Introduction to Construction Industry Final Project Report
Content
!
1.Project Introduction
1.1 Project Background
1.2 Project Objective
!
2. Project Plan
2.1 Site analysis
A. Location Plan
B. Site Specifications
C. Circulation Patterns on Site
!
2.2 Concept and rationale of design
A. Main Concept
B. Design Proposal
!
!
Page ! of !1 14
Introduction to Construction Industry Final Project Report
1. Project Introduction
!
!
1.1 Project Background
!!
For this particular project, we were required to work in a group of two and find a specific land
within Taylor’s University Lakeside Campus area to initiate a small construction project. The
requirements was that the size of the land should not be more than 30m x 30m.
!
!
!
1.2 Project Objective
!
The objective of the construction project was to provide an architectural response to the idea of
students and staff seeking rest and serenity amidst the busy university campus. The space is
conceived as a resting space, whose relationship to place is transitory, and who seek privacy in the
openness of spectacular landscapes. The conceptual premise was to transform this transient rapport
with space into a place – or an architecture – that reflects their fluctuation between association and
disassociation, presence and absence, public and private.
!
The following pages is a compilation of data report and design ideas that we would like to propose
for a construction project that serves as a rest area for students and staff of Taylor’s University
Lakeside Campus.
!
!
Page ! of !2 14
Introduction to Construction Industry Final Project Report
2. PROJECT PLAN
!
2.1 Site Analysis
!
A. Location Plan
The following is the location plan of our 10m*16m site (Site 1) which is located on a balcony
terrace between Block C and Block D of Taylor’s Univesity Lakeside Campus and and the 7m*8m
site (Site 2) which is located in front of Truffles Restaurant. Site 1 is adjacent to the Tourism Centre
and the Legal Aid Centre and is accessible through a flight of stairs from Truffles Restaurant ,it is a
16 by 10 metres slab of concrete balcony, complete with railing. While Site 2 is a secluded timber
deck surrounded by bamboo plantations, in front of Truffles Restaurant.


Page ! of !3 14
Fig 1. Location Plan of Taylor’s University Lakeside Campus
Location of Site 1:
Adjacent to the
Tourism Centre and
the Legal Aid Centre
and is accessible
through a flight of
stairs from Truffles
Restaurant ,it is a 16
by 10 metres slab of
concrete balcony,
complete with
railing.
Location of Site 2:
A secluded timber deck
surrounded by bamboo
plantations, in front of Truffles
Introduction to Construction Industry Final Project Report
B. Site Specifications
!
SITE 1: ORIGINAL CONDITION OF THE SITE


Page ! of !4 14
The right section of the site faces the Legal
Aid Centre while the left section faces the
Tourism Centre. There are glass panels of
the office windows on both sides where the
staff can look through from inside the
office.
Side View
The back section of the site contains two
doors as it is connected to Lecture Theater
Hall 7 & 8. At the side of the back section
of the site also includes several air
conditioner ventilation machines.
Back View
The front section of the site overlooks the
commercial block as well as the lake.
There are several trees plantations that
stood upon the site, making the site slightly
more shady while giving the site its
secluded feeling as the trees obstruct the
view from below.
Front View
Fig 2. Panoramic view of the site
Introduction to Construction Industry Final Project Report
SITE 2: ORIGINAL CONDITION OF THE SITE
We have chosen this site because it has the potential to become a popular resting spot for students. The area
is covered by trees which help to provide shade and also help to lower surrounding temperature. The site has
existing furniture to let students rest.


Page ! of !5 14
There are two stone slab pathway that
connects the stairs of the amphitheatre to
the timber deck.
On the left side of the deck, there is a
wooden deck walkway connecting Truffles
Restaurant to the timber deck. Surrounding
the walkway was pots of bamboo
plantations.
On the timber deck are a few chairs and
tables for seatings. Considering the size of
the timber deck, the amount of chairs or the
design of the seating can be increased to
maximum the utilisation of space.
The back and right side of the timber deck
is a small hill slope to the waterfront. There
are multiple plantations surrounding the
deck, but at noon hour till early afternoon,
the deck still gets too sunny for the public
to come and rest.
Introduction to Construction Industry Final Project Report!
C. Circulation Patterns on Site


