SlideShare a Scribd company logo
European Students of Industrial Engineering and Management
www.estiem.org
Control
for publication
1
European Students of Industrial Engineering and Management
www.estiem.org
It’s Feedback time!
2
Persons giving feedback
Link to the feedback form
(can be found on Schoology and
WhatsApp)
Instructor to give feedback toPersons giving feedback
INSTRUCTOR 1
INSTRUCTOR 2
European Students of Industrial Engineering and Management
www.estiem.org
Time to go to the Control phase.
What is the purpose of the Control phase?
3
European Students of Industrial Engineering and Management
www.estiem.org
Achieving real change in
processes is difficult
You as a GB, should help the process
owner to manage the implementation
4
European Students of Industrial Engineering and Management
www.estiem.org
“Control activities create a standard way
of working and “hold the gains” from
the project improvement activities.”
Control is a fundamental requirement for
routine work!
5
European Students of Industrial Engineering and Management
www.estiem.org
Incremental improvement achieves a local
maximum
Time
Progress in
Effectiveness
Continual Improvement
Designed Process
Capability (Cp)
Waste, Loss, Inefficiency
6
European Students of Industrial Engineering and Management
www.estiem.org
Capability improvement is “designed” into
systems
Time
Progress in
Effectiveness
Breakthrough
Stagnation
CP1
CP2
CP3
CP4
7
European Students of Industrial Engineering and Management
www.estiem.org
An integrated approach to systemic
improvement
Time
Progress in
Effectiveness
Breakthrough
New baseline
Maximum for CP1
Maximum for CP2
New baseline
New baseline
Multiplying effect of
combining incremental
and breakthrough
improvements.
Continual Improvement
8
European Students of Industrial Engineering and Management
www.estiem.org
In the Control phase, the workers are
engaged when using following methods
Documenting
standard work
Mistake-proofing
Statistical
control
9
European Students of Industrial Engineering and Management
www.estiem.org
Why should the standard work be
documented?
Documenting
standard work
Mistake-proofing Statistical control
10
European Students of Industrial Engineering and Management
www.estiem.org
People tend to do the things differently – some
ways are more optimal than others.
Without standards, there can be no
improvement.
Documenting
standard work
Mistake-proofing Statistical control
11
European Students of Industrial Engineering and Management
www.estiem.org
Documenting
standard work
Mistake-proofing Statistical control
What is the purpose of
mistake-proofing?
12
European Students of Industrial Engineering and Management
www.estiem.org
Catching mistakes and errors
before they turn into defects!
Documenting
standard work
Mistake-proofing Statistical control
13
European Students of Industrial Engineering and Management
www.estiem.org
Documenting
standard work
Mistake-proofing Statistical control
Mistakes
– within people
Errors
– within process
Defects
– outside factory
Don’t let defects escape the factory!
14
European Students of Industrial Engineering and Management
www.estiem.org
Control charts can be used to
monitor the process performance
Documenting
standard work
Mistake-proofing
Statistical
control
15
European Students of Industrial Engineering and Management
www.estiem.org
Which control chart you would
use to monitor a process and
why?
Documenting
standard work
Mistake-proofing
Statistical
control
16
European Students of Industrial Engineering and Management
www.estiem.org
Documenting
standard work
Mistake-proofing
Statistical
control
Which one gives you more information? – Data is the same
17
European Students of Industrial Engineering and Management
www.estiem.org
Documenting
standard work
Mistake-proofing
Statistical
control
Which one gives you more information? – Data is the same
18
European Students of Industrial Engineering and Management
www.estiem.org
Documenting
standard work
Mistake-proofing
Statistical
control
Which one gives you more information? – Data is the same
19
European Students of Industrial Engineering and Management
www.estiem.org
In the Control phase, the usage of 4 methods
is highly recommended for the success
Implementation
plan
Realization review
Control plan
Benefit Capture
plan
20
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
What is the purpose of
implementation plan?
21
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
Defines improvement activities,
accountable persons for each activity, and
targets for improvement
22
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
23
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
What is the purpose of
control plan?
24
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
Defines key process outputs,
measurements to control the outputs,
and
responses to abnormal situations
25
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
26
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
What is the purpose of
realization review?
27
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
One page executive summary
done in the end of the project,
describing the main findings of the projects
28
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
Can contain
AchievedBaselineProcess Capability
AchievedBaselineCost of Poor Quality
AchievedBaseline
Achieved Productivity
(Cycle Time)
Project charter information Budget Reduction Taken by Cost
Center (Approvals)
Lessons Learned
–Follow-on Projects Identified
Further Savings Leverage
Opportunities Identified
29
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
What is the purpose of
benefit capture plan?
30
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
Monitor execution of planned
improvements and report on benefits
received by these improvements
31
European Students of Industrial Engineering and Management
www.estiem.org
Implementation
plan
Realization
review
Control
plan
Benefit capture
plan
Responsibility accepted by a
line manager/supervisor
Baseline Measure
Monitored Performance
Measure
Identification of
improvement opportunity
Achievable Performance
Target
Expected Financial Benefit
Achieved Completion Date
Percentage of Task
Completion
Financial Benefit Achieved
(by financial department)
Additional Improvement
Available
32
European Students of Industrial Engineering and Management
www.estiem.org
All the previous methods are performed
by a Green Belt.
What is the reason of making them?
Ensuring the implementation of
changes and smooth transition to daily
management
33
European Students of Industrial Engineering and Management
www.estiem.org
The implementation of changes and
controlling the process is the job of
process owner.
Your help will be needed!
34
European Students of Industrial Engineering and Management
www.estiem.org
Questions & comments?
35
European Students of Industrial Engineering and Management
www.estiem.org
How important is the Control
phase?
36
European Students of Industrial Engineering and Management
www.estiem.org
Remember these? - which one do you want?
37
European Students of Industrial Engineering and Management
www.estiem.org
It’s Feedback time!
38
Persons giving feedback
Link to the feedback form
(can be found on Schoology and
WhatsApp)
Instructor to give feedback toPersons giving feedback
INSTRUCTOR 1
INSTRUCTOR 2
European Students of Industrial Engineering and Management
www.estiem.org
It’s Feedback time!
Feedback box
39
European Students of Industrial Engineering and Management
www.estiem.org
Usage license of the
materials
https://creativecommons.org/licenses/by-nc/4.0/legalcode
Contact leansixsigma@estiem.org
for commercial usage of the materials
Materials of the trainings have been created based on the materials provided by
ESTIEM Summer Academy Professor Gregory H. Watson

