Giant wind turbines in deep water and their challenges Moving to deeper waters enables the installation of giant turbines in the 5MW to 10MW range. However, there are several obstacles for the industry to overcome; foundation types, installation, operation and maintenance, and the financial cost of these installations. Find more information on the topic in the article here: http://bit.ly/Pawsey_Challenges