Page ! of !6 14
HUMAN: People can access the site by stairs and walk
around the site and exit again by the stairs.
!
WIND: The wind blows oppositely against the sun
direction, which is from the West direction to East.
!
SUN: The sun shone from the East to the West against the
direction of the wind. With more sunlight directed at the
middle section and more shady at the back,front and
corner section.
Human Circulation
Sun Circulation
Wind Circulation
The flight of stairs leading to our site.
The extended balcony is almost hidden
from view by a covering of tall
greenery.
STAIRS
Tourism
Centre
LEGAL
AID
CENTRE
Lecture Hall 7 & 8
Site 1:
Introduction to Construction Industry Final Project Report!
Site 2:
!


Page ! of !7 14
ENTRANCE
WALKWAY
ENTRANCE
WALKWAY
ENTRANCE
WALKWAY
TIMBER DECK
PLANTATIONS
AND SMALL
SLOPE HILL
PLANTations
and
Truffles
restaurant
!
PLANTATIONS
AND SMALL
SLOPE HILL
PLantations and
stairs leading to
the amphitheatre
Human Circulation
Wind Circulation
Sun Circulation
HUMAN: People can access the site by the three entrance
walkways and walk around the site and exit again by any
of the walkways.
!
WIND: The wind blows oppositely against the sun
direction, which is from the West direction to East.
!
SUN: The sun shone from the East to the West against the
direction of the wind. The plantations surrounding the
timber deck cast shades over the deck but the front part of
the deck still gets sunny at times.
Introduction to Construction Industry Final Project Report!
2.3 Design Concept and Rationale
A. Main Concept
After carrying out site analysis and observation, we came up with a concept that supported and
complemented the characteristics of both our site. Both being highly enclosed by a fringe of trees, it
is a protected haven of quiet seclusion. Taylor’s University Lakeside Campus could undoubtedly
maximize potential and empty spaces such as this to the student’s and staff’s benefit, providing a
small spot of simple pleasure to visitors.
Our idea progression originated from the idea of calm and serenity. Inspired further from the
location of our site, which is wedged between two busy buildings, contributed to the idea of
creating a small space of comfort. Easily accessible by the public but not a public display, the site
was perfect for the concept we had in mind. An open yet secluded pocket park with seating and
lounging spaces to unwind and relax was what we were aiming for.
Page ! of !8 14
These are some references for our design concept. Each of these pocket parks features a
lot of greeneries and plantations that gives the place a cool, shady, relaxing ambience. The
usage of plants and its shadows also provides the space the its secludedness but still
remained the refreshing openness and airiness of a resting space.Another idea is that since
there are quite a few bamboo plantations and wooden,stone ornamentation around Truffles
and Thyme, we would like to incorporate those elements into the site, so that there is a
continuity between each places.
Introduction to Construction Industry Final Project Report!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Page ! of !9 14
Introduction to Construction Industry Final Project Report!
B. Design Proposal (SITE 1)
!
Our proposal for Site 1 was to construct a small enclosed resting room surrounded
by a dense layer of greeneries. To “rest in the forest” was the idea that we would
like to express through this construction. The site measures only 10 by 16 meters.
!
!
!
Page ! of !10 14
!
!
!
A forest, was inserted into
the architectural box, as a
dense green space and
within the dense green
space is another glass
and wooden box
designed for resting and
lounging purposes.
!
!
!
The glass
and
wooden box
room within
the dense
greeneries
which is
intended to
be created
as a resting
and
lounging
space.
Introduction to Construction Industry Final Project Report!
Page ! of !11 14
!
!
!
The garden acts as both a divider of
space in the building and a
connection device.
!
Openings in the walls are controlled
to direct views of the vegetation: the
room can be opened to reveal the
garden; then, views of the forest are
hidden again.
!
This gives visitors the feeling of
arriving in nature and moving away
from the urban landscape and acts
as a retreat from their hectic lifestyles
and tight work schedules.
Proposed Design Layout: Overall
DENSE GREENERIES
DENSE
GREENERIES
DENSE
GREENERIES
DENSE
GREENERIES
Lounging
Space
RESTING
Space
ENTRANCE
16m!
Type to enter text
10m
Introduction to Construction Industry Final Project Report!
Lounge Area Specifications:
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Page ! of !12 14
seating area
TV AREA+
Stools
seatingSPorts Area:
The lounging
area is
intended to
serve as a
space where
students and
staff can
come to
lounge and
distress
through a
variety of
activity. For
example,
there are TV,
snooker
table, music
equipment
etc. that
students and
staffs can
choose from
to distress.
7m
6m
Introduction to Construction Industry Final Project Report!
!
B. Design Proposal (SITE 2)
!
Our proposal for site 2 is similar to site 1
to remained its continuity between the two
places. We would like to construct a semi-
enclosed glass and wooden room (As
shown in the figure at side) upon the deck
and add more furnitures within the deck
area to maximize the utilisation of the
space. The semi-wooden and glass room
will prevent the deck from being too
sunny so that the public can go there and
rest often even during the hot noon but
still not completely enclosed to makes
sure that the deck has the sufficient lighting and airiness as well as the perforation of
trees. At night the room is lighted,so that the public can also utilise the room.
!
!
Proposed Design Layout:
!
Page ! of !13 14
Water cooler
machine Tables and
BEnches Hammock
CUSHION SEATINGS
AREA
Introduction to Construction Industry Final Project Report!
Benefits of furniture fittings:
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Page ! of !14 14
The hammock can be tied to the trees beside the
wooden platform. By doing so, tired students can get
rested and be ready for the next class. Also, an
environment with trees and stones, it feels just like
nature and students get to experience nature in the
campus.
By adding a wooden bench, it maximizes the use of
space. More people can be fitted into the selected area
and it also provides more seats for people.
By doing so, more people can enjoy the nice scenery
as well as having a place to hang out with friends.
Students can do reading there or just sit there and rest.
To put a water cooler at the resting area so that
students can refill their water bottles and drink water
without having to walk so far to the nearest water
cooler. By doing so, students will not be as lazy to get
drinking water and they will stay hydrated. This
reduces the risk of getting sick.
!

