced power rating There is 50% of energy saving between the lights at full power and the Lights in reduced mode. Connection example on the substation GIL31
  • 56. Other ReferencesOther References Some examples of customer using our material as Compacto and Augier BoxSome examples of customer using our material as Compacto and Augier Box Toulouse cityToulouse city Alès cityAlès city Albi cityAlbi city Mende cityMende city Brignoles cityBrignoles city Puget sur Argens cityPuget sur Argens city Evian cityEvian city Limoges cityLimoges city MontMélian cityMontMélian city Carros cityCarros city Quimper cityQuimper city Reims cityReims city Rennes cityRennes city Martigne sur Mayenne cityMartigne sur Mayenne city Mans cityMans city Douarnenez cityDouarnenez city Ugine cityUgine city MontRigaud cityMontRigaud city Romans sur Isère cityRomans sur Isère city Thonon les Bains cityThonon les Bains city Chartres cityChartres city Nimes cityNimes city Blois cityBlois city Toury cityToury city Fleury les Aubrais cityFleury les Aubrais city Cagnes sur Mer cityCagnes sur Mer city Strasbourg cityStrasbourg city Angoulême cityAngoulême city Marmande cityMarmande city Jussecourt cityJussecourt city Mareuil cityMareuil city Aulnay cityAulnay city Commune of St Pierre (La Réunion)Commune of St Pierre (La Réunion) Industrial area of Beau séjour (la Réunion)Industrial area of Beau séjour (la Réunion) Pru of St Marie (la Réunion)Pru of St Marie (la Réunion) Nice airportNice airport Marseille airportMarseille airport Lyon airportLyon airport Paris airportParis airport Hospital of GrasseHospital of Grasse Texas Instrument (Villeneuve-Loubet)Texas Instrument (Villeneuve-Loubet)
  • 57. AUGIER STRENGTHAUGIER STRENGTH REPUTATION & EXPERIENCEREPUTATION & EXPERIENCE  Sauveur Beninati – Commerical DirectorSauveur Beninati – Commerical Director -- 31 years31 years  Raymond Grenneiser – Technical DirectorRaymond Grenneiser – Technical Director -- 27 years27 years  Yannick Pied – Production DirectorYannick Pied – Production Director -- 20 years20 years  Pascal Disdier – MV System design Incharge -Pascal Disdier – MV System design Incharge - 22 years22 years  Thien Vudo - Airport system InchargeThien Vudo - Airport system Incharge -- 10 years10 years  Pierre girin – Dimmer system & salesPierre girin – Dimmer system & sales -- 15 years15 years  Murielle Deweist – Sales & SupportMurielle Deweist – Sales & Support -- 15 years15 years  Gil Daver – Sales & SupportGil Daver – Sales & Support -- 13 years13 years  Gilbert Grec – Test & Comm Airfield systemsGilbert Grec – Test & Comm Airfield systems -- 20 years20 years  Jean Louis Tardy – Test & comm MV & dimm -Jean Louis Tardy – Test & comm MV & dimm - 14 years14 years  Serge villa – Technical incharge – DimmerSerge villa – Technical incharge – Dimmer -- 5 years5 years
  • 58. AUGIER S.AAUGIER S.A TO LIGHT THE WORLD BETTERTO LIGHT THE WORLD BETTER THANK YOUTHANK YOU