More Related Content

What's hot

DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
ESTIEM
 
A green belt practitioners guide for quality champions publication v2021
A green belt practitioners guide for quality champions publication v2021A green belt practitioners guide for quality champions publication v2021
A green belt practitioners guide for quality champions publication v2021
ESTIEM
 
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport ExtensionESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM
 
Professionalism & Quality: What accreditation offers engineering
Professionalism & Quality: What accreditation offers engineeringProfessionalism & Quality: What accreditation offers engineering
Professionalism & Quality: What accreditation offers engineering
Stephen Frezza
 
Doc publishing -LeanSixSigma Project
Doc publishing -LeanSixSigma ProjectDoc publishing -LeanSixSigma Project
Doc publishing -LeanSixSigma Project
Radhika Puthiyetath
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
Sidewinder2011
 
anil gaur
anil gauranil gaur
RME-085 TQM unit-4 part 1
RME-085 TQM unit-4  part 1RME-085 TQM unit-4  part 1
RME-085 TQM unit-4 part 1
ssuserf6c4bd
 
TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10
TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10
TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10
Daniel D'Angelo, P.E.
 
Om0018 summer-2016
Om0018 summer-2016Om0018 summer-2016
Om0018 summer-2016
smumbahelp
 

What's hot (10)

DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt CourseDMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
DMAIC Recap - ESTIEM Lean Six Sigma Green Belt Course
 
A green belt practitioners guide for quality champions publication v2021
A green belt practitioners guide for quality champions publication v2021A green belt practitioners guide for quality champions publication v2021
A green belt practitioners guide for quality champions publication v2021
 
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport ExtensionESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
ESTIEM Lean Six Sigma Green Belt Project at YIT - Airport Extension
 
Professionalism & Quality: What accreditation offers engineering
Professionalism & Quality: What accreditation offers engineeringProfessionalism & Quality: What accreditation offers engineering
Professionalism & Quality: What accreditation offers engineering
 
Doc publishing -LeanSixSigma Project
Doc publishing -LeanSixSigma ProjectDoc publishing -LeanSixSigma Project
Doc publishing -LeanSixSigma Project
 
PGP New Product Generation Project 2003
PGP New Product Generation Project 2003PGP New Product Generation Project 2003
PGP New Product Generation Project 2003
 
anil gaur
anil gauranil gaur
anil gaur
 
RME-085 TQM unit-4 part 1
RME-085 TQM unit-4  part 1RME-085 TQM unit-4  part 1
RME-085 TQM unit-4 part 1
 
TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10
TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10
TRB 2017_AFH20(1)_QM for APD_D'Angelo_2017-01-10
 
Om0018 summer-2016
Om0018 summer-2016Om0018 summer-2016
Om0018 summer-2016
 

Similar to 09 - Control - ESTIEM Lean Six Sigma Green Belt Course

Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
never1239
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
ramuaa124
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
ramuaa130
 
III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...
III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...
III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...
isabelmargarido
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
yearstart1
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
ramuaa124
 
Total Cost Management
Total Cost ManagementTotal Cost Management
Total Cost Management
Abhishek Raj
 
EPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-EngineeringEPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-Engineering
Monir Akrad
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-web
Dir Jan
 
A company's production process
A company's production processA company's production process
A company's production process
never1240
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
Md Mosaruf Hossan
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...
HasanRabbi3
 
Aie module3 handout
Aie module3 handoutAie module3 handout
Aie module3 handout
Shantanu Gupta
 
B15 1 implement & monitor_final
B15 1 implement & monitor_finalB15 1 implement & monitor_final
B15 1 implement & monitor_final
Dir Jan
 
Innovation management
Innovation managementInnovation management
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
johann11374
 
Six cigma AJAL
Six cigma AJALSix cigma AJAL
Six cigma AJAL
AJAL A J
 
PRODUCTION PLANNING AND CONTROL PPC NOTES.pptx
PRODUCTION PLANNING AND CONTROL PPC NOTES.pptxPRODUCTION PLANNING AND CONTROL PPC NOTES.pptx
PRODUCTION PLANNING AND CONTROL PPC NOTES.pptx
shishirrathod1
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET Journal
 
Matrikulasi mm - Operations management
Matrikulasi mm - Operations managementMatrikulasi mm - Operations management
Matrikulasi mm - Operations management
AchmadHSutawidjaya1
 

Similar to 09 - Control - ESTIEM Lean Six Sigma Green Belt Course (20)

Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
 
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
Ops 571 final exam guide (new, 2018) you have been called in as a consultant ...
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...
III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...
III Conferência CMMI Portugal, Presentation 6: Process Improvement in High Ma...
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
 
A company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rateA company's production process has an 80 percent learning curve rate
A company's production process has an 80 percent learning curve rate
 
Total Cost Management
Total Cost ManagementTotal Cost Management
Total Cost Management
 
EPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-EngineeringEPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-Engineering
 
E11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-webE11 1 intro to operational-excellence_final-web
E11 1 intro to operational-excellence_final-web
 
A company's production process
A company's production processA company's production process
A company's production process
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...Presentation on challenges and opportunitues of industrial engineer in rmg in...
Presentation on challenges and opportunitues of industrial engineer in rmg in...
 
Aie module3 handout
Aie module3 handoutAie module3 handout
Aie module3 handout
 
B15 1 implement & monitor_final
B15 1 implement & monitor_finalB15 1 implement & monitor_final
B15 1 implement & monitor_final
 
Innovation management
Innovation managementInnovation management
Innovation management
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
Six cigma AJAL
Six cigma AJALSix cigma AJAL
Six cigma AJAL
 
PRODUCTION PLANNING AND CONTROL PPC NOTES.pptx
PRODUCTION PLANNING AND CONTROL PPC NOTES.pptxPRODUCTION PLANNING AND CONTROL PPC NOTES.pptx
PRODUCTION PLANNING AND CONTROL PPC NOTES.pptx
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Matrikulasi mm - Operations management
Matrikulasi mm - Operations managementMatrikulasi mm - Operations management
Matrikulasi mm - Operations management
 

More from ESTIEM

Certification Requirements_2023 Version_FOR PUBLICATION.pdf
Certification Requirements_2023 Version_FOR PUBLICATION.pdfCertification Requirements_2023 Version_FOR PUBLICATION.pdf
Certification Requirements_2023 Version_FOR PUBLICATION.pdf
ESTIEM
 
Local Courses
Local CoursesLocal Courses
Local Courses
ESTIEM
 
Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...
Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...
Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...
ESTIEM
 
Conferene Paper - A blended learning approach to lean six sigma green belt ed...
Conferene Paper - A blended learning approach to lean six sigma green belt ed...Conferene Paper - A blended learning approach to lean six sigma green belt ed...
Conferene Paper - A blended learning approach to lean six sigma green belt ed...
ESTIEM
 
