Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
1
Minor Project/Major Project
Course Code: EX645, EX707
Year: BEX-III/I, IV/I
Project is one of the subjects of four year Bachelor’s degree in Engineering. Here a student
needs to form a group and plan and complete a work (system design, development, study,
simulations, survey, feasibility study, economic analysis, detailed design, etc according
to individual department) under the supervision of a supervisor. The group needs to
prepare written reports and give oral presentation. Each member of the group will be
evaluated individually.
Procedure
Formation of Group
Each group should consist of 3-4 students and they should have equal participation. The
group should inform to the department with written application to access the facilities
provided by college.
Proposal Defense
The group should do a number of literature reviews and select a topic for the Project. The
group should submit a proposal to the department within stipulated timeframe provided
by the department and should give oral defense too.
Mid-Term Defense
The group should prepare a written report under the guideline within the timeframe
provided by the Department. The group should give oral presentation and face viva to
supervisor and his committee.
Final defense
The group should prepare a written report under the guideline and deadline provided by
the Department. The group should give oral presentation, viva and project demonstration
to external examiner and supervisor.
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
2
Proposal Report Contents
Cover page
Abstract
Table of Contents
List of Figures
List of Tables
Acronyms/List of Abbreviations
1. Introduction
1.1 Background
1.2 Problem Statement
1.3 Objectives
2. Literature Review
3. Feasibility Study
3. Project Methodology
3.1 Block diagram of proposed system
3.2 Description of working flow of proposed system
4. Implementation Plan
4.1 Schedule (Gantt chart)
4.2 Hardware and Software requirements
4.3 Cost Estimation
5. Expected Outcomes
6. References
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
3
KATHFORD INTERNATIONAL COLLEGE OF
ENGINEERING AND MANAGEMENT
Balkumari, Lalitpur
A
Minor/Major Project Proposal
On
“Project Title Here”
[Subject Code: 123456]
Project Members
Abc Surname (XX/BCT/20 XX)
Acb Surname (XX/BCT/20 XX)
Xxd Surname (XX/BCT/20 XX)
Xyz Surname (XX/BCT/20 XX)
DEPARTMENT OF COMPUTER AND ELECTRONICS &
COMMUNICATION ENGINEERING
LALITPUR, NEPAL
OCTOBER, 2017
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
4
Abstract: This is the most important part of the proposal because it is the reviewer’s first
impression. Even though it appears at first, write it at last because it is the summary of
the proposal. Abstract is a concise description of project covering objectives, need,
methodology and dissemination plans. It should identify the expected outcomes of the
project. An ideal abstract should be less than 500 words and fit in one page. Abstract
contains:
• The problem statement;
• The project’s objectives;
• Key project activities; and
• The total project budget.
• Keywords: the internet searchable words
Background: Background of the project will be stated here. Elaborate on why you are
doing this project.
Problem Statement: Well-documented description of the problem to be addressed and
what it is important. Elaborate on what are the problems in existing system.
Objectives: Indicate the expected outcomes of the project, preferably in measurable
terms. This shows what you will do, for whom, by how much and by when. When the
project is completed, you will be able to evaluate it and determine whether the project
succeeded or not in achieving its objectives. Identify short-term and long-term objectives
Literature Review: In this section you should describe literature that you studied before
making final decision about doing this project work. You should be able to list similar
work that have already been done and the outcome of those works. References should be
given while citing the algorithms, principles, theories, works, results outcome etc.
Feasibility Study: While doing the project various unexpected problems may arise. So
you should be able to predict them. Feasibility study is about the evaluation of
sustainability of your project from the different prospect of cost, technology and
equipment, academic knowledge and time.
Methodology: How will you be doing it? It is the critical part of the proposal and is the
longest part and worth the most points. It is a plan of action for how the objectives will
be achieved. This section usually starts with a description of the overall approach, its
relevance, effectiveness and innovativeness. Then it gives details on methodology, the
population being addressed and how anticipated problems will be managed.
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
5
