Moderniza on
ANC MEETING, JULY 2014
PROJECT SCHEDULE
MILESTONE ACTIVITIES
• SMOOT GILBANE CONTRACT AWARD FALL 2013
• DEMOLITION WORK FALL 2013 TO SUMMER 2014
• GMP APPROVAL SUMMER 2014
• MEP ROUGH IN FALL 2014 TO SPRING 2015
• EXTERIOR BUILDING RESTORATION SPRING 2014 TO SPRING 2015
• ATRIUM SKYLIGHT WINTER 2014 TO SPRING 2015
• INTERIOR FINISHES FALL 2014 TO FALL 2015
• EXTERIOR SITE IMPROVEMENTS SPRING 2014 TO FALL 2015
• CONSTRUCTION COMPLETION FALL 2015
3. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
BUILDING ORGANIZATION
UPSHURST,NW
ALLISONST,NW
13TH ST, NW
IOWA AVE, NW
DNDN
ARTS AUDITORIUM ACADEMICS
RHS ENTRY
STAY/COMMUNITY ENTRY
COMMUNITY
+ ATHLETICS
4. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
1-15/16"
(88.9)
.P Y T
GIRLS
ATHLETIC
LOCKER
ROOM
ATHLETIC
STORAGE
GIRLS P.E.
LOCKER
ROOM
LAUNDRY
ROOM
BOYS P.E.
LOCKER
ROOM
DANCE/
AEROBICS
PE FAM
CHANG
BOYS
ATHLETIC
LOCKER
ROOM
STORAGE
FITNESS
ROOM
?
HEALTH
CLASSROOM
DEPT.
OFFICE
TRAINING
ROOM
FOOTBALL
GYM
COACHES
OFFICE
BASKETBALL
OFFICE
GIRLS
BOYS
CONCESSIONS
ELEC
ELEC
STORAGE
STORAGE
STAIR E4
STAIR E2
PAVILION
STAIR
STAIR E3
STAIR E1
ELEV E1 ELEV
PAVILION
GREENHOUSE
CORRIDOR
STORAGE
GIRLS
BOYS
CORRIDOR
VEST
VEST
OFFICE
STORAGE
IDF
CORRIDOR
BLEACHER CAPACITY INCREASED TO ~1,000 SEATS
STAY AND COMMUNITY ENTRANCE
PAVILION
THE MILK HOUSE
Department Legend
ACADEMIC
ADMINISTRATION
MEP
PHYSICAL EDUCATION
STAY
SUPPORT
FIRST FLOOR
ATHLETIC
ATHLETIC FIRST FLOOR
5. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
LIFE
GUARD/FIRST
AID OFFICE
TOWELS
GIRLS
LOCKER
FAMILY STORAGE
TOWELS
FAMILY
BOYS
LOCKER
POOL
ELECELEC
STAIR E3
STAIR E2 STAIR E4
ELEV E1
ELEV. E2
STAIR E1
CORRIDOR CORRIDOR
CORRIDORCORRIDOR
JANITOR
JANITOR
POOL MECHANICAL LEVEL
POOL LEVEL
ATHLETIC GROUND FLOOR
6. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
MEDIA
OFFICE
MEDIA
WKRM
MEDIA
CENTER
CAFETERIA
CULINARY
DINING LAB
CULINARY
LAB
GIRLS
ATRIUM
MECHANICAL
AND FIRE
PUMP
MAIN
ELECTRICAL
JROTC
UNIFORM
STORAGE
JROTC
OFFICE
JROTC
CLASSROOM
COSMETOLOGY
CLASSROOM
ELEC
COSMETOLOGY
LAB
OFFICE
STORAGE
OFFICEOFFICE
CAREER
CENTER
ELECTRICAL
JROTC
CLASSROOM
STUDENT
GOVERNMENT
BOYS
MECHANICAL
MECHANICAL
STOR
LAU
STAIR C2
STAIR D2
STAIR D1
ELEV D1
CORRIDOR
EQUIPMENT
STORAGE
EXTERNAL
DIPLOMA
EXTERNAL
DIPLOMA
OFFICE
OFFICE
CONF
LAYC
OFFICES
BES QUIET
RM
BES
CLASSROOM
BES
RESOURCE
BES
CLASSROOM
TEXTBOOK
STORAGE
BES OFFICE
SCHOOL
STORE
ELEC
ELEC
JROTC
ARMORY
STORAGE
CORRIDOR
DRY
STORAGE
COOLER
FREEZER
LOCKER
WOMEN
MEN
LOCKER
OFFICE
JANITOR
TELECOM
DEMARC/MDF
OFFICE
GA
COLLABORATIVE
OFFICES
IDF - C/D
BES
RECEPTION
AMPHITHEATER
PUMP
EQUIPMENT
JROTC
Department Legend
ACADEMIC
FAMILY SUPPORT
FIELD
FOOD SERVICE
HEALTH SUITE
JROTC
MEDIA CENTER
MEP
PATHWAYS
SPECIAL ED.
