SKILLS SUMMARY
Charles WIGT
Consultant
Construction & Project Management Engineer
Skills
 Project management : scheduling, organisation, contract management
 Costs, quality and time management
 Negociation with subcontractors, clients, consortium partners
 Progress management and activities coordination
 Reporting
 Engineers and workers teams management
 Working in multi-cultural contexts
 Adaptability to new contexts (type of project, cutural contexts : countries cultures or companies cultures)
 ….
Education
Engineer - Master's degree Arts & Métiers ParisTech
(ENSAM) - Major Entrepreneurship - France, 2010
Baccalauréat Scientifique (French high school degree) -
Major Science - France, 2004
LANGUAGES :
French, Mother tongue
English, Fluent
Spanish, School level
German, Basics
Experiences Context
Buildings :
- Luxury housing
- Housing (apartments, houses)
- Offices
- Restaurant
- Stadium
- Electrical plant building
Energies :
- Oil & Gas :
- Refinery
- Petrochemical plant
- Photovoltaïc plant
Software & Methods
MS Office (Word, Excel, Power Point)
MS Project
Outlook
Lotus Notes
Autocad (drawing analysis and reading)
Charles WIGT
charles.wigt@gadz.org
Page 2 sur 7
Expériences
Piman Consultants
March 2014 to January 2015 : Site Manager, Photovoltaïc plant "Bardzour", Le Port, La Réunion island,
France
Construction of a 9 MegaWatts photovoltaïc plant with energy storage & management, on an 11 hectares
area
o Coordinated all works internally (Civil works, Steel Structure, Electrical works,...) and with the other
consortium members (Electrical equipments, Energy storage buildings)
o Coordinated the interfaces with the consortium members and the client
o Supervised the design and coordinated the design with the construction
o Organised the works on site
o Elaborated works schedule for the entire site works, defined the priorities
o Found technical & practical solutions to solve issues
o Identified critical activities and wrote action plans
o Established and validated construction method statements
o Validated subcontractors bills
o Wrote bills to be paid by the client
o Defined needs and recruited staff (managers and workers)
o Organised and Managed Human Ressources
o Found solutions to reduce the end of works delay
o Managed issues linked to site constraints : construction of the plant within a prison walls
o Put in place Safety procedures (Tool box talks,...)
o Contract Management :
 Managed the costs : comparison and cause analysis of the differences between contractual
amounts and real costs
 Managed contracts between consortium members, between the consortium and the client,
and between the consortium and the subcontractors : identification and analysis of critical
points
 Contract and cost negotiation : debated on critical contractual points
 Negotiated contracts with the subcontractors and with the client
Results :
o Rigour
o Method
o Precise follow-up of works progress
o Mastery of activities and subcontractors on site
o Improvement of quality and safety
o Schedule mastery
o Quality mastery
o Safety mastery
o Adaptation to a multicultural context
o Created a motivated and supportive team
o Built a management team which had never had experience in construction
o Legal and contractual aspects mastery, with the client and the subcontractors
o Reduced financial losses
Charles WIGT
charles.wigt@gadz.org
Page 3 sur 7
TECHNIP FRANCE
6 months : Construction Engineer, Home office, Paris La Defense, France
o Established running costs estimation for camps and Site installations for different offers in Africa,
Middle East, Asia.
o Elaborated typical method statements
o Wrote typical folders defining scope of work limits between different activities for camps and site
installations
2 months : Underground works Superintendant, Algiers Refinery, Algeria
o Coordinated all the underground works (fundations, underground services)
 Supervised the design and coordinated the design with the construction
 Elaborated a schedule for design according to the construction needs
 Elaborated an underground works schedule for the whole site, identified the priorities
according to other activities
 Supervised and coordinated works on site
 Found technical and practical solutions to solve issues
 Identified critical activities and elaborated action plans
 Reviewed and corrected method statements
 Inspected works on site
o Coordination of heavy lifts activities (Equipments heavier than 50 tons) with civil works activities
 Elaborated a schedule according to the construction site needs
 Identified critical activities and elaborated of action plan
 Established method statements for transportation and installation of equipments
o Managed issues linked to construction site constraints (work around a running refinery, respect
security rules due to terrorism risks,...)
2 months : Civil works, Steel structure and Site installation Supervisor, BASF plant, Chlorine
production unit, Ludwigshafen, Germany
o Coordination of all the civil works (fundations, underground services)
 Supervised the design and coordinated the design with the construction
 Elaborated a schedule for design according to the construction needs
 Established an underground works schedule for the whole site, identified the priorities
according to other activities
 Supervised and coordinated works on site
 Found technical and practical solutions to solve issues
 Identified critical activities and elaborated action plan
 Reviewed and corrected method statements
 Inspected work on site
o Prepared and Coordinated heavy lifts activities (Equipments of more than 50 tons)
o Managed issues linked to construction site constraints : working at different remoted location within
a running plant surrouded by toxics and explosives chemical products
4 months : Shut-Down Coordinator, BASF plant, Chlorine production unit, Ludwigshafen, Germany
o Supervised and coordinated the design with fabrication and installation
Charles WIGT
charles.wigt@gadz.org
Page 4 sur 7
o Elaborated a schedule for studies according to installation needs
o Established a schedule for installation of piping and equipments, defined the priorities
o Supervised and coordinated installation works
o Found technical and practical solutions to solve issues
o Identified critical activities and elaborated action plans
o Reviewed and corrected installation method statements
o Inspected works on site
o Gave to the contract management all required informations for contract management : work
progress, contractual works not done by subcontractors, non-conformances, issues,...
Results :
o Rigour
o Method
o Precise follow-up of works progress
