One-page case history instrumentation and monitoring
Example 23 (2009) - Pre-piling of foundations for offshore wind turbines
CATEGORY MAIN OBJECTIVE MAIN BENEFIT
Construction control Monitor pile driving and final elevation of pile top Reduced cost of construction
BACKGROUND AND DESCRIPTION OF PROJECT
The current world-wide interest in renewable energy has
resulted in an exponential grow in the number of planned and
installed wind farm for generating electrical energy offshore.
The European commission stipulates that almost 9000 Offshore
Wind Turbines (OWT’s) will be in operation by year 2020
which corresponds to an installation rate of 2.5 OWT’s pr day.
This has opened up another area where geotechnical
instrumentation can play an important role.
At present the majority of the foundations for offshore wind
parks consist of driven steel monopiles. However, as these
installations move into deeper water (typical 25-50m) the
bending stiffness of monopiles is not sufficient. Consequently,
jackets or tripod foundations are required. Some wind farm
projects may include
hundreds of OWT’s. Thus
there is a need to simplify
the installation process.
One way to do this is to
drive the piles in advance
using a seabed template
with pile guides, Figure 3.
The larger (and more
expensive) lifting vessels
are then only required to
deploy the jacket or tri-
pods directly on the pre-
piled foundations.
FACTORS THAT INFLUENCED THE DESIGN OF THE
MONITORING PROGRAM
The pre-piling method requires that the pile stick up is
monitored during pile driving and pile top elevation differences
must be measured with high precision after all piles in the group
are installed. These measurements will be crucial for leveling
of the structure supporting the wind turbine.
The under-water conditions are usually very bad at offshore wind
farm locations because of strong tides, poor visibility and
obviously a lot of wind generated ocean waves. A major challenge
is to establish a level horizontal reference for measurements in
those conditions. In addition, the size of the piles (usually with 2.5
to 3 m diameter) makes measurements with millimeter precision
demanding. Another challenge is to develop a monitoring system
which will survive in the vicinity of a pile driving hammer.
SCOPE OF INSTRUMENTATION
The development of pre-piling monitoring systems at NGI
started in 2009 and has been improved in different stages. The
initial systems required diver or ROV assistance in placement
and operation of the instruments. The system has subsequently
been integrated with the piling template and is operated
remotely from the surface without any subsea intervention.
Obviously the durability of the system has been improved at the
same time to eliminate the weak parts.
The key measurands are: Driven
depth and inclination of the piles
during driving, and final elevation
and inclination of the pile tops.
Fig. 2.Taut-wire based pile
driving monitoring system
Fig. 3. Seabed template fitted with a liquid level system to
monitor elevation difference of pile sleeves and caliper arms to
measure the pile stick-up.
MOST SIGNIFICANT INFORMATION DERIVED
The monitoring systems provide real-time data to control the
pile driving to the specified depth. The pile elevation
measurements and tilt angles are used to adapt the structure to
fit the as-installed piles with a precision better than 10 mm.
Spacers are commonly used to compensate for the differences
in pile top elevations.
The measured data is a key element for the pre-piling
installation method and has significantly reduced the costs for
both offshore operations and the OWT structures themselves.
REFERENCE: Not published
Fig. 1. Pre-piled jacket foundation
NGI.NO
ON SAFE GROUND

More Related Content

Similar to 23-2009 Pre-piling for wind farms.pdf

e15007
e15007e15007
e15007
Ashish Dewan
 
Lcoe offshore
Lcoe offshoreLcoe offshore
Lcoe offshore
inesgs
 
Oil pipiline stress monitoring
Oil pipiline  stress monitoringOil pipiline  stress monitoring
Oil pipiline stress monitoring
Juan David Betancur
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
John Grover
 
2012 offshore wind cables
2012 offshore wind cables2012 offshore wind cables
2012 offshore wind cables
MEC Intelligence
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
Pablo Miguel Jurado
 
DYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATION
DYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATIONDYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATION
DYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATION
IRJET Journal
 
Inteligencia Windfarms.pptx
Inteligencia Windfarms.pptxInteligencia Windfarms.pptx
Inteligencia Windfarms.pptx
Leyneth1
 
TESSME Public. pages
TESSME Public. pagesTESSME Public. pages
TESSME Public. pages
James O'Donnell
 
IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...
IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...
IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...
IRJET Journal
 
IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...
IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...
IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...
IRJET Journal
 
Nwtc turb sim workshop september 22 24, 2008- boundary layer dynamics and wi...
Nwtc turb sim workshop september 22 24, 2008-  boundary layer dynamics and wi...Nwtc turb sim workshop september 22 24, 2008-  boundary layer dynamics and wi...
Nwtc turb sim workshop september 22 24, 2008- boundary layer dynamics and wi...
ndkelley
 
Offshore Wind Power Systems -public
Offshore Wind Power Systems -publicOffshore Wind Power Systems -public
Offshore Wind Power Systems -public
James O'Donnell
 
IRJET- Seismic Analysis of Offshore Wind Turbine Foundations
IRJET- Seismic Analysis of Offshore Wind Turbine FoundationsIRJET- Seismic Analysis of Offshore Wind Turbine Foundations
IRJET- Seismic Analysis of Offshore Wind Turbine Foundations
IRJET Journal
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
Gensol Engineering Limited
 
IRJET- An Investigation of Axial Hydrofoil Tidal Turbine
IRJET-  	  An Investigation of Axial Hydrofoil Tidal TurbineIRJET-  	  An Investigation of Axial Hydrofoil Tidal Turbine
IRJET- An Investigation of Axial Hydrofoil Tidal Turbine
IRJET Journal
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
minh nguyễn
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
IJET - International Journal of Engineering and Techniques
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"
Remedy Geotechnics Ltd
 
Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...
Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...
Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...
TELKOMNIKA JOURNAL
 

Similar to 23-2009 Pre-piling for wind farms.pdf (20)

e15007
e15007e15007
e15007
 
Lcoe offshore
Lcoe offshoreLcoe offshore
Lcoe offshore
 
Oil pipiline stress monitoring
Oil pipiline  stress monitoringOil pipiline  stress monitoring
Oil pipiline stress monitoring
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
2012 offshore wind cables
2012 offshore wind cables2012 offshore wind cables
2012 offshore wind cables
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
DYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATION
DYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATIONDYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATION
DYNAMIC STABILITY OF TRANSMISSION TOWER RESTING ON PILE FOUNDATION
 
Inteligencia Windfarms.pptx
Inteligencia Windfarms.pptxInteligencia Windfarms.pptx
Inteligencia Windfarms.pptx
 
TESSME Public. pages
TESSME Public. pagesTESSME Public. pages
TESSME Public. pages
 
IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...
IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...
IRJET - Experimental Study on Flow Net through Multilayered Soil by using Hyd...
 
IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...
IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...
IRJET- Optimized Blade Replacement Solution in Wind Turbine using Craneless T...
 
Nwtc turb sim workshop september 22 24, 2008- boundary layer dynamics and wi...
Nwtc turb sim workshop september 22 24, 2008-  boundary layer dynamics and wi...Nwtc turb sim workshop september 22 24, 2008-  boundary layer dynamics and wi...
Nwtc turb sim workshop september 22 24, 2008- boundary layer dynamics and wi...
 
Offshore Wind Power Systems -public
Offshore Wind Power Systems -publicOffshore Wind Power Systems -public
Offshore Wind Power Systems -public
 
IRJET- Seismic Analysis of Offshore Wind Turbine Foundations
IRJET- Seismic Analysis of Offshore Wind Turbine FoundationsIRJET- Seismic Analysis of Offshore Wind Turbine Foundations
IRJET- Seismic Analysis of Offshore Wind Turbine Foundations
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 
IRJET- An Investigation of Axial Hydrofoil Tidal Turbine
IRJET-  	  An Investigation of Axial Hydrofoil Tidal TurbineIRJET-  	  An Investigation of Axial Hydrofoil Tidal Turbine
IRJET- An Investigation of Axial Hydrofoil Tidal Turbine
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"
 
Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...
Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...
Design and Evaluation of Submersible 11/0.415kV Distribution Substation for F...
 