More Related Content

What's hot

Miguel Medina - Architectural Portfolio
Miguel Medina - Architectural PortfolioMiguel Medina - Architectural Portfolio
Miguel Medina - Architectural PortfolioMiguel Medina Albero
 
Introduction to the construction industry
Introduction to the construction industryIntroduction to the construction industry
Introduction to the construction industryIRFAANYADUN
 
Case study climatology (india habitat centre & peda)
Case study  climatology (india habitat centre & peda)Case study  climatology (india habitat centre & peda)
Case study climatology (india habitat centre & peda)Chandan kumar
 
Concordia(New Orleans)
Concordia(New Orleans)Concordia(New Orleans)
Concordia(New Orleans)Damian-111093
 
DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10 DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10 Dillon Clarke
 
150316 case studies
150316 case studies150316 case studies
150316 case studiesTieng Wei
 
Case Study on Residence Design of Rafiq Azam
Case Study on Residence Design of Rafiq AzamCase Study on Residence Design of Rafiq Azam
Case Study on Residence Design of Rafiq Azam17052MahmudurHossain
 
Foundation in natural and built environment
Foundation in natural and built environmentFoundation in natural and built environment
Foundation in natural and built environmentcheeweishan
 
JvR Sampler 2012
JvR Sampler 2012JvR Sampler 2012
JvR Sampler 2012jozefc44
 
Shigeru Ban Architects(Tokyo, Japan)
Shigeru Ban Architects(Tokyo, Japan)Shigeru Ban Architects(Tokyo, Japan)
Shigeru Ban Architects(Tokyo, Japan)Damian-111093
 
ICI final project report
ICI final project reportICI final project report
ICI final project reportSheau Hui Tan
 
Foundation in natural and built environment
Foundation in natural and built environmentFoundation in natural and built environment
Foundation in natural and built environmentJaclyn Hwang
 

What's hot (19)

Miguel Medina - Architectural Portfolio
Miguel Medina - Architectural PortfolioMiguel Medina - Architectural Portfolio
Miguel Medina - Architectural Portfolio
 
Portfolio
PortfolioPortfolio
Portfolio
 
Introduction to the construction industry
Introduction to the construction industryIntroduction to the construction industry
Introduction to the construction industry
 