o Mastery of activities and subcontractors on site
o Improvement of quality and safety
o Schedule mastery
o Quality mastery
o Safety mastery
o Adaptation to a multicultural context
o Created a motivated and supportive team
o Legal and contractual aspects mastery, with the client and the subcontractors
Charles WIGT
charles.wigt@gadz.org
Page 5 sur 7
CAMPENON BERNARD CONSTRUCTION (VINCI)
5 months: Technical Trades Engineer, Rehabilitation of the University Pierre et Marie Curie, 100.000m2
area, Paris, France
In charge of the Mechanical works : Plumbing, Medical fluids, laboratory working tables and ventilation
(design, schedule, execution and coordination of works)
o Managed the interfaces between subcontractors
o Managed issues linked to construction site constraints
o Managed issued linked to the density of technical services
o Engineering management :
 Established an engineering schedule in collaboration with subcontractors
 Validated the subcontractors bills
 Choose the equipments to be used in order to respect the budget
 Found technical and architectural solutions (variations to the contract) in order to respect the
budget
 Coordinated all the different technical trades taking into account the architectural constraints
o Works on site management :
 Established a schedule of work in collaboration with subcontractors
 Managed the building costs, validated the subcontractors bills
 Prepared the mock-up area : deliveries logistic, established a sequence of works
 Identified critical activities and established action plans
o Contract management :
 Cost Management : comparison and cause analysis of the differences between contract
amounts and real costs
 Managed legal and contract aspects with the client and with the subcontractors
 Negciated extra-costs and extra-works with the subcontractors and with the client
 Negotiated of contract with the subcontractors and with the client
Results :
o Rigour
o Method
o Precise follow-up of works progress
o Mastery of activities and subcontractors on site
o Improvement of quality and safety
o Costs mastery
o Schedule mastery
o Quality mastery
o Safety mastery
o Legal and contractual aspects mastery, with the client and the subcontractors
Charles WIGT
charles.wigt@gadz.org
Page 6 sur 7
BOUYGUES BATIMENT OUVRAGES PUBLICS
4 months : Construction Engineer, Ministry of Defense, Paris
Managed the construction all trades of the thermic plant building - Confidential Defense project
o Coordinated the interfaces with the other buildings construction
o Managed issues linked to security during the construction activities : site access, information
transmission
o Managed issues linked to the security for the future operation period : access control, security
systems,...
o Civil Works management :
• Established a schedule of works
• Managed the building costs, validated the subcontractors bills
• Coordinated the deliveries, choose the equipements to be used
• Coordinated the works on site : underground services installation (1.2km of pipe sleeves
under 800m2 of slab), piles, ground beams, concrete walls cast in situ, precast walls, precast
slabs
o Technical trades engineering and construction management :
• Supervised the engineering, made drawings when not provided
• Coordinated the subcontractors and the interfaces with the civil works
o Contract management :
• Cost Management : comparison and cause analysis of the differences between contract
amounts and real costs
• Managed legal and contract aspects with the client and with the subcontractors
• Negociated extra-costs and extra-works with the subcontractors and with the client
• Negotiated contracts with the subcontractors and with the client
Results :
o Rigour
o Method
o Precise follow-up of works progress
o Mastery of activities and subcontractors on site
o Improvement of quality and safety
o Costs mastery
o Schedule mastery
o Quality mastery
o Safety mastery
o Legal and contractual aspects mastery, with the client and the subcontractors
Charles WIGT
charles.wigt@gadz.org
Page 7 sur 7
BOUYGUES BATIMENT INTERNATIONAL
1 year : Site engineer all trades, Singapore Sports Hub, Singapore
o Demolition : (function ensured 8 months)
• Defined the demolition method (writting of method statements) : established a sequence of
work, choose the equipments and the method to be applied
• Planned and supervised the works : ensured the respect of established method, adapted the
methods when required by site constraints, made safety rules applied by everyone
o Purchasing : (function ensured 10 months) - Reorganization of the purchasing department in order
to minimize the products buying costs
• Established a new purchasing process (quotation, price negociation, validation process,
purchase order,...)
• Established partnership relations with suppliers
• Choose products to be used, submitted them to the client and followed their validations
o Underground Services : (function ensured 9 months) - Supervised the engineering and construction
(about 5km of underground services below the stadium area : waste water, rain water, fire
protection, electrical pipe sleeves)
• Supervised subcontractors quotations : measured the quantity of work, asked for quotations,
compared the different offers, choose the subcontractor
• Checked the drawings to remove mistakes, to make them compliant with the standards in
order to make the construction easier
• Supervised the work execution : established a schedule, managed the subcontractor, solved
construction problems (interfaces with civil works and with other areas,...) finding practical
solutions
• Validated the subcontractors construction progress and bills
o Civil Works : (function ensured 6 months) - Supervised the construction of half of the stadium
• Checked the steel consuption, compared the steel and concrete quantities used to the
forecasts
• Found solutions to solve issues during the construction
• Made the safety rules respected by everyone, coordinated the works between my workers
and subcontractors workers
o Contract management :
• Cost Management : comparison and cause analysis of the differences between contract
amounts and real costs
• Managed legal and contract aspects with the client and with the subcontractors
• Negotiated of contract with the subcontractors and with the client
Results :
o Rigour
o Method
o Precise follow-up of works progress
o Mastery of activities and subcontractors on site
o Improvement of quality and safety
o Schedule mastery
o Quality mastery
o Safety mastery
o Adaptation to a multicultural context
o Created a motivated and supportive team
o Legal and contractual aspects mastery, with the client and the subcontractors