Recently uploaded

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
zubairahmad848137
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
sachin chaurasia
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 

Recently uploaded (20)

Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Casting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdfCasting-Defect-inSlab continuous casting.pdf
Casting-Defect-inSlab continuous casting.pdf
 
The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.The Python for beginners. This is an advance computer language.
The Python for beginners. This is an advance computer language.
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 

23-2009 Pre-piling for wind farms.pdf

  • 1. One-page case history instrumentation and monitoring Example 23 (2009) - Pre-piling of foundations for offshore wind turbines CATEGORY MAIN OBJECTIVE MAIN BENEFIT Construction control Monitor pile driving and final elevation of pile top Reduced cost of construction BACKGROUND AND DESCRIPTION OF PROJECT The current world-wide interest in renewable energy has resulted in an exponential grow in the number of planned and installed wind farm for generating electrical energy offshore. The European commission stipulates that almost 9000 Offshore Wind Turbines (OWT’s) will be in operation by year 2020 which corresponds to an installation rate of 2.5 OWT’s pr day. This has opened up another area where geotechnical instrumentation can play an important role. At present the majority of the foundations for offshore wind parks consist of driven steel monopiles. However, as these installations move into deeper water (typical 25-50m) the bending stiffness of monopiles is not sufficient. Consequently, jackets or tripod foundations are required. Some wind farm projects may include hundreds of OWT’s. Thus there is a need to simplify the installation process. One way to do this is to drive the piles in advance using a seabed template with pile guides, Figure 3. The larger (and more expensive) lifting vessels are then only required to deploy the jacket or tri- pods directly on the pre- piled foundations. FACTORS THAT INFLUENCED THE DESIGN OF THE MONITORING PROGRAM The pre-piling method requires that the pile stick up is monitored during pile driving and pile top elevation differences must be measured with high precision after all piles in the group are installed. These measurements will be crucial for leveling of the structure supporting the wind turbine. The under-water conditions are usually very bad at offshore wind farm locations because of strong tides, poor visibility and obviously a lot of wind generated ocean waves. A major challenge is to establish a level horizontal reference for measurements in those conditions. In addition, the size of the piles (usually with 2.5 to 3 m diameter) makes measurements with millimeter precision demanding. Another challenge is to develop a monitoring system which will survive in the vicinity of a pile driving hammer. SCOPE OF INSTRUMENTATION The development of pre-piling monitoring systems at NGI started in 2009 and has been improved in different stages. The initial systems required diver or ROV assistance in placement and operation of the instruments. The system has subsequently been integrated with the piling template and is operated remotely from the surface without any subsea intervention. Obviously the durability of the system has been improved at the same time to eliminate the weak parts. The key measurands are: Driven depth and inclination of the piles during driving, and final elevation and inclination of the pile tops. Fig. 2.Taut-wire based pile driving monitoring system Fig. 3. Seabed template fitted with a liquid level system to monitor elevation difference of pile sleeves and caliper arms to measure the pile stick-up. MOST SIGNIFICANT INFORMATION DERIVED The monitoring systems provide real-time data to control the pile driving to the specified depth. The pile elevation measurements and tilt angles are used to adapt the structure to fit the as-installed piles with a precision better than 10 mm. Spacers are commonly used to compensate for the differences in pile top elevations. The measured data is a key element for the pre-piling installation method and has significantly reduced the costs for both offshore operations and the OWT structures themselves. REFERENCE: Not published Fig. 1. Pre-piled jacket foundation NGI.NO ON SAFE GROUND