This document provides the curriculum vitae of Abdulmeguid Ali Ali, an Egyptian civil engineer with over 6 years of experience in planning and project management roles. It details his educational background, including a 2009 BSc in civil engineering. It then outlines his professional experience with several companies in Saudi Arabia, the UAE, and Egypt between 2010-present, working on projects such as bridges, military bases, and schools. His responsibilities included scheduling, cost control, risk management, and coordinating project teams. Contact information is provided at the top.
1. Name : Abdulmeguid Ali Ali
Year of Birth : 06-Sep-1986
Nationality : Egyptian
Educational Attainment : B.Sc of Civil Engineering - 2009
Total Experience : 6 Years
PHONE : 966544076565 - 966544455214
Professional Experience : Al-ayuni Investment & Contracting - KSA ( Planning Engineer ) PMO
E-Mail : geedo0609@gmail.com
2015 - PRESENT
*
Provides planning, progress monitoring services and have significant impact and input on the planning and organizational issues and
relevant decision making of the project’s Senior Management Team.
* Review contract documentation to ensure a thorough understanding of the contract requirements.
*
Develops a fully detailed Project Schedule, proposing amendments and alternatives to it and to the project construction Method
Statement as considered advantageous to meet or improve on project targets. Ensures that the project organization chart and all
manning schedules are kept up-to-date.
* Designs report forms of all sorts as required for progress reports on all aspects of the project (excepting cost reports).
*
Updates the overall programs. Prepares in conjunction with the concerned staff the detailed short-term working programs as necessary,
accentuating any revision in the sequences of durations of activities arising from enforced changes being made to the overall program.
*
Checks progress on the above programs by frequent site inspection, and stresses to site supervisors the need to adhere to the required
sequences and durations of the scheduled activities.
*
Where necessary draws up daily programs showing hourly resource allocation for manpower, plant and factory production items.
Recommends priorities for allocation in the event of conflicting demands and co-ordinates the transfer of labor as necessary.
*
Prepares programs as required prior to the letting of sub-contracts to arrange continuity of work for the sub-contractor at the least cost
to the project. Issues necessary programs to Sub-contractors on site and checks to ensure that their activities are kept in line with
contract requirements.
*
Prepares and updates labor resource programs showing the work force required for each direct trade, and for major sub-contractors
when applicable.
*
Prepares programs for major site operations and production facilities (earthworks, concrete production, precasting, steel fabrication,
etc.) and monitors output to ensure that site requirements are met.
*
Monitors all change orders to the contract to make certain that all additions and deletions are incorporated in revisions of the
construction method statement and the overall program.
* Train and guide new planers. Identify, in conjunction with manager, the need and areas where training is required.
* Maintain and run the project cost control system.
* Establish and produce the project monthly cost reports
* Record and supervise cost Manpower, Equipment, Subcontracts and Materials Logs.
* Monitor and supervise changes to maintain awareness of project progress / cost and report them to the management.
* Prepare cost variation analysis, cost trends and record changes affecting budget and forecast cost.
ALAYUNI INVESTMENT & CONTRACTING
شركةالعيونىلالستثماروالمقاوالت
CURRICULUM VITAE
PLANNING ENGINEER
2. ALMOBTY CO. for Contracting
شركةسعدالمبطيوشركاهللمقاوالت
2013 - 2015 : Al Mobty Co. for Contracting - KSA - Planning Engineer (PMO)
* Processing schedule of the projects using Primavera.
* Add schedule of subcontractor to main schedule of the project and ensure commitment to the time specified stages.
* Sort responsibilites, coordination with the managers, finance and accounting to ensure safety cash flow in all phases of projects.
* Reliability clarify the relationships between task and activities.
* Develops overall project controls system.
* Integrates engineering, construction and startup controls system.
* Manage change decision process foe engineering design.
* Recieve, analyze, and integrate cost and schedule reports.
* Report status and variation from plan to the project on periodic basis.
* Determine risk of the projects with the calculation risk-based budget.
* Update work schedule of the project with the completion of proj. account and follow-up reports in the proj. workflow
* Prepare and regularly validates the project forecast cost and completion.
* Coordinate with the management in the preparation of claims and provide / retrieve data where needed.
* Participate and assist in the preparation of V.O pricing and scope changes cost impacts
* Initiate budget revisions drafts in coordination with estimation, budget department.
2011 - 2012 : Sakan for Engineering & Consultancy Co. - KSA
* Structural design of school in a way computer-aided structural analysis modeling and analysis building (sap 2000 Tabuk city)
* Supervising projects of the Ministry of Interior.
*
Technical work office (work amounts inventory of projects, ministry of interior,and prepare drawings implementation and preparation of
extract contractors)
* Preparing schedule with follow-up schedule for contractors.
*
Preparation of bids and tenders for projects, work schedules of quantities and engineering specifications for construction and
architectural works.
2010 - 2011 : Abery for Construction & Development Co. - UAE, Abu Dhabi
* Technical Site Engineer in Zayed Military City
* Planner Engineer for Construction Building-Scheduling & Updating
* Design of the Construction of the Foundation of the Building
* Design of the Construction of Steel and Concrete Column with Glass Façade in Zayed Military City
2009 - 2010 : General Nile Works for Roads & Bridges Co. - EGYPT
* Site Engineer at Bridge of Aswan Project
* Supervisor of the Construction of Mechanical Workshop, Aggregate Shed, and Two Patch Plants (Two Eleba & One Stetter)
* Participating in the Construction of Foundation of the Bridge.