Proposal for SAMAN FARAZ GHESHM Ultra Low
Coal Seam Longwall Mining Units
Beijing HOT Mining Tech Co., Ltd
北京浩沃特矿业技术有限公司
Beijing  Chengdu  Sydney  Calcutta Santiago
 北京  成都  悉尼  加尔各答  圣地亚哥 Web: www.hot-mining.com
Table of Content
1. About the Supporting Method and Cross-section of the Roadway .....................1
1.1 Trapezoid roadway............................................................................................................1
1.2 Semi-circular arched roadway.........................................................................................1
1.3 Abnormity roadway ..........................................................................................................1
2 Estimation of the Annual Output and Monthly Output........................................2
3 Fully Mechanized Longwall Mining Equipment................................................................3
3.1 Hydraulic Support : ZY3400-07-17.........................................................................3
3.2 AFC: SGZ630/264 ...................................................................................................5
3.3 Coal Shearer : MG2×100/468 –BWD .....................................................................7
3.4 BSL : SZZ630/110 ...................................................................................................9
3.5 Other Ancillary Equipment....................................................................................11
4. A Summary of Longwall Extraction and Coal Output from Each Longwall Face.....12
5. Summary of Quoted Prices .................................................................................13
5.1 Quoted Price of Equipment....................................................................................13
5.2 Quoted Price of Technical Services Fees...............................................................14
1
Due to the lack of more useful information such as geological structure, gas,
hydrogeololgy, roof and floor conditions, power supply, transportation and ventilation
system, we made the proposal below just according to the available information.
1. About the Supporting Method and Cross-section of the Roadway
(ventilation roadway and mechanical roadway)
1.1 Trapezoid roadway
Ventilation roadway: upper net width is 2.4-2.6m, lower net width is 3.4-3.5m, net
height is 2.1-2.2m.
Mechanical roadway: upper net width is 2.9-3.1m, lower net width is 4-4.1m, net
height is 2.1-2.2m.
1.2 Semi-circular arched roadway
Ventilation roadway: net height is 3.1m, net width is 3-3.2m.
Mechanical roadway: net height is 3.1m, net width is 4m.(Comprehensive
transportation roadway)
1.3 Abnormity roadway
Ventilation roadway: lying side net height is 2m, net width is 3.2-3.5m, and is
suggested to be supported by wire meshes beam.
Mechanical roadway: lying side net height is 2-2.2m, net width is 4-4.2m.
The three roadways above need to be controlled according to the middle waist line
when advancing.
1.4 The layout of open-off cut
The hydraulic support of the trend width could add 1m additional, the supporting
system is suggested to use wire meshes beam.
2
2 Estimation of the Annual Output and Monthly Output
Advancing output per 1m: 160*1.1*1.4*1=246.4 ton.
(longwall working face length*mining height*density*advancing rate)
Daily output could be 591-887 ton based on 4-6 circulation.
Monthly output could be 14775-22175ton if works 25 days.
The annual output could reach 147750-221750ton if works 10 months (deducting the
dismantlement and installation of the working face).
If there’s no coal and gas outburst, no heavy tectonic fault, the maximum annual
output could be 350000-400000ton.
Generally speaking, the annual output is 250000-300000ton, because in the ultra low
coal seam the coal shearer couldn’t operate too fast, the machine height will influence
the coal production, workers’ physical exertion is too heavy and etc. The lower end of
the working surface needs to be made an advance gap. The monthly advancing rate is
60-100m, and annual advancing rate is 700-1000m.
3
3 Fully Mechanized Longwall Mining Equipment
3.1 Hydraulic Support : ZY3400-07-17
4
Technical Parameters
Model ZY3400/07/17 Type Shield Hydraulic Support
Height 700-1700mm(The column uses double
expansion and extraction function hydraulic
cylinder)
Center Distance 1500mm
Width 1430-1600mm
Rated Fluid Pressure 31.5MPa
Setting Load 2617KN(p=31.5MPa)
Working Resistance 3400KN(P=40MPa)
Supporting Strength 0.37-0.44
Average pressure on the floor 0.85-1.06 MPa
Distance of One Step 700-750mm
Trusting Force 178/306KN
Dip Angle ≤30 (Antiskid device is kept reserved)
Distance Between the Beam Ends
(at 1100mm height)
310-340mm
Operation Mode Adjacent operation
Weight ≤11.5t
Transportation Size <5200X1430X700
It’s suggested that there’s bottom lifting device, antiskid device for conveyor,
moveable beam roof and wall protection device.
5
3.2 AFC: SGZ630/264
6
Technical Parameters
Model SGZ630/264
Length of supply 170m
Conveying capacity 400t/h
Total Power 2×132kW
Chain Speed 1.04m/s
Scraper Chain
Type Double center chain
Specification of round link chain 2-Φ22×86-Cmm
Round-link chain breaking load ≥610Kn
Motor
Model YBSS2-132
Voltage class 1140V
Cooling mode Water cooling
Middle Pan
Type Casting joint sealing structure
Dimension 1500×590(inner width)×210mm
Connection method between pans Dumbbell pin(there’s medium plate side open
slot every 10 section)
Chain tighten method Brake disc tight chain
Traction method of shearer and
AFC
Gear-eicotrack(welded, distance of pin rach
125mm)
7
3.3 Coal Shearer : MG2×100/468 –BWD
8
Technical Parameters
Model MG2×100/468 –BWD
Cutting height range 0.85-1.7m
Dip angle ≤60°(fourth-quadrant, frequency control)
Coal hardness f ≤4.5
Total motor power 468kw
Cutting motor power 2×2×100kw
Traction motor power 2×30kw
Pump motor power 7.5kw
Voltage class 1140V
Machine height 710mm
Max cutting height 2000mm
Undercutting depth 95mm
Drum diameter φ950mm
Drum rotate speed 54.762 r/min
Cutting depth 630mm
Rocker arm length 2000mm
Rocker arm swing center distance 4456mm
Speed control method ACVF, on board
Traction force 2×200kN
Traction speed 0-6m/min
Chainless traction method Cyclodial gear and eicotrack