More Related Content

What's hot

CV 2014 WEB UPLOAD
CV 2014 WEB UPLOADCV 2014 WEB UPLOAD
CV 2014 WEB UPLOAD
alhabtoor specon Ayman mashad
 
Jacobs Curriculum Vitae
Jacobs Curriculum VitaeJacobs Curriculum Vitae
Jacobs Curriculum Vitae
James King
 
CV Stuart Hutchison
CV Stuart HutchisonCV Stuart Hutchison
CV Stuart Hutchison
Stuart Hutchison
 
Cv ian barlow 2016 summary
Cv ian barlow 2016 summaryCv ian barlow 2016 summary
Cv ian barlow 2016 summary
Ian Barlow
 
Nguyen Van Tuan - English
Nguyen Van Tuan - English Nguyen Van Tuan - English
Nguyen Van Tuan - English
nguyễn văn Tuấn
 
CV-DF-15
CV-DF-15CV-DF-15
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
Mohamed Sayed
 

What's hot (7)

CV 2014 WEB UPLOAD
CV 2014 WEB UPLOADCV 2014 WEB UPLOAD
CV 2014 WEB UPLOAD
 
Jacobs Curriculum Vitae
Jacobs Curriculum VitaeJacobs Curriculum Vitae
Jacobs Curriculum Vitae
 
CV Stuart Hutchison
CV Stuart HutchisonCV Stuart Hutchison
CV Stuart Hutchison
 
Cv ian barlow 2016 summary
Cv ian barlow 2016 summaryCv ian barlow 2016 summary
Cv ian barlow 2016 summary
 
Nguyen Van Tuan - English
Nguyen Van Tuan - English Nguyen Van Tuan - English
Nguyen Van Tuan - English
 
CV-DF-15
CV-DF-15CV-DF-15
CV-DF-15
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 

Similar to 2015-01 Charles WIGT DC English

CV
CVCV
Donald Buchanan CV PM1.docx
Donald Buchanan CV PM1.docxDonald Buchanan CV PM1.docx
Donald Buchanan CV PM1.docx
Donald Buchanan
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
Ronald Fung
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio Martin Martinez Arano
 