Schedule (Gantt chart): Describe how long specific tasks or components of the project
will take. Include graphical chart representation.
Hardware/software requirements: List the required hardware/software that the project
going to use.
Cost Estimation: Show the overall cost of the project.
Expected Outcomes: State about what may be the result.
Reference- IEEE Style
[University paper with two authors]
[1] R. Gowarishankar and M. F. Demirkol, “Adaptive M-QAM Modulation for MIMO
Systems”, IEEE 2005, University of Hawaii at Manoa, Honolulu, USA, 2005
[Proceeding of Conference]
[2] A. Svensson, “An Introduction to Adaptive QAM Modulation Schemes for Known
and Predicted Channels”, Proceedings of the IEEE | Vol. 95, No. 12, December 2007
[Book]
[3] T. S. Rappaport, “Wireless Communications: Principles and Practice” Second Edition,
Prentice Hall, 2003
[Website or Document from any electronic source]
[4] Quantil, "Data Transmission – Parallel vs Serial," 2017. [Online]. Available:
https://www.quantil.com/content-delivery-insights/content-acceleration/data-
transmission/.
Report format guidelines
Your report should meet following standards:
Font Name: Times New Roman
Font Size: 12 pt (for normal text)
Left Margin: 1.5 inch
Right Margin: 1 inch
Top Margin: 1 inch
Bottom Margin: 1 inch
Header and Footer: 0.5 inch
Line Spacing: 1.5
All the text should be justified.
Before Paragraph: 6 Pt
Heading should be in following standard
1. Heading1 (16 pt, Bold)
1.1 Heading2 (14 pt, Bold)
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
6
1.1.1 Heading3 (13 pt, Bold)
1.1.1.1 Heading4 (12 pt, Bold)
Numbering sections, subsections, equations, figures etc:
A word on numbering scheme used in the project is in order. It is common practice to use
decimal numbering in the project. If the chapter number is 2, the section numbers will be
2.1, 2.2, 2.3 etc. The subsections in section 2.2 will be numbered as 2.2.1, 2.2.2 etc. Unless
essential, it is not necessary to use numbers to lower levels than three stages.
Similarly, it is useful and convenient to number the figures also chapter-wise. The figures
in chapter 4 will be numbered as Figure 4.1: Figure Name, Figure 4.2: Figure Name etc.
This helps you in assembling the figures and putting it in proper order.
Similarly, the tables are also numbered as Table 4.1: Table Name, Table 4.2: Table Name
etc. All figures and tables should have proper captions. Usually the figure captions are
written below the figure and table captions on top of the table. All figures should have
proper description by legends, title of the axes and any other information to make the
figures self-explanatory.
The same numbering scheme can be used for equations also. Only thing to be remembered
is that references to the figures are made like Figure 4.2: Figure Name and equations as
Eqn (5.8).
Chapters – The main text will be divided into several chapters and each chapter may be
further divided into several divisions and sub-divisions as per the requirement.
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
7
Mid Term- Progress Report Contents
Cover page
Abstract
Table of Contents
List of Figures
List of Tables
Acronyms/List of Abbreviations
1. Introduction
1.1 Background
1.2 Problem Statement
1.3 Objectives
2. Literature Review
3. Project Methodology
3.1 Block diagram of the system
3.2 Description of working flow of the system
4. Work Completed
5. Work in Progress
5. Conclusion
6. References
Important Notes:
 Students should add sub-section such as Design of circuit, Simulation graphs, figures
& description of some experimental work in “Work Completed” section.
 Students should mention about the tasks you are currently working on and tasks
remained to do in “Work in Progress” section.
Major/Minor Project Guidelines
Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX)
8
Final Report Contents
Cover page
Inner cover page
Copyright
Page for External, Supervisor & Coordinator
Departmental acceptance
Acknowledgement
Abstract
Table of Contents
List of Figures
List of Tables
Acronyms/List of Abbreviations
1. Introduction
1.1 Background
1.2 Problem Statements
1.3 Objectives
1.3.1 Main objective
1.3.2 Specific objectives
1.4 Scopes and Applications
2. Literature Review
2.1 Historical background
2.2 Review of related literatures
2.3 Review of existing systems
3. Methodology
3.1 Flow diagram of methodology adopted (with description)
3.2 Block diagram of the system (with description)
3.3 Flow chart of the system (with description)
4. Hardware and Software Requirement
4. Results and Discussion
5. Conclusion
6. Limitation and Future Enhancement
7. References
Appendices
Note: Result should contain results of simulation (Proteus Snapshots) and hardware
testings (Output) of the designed system. Design of circuit, simulation graphs, figures,
images of system, and important datasheets of hardware components should be included
in Appendices section in relevant appendix.