Matched main cable model MCP3x95+1x25+4x4
Matched feed pipe model KJR19-180
Matched AFC model SGZ630/264
Total weight 22t
9
3.4 BSL : SZZ630/110
10
Technical Parameters
Model SZZ630/110
Design length 30m
Conveying capacity 550t/h
Total power 110kw
Scraper chain
Chain type Double center chain
Specification of round-link chain 2-φ22x86 mm -C(class)
Round-link chain breaking load ≥610kN
Scraper space 900mm
Motor
Model YBS-110
Voltage class 1140/660V
Middle pan
Structure type Compound welding box structure
Bridging section chute connection
method
Bolt
Landing section chute connection
method
Dumbbell pin
Climbing angle 10°
Chain tighten method Brake disc tight chain
Effective length of connection with
belt
12m(could be lengthened)
11
3.5 Other Ancillary Equipment
Belt Conveyor DSJ-80 Set 2
Machinery roadway use, belt
speed is 2m/s, 400m length
each set.
Emulsion Pump BRW200/31.5 Set 2
Emulsion Tank RX1000 Pc 2 2 sets of emulsion tank
Mobile
Substation
KBSGZY-800/10/1.14/
0.66
Set 2
High-voltage
switch
PBG-200/10Y Set 3
2 sets of branch switch, and 1
set of general control switch
Vacuum circuit
breakers
KBZ-400/1140/660 Set 6 5 sets for normal use ,1 set in
reserve
Vacuum
magnetic starter
QBZ-400/1140/660 Set 4
2 sets for shearer and
conveyor use, 2 sets in
reserve
Vacuum
magnetic starter
QBZ-200/1140/660 Set 10
Working face equipment: 5
sets belt conveyor, emulsion
pump 2 sets, spray pump 2
sets, 1 set in reserve
Vacuum
magnetic starter
QBZ/120N/660 Set 4
2 sets for start buttons for
prop drawer in upper air way,
1 set in working face, 1 set in
machinery roadway.
Vacuum
magnetic starter
QBZ/80/660 Set 2
The power supply system and winch installation need to be equipped according to
actual requirement. Part of roadway high and low pressure liquid pipeline is advised
to use seamless steel tube.
12
4. A Summary of Longwall Extraction and Coal Output from Each
Longwall Face
ID
of LWI
Face
Face W.
(m)
Cutting D.
(m)
Seam T
(m)
Mining H.
(m)
Rock pct.
(%)
Daily
Output
Working
Days
Longwall Output
(103
t)
Face Length
(m)
Annual Extraction
Rate (m)
C301 180 0.6 1 1.05~1.1 5~10 7~9 289 250~300 1.328 800~1500
C302 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.576 800~1500
C303 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.325 800~1500
C304 180 0.6 1.07 1.05~1.1 5~10 7~9 289 250~300 1.564 800~1500
C305 180 0.6 0.93 1.05~1.1 5~10 7~9 289 250~300 1.338 800~1500
C306 180 0.6 1.25 1.05~1.1 5~10 7~9 289 250~300 1.562 800~1500
B301 180 0.6 0.9 1.05~1.1 5~10 7~9 289 250~300 1.328 800~1500
B302 180 0.6 1.03 1.05~1.1 5~10 7~9 289 250~300 1.576 800~1500
B303 180 0.6 0.97 1.05~1.1 5~10 7~9 289 250~300 1.325 800~1500
B304 180 0.6 1.03 1.05~1.1 5~10 7~9 289 250~300 1.564 800~1500
B305 180 0.6 1.05 1.05~1.1 5~10 7~9 289 250~300 1.338 800~1500
B306 180 0.6 1.02 1.05~1.1 5~10 7~9 289 250~300 1.562 800~1500
C307 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.379 800~1500
C308 180 0.6 0.93 1.05~1.1 5~10 7~9 289 250~300 1.539 800~1500
C309 180 0.6 0.93 1.05~1.1 5~10 7~9 289 250~300 1.45 800~1500
C310 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.506 800~1500
B307 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.379 800~1500
B308 180 0.6 1.1 1.05~1.1 5~10 7~9 289 250~300 1.539 800~1500
B309 180 0.6 0.9 1.05~1.1 5~10 7~9 289 250~300 1.45 800~1500
B310 180 0.6 1 1.05~1.1 5~10 7~9 289 250~300 1.506 800~1500
13
5. Summary of Quoted Prices
5.1 Quoted Price of Equipment
No. Description Model Quantity Unit Price
(Ex-works, USD)
Sub-total Price
(Ex-works, USD)
1 Coal Shearer MG2×100/468-BWD 1 set
2 AFC SGZ630/264 1 set
3 BSL SZZ630/110 1 set
4 Shield
Hydraulic
Support
ZY3400-07-17 113 set
5 Belt Conveyor DJS80-40-2*40 2 sets
6 Emulsion
Pump
BRW200/31.5 2 sets
7 Emulsion
Tank
RX1000 2 sets
8 Mobile
Substation
KBSGZY-800/10/1.14
/0.66
2 sets
9 High-voltage
switch
PBG-200/10Y 3 sets
10 Vacuum
circuit
breakers
KBZ-400/1140/660 6 sets
11 Vacuum
magnetic
starter
QBZ-200/1140/660 10 sets
12 Vacuum
magnetic
starter
QBZ/120N/660 4 sets
14
13 Vacuum
magnetic
starter
QBZ/80/660 2 sets
14 Vacuum
magnetic
starter
QBZ-400/1140/660 4 sets
Total Price (Ex-works, USD)
Remark:
1、 This price includes EX-Works quoted price of equipment only. Reference freight prices will be listed
separately.
2、 After the equipment delivery to designated ports, Customer should be responsible for the domestic
customs and the inland transportation.
3、 Lead time is depending on the shipping method you selected finally (The details will be explain on the
shipping quotes).
4、 Payment method: Will discuss this issue later after we are chosen to be your preferred supplier.
5、 Installation, commissioning guidance and other services charged separately.
6、 Validity date: 30 days.
7、 Exchange rate is fixed on currency rate 1 US$=6.5196 CNY, date March 16th, 2016. If exchange rate
floats above 1.5% out of following 30 days, our price will floats 1.5% follow it. USD and Euro are all
acceptable.
5.2 Quoted Price of Technical Services Fees
TECHNICAL SERVICE COST
No. ITEM FIXED
VARIABLE
NOTES
STAFFING VALUE RELATED
1 2 4
15
1
Commissioning
Schedule
Introduction
N/A 5 Each personnel per day cost
2 Installation Guide N/A 5 Each personnel per day cost
3 Commissioning N/A 5 Each personnel per day cost
4 Supervision costs N/A Included N/A
5
Insurance & Legal
Fees
5 Based on real cost
5 people are enough
(4 engineers and 1 coordinator).
6 Visa’s 5 Based on real cost
7 Traveling Expense(International and project sites) Client-supplied
8 Accommodation Fee(International and project sites) Client-supplied
9 Medical Insurance(International and project sites) Client-supplied
10
Others
(if applicable)
TOTAL
Notes:
1、No fixed costs for technical services.
2、We provide 5 days technical services in Iran for free.
3、The variable costs will be settled by actual time, If exceed 5 days from the first day after our engineers
arrived Iran, client need to pay the variable rates due to we have high personnel costs.
Quotation basis on daily cost, and paid term based per each 5 working days.
4、Exchange rate: Exchange rate is fixed on currency rate 1 US$=6.5196 CNY, date March 16th, 2016. If
exchange rate floats above 1.5% out of following 30 days, our price will floats 1.5% follow it.