Guc arct 702 legislations lecture 1 - course introduction 14-9-2017
Guc arct 702 legislations   lecture 1 - course introduction 14-9-2017Guc arct 702 legislations   lecture 1 - course introduction 14-9-2017
Guc arct 702 legislations lecture 1 - course introduction 14-9-2017
Galala University
 
Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016
Thomas Frank.
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
juwes
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
Dinesh Pardeshi
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
Shailesh Pawar
 
Project 27663255255255781771777166162666
Project 27663255255255781771777166162666Project 27663255255255781771777166162666
Project 27663255255255781771777166162666
MilkiasMuse
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
Mohideen Sheik Asan
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
Mohamed S. Hegazi
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
jafar hussain
 
Ashoka-CV
Ashoka-CVAshoka-CV
Ashoka-CV
Ashokkumar C
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 
hisham ibrahim CV
hisham ibrahim CVhisham ibrahim CV
hisham ibrahim CV
Hisham Ibrahim
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
pramod patel
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
rias ahamed
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar
 

Similar to 2015-01 Charles WIGT DC English (20)

CV
CVCV
CV
 
Donald Buchanan CV PM1.docx
Donald Buchanan CV PM1.docxDonald Buchanan CV PM1.docx
Donald Buchanan CV PM1.docx
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
Guc arct 702 legislations lecture 1 - course introduction 14-9-2017
Guc arct 702 legislations   lecture 1 - course introduction 14-9-2017Guc arct 702 legislations   lecture 1 - course introduction 14-9-2017
Guc arct 702 legislations lecture 1 - course introduction 14-9-2017
 
Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016Thomas Koziarski Consulting brief presentation 2016
Thomas Koziarski Consulting brief presentation 2016
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
DCP_RESUME
DCP_RESUMEDCP_RESUME
DCP_RESUME
 
Shailesh Pawar Profile
Shailesh Pawar ProfileShailesh Pawar Profile
Shailesh Pawar Profile
 
Project 27663255255255781771777166162666
Project 27663255255255781771777166162666Project 27663255255255781771777166162666
Project 27663255255255781771777166162666
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Ashoka-CV
Ashoka-CVAshoka-CV
Ashoka-CV
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
hisham ibrahim CV
hisham ibrahim CVhisham ibrahim CV
hisham ibrahim CV
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Project - Logistics & Operation
Project - Logistics & OperationProject - Logistics & Operation
Project - Logistics & Operation
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 