More Related Content

What's hot

4.3 techniques for turing machines construction
4.3 techniques for turing machines construction4.3 techniques for turing machines construction
4.3 techniques for turing machines constructionSampath Kumar S
 
Sample project-synopsis
Sample project-synopsisSample project-synopsis
Sample project-synopsisSheshank Priya
 
User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15koolkampus
 
Software Engineering Assignment
Software Engineering AssignmentSoftware Engineering Assignment
Software Engineering AssignmentSohaib Latif
 
A c program of Phonebook application
A c program of Phonebook applicationA c program of Phonebook application
A c program of Phonebook applicationsvrohith 9
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)Er. Shiva K. Shrestha
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation TechniquesSanthi thi
 
Modules and modularization criteria
Modules and modularization criteriaModules and modularization criteria
Modules and modularization criteriaUmaselvi_R
 
Evolving role of Software,Legacy software,CASE tools,Process Models,CMMI
Evolving role of Software,Legacy software,CASE tools,Process Models,CMMIEvolving role of Software,Legacy software,CASE tools,Process Models,CMMI
Evolving role of Software,Legacy software,CASE tools,Process Models,CMMInimmik4u
 
Command center processing and display system replacement (ccpds-r) - Case Study
Command center processing and display system  replacement (ccpds-r) - Case StudyCommand center processing and display system  replacement (ccpds-r) - Case Study
Command center processing and display system replacement (ccpds-r) - Case StudyKuppusamy P
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimationKanchana Devi
 
Fundamental design concepts
Fundamental design conceptsFundamental design concepts
Fundamental design conceptssrijavel
 
Software Re-Engineering
Software Re-EngineeringSoftware Re-Engineering
Software Re-EngineeringSaqib Raza
 
Chapter 8 software testing
Chapter 8 software testingChapter 8 software testing
Chapter 8 software testingdespicable me
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project ManagementReetesh Gupta
 
Library work breakdown structure
Library work breakdown structureLibrary work breakdown structure
Library work breakdown structureMuhammadUsman1700
 

What's hot (20)

4.3 techniques for turing machines construction
4.3 techniques for turing machines construction4.3 techniques for turing machines construction
4.3 techniques for turing machines construction
 
Sample project-synopsis
Sample project-synopsisSample project-synopsis
Sample project-synopsis
 
User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15User Interface Design in Software Engineering SE15
User Interface Design in Software Engineering SE15
 
Software Engineering Assignment
Software Engineering AssignmentSoftware Engineering Assignment
Software Engineering Assignment
 
A c program of Phonebook application
A c program of Phonebook applicationA c program of Phonebook application
A c program of Phonebook application
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)
 
Software Cost Estimation Techniques
Software Cost Estimation TechniquesSoftware Cost Estimation Techniques
Software Cost Estimation Techniques
 
Modules and modularization criteria
Modules and modularization criteriaModules and modularization criteria
Modules and modularization criteria
 
Evolving role of Software,Legacy software,CASE tools,Process Models,CMMI
Evolving role of Software,Legacy software,CASE tools,Process Models,CMMIEvolving role of Software,Legacy software,CASE tools,Process Models,CMMI
Evolving role of Software,Legacy software,CASE tools,Process Models,CMMI
 
Command center processing and display system replacement (ccpds-r) - Case Study
Command center processing and display system  replacement (ccpds-r) - Case StudyCommand center processing and display system  replacement (ccpds-r) - Case Study
Command center processing and display system replacement (ccpds-r) - Case Study
 
Software Engineering Practice
Software Engineering PracticeSoftware Engineering Practice
Software Engineering Practice
 
Spm software effort estimation
Spm software effort estimationSpm software effort estimation
Spm software effort estimation
 
Fundamental design concepts
Fundamental design conceptsFundamental design concepts
Fundamental design concepts
 
Software Re-Engineering
Software Re-EngineeringSoftware Re-Engineering
Software Re-Engineering
 
Chapter 8 software testing
Chapter 8 software testingChapter 8 software testing
Chapter 8 software testing
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Assembler
AssemblerAssembler
Assembler
 
Sqa plan
Sqa planSqa plan
Sqa plan
 
unit testing and debugging
unit testing and debuggingunit testing and debugging
unit testing and debugging
 
Library work breakdown structure
Library work breakdown structureLibrary work breakdown structure
Library work breakdown structure
 

Similar to Major/Minor Project Guidelines for BE-Electronics and Communication

Guidelines for Final Year Engineering & Technology Project.ppt
Guidelines for Final Year Engineering & Technology  Project.pptGuidelines for Final Year Engineering & Technology  Project.ppt
Guidelines for Final Year Engineering & Technology Project.pptPradeepmane16
 
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxWeek 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxmelbruce90096
 
IT 700 Capstone Component 2 IT Project Report Guidelines a.docx
 IT 700 Capstone Component 2 IT Project Report Guidelines a.docx IT 700 Capstone Component 2 IT Project Report Guidelines a.docx
IT 700 Capstone Component 2 IT Project Report Guidelines a.docxaryan532920
 
The format for_the_project__training_report
The format for_the_project__training_reportThe format for_the_project__training_report
The format for_the_project__training_reportmohandeepain
 
Criterion Unacceptable Minimum Satisfactory Excellent Weight.docx
Criterion Unacceptable Minimum Satisfactory Excellent Weight.docxCriterion Unacceptable Minimum Satisfactory Excellent Weight.docx
Criterion Unacceptable Minimum Satisfactory Excellent Weight.docxannettsparrow
 
Bus 517 assignment 2 project scope
Bus 517 assignment 2   project scopeBus 517 assignment 2   project scope
Bus 517 assignment 2 project scopeLaynevine
 