More Related Content

What's hot

V belt drive
V belt driveV belt drive
V belt driveMD_Y_A
 
design of belt drive and chain drive
design of belt drive and chain drivedesign of belt drive and chain drive
design of belt drive and chain driveHrdbs
 
Mechanical drives & power transmission
Mechanical drives & power transmissionMechanical drives & power transmission
Mechanical drives & power transmissionJames Shearer
 
V belt installation and tensioning 1.08 (1)
V belt installation and tensioning 1.08 (1)V belt installation and tensioning 1.08 (1)
V belt installation and tensioning 1.08 (1)Abuubakr Abdelwahab
 
Spur gear problem and solution
Spur gear   problem and solutionSpur gear   problem and solution
Spur gear problem and solutiondodi mulya
 
Belt tension calculation
Belt tension calculationBelt tension calculation
Belt tension calculationKalyan Halder
 
Theory of machines by rs. khurmi_ solution manual _ chapter 11
Theory of machines by rs. khurmi_ solution manual _ chapter 11Theory of machines by rs. khurmi_ solution manual _ chapter 11
Theory of machines by rs. khurmi_ solution manual _ chapter 11Darawan Wahid
 
introduction, drawing, calculation for winch design
introduction, drawing, calculation for winch designintroduction, drawing, calculation for winch design
introduction, drawing, calculation for winch designAman Huri
 
MET 304 Belt drives
MET 304 Belt drivesMET 304 Belt drives
MET 304 Belt driveshotman1991
 
Basic of Clutches, kopling tidak tetap
Basic of Clutches, kopling tidak tetapBasic of Clutches, kopling tidak tetap
Basic of Clutches, kopling tidak tetapdodi mulya
 
ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...
ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...
ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...Betty Wang
 

What's hot (20)

Belt drive in machines presentation
Belt drive in machines presentationBelt drive in machines presentation
Belt drive in machines presentation
 
