An-Najah National University
Faculty of Engineering & Information Technology
Industrial Engineering Department
Assessment of the Implementation of Lean Manufacturing
Concepts in the Palestinian Dairy Industry
Supervisor: Dr. Ahmad Al- Ramahi
Our Team
Asem Judeh
Majd Tbaileh
Baraa Ali
Motaz Hindi
Problem Statement
• Lack of a clear understanding of lean performance and its
measurement .
• Companies should understand the implementation of lean
manufacturing concepts.
• Assessment is essential to identify both the and progress of lean
concepts with deficiencies in firms.
Objectives
This project is to assess level of implementation of lean manufacturing concepts in
the Palestinian dairy industry, the project aims to satisfy the following two main:
Framework for
enhancing
implementation
of lean concepts
Achieve
clear gap
analysis
Work of scope
1- Design assessment
tool including
measuring indicators
fit dairy industry
Lean definition and philosophy
Def: Provide clients and customers the products or services they want, at which time they wish, by
using the most effective ways and fewer resources available.
Philosophy
• There is waste in any production system.
• Lean manufacturing is a dynamic and continuous improvement of the system of production
process.
• Training and education for all employees on the concept of lean manufacturing.
Lean manufacturing tools
Lean
Tools
TPM
JIT
5S
V.S.M
Poka
Yoke
Jidoka
K.P.I
SMED
Kaizen
Heijunka
Methodology
Reviewing lean
concept
Understand lean
industry
Primary field visit
Selection of lean
tools that fit local
diary industry
Design the
assessment tools
(Questionnaire)
Data collect and
analysis
Finalize a framework
to enhance the
implementation of
lean concepts
Results & Analysis
Analysis product Variety
Preceding knowledge of the concept of lean
manufacturing
55.56
44.44
YES
NO
0 10 20 30 40 50 60
knowledge of the concept of lean manufacturing
knowledge of the concept of lean manufacturing
Perception about benefits of lean
manufacturing
Perception of facilities about factors helping to
implement concepts of lean manufacturing
Perception about obstacles in
implementing lean manufacturing
The structure of the Roadmap for manufacturing the
assessment of level of implementation of lean in the dairy
sector
Data Collection
No
If normal
Yes
Identify level
Data analysis
Normal
distribution test
Level 1
Level 3
Level 3
Transformation data
to Normal dis
Total productive maintenance
The level of facilities in term of implementing
Total Productive Maintenance
Normal distribution test for T.P.M
1- level 1(low level) <μ-σ
level 1 <2.35
2- μ-σ≤level 2 (mid level)≤ μ+σ
2.35≤level 2≤4.087
3- level 3 (high level) ≥μ+σ
level 3 >4.087
The level of each plant in implement TPM
Analysis of implementing lean
manufacturing practices
The level of facilities in term of
implementing lean manufacturing tools
The level of lean manufacturing tools
Normal distribution test for Lean
manufacturing tools
1- level 1(high level) <μ-σ
level 1 <2.39
2- μ-σ≤level 2(mid level)≤ μ+σ
2.39≤level 2≤3.59
3- level 3 (low level) ≥ μ+σ
level 3 >3.59
The level of each plant implementing Lean
Manufacturing tools
Key performance indicator
Framework to implement lean
manufacturing tools
Identifying vulnerable indicators in
each tool.
Improve vulnerable indicators in each
tool.
Sustain improvement to maintain each
tool at the highest possible level.
Lean manufacturing indicators for AL-
Rayan Factory
Improving vulnerable indicators in each
tool
Sustainability to maintain each tool at
the highest level
Quantitative indicators
Conclusion
• Develop a questionnaire for the assessment of the level of
implementation of lean manufacturing concept.
1. 55% of the facilities have prior knowledge about lean
manufacturing,
2. 66% has a positive perception about the benefits .
3. 66% confident that they have factors help in implementing lean.
4. 11% don't have serious obstacles that prevents the implementation.
Continue
• For the level of implementing lean manufacturing practices (tools), we conclude
the following
a) Approximately 44% of the studied sample have a weakness in implementing
TPM
b) 100% of the studied sample have a weakness in implementing VSM
c) 55 % of the studied sample have a weakness in implementing Kaizen.
d) 33 % of the studied sample have a weakness in implementing 5S
e) 44 % of the studied sample have a weakness in implementing Poka-Yoke
f) 44 % of the studied sample have a weakness in implementing JIT
g) 44 % of the studied sample have a weakness in implementing SMED.
h) 77 % of the studied sample have a weakness in implementing JIDOKA.
i) 66 % of the studied sample have a weakness in implementing Hijunka.
Continue
There is a weakness in implementing “VSM”, and strong implementation of “5S”
tool in the local dairy sector.
Framework was introduced:
(1) Assessment of level of implementation.
(2) Improve level of implementation of vulnerable tools.
(3) Sustain improvements.
Recommendation
1- It is recommended that the Palestine federation of industries should conduct
awareness campaign about the concepts of lean manufacturing and its importance to
the local industries in general and dairy industries in particular.
2- Dairy industries are recommended to train their staff on how to implement the
different lean manufacturing tools in their factories.
3- Dairy industries are recommended to appoint industrial engineers to help in
transferring the knowledge and practices of lean manufacturing local dairy sector.
4- Dairy industries are recommended to be more open in providing real data needed
for quantitative analysis; this is really necessary for the step of sustaining
development in the facility.
5- As future work. it is recommended to improve the check list (questionnaire) and
make it relay more on quantitative indicators in addition to qualitative indicators.
Ram.pptx