E-book of LSSGB Project History
E-book of LSSGB Project HistoryE-book of LSSGB Project History
E-book of LSSGB Project History
ESTIEM
 
ESTIEM Lean Six Sigma Green Belt course - Glossary of terms
ESTIEM Lean Six Sigma Green Belt course - Glossary of termsESTIEM Lean Six Sigma Green Belt course - Glossary of terms
ESTIEM Lean Six Sigma Green Belt course - Glossary of terms
ESTIEM
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM
 

More from ESTIEM (7)

Certification Requirements_2023 Version_FOR PUBLICATION.pdf
Certification Requirements_2023 Version_FOR PUBLICATION.pdfCertification Requirements_2023 Version_FOR PUBLICATION.pdf
Certification Requirements_2023 Version_FOR PUBLICATION.pdf
 
Local Courses
Local CoursesLocal Courses
Local Courses
 
Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...
Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...
Conference Paper - The influence of Lean Six Sigma Green Belt course on Europ...
 
Conferene Paper - A blended learning approach to lean six sigma green belt ed...
Conferene Paper - A blended learning approach to lean six sigma green belt ed...Conferene Paper - A blended learning approach to lean six sigma green belt ed...
Conferene Paper - A blended learning approach to lean six sigma green belt ed...
 
E-book of LSSGB Project History
E-book of LSSGB Project HistoryE-book of LSSGB Project History
E-book of LSSGB Project History
 
ESTIEM Lean Six Sigma Green Belt course - Glossary of terms
ESTIEM Lean Six Sigma Green Belt course - Glossary of termsESTIEM Lean Six Sigma Green Belt course - Glossary of terms
ESTIEM Lean Six Sigma Green Belt course - Glossary of terms
 
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap ReductionESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
ESTIEM Lean Six Sigma Green Belt Project at Continental - Scrap Reduction
 

Recently uploaded

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
Priyankaranawat4
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
GeorgeMilliken2
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
siemaillard
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 

Recently uploaded (20)

How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdfANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
ANATOMY AND BIOMECHANICS OF HIP JOINT.pdf
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
What is Digital Literacy? A guest blog from Andy McLaughlin, University of Ab...
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptxPrésentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
Présentationvvvvvvvvvvvvvvvvvvvvvvvvvvvv2.pptx
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 