V belt drive
V belt driveV belt drive
V belt drive
 
design of belt drive and chain drive
design of belt drive and chain drivedesign of belt drive and chain drive
design of belt drive and chain drive
 
Chain drives
Chain drivesChain drives
Chain drives
 
Mechanical drives & power transmission
Mechanical drives & power transmissionMechanical drives & power transmission
Mechanical drives & power transmission
 
V belt installation and tensioning 1.08 (1)
V belt installation and tensioning 1.08 (1)V belt installation and tensioning 1.08 (1)
V belt installation and tensioning 1.08 (1)
 
Unit 2b Power Transmission by Belts
Unit 2b Power Transmission by BeltsUnit 2b Power Transmission by Belts
Unit 2b Power Transmission by Belts
 
Spur gear problem and solution
Spur gear   problem and solutionSpur gear   problem and solution
Spur gear problem and solution
 
Belt tension calculation
Belt tension calculationBelt tension calculation
Belt tension calculation
 
Theory of machines by rs. khurmi_ solution manual _ chapter 11
Theory of machines by rs. khurmi_ solution manual _ chapter 11Theory of machines by rs. khurmi_ solution manual _ chapter 11
Theory of machines by rs. khurmi_ solution manual _ chapter 11
 
introduction, drawing, calculation for winch design
introduction, drawing, calculation for winch designintroduction, drawing, calculation for winch design
introduction, drawing, calculation for winch design
 
MET 304 Belt drives
MET 304 Belt drivesMET 304 Belt drives
MET 304 Belt drives
 
3. v belt and sample problem
3. v belt and sample problem3. v belt and sample problem
3. v belt and sample problem
 
Basic of Clutches, kopling tidak tetap
Basic of Clutches, kopling tidak tetapBasic of Clutches, kopling tidak tetap
Basic of Clutches, kopling tidak tetap
 
V belt drives
V belt drivesV belt drives
V belt drives
 
ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...
ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...
ringchainbucketelevator-productintroduction-pkmachinery-150423014804-conversi...
 
DTS Unit i
DTS Unit   iDTS Unit   i
DTS Unit i
 
Design procedure for dts (revised)
Design procedure for dts (revised)Design procedure for dts (revised)
Design procedure for dts (revised)
 
Cke900 1 f-spec
Cke900 1 f-specCke900 1 f-spec
Cke900 1 f-spec
 
DTS procedure
DTS procedureDTS procedure
DTS procedure
 

Viewers also liked

Viewers also liked (8)

Teoria de-enfermera
Teoria de-enfermeraTeoria de-enfermera
Teoria de-enfermera
 
Dinamica costos 2011
Dinamica costos  2011Dinamica costos  2011
Dinamica costos 2011
 
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
薄煤层综采Thin_Low Coal Seam Mining Technology_HOT Mining_Serena
 
Aprendizaje activo y educación superior. Por Monserrat Creamer
Aprendizaje activo y educación superior. Por Monserrat CreamerAprendizaje activo y educación superior. Por Monserrat Creamer
Aprendizaje activo y educación superior. Por Monserrat Creamer
 
USMA Panamá - Haciendo Universidad N° 35
USMA Panamá - Haciendo Universidad N° 35USMA Panamá - Haciendo Universidad N° 35
USMA Panamá - Haciendo Universidad N° 35
 
Module 5 do your research
Module 5   do your researchModule 5   do your research
Module 5 do your research
 
TET- Significado Profundo de la Novena Letra del Hebreo
TET- Significado Profundo de la Novena Letra del HebreoTET- Significado Profundo de la Novena Letra del Hebreo
TET- Significado Profundo de la Novena Letra del Hebreo
 
Advance Data Mining Project Report
Advance Data Mining Project ReportAdvance Data Mining Project Report
Advance Data Mining Project Report
 

Similar to 160316_Proposal for SAMAN FARAZ GHESHM Ultra Low Coal Seam Longwall Mining Units_HOT Mining

JVL Intergrated Servo Motor in Stainless Steel
JVL Intergrated Servo Motor in Stainless Steel JVL Intergrated Servo Motor in Stainless Steel
JVL Intergrated Servo Motor in Stainless Steel Electromate
 
New Holland W190C Wheel Loader Service Repair Manual Instant Download.pdf
New Holland W190C Wheel Loader Service Repair Manual Instant Download.pdfNew Holland W190C Wheel Loader Service Repair Manual Instant Download.pdf
New Holland W190C Wheel Loader Service Repair Manual Instant Download.pdftaishang3939
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfgan51huishu
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualujdjjkkskmme
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualfjskkksmemm
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualfujsjfjksekem
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdff8seujdjkddm
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdffusjekkdkdme3
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualfujsjefkskekmem
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdffujksekd9dokd
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdffusedkdd9idi
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfhmc151121
 
Katalog Blatindo.pdf
Katalog Blatindo.pdfKatalog Blatindo.pdf
Katalog Blatindo.pdfSyamsul Bahri
 
Kaup t185 t184_t198_en
Kaup t185 t184_t198_enKaup t185 t184_t198_en
Kaup t185 t184_t198_ensanjay8909
 

Similar to 160316_Proposal for SAMAN FARAZ GHESHM Ultra Low Coal Seam Longwall Mining Units_HOT Mining (20)

Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Tk catalog english_18_1
Tk catalog english_18_1Tk catalog english_18_1
Tk catalog english_18_1
 
JVL Intergrated Servo Motor in Stainless Steel
JVL Intergrated Servo Motor in Stainless Steel JVL Intergrated Servo Motor in Stainless Steel
JVL Intergrated Servo Motor in Stainless Steel
 
La Meccanica Srl Machinery
La Meccanica Srl MachineryLa Meccanica Srl Machinery
La Meccanica Srl Machinery
 
New Holland W190C Wheel Loader Service Repair Manual Instant Download.pdf
New Holland W190C Wheel Loader Service Repair Manual Instant Download.pdfNew Holland W190C Wheel Loader Service Repair Manual Instant Download.pdf
New Holland W190C Wheel Loader Service Repair Manual Instant Download.pdf
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdf
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manual
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manual
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manual
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdf
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdf
 
New holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manualNew holland w190 c wheel loader service repair manual
New holland w190 c wheel loader service repair manual
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdf
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdf
 
New Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdfNew Holland W190C Wheel Loader Service Repair Manual.pdf
New Holland W190C Wheel Loader Service Repair Manual.pdf
 
Jaw Crusher
Jaw CrusherJaw Crusher
Jaw Crusher
 
Katalog Blatindo.pdf
Katalog Blatindo.pdfKatalog Blatindo.pdf
Katalog Blatindo.pdf
 
2014 Auto ..docx
2014 Auto ..docx2014 Auto ..docx
2014 Auto ..docx
 
CONTINUOUS MINERS
CONTINUOUS MINERSCONTINUOUS MINERS
CONTINUOUS MINERS
 
Kaup t185 t184_t198_en
Kaup t185 t184_t198_enKaup t185 t184_t198_en
Kaup t185 t184_t198_en
 

More from Serena Fu

Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...
Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...
Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...Serena Fu
 
Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...
Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...
Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...Serena Fu
 
Xrt x ray transmission ore sorter intelligent dry separation-hot mining_serena
Xrt x ray transmission ore sorter intelligent dry separation-hot mining_serenaXrt x ray transmission ore sorter intelligent dry separation-hot mining_serena
Xrt x ray transmission ore sorter intelligent dry separation-hot mining_serenaSerena Fu
 
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...Serena Fu
 
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...Serena Fu
 
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...Serena Fu
 
Aa plc-xrassa coal handling and preparation plant design instruction
Aa plc-xrassa coal handling and preparation plant design instructionAa plc-xrassa coal handling and preparation plant design instruction
Aa plc-xrassa coal handling and preparation plant design instructionSerena Fu
 
Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...
Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...
Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...Serena Fu
 
Mining and Mineral Processing Capability_HOT Mining_Serena
Mining and Mineral Processing Capability_HOT Mining_SerenaMining and Mineral Processing Capability_HOT Mining_Serena
Mining and Mineral Processing Capability_HOT Mining_SerenaSerena Fu
 
HOT PUMP PARTS
HOT PUMP PARTSHOT PUMP PARTS
HOT PUMP PARTSSerena Fu
 
Sorucing_QCP_HOT Mining
Sorucing_QCP_HOT MiningSorucing_QCP_HOT Mining
Sorucing_QCP_HOT MiningSerena Fu
 
Low Coal Seam Longwall Mining Technology_HOT Mining_Serena
Low Coal Seam Longwall Mining Technology_HOT Mining_SerenaLow Coal Seam Longwall Mining Technology_HOT Mining_Serena
Low Coal Seam Longwall Mining Technology_HOT Mining_SerenaSerena Fu
 
Tender for Iran_Low Coal Seam Mining Units_HOT Mining_Serena
Tender for Iran_Low Coal Seam Mining Units_HOT Mining_SerenaTender for Iran_Low Coal Seam Mining Units_HOT Mining_Serena
Tender for Iran_Low Coal Seam Mining Units_HOT Mining_SerenaSerena Fu
 
Mineral processing equipments_HOT Mining_Serena Fu
Mineral processing equipments_HOT Mining_Serena FuMineral processing equipments_HOT Mining_Serena Fu
Mineral processing equipments_HOT Mining_Serena FuSerena Fu
 
Mineral Processing Capability_HOT Mining_Serena Fu
Mineral Processing Capability_HOT Mining_Serena FuMineral Processing Capability_HOT Mining_Serena Fu
Mineral Processing Capability_HOT Mining_Serena FuSerena Fu
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningSerena Fu
 

More from Serena Fu (16)

Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...
Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...
Application Prospect of XRT Intelligent X-ray Transmission Ore Sorter for Dry...
 
Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...
Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...
Truck-mounted Mobile Modular CHPP Coal Washing and Preparation Plant - Hot Mi...
 
Xrt x ray transmission ore sorter intelligent dry separation-hot mining_serena
Xrt x ray transmission ore sorter intelligent dry separation-hot mining_serenaXrt x ray transmission ore sorter intelligent dry separation-hot mining_serena
Xrt x ray transmission ore sorter intelligent dry separation-hot mining_serena
 
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
 
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
190109 horizontal vibration centrifuge-clean coal-coal concentrate-hot mining...
 