Case study climatology (india habitat centre & peda)
Case study  climatology (india habitat centre & peda)Case study  climatology (india habitat centre & peda)
Case study climatology (india habitat centre & peda)
 
Ici
IciIci
Ici
 
Eugene pandala
Eugene pandalaEugene pandala
Eugene pandala
 
Gehry's house
Gehry's houseGehry's house
Gehry's house
 
Concordia(New Orleans)
Concordia(New Orleans)Concordia(New Orleans)
Concordia(New Orleans)
 
DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10 DETROIT HOUSING SPREADS 8.5 x 10
DETROIT HOUSING SPREADS 8.5 x 10
 
150316 case studies
150316 case studies150316 case studies
150316 case studies
 
Case Study on Residence Design of Rafiq Azam
Case Study on Residence Design of Rafiq AzamCase Study on Residence Design of Rafiq Azam
Case Study on Residence Design of Rafiq Azam
 
Green Architecture
Green ArchitectureGreen Architecture
Green Architecture
 
Foundation in natural and built environment
Foundation in natural and built environmentFoundation in natural and built environment
Foundation in natural and built environment
 
Case Study - Heritage School
Case Study - Heritage SchoolCase Study - Heritage School
Case Study - Heritage School
 
JvR Sampler 2012
JvR Sampler 2012JvR Sampler 2012
JvR Sampler 2012
 
Shigeru Ban Architects(Tokyo, Japan)
Shigeru Ban Architects(Tokyo, Japan)Shigeru Ban Architects(Tokyo, Japan)
Shigeru Ban Architects(Tokyo, Japan)
 
Architectural Case Study
Architectural Case StudyArchitectural Case Study
Architectural Case Study
 
ICI final project report
ICI final project reportICI final project report
ICI final project report
 
Foundation in natural and built environment
Foundation in natural and built environmentFoundation in natural and built environment
Foundation in natural and built environment
 

Similar to Ici final report pdf

Ici final group
Ici final groupIci final group
Ici final groupKailyn Lee
 
Constructed Landscape Final Project Report
Constructed Landscape Final Project ReportConstructed Landscape Final Project Report
Constructed Landscape Final Project ReportAnna Neo
 
Heiwa Report ( Constructed Landscape )
Heiwa Report ( Constructed Landscape )Heiwa Report ( Constructed Landscape )
Heiwa Report ( Constructed Landscape )Kayla Neoh
 
HEIWA REPORT
HEIWA REPORTHEIWA REPORT
HEIWA REPORTShiko Foo
 
Report - Heiwa
Report - HeiwaReport - Heiwa
Report - Heiwasuehwa533
 
Ici final project
Ici final projectIci final project
Ici final projecttfkc1212
 
13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES
13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES
13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RESAr. Archana Jaiswal
 
Ici final project 3
Ici final project 3Ici final project 3
Ici final project 3wyinsam
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project Ryan Kerry Jy
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTLucasssong
 
Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02Christina Ng Sue Li
 
Constructed landscape final project (final)
Constructed landscape final project (final)Constructed landscape final project (final)
Constructed landscape final project (final)Muhammad Naim
 
Undergrad Portfolio 2010-2013: Ryan Northcutt
Undergrad Portfolio 2010-2013: Ryan NorthcuttUndergrad Portfolio 2010-2013: Ryan Northcutt
Undergrad Portfolio 2010-2013: Ryan NorthcuttRyan Northcutt
 
Kevin's Portfolio.compressed
Kevin's Portfolio.compressedKevin's Portfolio.compressed
Kevin's Portfolio.compressedKevin Kelly
 
CL final report for proposed Garden
CL final report for proposed GardenCL final report for proposed Garden
CL final report for proposed GardenSchani B
 
Reportf inal
Reportf inalReportf inal
Reportf inalAmos Tan
 

Similar to Ici final report pdf (20)

Ici final group
Ici final groupIci final group
Ici final group
 
Ici report
Ici reportIci report
Ici report
 
Ici final
Ici final Ici final
Ici final
 
Constructed Landscape Final Project Report
Constructed Landscape Final Project ReportConstructed Landscape Final Project Report
Constructed Landscape Final Project Report
 