09 - Control - ESTIEM Lean Six Sigma Green Belt Course

  • 1. European Students of Industrial Engineering and Management www.estiem.org Control for publication 1
  • 2. European Students of Industrial Engineering and Management www.estiem.org It’s Feedback time! 2 Persons giving feedback Link to the feedback form (can be found on Schoology and WhatsApp) Instructor to give feedback toPersons giving feedback INSTRUCTOR 1 INSTRUCTOR 2
  • 3. European Students of Industrial Engineering and Management www.estiem.org Time to go to the Control phase. What is the purpose of the Control phase? 3
  • 4. European Students of Industrial Engineering and Management www.estiem.org Achieving real change in processes is difficult You as a GB, should help the process owner to manage the implementation 4
  • 5. European Students of Industrial Engineering and Management www.estiem.org “Control activities create a standard way of working and “hold the gains” from the project improvement activities.” Control is a fundamental requirement for routine work! 5
  • 6. European Students of Industrial Engineering and Management www.estiem.org Incremental improvement achieves a local maximum Time Progress in Effectiveness Continual Improvement Designed Process Capability (Cp) Waste, Loss, Inefficiency 6
  • 7. European Students of Industrial Engineering and Management www.estiem.org Capability improvement is “designed” into systems Time Progress in Effectiveness Breakthrough Stagnation CP1 CP2 CP3 CP4 7
  • 8. European Students of Industrial Engineering and Management www.estiem.org An integrated approach to systemic improvement Time Progress in Effectiveness Breakthrough New baseline Maximum for CP1 Maximum for CP2 New baseline New baseline Multiplying effect of combining incremental and breakthrough improvements. Continual Improvement 8
  • 9. European Students of Industrial Engineering and Management www.estiem.org In the Control phase, the workers are engaged when using following methods Documenting standard work Mistake-proofing Statistical control 9
  • 10. European Students of Industrial Engineering and Management www.estiem.org Why should the standard work be documented? Documenting standard work Mistake-proofing Statistical control 10
  • 11. European Students of Industrial Engineering and Management www.estiem.org People tend to do the things differently – some ways are more optimal than others. Without standards, there can be no improvement. Documenting standard work Mistake-proofing Statistical control 11
  • 12. European Students of Industrial Engineering and Management www.estiem.org Documenting standard work Mistake-proofing Statistical control What is the purpose of mistake-proofing? 12
  • 13. European Students of Industrial Engineering and Management www.estiem.org Catching mistakes and errors before they turn into defects! Documenting standard work Mistake-proofing Statistical control 13
  • 14. European Students of Industrial Engineering and Management www.estiem.org Documenting standard work Mistake-proofing Statistical control Mistakes – within people Errors – within process Defects – outside factory Don’t let defects escape the factory! 14
  • 15. European Students of Industrial Engineering and Management www.estiem.org Control charts can be used to monitor the process performance Documenting standard work Mistake-proofing Statistical control 15
  • 16. European Students of Industrial Engineering and Management www.estiem.org Which control chart you would use to monitor a process and why? Documenting standard work Mistake-proofing Statistical control 16
  • 17. European Students of Industrial Engineering and Management www.estiem.org Documenting standard work Mistake-proofing Statistical control Which one gives you more information? – Data is the same 17
  • 18. European Students of Industrial Engineering and Management www.estiem.org Documenting standard work Mistake-proofing Statistical control Which one gives you more information? – Data is the same 18
  • 19. European Students of Industrial Engineering and Management www.estiem.org Documenting standard work Mistake-proofing Statistical control Which one gives you more information? – Data is the same 19
  • 20. European Students of Industrial Engineering and Management www.estiem.org In the Control phase, the usage of 4 methods is highly recommended for the success Implementation plan Realization review Control plan Benefit Capture plan 20
  • 21. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan What is the purpose of implementation plan? 21
  • 22. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan Defines improvement activities, accountable persons for each activity, and targets for improvement 22
  • 23. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan 23
  • 24. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan What is the purpose of control plan? 24
  • 25. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan Defines key process outputs, measurements to control the outputs, and responses to abnormal situations 25
  • 26. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan 26
  • 27. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan What is the purpose of realization review? 27
  • 28. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan One page executive summary done in the end of the project, describing the main findings of the projects 28
  • 29. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan Can contain AchievedBaselineProcess Capability AchievedBaselineCost of Poor Quality AchievedBaseline Achieved Productivity (Cycle Time) Project charter information Budget Reduction Taken by Cost Center (Approvals) Lessons Learned –Follow-on Projects Identified Further Savings Leverage Opportunities Identified 29
  • 30. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan What is the purpose of benefit capture plan? 30
  • 31. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan Monitor execution of planned improvements and report on benefits received by these improvements 31
  • 32. European Students of Industrial Engineering and Management www.estiem.org Implementation plan Realization review Control plan Benefit capture plan Responsibility accepted by a line manager/supervisor Baseline Measure Monitored Performance Measure Identification of improvement opportunity Achievable Performance Target Expected Financial Benefit Achieved Completion Date Percentage of Task Completion Financial Benefit Achieved (by financial department) Additional Improvement Available 32
  • 33. European Students of Industrial Engineering and Management www.estiem.org All the previous methods are performed by a Green Belt. What is the reason of making them? Ensuring the implementation of changes and smooth transition to daily management 33
  • 34. European Students of Industrial Engineering and Management www.estiem.org The implementation of changes and controlling the process is the job of process owner. Your help will be needed! 34
  • 35. European Students of Industrial Engineering and Management www.estiem.org Questions & comments? 35
  • 36. European Students of Industrial Engineering and Management www.estiem.org How important is the Control phase? 36
  • 37. European Students of Industrial Engineering and Management www.estiem.org Remember these? - which one do you want? 37
  • 38. European Students of Industrial Engineering and Management www.estiem.org It’s Feedback time! 38 Persons giving feedback Link to the feedback form (can be found on Schoology and WhatsApp) Instructor to give feedback toPersons giving feedback INSTRUCTOR 1 INSTRUCTOR 2
  • 39. European Students of Industrial Engineering and Management www.estiem.org It’s Feedback time! Feedback box 39
  • 40. European Students of Industrial Engineering and Management www.estiem.org Usage license of the materials https://creativecommons.org/licenses/by-nc/4.0/legalcode Contact leansixsigma@estiem.org for commercial usage of the materials Materials of the trainings have been created based on the materials provided by ESTIEM Summer Academy Professor Gregory H. Watson