STAY
SUPPORT
GROUND FLOOR
ACADEMIC
ACADEMIC GROUND FLOOR
7. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
ATRIUM
Careers
13th Street
Por co
Central
Stair
Media
Center
Amphi-
theater
“The
Heart”
Water-
works
Green-
house
Garden
Culinary/
Dining
13. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
TODDLER
AREA
ELEC
TOILET
KIDS TOILET
DAYCARE
STORAGE
DAYCARE
OFFICE
MECHANICAL
OUTSIDE
EQUIPMENT
STORAGE
WOMEN'S
LOCKER
JAN
MENS
LOCKER
PARKING
GENERATOR
ELEV A1
STAIR A2
STAIR A1
SUPPLY
STORAGE
CUSTODIAL
EQUIPMENT
STORAGE
RECEIVING
STAY
STORAGE
STAIR A3
MECHANICAL
ELEC
STAIR A4
CORRIDOR
VEST
VEST
CMC
STORAGE
RECYCLING
INFANT
AREA
ELEC
IDF - B
Department Legend
CUSTODIAL
FAMILY SUPPORT
MEP
PARKING
STAY
SUPPORT
GROUND FLOOR
ARTS
ARTS GROUND FLOOR
14. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
CHORAL /
KEYBOARDING
INSTRUMENTAL
PRACTICE 4
MUSIC
OFFICE
ART
STORAGE
MULTI-PURPOSE
STUDIO
KILN
OT/PT
STAFF
BREAKROOM
CHAIR /
PIANO
STORAGE
GREEN
ROOM 2
ELEC
3D/2D
STUDIO
ART OFFICE
INSTRUMENT
STORAGE
SCENE
SHOP
GALLERY
GREEN
ROOM 1
STAIR A1
STAIR A2
STAIR B1
ELEV A1
MEDIA
PRODUCTION
CLASSROOM
SPEECH/
TESTING
SENSORY
STAIR A3
TOILET
BOYS
TOILET
GIRLS
STAIR A4
CORRIDOR
ELEC
ELEC
CORRIDOR
CORRIDOR
VESTIBULE
KEYBOARD
STORAGE
MUSIC
OFFICE
VESTIBULEFOLIO /
MUSIC
STORAGE
IDF-A/B
ART
STORAGE
CORRIDOR
MEDIA
PRODUCTION
VIDEO
Department Legend
ADMINISTRATION
MEDIA CENTER
MEP
PERFORMING ARTS
FIRST FLOOR
ARTS
FIRST FLOOR
GALLERY
ARTS FIRST FLOOR
15. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
ACTIVITY
• INTERIOR DEMOLITION: ONGOING THROUGH END OF AUGUST
• ATRIUM & PAVILION EXCAVATION/FOUNDATIONS: LATE JULY START
• MECHANICAL/ELECTRICAL/
• PLUMBING ROUGH IN: ONGOING
• MASONRY RESTORATION: ONGOING
• NEW WALL CONSTRUCTION: SEPTEMBER START
• NEW EXTERIOR WINDOW FABRICATION: AUGUST START
• SITE CLEARING AND REGRADING: AUGUST START
• WINDOW RESTORATION: AUGUST START
• ROOFING: SEPTEMBER START
• SUBMITTAL/SHOP DRAWING REVIEW: ONGOING
WHAT TO EXPECT IN THE NEXT 30 90 DAYS
16. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
•52% OF WORK TO DATE HAS BEEN AWARDED TO CBE COMPANIES WITH AN
ESTIMATED VALUE OF $64M.
•64% OF EMPLOYEES ARE DC RESIDENTS
•DC RESIDENTS INTERESTED IN EMPLOYMENT ON THIS OR ANY OTHER DGS
CONSTRUCTION PROJECT, VISIT YOUR NEAREST DEPARTMENT OF EMPLOYMENT
SERVICES DOES ONE STOP LOCATION TO APPLY FOR EMPLOYMENT.
CBE PARTICIPATION BY WARD
WARD NUMBER OF CBEs
WARD 1 2
WARD 2 2
WARD 3 1
WARD 4 5
WARD 5 8
WARD 6 4
WARD 7 1
WARD 8 1
TOTAL 24
RESIDENT PARTICIPATION BY WARD
WARD NUMBER OF DC EMPLOYEES
WARD 1 20
WARD 2 14
WARD 3 0
WARD 4 34
WARD 5 12
WARD 6 1
WARD 7 29
WARD 8 37
TOTAL 147
CERTIFIED BUSINESS ENTERPRISE CBE AND
DC RESIDENT PARTICIPATION
17. Roosevelt High School
Moderniza on
ANC MEETING, JULY 2014
FUTURE QUESTIONS OR COMMENTS ABOUT ROOSEVELT MODERNIZATION
Darrell S. Pressley
Public Affairs Specialist
Office of Government Affairs and Communica ons
Department of General Services
(202) 698-7703 (office)
darrell.pressley@dc.gov
18. Elevating the Quality of Life in the Districtality of Life in the Districty f fElevating theg aQuaQ
SITE OVERVIEW
20. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning
2.June.2013
B4
DN
UP
UP
UP
DN
UP
DN
DN DN
GRAND
STAIR 347 SF
PRO.
