Nguyen Van Tuan Present address:
Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi
Email: Nguyenvantuan23887@gmail.com .
1
CURRICULUM VITAE
(A) Pesonal Profile
Full name : Nguyen Van Tuan
Date of birth : August 23rd
, 1987
Place of birth : Hai Duong
Current address : No 5, lane 28/8, Dai Linh Street, Trung Van Ward, Tu Liem District, Ha Noi.
Marital status : Married
Mobile phone : 0908823887,0966320011
Email : nguyenvantuan23887@gmail.com
(B) Education Background
 June, 2012: Graduate from National University of Civil Engineering,
 Major in In-door engineering system.
Career Objective:
Aiming to apply my 6 years project execution skills to effectively fill the managerial role in
your company.
 Core Competencies:
 Specification and drawing
 Document administration
 Project Monitoring & Co-ordination
 Quality Audit, Progress Control
(C) Computer Skill
 Operating System: Windows XP/ 7, 8...
 Tools: Be good at MS. Office, PowerPoint, AutoCAD,...
 Proficient in mechanical major software such as: VRV Xpress, Fantech...
Nguyen Van Tuan Present address:
Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi
Email: Nguyenvantuan23887@gmail.com .
2
(D) Professional Experience
1.Thang Tien Technical Material Co., Ltd
 Viet Nam M&E Company
 Position: Engineer Design and Project Minotoring
 Working Time: From July 2012 to Sep 2015
Office Design in Thang Tien
 Major duties:
 Design the air conditioner system
 Design the ventilation system
 Design firefighting system
 Design Sprinkler system
 Design the air compressor system
 Design the water supply system
 Design the waste water drain system
 Design the pumping system
 Shop drawing
 Material document for approval
Ojtex Bac Ninh Project ( VSIP- Bac Ninh): Supply and installation equipment M&E for
factory.
 Monitoring check on the site.
 Prepare detailed project plans for the works program, and coordinate the work of site
operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
 Edit shop drawing on the site approval main contractor Konoike, order material.
 Ensure compliance with code requirements, safe work practices & procedures.
Sutex karya Bac Giang addition works ( Dinh Tram- Bac Giang): Supply and
installation : waste water pipe for production machine, Power supply for machine,
Boiler pipe connect to machine...
 Position: Site Engineer.
 Monitoring check on the site.
 Prepare detailed project plans for the works program, and coordinate the work of all
site operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
Nguyen Van Tuan Present address:
Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi
Email: Nguyenvantuan23887@gmail.com .
3
 Shop drawing on the site approval owner, order material.
 Ensure compliance with code requirements, safe work practices & procedures.
Sunway Steel Project ( Que Vo 2 - Bac Ninh): Supply and installation M& E, HVAC for
factory.
 Position: Site Engineer.
 Monitoring check on the site.
 Prepare detailed project plans for the works program, and coordinate the work of all
site operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
 Shop drawing on the site approval owner, order material.
 Ensure compliance with code requirements, safe work practices & procedures.
 Hand over document
Hino Motor Viet Nam addtion works ( Ngoc Hoi -Ha Noi): Supply & installation M&E for
rest room, Renovation waste water drain for office, power supply for rest room, ware
house. Supply & installation new pump room....
 Position: Site Engineer.
 Monitoring check on the site.
 Prepare detailed project plans for the works program, and coordinate the work of all
site operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
 Shop drawing on the site approval main contractor OVC, order material.
 Ensure compliance with code requirements, safe work practices & procedures.
 Hand over document.
SIDOOH Vina ( Khai Quang - Vinh Phuc): Supply & installation M&E for Factory,
 Monitoring check on the site.
 Position: Site Engineer.
 Prepare detailed project plans for the works program, and coordinate the work of all
site operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
 Shop drawing on the site approval main contractor 105, order material.
 Ensure compliance with code requirements, safe work practices & procedures.
 Hand over document.
Nguyen Van Tuan Present address:
Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi
Email: Nguyenvantuan23887@gmail.com .
4
2.Sundoo Mechanic & Electrical Co., Ltd
 Viet Nam M&E Company
 Position: Engineer Design, BoQ and Site Engineer
 Working Time: From Oct 2015 to Now
Office Design in Sudoo
 Major duties:
 Design the air conditioner system
 Design the ventilation system
 Design firefighting system
 Design Sprinkler system
 Design the air compressor system
 Design the water supply system
 Design the waste water drain system
 Design the pumping system
 Shop drawing
 Review and approve for BoQ from supplier.
