4. Resilience
Company culture = prepared
Reduction Identify and analyse risks
Develop plans and systems to reduce these risks
Readiness Develop and exercise operational contingency plans
Response Immediate actions during or directly after an emergency event
Recovery Longer term restoration of all power including permanent repairs