More Related Content

Similar to Ram.pptx

Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
Sean Hougham
 
Quality investment by Amr Gwaily
Quality investment by Amr GwailyQuality investment by Amr Gwaily
Quality investment by Amr Gwaily
Amr Gwaily
 
HACCP Manual for jam industry
HACCP Manual for jam industryHACCP Manual for jam industry
HACCP Manual for jam industry
Kamal indika
 
Statistical Process Control Tools
Statistical Process Control ToolsStatistical Process Control Tools
Statistical Process Control Tools
Raja Farhan Saeed
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9
Warui Maina
 
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
IJERA Editor
 
Protein Purification Handbook
Protein Purification HandbookProtein Purification Handbook
Protein Purification Handbook
guest303321
 

Similar to Ram.pptx (20)

Sean_Hougham_Resume
Sean_Hougham_ResumeSean_Hougham_Resume
Sean_Hougham_Resume
 
Quality investment by Amr Gwaily
Quality investment by Amr GwailyQuality investment by Amr Gwaily
Quality investment by Amr Gwaily
 
Lean Production POM.pptx
Lean Production POM.pptxLean Production POM.pptx
Lean Production POM.pptx
 
Total Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdfTotal Productive Maintenance (TPM).pdf
Total Productive Maintenance (TPM).pdf
 
Quality 2.pptx
Quality 2.pptxQuality 2.pptx
Quality 2.pptx
 
HACCP Manual for jam industry
HACCP Manual for jam industryHACCP Manual for jam industry
HACCP Manual for jam industry
 
TPM-PPT-4.pptx
TPM-PPT-4.pptxTPM-PPT-4.pptx
TPM-PPT-4.pptx
 
Statistical Process Control Tools
Statistical Process Control ToolsStatistical Process Control Tools
Statistical Process Control Tools
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9
 
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
Multi criteria Decision model (MCDM) for the evaluation of maintenance practi...
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & ORE
 
Protein Purification Handbook
Protein Purification HandbookProtein Purification Handbook
Protein Purification Handbook
 
Protein Purification Handbook
Protein Purification HandbookProtein Purification Handbook
Protein Purification Handbook
 
Protein Purification Handbook
Protein Purification HandbookProtein Purification Handbook
Protein Purification Handbook
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Good Automated Manufacturing Practices
Good Automated Manufacturing PracticesGood Automated Manufacturing Practices
Good Automated Manufacturing Practices
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
Tpm final
Tpm finalTpm final
Tpm final
 
Cv arg
Cv argCv arg
Cv arg
 

Recently uploaded

Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
ogawka
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
nafizanafzal
 

Recently uploaded (20)

Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di MalangObat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
Obat Aborsi Malang 0851\7696\3835 Jual Obat Cytotec Di Malang
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...NewBase   17 May  2024  Energy News issue - 1725 by Khaled Al Awadi_compresse...
NewBase 17 May 2024 Energy News issue - 1725 by Khaled Al Awadi_compresse...
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
The Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and UncertaintyThe Art of Decision-Making: Navigating Complexity and Uncertainty
The Art of Decision-Making: Navigating Complexity and Uncertainty
 
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
First Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLCFirst Time Home Buyer's Guide - KM Realty Group LLC
First Time Home Buyer's Guide - KM Realty Group LLC
 
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(SUT毕业证书)斯威本科技大学毕业证成绩单本科硕士学位证留信学历认证
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.Mastering The Art Of 'Closing The Sale'.
Mastering The Art Of 'Closing The Sale'.
 