2015-01 Charles WIGT DC English

  • 1. Charles WIGT charles.wigt@gadz.org Page 1 sur 7 SKILLS SUMMARY Charles WIGT Consultant Construction & Project Management Engineer Skills  Project management : scheduling, organisation, contract management  Costs, quality and time management  Negociation with subcontractors, clients, consortium partners  Progress management and activities coordination  Reporting  Engineers and workers teams management  Working in multi-cultural contexts  Adaptability to new contexts (type of project, cutural contexts : countries cultures or companies cultures)  …. Education Engineer - Master's degree Arts & Métiers ParisTech (ENSAM) - Major Entrepreneurship - France, 2010 Baccalauréat Scientifique (French high school degree) - Major Science - France, 2004 LANGUAGES : French, Mother tongue English, Fluent Spanish, School level German, Basics Experiences Context Buildings : - Luxury housing - Housing (apartments, houses) - Offices - Restaurant - Stadium - Electrical plant building Energies : - Oil & Gas : - Refinery - Petrochemical plant - Photovoltaïc plant Software & Methods MS Office (Word, Excel, Power Point) MS Project Outlook Lotus Notes Autocad (drawing analysis and reading)
  • 2. Charles WIGT charles.wigt@gadz.org Page 2 sur 7 Expériences Piman Consultants March 2014 to January 2015 : Site Manager, Photovoltaïc plant "Bardzour", Le Port, La Réunion island, France Construction of a 9 MegaWatts photovoltaïc plant with energy storage & management, on an 11 hectares area o Coordinated all works internally (Civil works, Steel Structure, Electrical works,...) and with the other consortium members (Electrical equipments, Energy storage buildings) o Coordinated the interfaces with the consortium members and the client o Supervised the design and coordinated the design with the construction o Organised the works on site o Elaborated works schedule for the entire site works, defined the priorities o Found technical & practical solutions to solve issues o Identified critical activities and wrote action plans o Established and validated construction method statements o Validated subcontractors bills o Wrote bills to be paid by the client o Defined needs and recruited staff (managers and workers) o Organised and Managed Human Ressources o Found solutions to reduce the end of works delay o Managed issues linked to site constraints : construction of the plant within a prison walls o Put in place Safety procedures (Tool box talks,...) o Contract Management :  Managed the costs : comparison and cause analysis of the differences between contractual amounts and real costs  Managed contracts between consortium members, between the consortium and the client, and between the consortium and the subcontractors : identification and analysis of critical points  Contract and cost negotiation : debated on critical contractual points  Negotiated contracts with the subcontractors and with the client Results : o Rigour o Method o Precise follow-up of works progress o Mastery of activities and subcontractors on site o Improvement of quality and safety o Schedule mastery o Quality mastery o Safety mastery o Adaptation to a multicultural context o Created a motivated and supportive team o Built a management team which had never had experience in construction o Legal and contractual aspects mastery, with the client and the subcontractors o Reduced financial losses
  • 3. Charles WIGT charles.wigt@gadz.org Page 3 sur 7 TECHNIP FRANCE 6 months : Construction Engineer, Home office, Paris La Defense, France o Established running costs estimation for camps and Site installations for different offers in Africa, Middle East, Asia. o Elaborated typical method statements o Wrote typical folders defining scope of work limits between different activities for camps and site installations 2 months : Underground works Superintendant, Algiers Refinery, Algeria o Coordinated all the underground works (fundations, underground services)  Supervised the design and coordinated the design with the construction  Elaborated a schedule for design according to the construction needs  Elaborated an underground works schedule for the whole site, identified the priorities according to other activities  Supervised and coordinated works on site  Found technical and practical solutions to solve issues  Identified critical activities and elaborated action plans  Reviewed and corrected method statements  Inspected works on site o Coordination of heavy lifts activities (Equipments heavier than 50 tons) with civil works activities  Elaborated a schedule according to the construction site needs  Identified critical activities and elaborated of action plan  Established method statements for transportation and installation of equipments o Managed issues linked to construction site constraints (work around a running refinery, respect security rules due to terrorism risks,...) 2 months : Civil works, Steel structure and Site installation Supervisor, BASF plant, Chlorine production unit, Ludwigshafen, Germany o Coordination of all the civil works (fundations, underground services)  Supervised the design and coordinated the design with the construction  Elaborated a schedule for design according to the construction needs  Established an underground works schedule for the whole site, identified the priorities according to other activities  Supervised and coordinated works on site  Found technical and practical solutions to solve issues  Identified critical activities and elaborated action plan  Reviewed and corrected method statements  Inspected work on site o Prepared and Coordinated heavy lifts activities (Equipments of more than 50 tons) o Managed issues linked to construction site constraints : working at different remoted location within a running plant surrouded by toxics and explosives chemical products 4 months : Shut-Down Coordinator, BASF plant, Chlorine production unit, Ludwigshafen, Germany o Supervised and coordinated the design with fabrication and installation
  • 4. Charles WIGT charles.wigt@gadz.org Page 4 sur 7 o Elaborated a schedule for studies according to installation needs o Established a schedule for installation of piping and equipments, defined the priorities o Supervised and coordinated installation works o Found technical and practical solutions to solve issues o Identified critical activities and elaborated action plans o Reviewed and corrected installation method statements o Inspected works on site o Gave to the contract management all required informations for contract management : work progress, contractual works not done by subcontractors, non-conformances, issues,... Results : o Rigour o Method o Precise follow-up of works progress o Mastery of activities and subcontractors on site o Improvement of quality and safety o Schedule mastery o Quality mastery o Safety mastery o Adaptation to a multicultural context o Created a motivated and supportive team o Legal and contractual aspects mastery, with the client and the subcontractors