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
 
Aa plc-xrassa coal handling and preparation plant design instruction
Aa plc-xrassa coal handling and preparation plant design instructionAa plc-xrassa coal handling and preparation plant design instruction
Aa plc-xrassa coal handling and preparation plant design instruction
 
Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...
Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...
Ungerground-Mechanized-longwall-shortwall-adit-Mining-Technology_HOT_ Mining_...
 
Mining and Mineral Processing Capability_HOT Mining_Serena
Mining and Mineral Processing Capability_HOT Mining_SerenaMining and Mineral Processing Capability_HOT Mining_Serena
Mining and Mineral Processing Capability_HOT Mining_Serena
 
HOT PUMP PARTS
HOT PUMP PARTSHOT PUMP PARTS
HOT PUMP PARTS
 
Sorucing_QCP_HOT Mining
Sorucing_QCP_HOT MiningSorucing_QCP_HOT Mining
Sorucing_QCP_HOT Mining
 
Low Coal Seam Longwall Mining Technology_HOT Mining_Serena
Low Coal Seam Longwall Mining Technology_HOT Mining_SerenaLow Coal Seam Longwall Mining Technology_HOT Mining_Serena
Low Coal Seam Longwall Mining Technology_HOT Mining_Serena
 
Tender for Iran_Low Coal Seam Mining Units_HOT Mining_Serena
Tender for Iran_Low Coal Seam Mining Units_HOT Mining_SerenaTender for Iran_Low Coal Seam Mining Units_HOT Mining_Serena
Tender for Iran_Low Coal Seam Mining Units_HOT Mining_Serena
 
Mineral processing equipments_HOT Mining_Serena Fu
Mineral processing equipments_HOT Mining_Serena FuMineral processing equipments_HOT Mining_Serena Fu
Mineral processing equipments_HOT Mining_Serena Fu
 
Mineral Processing Capability_HOT Mining_Serena Fu
Mineral Processing Capability_HOT Mining_Serena FuMineral Processing Capability_HOT Mining_Serena Fu
Mineral Processing Capability_HOT Mining_Serena Fu
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
 

160316_Proposal for SAMAN FARAZ GHESHM Ultra Low Coal Seam Longwall Mining Units_HOT Mining