 Manager, prepare detailed project plans for the works program, and coordinate the
work of all site operations for Sub- Contractor.
 Prepare calculation sheet, design drawings, BoQ, quotation for Mechanical system for
project: ACE- Ha Nam, Castec, LGI- Hai Phong, KET- Thai Nguyen, KPF - Hai Duong,
Halla- Hai Phong, Samjin- Vinh Phuc, RF- tech, Topas - Thai Nguyen,Oh- Sung- Hai
Phong, Woo- Sung - Hai Phong, Seoul- Semi- Ha Nam....
LGI Project ( Trang Due - Hai Phong): Supply & installation M&E, HVAC for Factory,
 Monitoring check Sub Contractor.
 Position: Site Engineer.
 Prepare detailed project plans for the works program, and coordinate the work of Sub
Contractor operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
 Shop drawing on the site approval main contractor Yongjin.
 Check Hand over document Sub - Contractor.
 Check quanlity Balance for Sub - Contractor.
KET Project ( Diem Thuy - Thai Nguyen ): Supply & installation M&E, HVAC for Factory,
 Position: Site Engineer.
 Monitoring check Sub Contractor.
Nguyen Van Tuan Present address:
Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi
Email: Nguyenvantuan23887@gmail.com .
5
 Prepare detailed project plans for the works program, and coordinate the work of Sub
Contractor operations.
 Ensure project objectives are achieved and projects move forward in accordance with
agreed scope, timeframe, quality and safety standards.
 Shop drawing on the site approval main contractor Yongjin.
 Check Hand over document Sub - Contractor.
 Check quanlity Balance for Sub - Contractor.
(E) Languages & Capability , Qualification
Languages:
 Vietnamese : Mother tongue
 English : English be able to read, translate specialized documents and Able to
communicate in English at basic level.
Capability & Qualification:
 Being hard-working, careful, well-disciplined and enthusiastic
 Having the ability to work independently or team work
 Willingness to learn and do what takes to get a job done well even under pressure or
on far mission.
 Good communication skill with client, sub-contractor, vendor.
 Being dynamic and creative
(F) Additional Information
 To be recruiting and worked for a professional environment are what I expect. I believe I
can contribute by developing all skills and experience I have learned and gained during
the past five years to your company.
 I hereby declare that the above information furnished by me is accurate and true to the
best of my knowledge and belief.
 I Sincerely thank.

Nguyen Van Tuan - English

  • 1.
    Nguyen Van TuanPresent address: Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi Email: Nguyenvantuan23887@gmail.com . 1 CURRICULUM VITAE (A) Pesonal Profile Full name : Nguyen Van Tuan Date of birth : August 23rd , 1987 Place of birth : Hai Duong Current address : No 5, lane 28/8, Dai Linh Street, Trung Van Ward, Tu Liem District, Ha Noi. Marital status : Married Mobile phone : 0908823887,0966320011 Email : nguyenvantuan23887@gmail.com (B) Education Background  June, 2012: Graduate from National University of Civil Engineering,  Major in In-door engineering system. Career Objective: Aiming to apply my 6 years project execution skills to effectively fill the managerial role in your company.  Core Competencies:  Specification and drawing  Document administration  Project Monitoring & Co-ordination  Quality Audit, Progress Control (C) Computer Skill  Operating System: Windows XP/ 7, 8...  Tools: Be good at MS. Office, PowerPoint, AutoCAD,...  Proficient in mechanical major software such as: VRV Xpress, Fantech...
  • 2.
    Nguyen Van TuanPresent address: Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi Email: Nguyenvantuan23887@gmail.com . 2 (D) Professional Experience 1.Thang Tien Technical Material Co., Ltd  Viet Nam M&E Company  Position: Engineer Design and Project Minotoring  Working Time: From July 2012 to Sep 2015 Office Design in Thang Tien  Major duties:  Design the air conditioner system  Design the ventilation system  Design firefighting system  Design Sprinkler system  Design the air compressor system  Design the water supply system  Design the waste water drain system  Design the pumping system  Shop drawing  Material document for approval Ojtex Bac Ninh Project ( VSIP- Bac Ninh): Supply and installation equipment M&E for factory.  Monitoring check on the site.  Prepare detailed project plans for the works program, and coordinate the work of site operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.  Edit shop drawing on the site approval main contractor Konoike, order material.  Ensure compliance with code requirements, safe work practices & procedures. Sutex karya Bac Giang addition works ( Dinh Tram- Bac Giang): Supply and installation : waste water pipe for production machine, Power supply for machine, Boiler pipe connect to machine...  Position: Site Engineer.  Monitoring check on the site.  Prepare detailed project plans for the works program, and coordinate the work of all site operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.