  • 5. Charles WIGT charles.wigt@gadz.org Page 5 sur 7 CAMPENON BERNARD CONSTRUCTION (VINCI) 5 months: Technical Trades Engineer, Rehabilitation of the University Pierre et Marie Curie, 100.000m2 area, Paris, France In charge of the Mechanical works : Plumbing, Medical fluids, laboratory working tables and ventilation (design, schedule, execution and coordination of works) o Managed the interfaces between subcontractors o Managed issues linked to construction site constraints o Managed issued linked to the density of technical services o Engineering management :  Established an engineering schedule in collaboration with subcontractors  Validated the subcontractors bills  Choose the equipments to be used in order to respect the budget  Found technical and architectural solutions (variations to the contract) in order to respect the budget  Coordinated all the different technical trades taking into account the architectural constraints o Works on site management :  Established a schedule of work in collaboration with subcontractors  Managed the building costs, validated the subcontractors bills  Prepared the mock-up area : deliveries logistic, established a sequence of works  Identified critical activities and established action plans o Contract management :  Cost Management : comparison and cause analysis of the differences between contract amounts and real costs  Managed legal and contract aspects with the client and with the subcontractors  Negciated extra-costs and extra-works with the subcontractors and with the client  Negotiated of contract with the subcontractors and with the client Results : o Rigour o Method o Precise follow-up of works progress o Mastery of activities and subcontractors on site o Improvement of quality and safety o Costs mastery o Schedule mastery o Quality mastery o Safety mastery o Legal and contractual aspects mastery, with the client and the subcontractors
  • 6. Charles WIGT charles.wigt@gadz.org Page 6 sur 7 BOUYGUES BATIMENT OUVRAGES PUBLICS 4 months : Construction Engineer, Ministry of Defense, Paris Managed the construction all trades of the thermic plant building - Confidential Defense project o Coordinated the interfaces with the other buildings construction o Managed issues linked to security during the construction activities : site access, information transmission o Managed issues linked to the security for the future operation period : access control, security systems,... o Civil Works management : • Established a schedule of works • Managed the building costs, validated the subcontractors bills • Coordinated the deliveries, choose the equipements to be used • Coordinated the works on site : underground services installation (1.2km of pipe sleeves under 800m2 of slab), piles, ground beams, concrete walls cast in situ, precast walls, precast slabs o Technical trades engineering and construction management : • Supervised the engineering, made drawings when not provided • Coordinated the subcontractors and the interfaces with the civil works o Contract management : • Cost Management : comparison and cause analysis of the differences between contract amounts and real costs • Managed legal and contract aspects with the client and with the subcontractors • Negociated extra-costs and extra-works with the subcontractors and with the client • Negotiated contracts with the subcontractors and with the client Results : o Rigour o Method o Precise follow-up of works progress o Mastery of activities and subcontractors on site o Improvement of quality and safety o Costs mastery o Schedule mastery o Quality mastery o Safety mastery o Legal and contractual aspects mastery, with the client and the subcontractors
  • 7. Charles WIGT charles.wigt@gadz.org Page 7 sur 7 BOUYGUES BATIMENT INTERNATIONAL 1 year : Site engineer all trades, Singapore Sports Hub, Singapore o Demolition : (function ensured 8 months) • Defined the demolition method (writting of method statements) : established a sequence of work, choose the equipments and the method to be applied • Planned and supervised the works : ensured the respect of established method, adapted the methods when required by site constraints, made safety rules applied by everyone o Purchasing : (function ensured 10 months) - Reorganization of the purchasing department in order to minimize the products buying costs • Established a new purchasing process (quotation, price negociation, validation process, purchase order,...) • Established partnership relations with suppliers • Choose products to be used, submitted them to the client and followed their validations o Underground Services : (function ensured 9 months) - Supervised the engineering and construction (about 5km of underground services below the stadium area : waste water, rain water, fire protection, electrical pipe sleeves) • Supervised subcontractors quotations : measured the quantity of work, asked for quotations, compared the different offers, choose the subcontractor • Checked the drawings to remove mistakes, to make them compliant with the standards in order to make the construction easier • Supervised the work execution : established a schedule, managed the subcontractor, solved construction problems (interfaces with civil works and with other areas,...) finding practical solutions • Validated the subcontractors construction progress and bills o Civil Works : (function ensured 6 months) - Supervised the construction of half of the stadium • Checked the steel consuption, compared the steel and concrete quantities used to the forecasts • Found solutions to solve issues during the construction • Made the safety rules respected by everyone, coordinated the works between my workers and subcontractors workers o Contract management : • Cost Management : comparison and cause analysis of the differences between contract amounts and real costs • Managed legal and contract aspects with the client and with the subcontractors • Negotiated of contract with the subcontractors and with the client Results : o Rigour o Method o Precise follow-up of works progress o Mastery of activities and subcontractors on site o Improvement of quality and safety o Schedule mastery o Quality mastery o Safety mastery o Adaptation to a multicultural context o Created a motivated and supportive team o Legal and contractual aspects mastery, with the client and the subcontractors