Heiwa Report ( Constructed Landscape )
Heiwa Report ( Constructed Landscape )Heiwa Report ( Constructed Landscape )
Heiwa Report ( Constructed Landscape )
 
HEIWA REPORT
HEIWA REPORTHEIWA REPORT
HEIWA REPORT
 
Report - Heiwa
Report - HeiwaReport - Heiwa
Report - Heiwa
 
Ici final project
Ici final projectIci final project
Ici final project
 
13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES
13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES
13-03-2017_PORTFOLIO_ACADEMIC_PROFESSIONAL_LOW_RES
 
Ici final project 3
Ici final project 3Ici final project 3
Ici final project 3
 
CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project CL - Project 3 ( Final Project ) ~ The Landscape Project
CL - Project 3 ( Final Project ) ~ The Landscape Project
 
Cl
ClCl
Cl
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECT
 
Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02Constructedlandscapefinalprojectfinal 140822034343-phpapp02
Constructedlandscapefinalprojectfinal 140822034343-phpapp02
 
Constructed landscape final project (final)
Constructed landscape final project (final)Constructed landscape final project (final)
Constructed landscape final project (final)
 
Undergrad Portfolio 2010-2013: Ryan Northcutt
Undergrad Portfolio 2010-2013: Ryan NorthcuttUndergrad Portfolio 2010-2013: Ryan Northcutt
Undergrad Portfolio 2010-2013: Ryan Northcutt
 
Kevin's Portfolio.compressed
Kevin's Portfolio.compressedKevin's Portfolio.compressed
Kevin's Portfolio.compressed
 
CL final report for proposed Garden
CL final report for proposed GardenCL final report for proposed Garden
CL final report for proposed Garden
 
Reportf inal
Reportf inalReportf inal
Reportf inal
 

More from simpsonchin

More from simpsonchin (10)

Dpj3
Dpj3Dpj3
Dpj3
 
Dpj2
Dpj2Dpj2
Dpj2
 
Iron man
Iron manIron man
Iron man
 
Sp report
Sp report Sp report
Sp report
 
Compiled journals
Compiled journalsCompiled journals
Compiled journals
 
Eng 2 essay
Eng 2 essayEng 2 essay
Eng 2 essay
 
Untitled
UntitledUntitled
Untitled
 
CNC China Indiviual journal
CNC China Indiviual journalCNC China Indiviual journal
CNC China Indiviual journal
 
Enbe report
Enbe reportEnbe report
Enbe report
 
Cl proposal
Cl proposalCl proposal
Cl proposal
 

Recently uploaded

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio managementJunaidKhan750825
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 

Recently uploaded (20)

Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio management
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 