  • 3.
    Nguyen Van TuanPresent address: Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi Email: Nguyenvantuan23887@gmail.com . 3  Shop drawing on the site approval owner, order material.  Ensure compliance with code requirements, safe work practices & procedures. Sunway Steel Project ( Que Vo 2 - Bac Ninh): Supply and installation M& E, HVAC for factory.  Position: Site Engineer.  Monitoring check on the site.  Prepare detailed project plans for the works program, and coordinate the work of all site operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.  Shop drawing on the site approval owner, order material.  Ensure compliance with code requirements, safe work practices & procedures.  Hand over document Hino Motor Viet Nam addtion works ( Ngoc Hoi -Ha Noi): Supply & installation M&E for rest room, Renovation waste water drain for office, power supply for rest room, ware house. Supply & installation new pump room....  Position: Site Engineer.  Monitoring check on the site.  Prepare detailed project plans for the works program, and coordinate the work of all site operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.  Shop drawing on the site approval main contractor OVC, order material.  Ensure compliance with code requirements, safe work practices & procedures.  Hand over document. SIDOOH Vina ( Khai Quang - Vinh Phuc): Supply & installation M&E for Factory,  Monitoring check on the site.  Position: Site Engineer.  Prepare detailed project plans for the works program, and coordinate the work of all site operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.  Shop drawing on the site approval main contractor 105, order material.  Ensure compliance with code requirements, safe work practices & procedures.  Hand over document.
  • 4.
    Nguyen Van TuanPresent address: Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi Email: Nguyenvantuan23887@gmail.com . 4 2.Sundoo Mechanic & Electrical Co., Ltd  Viet Nam M&E Company  Position: Engineer Design, BoQ and Site Engineer  Working Time: From Oct 2015 to Now Office Design in Sudoo  Major duties:  Design the air conditioner system  Design the ventilation system  Design firefighting system  Design Sprinkler system  Design the air compressor system  Design the water supply system  Design the waste water drain system  Design the pumping system  Shop drawing  Review and approve for BoQ from supplier.  Manager, prepare detailed project plans for the works program, and coordinate the work of all site operations for Sub- Contractor.  Prepare calculation sheet, design drawings, BoQ, quotation for Mechanical system for project: ACE- Ha Nam, Castec, LGI- Hai Phong, KET- Thai Nguyen, KPF - Hai Duong, Halla- Hai Phong, Samjin- Vinh Phuc, RF- tech, Topas - Thai Nguyen,Oh- Sung- Hai Phong, Woo- Sung - Hai Phong, Seoul- Semi- Ha Nam.... LGI Project ( Trang Due - Hai Phong): Supply & installation M&E, HVAC for Factory,  Monitoring check Sub Contractor.  Position: Site Engineer.  Prepare detailed project plans for the works program, and coordinate the work of Sub Contractor operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.  Shop drawing on the site approval main contractor Yongjin.  Check Hand over document Sub - Contractor.  Check quanlity Balance for Sub - Contractor. KET Project ( Diem Thuy - Thai Nguyen ): Supply & installation M&E, HVAC for Factory,  Position: Site Engineer.  Monitoring check Sub Contractor.
  • 5.
    Nguyen Van TuanPresent address: Mobile Phone:0908823887 Trung Van - Nam Tu Liem- Ha Noi Email: Nguyenvantuan23887@gmail.com . 5  Prepare detailed project plans for the works program, and coordinate the work of Sub Contractor operations.  Ensure project objectives are achieved and projects move forward in accordance with agreed scope, timeframe, quality and safety standards.  Shop drawing on the site approval main contractor Yongjin.  Check Hand over document Sub - Contractor.  Check quanlity Balance for Sub - Contractor. (E) Languages & Capability , Qualification Languages:  Vietnamese : Mother tongue  English : English be able to read, translate specialized documents and Able to communicate in English at basic level. Capability & Qualification:  Being hard-working, careful, well-disciplined and enthusiastic  Having the ability to work independently or team work  Willingness to learn and do what takes to get a job done well even under pressure or on far mission.  Good communication skill with client, sub-contractor, vendor.  Being dynamic and creative (F) Additional Information  To be recruiting and worked for a professional environment are what I expect. I believe I can contribute by developing all skills and experience I have learned and gained during the past five years to your company.  I hereby declare that the above information furnished by me is accurate and true to the best of my knowledge and belief.  I Sincerely thank.