  • 1. Proposal for SAMAN FARAZ GHESHM Ultra Low Coal Seam Longwall Mining Units Beijing HOT Mining Tech Co., Ltd 北京浩沃特矿业技术有限公司 Beijing  Chengdu  Sydney  Calcutta Santiago  北京  成都  悉尼  加尔各答  圣地亚哥 Web: www.hot-mining.com
  • 2. Table of Content 1. About the Supporting Method and Cross-section of the Roadway .....................1 1.1 Trapezoid roadway............................................................................................................1 1.2 Semi-circular arched roadway.........................................................................................1 1.3 Abnormity roadway ..........................................................................................................1 2 Estimation of the Annual Output and Monthly Output........................................2 3 Fully Mechanized Longwall Mining Equipment................................................................3 3.1 Hydraulic Support : ZY3400-07-17.........................................................................3 3.2 AFC: SGZ630/264 ...................................................................................................5 3.3 Coal Shearer : MG2×100/468 –BWD .....................................................................7 3.4 BSL : SZZ630/110 ...................................................................................................9 3.5 Other Ancillary Equipment....................................................................................11 4. A Summary of Longwall Extraction and Coal Output from Each Longwall Face.....12 5. Summary of Quoted Prices .................................................................................13 5.1 Quoted Price of Equipment....................................................................................13 5.2 Quoted Price of Technical Services Fees...............................................................14
  • 3. 1 Due to the lack of more useful information such as geological structure, gas, hydrogeololgy, roof and floor conditions, power supply, transportation and ventilation system, we made the proposal below just according to the available information. 1. About the Supporting Method and Cross-section of the Roadway (ventilation roadway and mechanical roadway) 1.1 Trapezoid roadway Ventilation roadway: upper net width is 2.4-2.6m, lower net width is 3.4-3.5m, net height is 2.1-2.2m. Mechanical roadway: upper net width is 2.9-3.1m, lower net width is 4-4.1m, net height is 2.1-2.2m. 1.2 Semi-circular arched roadway Ventilation roadway: net height is 3.1m, net width is 3-3.2m. Mechanical roadway: net height is 3.1m, net width is 4m.(Comprehensive transportation roadway) 1.3 Abnormity roadway Ventilation roadway: lying side net height is 2m, net width is 3.2-3.5m, and is suggested to be supported by wire meshes beam. Mechanical roadway: lying side net height is 2-2.2m, net width is 4-4.2m. The three roadways above need to be controlled according to the middle waist line when advancing. 1.4 The layout of open-off cut The hydraulic support of the trend width could add 1m additional, the supporting system is suggested to use wire meshes beam.
  • 4. 2 2 Estimation of the Annual Output and Monthly Output Advancing output per 1m: 160*1.1*1.4*1=246.4 ton. (longwall working face length*mining height*density*advancing rate) Daily output could be 591-887 ton based on 4-6 circulation. Monthly output could be 14775-22175ton if works 25 days. The annual output could reach 147750-221750ton if works 10 months (deducting the dismantlement and installation of the working face). If there’s no coal and gas outburst, no heavy tectonic fault, the maximum annual output could be 350000-400000ton. Generally speaking, the annual output is 250000-300000ton, because in the ultra low coal seam the coal shearer couldn’t operate too fast, the machine height will influence the coal production, workers’ physical exertion is too heavy and etc. The lower end of the working surface needs to be made an advance gap. The monthly advancing rate is 60-100m, and annual advancing rate is 700-1000m.
  • 5. 3 3 Fully Mechanized Longwall Mining Equipment 3.1 Hydraulic Support : ZY3400-07-17
  • 6. 4 Technical Parameters Model ZY3400/07/17 Type Shield Hydraulic Support Height 700-1700mm(The column uses double expansion and extraction function hydraulic cylinder) Center Distance 1500mm Width 1430-1600mm Rated Fluid Pressure 31.5MPa Setting Load 2617KN(p=31.5MPa) Working Resistance 3400KN(P=40MPa) Supporting Strength 0.37-0.44 Average pressure on the floor 0.85-1.06 MPa Distance of One Step 700-750mm Trusting Force 178/306KN Dip Angle ≤30 (Antiskid device is kept reserved) Distance Between the Beam Ends (at 1100mm height) 310-340mm Operation Mode Adjacent operation Weight ≤11.5t Transportation Size <5200X1430X700 It’s suggested that there’s bottom lifting device, antiskid device for conveyor, moveable beam roof and wall protection device.
  • 8. 6 Technical Parameters Model SGZ630/264 Length of supply 170m Conveying capacity 400t/h Total Power 2×132kW Chain Speed 1.04m/s Scraper Chain Type Double center chain Specification of round link chain 2-Φ22×86-Cmm Round-link chain breaking load ≥610Kn Motor Model YBSS2-132 Voltage class 1140V Cooling mode Water cooling Middle Pan Type Casting joint sealing structure Dimension 1500×590(inner width)×210mm Connection method between pans Dumbbell pin(there’s medium plate side open slot every 10 section) Chain tighten method Brake disc tight chain Traction method of shearer and AFC Gear-eicotrack(welded, distance of pin rach 125mm)
  • 9. 7 3.3 Coal Shearer : MG2×100/468 –BWD
  • 10. 8 Technical Parameters Model MG2×100/468 –BWD Cutting height range 0.85-1.7m Dip angle ≤60°(fourth-quadrant, frequency control) Coal hardness f ≤4.5 Total motor power 468kw Cutting motor power 2×2×100kw Traction motor power 2×30kw Pump motor power 7.5kw Voltage class 1140V Machine height 710mm Max cutting height 2000mm Undercutting depth 95mm Drum diameter φ950mm Drum rotate speed 54.762 r/min Cutting depth 630mm Rocker arm length 2000mm Rocker arm swing center distance 4456mm Speed control method ACVF, on board Traction force 2×200kN Traction speed 0-6m/min Chainless traction method Cyclodial gear and eicotrack Matched main cable model MCP3x95+1x25+4x4 Matched feed pipe model KJR19-180 Matched AFC model SGZ630/264 Total weight 22t