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![©  ر
00971508021841 حبوب الإجهاض في دبي | أبوظبي | الشارقة | السطوة |❇ ❈ ((![© ر
 
Unlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA FirmsUnlocking Growth The Power of Outsourcing for CPA Firms
Unlocking Growth The Power of Outsourcing for CPA Firms
 

Ram.pptx

  • 1. An-Najah National University Faculty of Engineering & Information Technology Industrial Engineering Department Assessment of the Implementation of Lean Manufacturing Concepts in the Palestinian Dairy Industry Supervisor: Dr. Ahmad Al- Ramahi
  • 2. Our Team Asem Judeh Majd Tbaileh Baraa Ali Motaz Hindi
  • 3.
  • 4. Problem Statement • Lack of a clear understanding of lean performance and its measurement . • Companies should understand the implementation of lean manufacturing concepts. • Assessment is essential to identify both the and progress of lean concepts with deficiencies in firms.
  • 5. Objectives This project is to assess level of implementation of lean manufacturing concepts in the Palestinian dairy industry, the project aims to satisfy the following two main: Framework for enhancing implementation of lean concepts Achieve clear gap analysis
  • 6. Work of scope 1- Design assessment tool including measuring indicators fit dairy industry
  • 7. Lean definition and philosophy Def: Provide clients and customers the products or services they want, at which time they wish, by using the most effective ways and fewer resources available. Philosophy • There is waste in any production system. • Lean manufacturing is a dynamic and continuous improvement of the system of production process. • Training and education for all employees on the concept of lean manufacturing.
  • 9. Methodology Reviewing lean concept Understand lean industry Primary field visit Selection of lean tools that fit local diary industry Design the assessment tools (Questionnaire) Data collect and analysis Finalize a framework to enhance the implementation of lean concepts
  • 12. Preceding knowledge of the concept of lean manufacturing 55.56 44.44 YES NO 0 10 20 30 40 50 60 knowledge of the concept of lean manufacturing knowledge of the concept of lean manufacturing
  • 13. Perception about benefits of lean manufacturing
  • 14. Perception of facilities about factors helping to implement concepts of lean manufacturing
  • 15. Perception about obstacles in implementing lean manufacturing
  • 16. The structure of the Roadmap for manufacturing the assessment of level of implementation of lean in the dairy sector Data Collection No If normal Yes Identify level Data analysis Normal distribution test Level 1 Level 3 Level 3 Transformation data to Normal dis
  • 18. The level of facilities in term of implementing Total Productive Maintenance
  • 19. Normal distribution test for T.P.M 1- level 1(low level) <μ-σ level 1 <2.35 2- μ-σ≤level 2 (mid level)≤ μ+σ 2.35≤level 2≤4.087 3- level 3 (high level) ≥μ+σ level 3 >4.087
  • 20. The level of each plant in implement TPM
  • 21. Analysis of implementing lean manufacturing practices
  • 22. The level of facilities in term of implementing lean manufacturing tools
  • 23. The level of lean manufacturing tools
  • 24. Normal distribution test for Lean manufacturing tools 1- level 1(high level) <μ-σ level 1 <2.39 2- μ-σ≤level 2(mid level)≤ μ+σ 2.39≤level 2≤3.59 3- level 3 (low level) ≥ μ+σ level 3 >3.59
  • 25. The level of each plant implementing Lean Manufacturing tools
  • 27. Framework to implement lean manufacturing tools Identifying vulnerable indicators in each tool. Improve vulnerable indicators in each tool. Sustain improvement to maintain each tool at the highest possible level.
  • 28. Lean manufacturing indicators for AL- Rayan Factory
  • 30. Sustainability to maintain each tool at the highest level
  • 32. Conclusion • Develop a questionnaire for the assessment of the level of implementation of lean manufacturing concept. 1. 55% of the facilities have prior knowledge about lean manufacturing, 2. 66% has a positive perception about the benefits . 3. 66% confident that they have factors help in implementing lean. 4. 11% don't have serious obstacles that prevents the implementation.
  • 33. Continue • For the level of implementing lean manufacturing practices (tools), we conclude the following a) Approximately 44% of the studied sample have a weakness in implementing TPM b) 100% of the studied sample have a weakness in implementing VSM c) 55 % of the studied sample have a weakness in implementing Kaizen. d) 33 % of the studied sample have a weakness in implementing 5S e) 44 % of the studied sample have a weakness in implementing Poka-Yoke f) 44 % of the studied sample have a weakness in implementing JIT g) 44 % of the studied sample have a weakness in implementing SMED. h) 77 % of the studied sample have a weakness in implementing JIDOKA. i) 66 % of the studied sample have a weakness in implementing Hijunka.
  • 34. Continue There is a weakness in implementing “VSM”, and strong implementation of “5S” tool in the local dairy sector. Framework was introduced: (1) Assessment of level of implementation. (2) Improve level of implementation of vulnerable tools. (3) Sustain improvements.
  • 35. Recommendation 1- It is recommended that the Palestine federation of industries should conduct awareness campaign about the concepts of lean manufacturing and its importance to the local industries in general and dairy industries in particular. 2- Dairy industries are recommended to train their staff on how to implement the different lean manufacturing tools in their factories. 3- Dairy industries are recommended to appoint industrial engineers to help in transferring the knowledge and practices of lean manufacturing local dairy sector. 4- Dairy industries are recommended to be more open in providing real data needed for quantitative analysis; this is really necessary for the step of sustaining development in the facility. 5- As future work. it is recommended to improve the check list (questionnaire) and make it relay more on quantitative indicators in addition to qualitative indicators.