Ici final report pdf

  • 1. Introduction to Construction Industry Final Project Report Content ! 1.Project Introduction 1.1 Project Background 1.2 Project Objective ! 2. Project Plan 2.1 Site analysis A. Location Plan B. Site Specifications C. Circulation Patterns on Site ! 2.2 Concept and rationale of design A. Main Concept B. Design Proposal ! ! Page ! of !1 14
  • 2. Introduction to Construction Industry Final Project Report 1. Project Introduction ! ! 1.1 Project Background !! For this particular project, we were required to work in a group of two and find a specific land within Taylor’s University Lakeside Campus area to initiate a small construction project. The requirements was that the size of the land should not be more than 30m x 30m. ! ! ! 1.2 Project Objective ! The objective of the construction project was to provide an architectural response to the idea of students and staff seeking rest and serenity amidst the busy university campus. The space is conceived as a resting space, whose relationship to place is transitory, and who seek privacy in the openness of spectacular landscapes. The conceptual premise was to transform this transient rapport with space into a place – or an architecture – that reflects their fluctuation between association and disassociation, presence and absence, public and private. ! The following pages is a compilation of data report and design ideas that we would like to propose for a construction project that serves as a rest area for students and staff of Taylor’s University Lakeside Campus. ! ! Page ! of !2 14
  • 3. Introduction to Construction Industry Final Project Report 2. PROJECT PLAN ! 2.1 Site Analysis ! A. Location Plan The following is the location plan of our 10m*16m site (Site 1) which is located on a balcony terrace between Block C and Block D of Taylor’s Univesity Lakeside Campus and and the 7m*8m site (Site 2) which is located in front of Truffles Restaurant. Site 1 is adjacent to the Tourism Centre and the Legal Aid Centre and is accessible through a flight of stairs from Truffles Restaurant ,it is a 16 by 10 metres slab of concrete balcony, complete with railing. While Site 2 is a secluded timber deck surrounded by bamboo plantations, in front of Truffles Restaurant. 
 Page ! of !3 14 Fig 1. Location Plan of Taylor’s University Lakeside Campus Location of Site 1: Adjacent to the Tourism Centre and the Legal Aid Centre and is accessible through a flight of stairs from Truffles Restaurant ,it is a 16 by 10 metres slab of concrete balcony, complete with railing. Location of Site 2: A secluded timber deck surrounded by bamboo plantations, in front of Truffles
  • 4. Introduction to Construction Industry Final Project Report B. Site Specifications ! SITE 1: ORIGINAL CONDITION OF THE SITE 
 Page ! of !4 14 The right section of the site faces the Legal Aid Centre while the left section faces the Tourism Centre. There are glass panels of the office windows on both sides where the staff can look through from inside the office. Side View The back section of the site contains two doors as it is connected to Lecture Theater Hall 7 & 8. At the side of the back section of the site also includes several air conditioner ventilation machines. Back View The front section of the site overlooks the commercial block as well as the lake. There are several trees plantations that stood upon the site, making the site slightly more shady while giving the site its secluded feeling as the trees obstruct the view from below. Front View Fig 2. Panoramic view of the site
  • 5. Introduction to Construction Industry Final Project Report SITE 2: ORIGINAL CONDITION OF THE SITE We have chosen this site because it has the potential to become a popular resting spot for students. The area is covered by trees which help to provide shade and also help to lower surrounding temperature. The site has existing furniture to let students rest. 
 Page ! of !5 14 There are two stone slab pathway that connects the stairs of the amphitheatre to the timber deck. On the left side of the deck, there is a wooden deck walkway connecting Truffles Restaurant to the timber deck. Surrounding the walkway was pots of bamboo plantations. On the timber deck are a few chairs and tables for seatings. Considering the size of the timber deck, the amount of chairs or the design of the seating can be increased to maximum the utilisation of space. The back and right side of the timber deck is a small hill slope to the waterfront. There are multiple plantations surrounding the deck, but at noon hour till early afternoon, the deck still gets too sunny for the public to come and rest.
  • 6. Introduction to Construction Industry Final Project Report! C. Circulation Patterns on Site 
 Page ! of !6 14 HUMAN: People can access the site by stairs and walk around the site and exit again by the stairs. ! WIND: The wind blows oppositely against the sun direction, which is from the West direction to East. ! SUN: The sun shone from the East to the West against the direction of the wind. With more sunlight directed at the middle section and more shady at the back,front and corner section. Human Circulation Sun Circulation Wind Circulation The flight of stairs leading to our site. The extended balcony is almost hidden from view by a covering of tall greenery. STAIRS Tourism Centre LEGAL AID CENTRE Lecture Hall 7 & 8 Site 1:
  • 7. Introduction to Construction Industry Final Project Report! Site 2: ! 
 Page ! of !7 14 ENTRANCE WALKWAY ENTRANCE WALKWAY ENTRANCE WALKWAY TIMBER DECK PLANTATIONS AND SMALL SLOPE HILL PLANTations and Truffles restaurant ! PLANTATIONS AND SMALL SLOPE HILL PLantations and stairs leading to the amphitheatre Human Circulation Wind Circulation Sun Circulation HUMAN: People can access the site by the three entrance walkways and walk around the site and exit again by any of the walkways. ! WIND: The wind blows oppositely against the sun direction, which is from the West direction to East. ! SUN: The sun shone from the East to the West against the direction of the wind. The plantations surrounding the timber deck cast shades over the deck but the front part of the deck still gets sunny at times.