  • 11. 9 3.4 BSL : SZZ630/110
  • 12. 10 Technical Parameters Model SZZ630/110 Design length 30m Conveying capacity 550t/h Total power 110kw Scraper chain Chain type Double center chain Specification of round-link chain 2-φ22x86 mm -C(class) Round-link chain breaking load ≥610kN Scraper space 900mm Motor Model YBS-110 Voltage class 1140/660V Middle pan Structure type Compound welding box structure Bridging section chute connection method Bolt Landing section chute connection method Dumbbell pin Climbing angle 10° Chain tighten method Brake disc tight chain Effective length of connection with belt 12m(could be lengthened)
  • 13. 11 3.5 Other Ancillary Equipment Belt Conveyor DSJ-80 Set 2 Machinery roadway use, belt speed is 2m/s, 400m length each set. Emulsion Pump BRW200/31.5 Set 2 Emulsion Tank RX1000 Pc 2 2 sets of emulsion tank Mobile Substation KBSGZY-800/10/1.14/ 0.66 Set 2 High-voltage switch PBG-200/10Y Set 3 2 sets of branch switch, and 1 set of general control switch Vacuum circuit breakers KBZ-400/1140/660 Set 6 5 sets for normal use ,1 set in reserve Vacuum magnetic starter QBZ-400/1140/660 Set 4 2 sets for shearer and conveyor use, 2 sets in reserve Vacuum magnetic starter QBZ-200/1140/660 Set 10 Working face equipment: 5 sets belt conveyor, emulsion pump 2 sets, spray pump 2 sets, 1 set in reserve Vacuum magnetic starter QBZ/120N/660 Set 4 2 sets for start buttons for prop drawer in upper air way, 1 set in working face, 1 set in machinery roadway. Vacuum magnetic starter QBZ/80/660 Set 2 The power supply system and winch installation need to be equipped according to actual requirement. Part of roadway high and low pressure liquid pipeline is advised to use seamless steel tube.
  • 14. 12 4. A Summary of Longwall Extraction and Coal Output from Each Longwall Face ID of LWI Face Face W. (m) Cutting D. (m) Seam T (m) Mining H. (m) Rock pct. (%) Daily Output Working Days Longwall Output (103 t) Face Length (m) Annual Extraction Rate (m) C301 180 0.6 1 1.05~1.1 5~10 7~9 289 250~300 1.328 800~1500 C302 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.576 800~1500 C303 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.325 800~1500 C304 180 0.6 1.07 1.05~1.1 5~10 7~9 289 250~300 1.564 800~1500 C305 180 0.6 0.93 1.05~1.1 5~10 7~9 289 250~300 1.338 800~1500 C306 180 0.6 1.25 1.05~1.1 5~10 7~9 289 250~300 1.562 800~1500 B301 180 0.6 0.9 1.05~1.1 5~10 7~9 289 250~300 1.328 800~1500 B302 180 0.6 1.03 1.05~1.1 5~10 7~9 289 250~300 1.576 800~1500 B303 180 0.6 0.97 1.05~1.1 5~10 7~9 289 250~300 1.325 800~1500 B304 180 0.6 1.03 1.05~1.1 5~10 7~9 289 250~300 1.564 800~1500 B305 180 0.6 1.05 1.05~1.1 5~10 7~9 289 250~300 1.338 800~1500 B306 180 0.6 1.02 1.05~1.1 5~10 7~9 289 250~300 1.562 800~1500 C307 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.379 800~1500 C308 180 0.6 0.93 1.05~1.1 5~10 7~9 289 250~300 1.539 800~1500 C309 180 0.6 0.93 1.05~1.1 5~10 7~9 289 250~300 1.45 800~1500 C310 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.506 800~1500 B307 180 0.6 0.95 1.05~1.1 5~10 7~9 289 250~300 1.379 800~1500 B308 180 0.6 1.1 1.05~1.1 5~10 7~9 289 250~300 1.539 800~1500 B309 180 0.6 0.9 1.05~1.1 5~10 7~9 289 250~300 1.45 800~1500 B310 180 0.6 1 1.05~1.1 5~10 7~9 289 250~300 1.506 800~1500
  • 15. 13 5. Summary of Quoted Prices 5.1 Quoted Price of Equipment No. Description Model Quantity Unit Price (Ex-works, USD) Sub-total Price (Ex-works, USD) 1 Coal Shearer MG2×100/468-BWD 1 set 2 AFC SGZ630/264 1 set 3 BSL SZZ630/110 1 set 4 Shield Hydraulic Support ZY3400-07-17 113 set 5 Belt Conveyor DJS80-40-2*40 2 sets 6 Emulsion Pump BRW200/31.5 2 sets 7 Emulsion Tank RX1000 2 sets 8 Mobile Substation KBSGZY-800/10/1.14 /0.66 2 sets 9 High-voltage switch PBG-200/10Y 3 sets 10 Vacuum circuit breakers KBZ-400/1140/660 6 sets 11 Vacuum magnetic starter QBZ-200/1140/660 10 sets 12 Vacuum magnetic starter QBZ/120N/660 4 sets
  • 16. 14 13 Vacuum magnetic starter QBZ/80/660 2 sets 14 Vacuum magnetic starter QBZ-400/1140/660 4 sets Total Price (Ex-works, USD) Remark: 1、 This price includes EX-Works quoted price of equipment only. Reference freight prices will be listed separately. 2、 After the equipment delivery to designated ports, Customer should be responsible for the domestic customs and the inland transportation. 3、 Lead time is depending on the shipping method you selected finally (The details will be explain on the shipping quotes). 4、 Payment method: Will discuss this issue later after we are chosen to be your preferred supplier. 5、 Installation, commissioning guidance and other services charged separately. 6、 Validity date: 30 days. 7、 Exchange rate is fixed on currency rate 1 US$=6.5196 CNY, date March 16th, 2016. If exchange rate floats above 1.5% out of following 30 days, our price will floats 1.5% follow it. USD and Euro are all acceptable. 5.2 Quoted Price of Technical Services Fees TECHNICAL SERVICE COST No. ITEM FIXED VARIABLE NOTES STAFFING VALUE RELATED 1 2 4
  • 17. 15 1 Commissioning Schedule Introduction N/A 5 Each personnel per day cost 2 Installation Guide N/A 5 Each personnel per day cost 3 Commissioning N/A 5 Each personnel per day cost 4 Supervision costs N/A Included N/A 5 Insurance & Legal Fees 5 Based on real cost 5 people are enough (4 engineers and 1 coordinator). 6 Visa’s 5 Based on real cost 7 Traveling Expense(International and project sites) Client-supplied 8 Accommodation Fee(International and project sites) Client-supplied 9 Medical Insurance(International and project sites) Client-supplied 10 Others (if applicable) TOTAL Notes: 1、No fixed costs for technical services. 2、We provide 5 days technical services in Iran for free. 3、The variable costs will be settled by actual time, If exceed 5 days from the first day after our engineers arrived Iran, client need to pay the variable rates due to we have high personnel costs. Quotation basis on daily cost, and paid term based per each 5 working days. 4、Exchange rate: Exchange rate is fixed on currency rate 1 US$=6.5196 CNY, date March 16th, 2016. If exchange rate floats above 1.5% out of following 30 days, our price will floats 1.5% follow it.