LITERACY
RM.
CORRIDOR
GIRLS
2964 SF
AUDITORIUM
VESTIBULE
LOBBY
GIRLS
CORRIDOR
VEST.
1003 SF
KINDERGARTEN
1003 SF
KINDERGARTEN
76 SF
SECURITY
ATRIUM
TEACHER'S
TOILET
1616 SF
KITCHEN
864 SF
FIRST
GRADE
864 SF
FIRST
GRADE
864 SF
FIRST
GRADE
835 SF
FIRST
GRADE
CORRIDOR
446 SF
PRINC. OFF
/ CONF RM 355 SF
HEALTH
BOYS
VEST.
ATRIUM
KINDERGARTEN
1000 SF
408 SF
SE
RESOURCE
ROOM
PRE-KINDERGARTEN
1000 SF
PRE-SCHOOL
1000 SF
PRE-KINDERGARTEN
1000 SF
PRE-SCHOOL
1000 SF
PRE-SCHOOL
1027 SF
KINDERGARTEN
1053 SF
*
252 SF
CUST.
OFFICE
612 SF
RECEIVING
AREA
163 SF
ADMIN. WK.
170 SF
BK. RM.
426 SF
FAMILY
RESPECT
CNTR
WEL. CENTER
440 SF
GALLERY
55 SF
JAN. CL.
PRE-KINDERGARTEN
1022 SF
RECORD RM.
141 SF
MAIL RM.
118 SF
ELEC.
2682 SF
DINING/AUDITORIUM
|ProposedPlans|MasterPlan-FloorPlans
0 16 32
Basement PlanFirst Floor Plan
Master Plan
MECH. RM ELEC. RM.
BOILER
ROOM
UP
CRAWL SPACE
200 SF
TOILET /
SHOWER
150 SF
CUST.
OFFICE
21. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning
2.June.2013
B5
DN
DN
GRAND
STAIR
BOYS
524 SF
SPEECH
RM.
845 SF
SECOND
GRADE
CORRIDOR
BOYS
TER
JAN. CL.
GIRLS
773 SF
FOURTH
GRADE
1078 SF
COLLABORATION
ROOM
CORRIDOR
STAGE STO. STAGE STO.
328 SF
SCIENCE
STO.
519 SF
TEACH.
OFF. (2)
168 SF
SUPPORT
OFFICE
TR
1704 SF
LIBRARY
970 SF
COMPUTER
LAB
848 SF
FOURTH
GRADE
848 SF
FIFTH
GRADE
834 SF
FIFTH
GRADE
849 SF
FIFTH
GRADE
CORRIDOR
ATRIUM
1340 SF
ART
1348 SF
MUSIC LAB
THIRD
GRADE
803 SF
280 SF
BK. RM.
THIRD
GRADE
849 SF
SECOND
GRADE
844 SF
THIRD
GRADE
895 SF
SECOND
GRADE
885 SF
120 SF
VP OFF.
*
**
258 SF
GUID. OFF
817 SF
STUDENT
INTRV. RM +
GUID. OFF. 350 SF
RESOURCE
ROOM
174 SF
SUPPORT
OFFICE
173 SF
SUPPORT
OFFICE
ELEC.
259 SF
EX. DAY
CORRIDOR
120 SF
BUS. MGT
103 SF
INST.
COACH
CORRIDOR
FOURTH
GRADE
830 SF
STAFF
LOUNGE
380 SF
|ProposedPlans|MasterPlan-FloorPlans
0 16 32
Second Floor Plan
Master Plan
22. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning
2.June.2013
C3
|DesignNarrative|Perspectives
23. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning
2.June.2013
C4
|DesignNarrative|Perspectives
24. A P P R O V E D S C H E M A T I C D E S I G N - P O W E L L E L E M E N T A R Y S C H O O L ISTUDIOarchitecture | design | planning
2.June.2013
C5
|DesignNarrative|Perspectives
25.
26.
27.
28.
29.
30. Elevating the Quality of Life in the District
Pros
• Accessible from street
• Flat
Cons
• Solar Access – Shaded by large trees
• Too small at 6,000 sf (existing community garden is 14,000 sf)
• Highly visible and public location might be more appropriate for other
uses like open play area
Pros
SITE PLAN: OPTION #1
31. Elevating the Quality of Life in the District
SITE PLAN: OPTION #2
Pros
• Maximize Green Space at Powell
ES
• Good Solar Access for Gardens
• Views from Garden
• Central Location
• Maximize Under Utilized Spaces
• Equitable to Both DCPS & DPR
Cons
• Brush and Mechanical Equipment
Needs Removal Required at Parking
Site
• Possible Re-grading or retaining wall
at Parking Site