  • 8. Introduction to Construction Industry Final Project Report! 2.3 Design Concept and Rationale A. Main Concept After carrying out site analysis and observation, we came up with a concept that supported and complemented the characteristics of both our site. Both being highly enclosed by a fringe of trees, it is a protected haven of quiet seclusion. Taylor’s University Lakeside Campus could undoubtedly maximize potential and empty spaces such as this to the student’s and staff’s benefit, providing a small spot of simple pleasure to visitors. Our idea progression originated from the idea of calm and serenity. Inspired further from the location of our site, which is wedged between two busy buildings, contributed to the idea of creating a small space of comfort. Easily accessible by the public but not a public display, the site was perfect for the concept we had in mind. An open yet secluded pocket park with seating and lounging spaces to unwind and relax was what we were aiming for. Page ! of !8 14 These are some references for our design concept. Each of these pocket parks features a lot of greeneries and plantations that gives the place a cool, shady, relaxing ambience. The usage of plants and its shadows also provides the space the its secludedness but still remained the refreshing openness and airiness of a resting space.Another idea is that since there are quite a few bamboo plantations and wooden,stone ornamentation around Truffles and Thyme, we would like to incorporate those elements into the site, so that there is a continuity between each places.
  • 9. Introduction to Construction Industry Final Project Report! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Page ! of !9 14
  • 10. Introduction to Construction Industry Final Project Report! B. Design Proposal (SITE 1) ! Our proposal for Site 1 was to construct a small enclosed resting room surrounded by a dense layer of greeneries. To “rest in the forest” was the idea that we would like to express through this construction. The site measures only 10 by 16 meters. ! ! ! Page ! of !10 14 ! ! ! A forest, was inserted into the architectural box, as a dense green space and within the dense green space is another glass and wooden box designed for resting and lounging purposes. ! ! ! The glass and wooden box room within the dense greeneries which is intended to be created as a resting and lounging space.
  • 11. Introduction to Construction Industry Final Project Report! Page ! of !11 14 ! ! ! The garden acts as both a divider of space in the building and a connection device. ! Openings in the walls are controlled to direct views of the vegetation: the room can be opened to reveal the garden; then, views of the forest are hidden again. ! This gives visitors the feeling of arriving in nature and moving away from the urban landscape and acts as a retreat from their hectic lifestyles and tight work schedules. Proposed Design Layout: Overall DENSE GREENERIES DENSE GREENERIES DENSE GREENERIES DENSE GREENERIES Lounging Space RESTING Space ENTRANCE 16m! Type to enter text 10m
  • 12. Introduction to Construction Industry Final Project Report! Lounge Area Specifications: ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Page ! of !12 14 seating area TV AREA+ Stools seatingSPorts Area: The lounging area is intended to serve as a space where students and staff can come to lounge and distress through a variety of activity. For example, there are TV, snooker table, music equipment etc. that students and staffs can choose from to distress. 7m 6m
  • 13. Introduction to Construction Industry Final Project Report! ! B. Design Proposal (SITE 2) ! Our proposal for site 2 is similar to site 1 to remained its continuity between the two places. We would like to construct a semi- enclosed glass and wooden room (As shown in the figure at side) upon the deck and add more furnitures within the deck area to maximize the utilisation of the space. The semi-wooden and glass room will prevent the deck from being too sunny so that the public can go there and rest often even during the hot noon but still not completely enclosed to makes sure that the deck has the sufficient lighting and airiness as well as the perforation of trees. At night the room is lighted,so that the public can also utilise the room. ! ! Proposed Design Layout: ! Page ! of !13 14 Water cooler machine Tables and BEnches Hammock CUSHION SEATINGS AREA
  • 14. Introduction to Construction Industry Final Project Report! Benefits of furniture fittings: ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Page ! of !14 14 The hammock can be tied to the trees beside the wooden platform. By doing so, tired students can get rested and be ready for the next class. Also, an environment with trees and stones, it feels just like nature and students get to experience nature in the campus. By adding a wooden bench, it maximizes the use of space. More people can be fitted into the selected area and it also provides more seats for people. By doing so, more people can enjoy the nice scenery as well as having a place to hang out with friends. Students can do reading there or just sit there and rest. To put a water cooler at the resting area so that students can refill their water bottles and drink water without having to walk so far to the nearest water cooler. By doing so, students will not be as lazy to get drinking water and they will stay hydrated. This reduces the risk of getting sick. !