517 assignment 2 – project scope
 517 assignment 2 – project scope 517 assignment 2 – project scope
517 assignment 2 – project scopehwcampusinfo
 
Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1eyavagal
 
Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1uopassignment
 
Case Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docxCase Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docxzebadiahsummers
 
Developing project objectives and Execution plan in Economy management
Developing project objectives and Execution plan in Economy management Developing project objectives and Execution plan in Economy management
Developing project objectives and Execution plan in Economy management Nzar Braim
 
Bogdan SalackiECON - 420R-Script for HW 4library(readxl).docx
Bogdan SalackiECON - 420R-Script for HW 4library(readxl).docxBogdan SalackiECON - 420R-Script for HW 4library(readxl).docx
Bogdan SalackiECON - 420R-Script for HW 4library(readxl).docxmoirarandell
 

Similar to Major/Minor Project Guidelines for BE-Electronics and Communication (14)

Guidelines for Final Year Engineering & Technology Project.ppt
Guidelines for Final Year Engineering & Technology  Project.pptGuidelines for Final Year Engineering & Technology  Project.ppt
Guidelines for Final Year Engineering & Technology Project.ppt
 
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxWeek 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
 
IT 700 Capstone Component 2 IT Project Report Guidelines a.docx
 IT 700 Capstone Component 2 IT Project Report Guidelines a.docx IT 700 Capstone Component 2 IT Project Report Guidelines a.docx
IT 700 Capstone Component 2 IT Project Report Guidelines a.docx
 
The format for_the_project__training_report
The format for_the_project__training_reportThe format for_the_project__training_report
The format for_the_project__training_report
 
Criterion Unacceptable Minimum Satisfactory Excellent Weight.docx
Criterion Unacceptable Minimum Satisfactory Excellent Weight.docxCriterion Unacceptable Minimum Satisfactory Excellent Weight.docx
Criterion Unacceptable Minimum Satisfactory Excellent Weight.docx
 
Bus 517 assignment 2 project scope
Bus 517 assignment 2   project scopeBus 517 assignment 2   project scope
Bus 517 assignment 2 project scope
 
517 assignment 2 – project scope
 517 assignment 2 – project scope 517 assignment 2 – project scope
517 assignment 2 – project scope
 
Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1
 
Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1Strayer cis 348 week 6 assignment 4 mobile app part 1
Strayer cis 348 week 6 assignment 4 mobile app part 1
 
Case Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docxCase Study Research paper- report Spring 20201) Total points.docx
Case Study Research paper- report Spring 20201) Total points.docx
 
Attachment
AttachmentAttachment
Attachment
 
U4 A2-2.pdf
U4 A2-2.pdfU4 A2-2.pdf
U4 A2-2.pdf
 
Developing project objectives and Execution plan in Economy management
Developing project objectives and Execution plan in Economy management Developing project objectives and Execution plan in Economy management
Developing project objectives and Execution plan in Economy management
 
Bogdan SalackiECON - 420R-Script for HW 4library(readxl).docx
Bogdan SalackiECON - 420R-Script for HW 4library(readxl).docxBogdan SalackiECON - 420R-Script for HW 4library(readxl).docx
Bogdan SalackiECON - 420R-Script for HW 4library(readxl).docx
 

More from Saban Kumar K.C.

Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...
Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...
Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...Saban Kumar K.C.
 
Minor Project Report: Automatic Door Control System
Minor Project Report: Automatic Door Control SystemMinor Project Report: Automatic Door Control System
Minor Project Report: Automatic Door Control SystemSaban Kumar K.C.
 
Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI...
 Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI... Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI...
Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI...Saban Kumar K.C.
 
Project Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...
Project  Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...Project  Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...
Project Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...Saban Kumar K.C.
 
Scope of Electronics and Communication Engineering in Nepal
Scope of Electronics and Communication Engineering in Nepal Scope of Electronics and Communication Engineering in Nepal
Scope of Electronics and Communication Engineering in Nepal Saban Kumar K.C.
 
Mine Wonderful experience at Digitronix Nepal
Mine Wonderful experience at Digitronix NepalMine Wonderful experience at Digitronix Nepal
Mine Wonderful experience at Digitronix NepalSaban Kumar K.C.
 
Aeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha AirAeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha AirSaban Kumar K.C.
 
Critiques on PM Narendra Modi
 Critiques on PM Narendra Modi  Critiques on PM Narendra Modi
Critiques on PM Narendra Modi Saban Kumar K.C.
 
Presentation on Strategic Management
Presentation on Strategic ManagementPresentation on Strategic Management
Presentation on Strategic ManagementSaban Kumar K.C.
 
Project Management of Project-Blood Information Management System
 Project Management of Project-Blood Information Management System  Project Management of Project-Blood Information Management System
Project Management of Project-Blood Information Management System Saban Kumar K.C.
 
Wireless Electronic Notice Board using GSM Technology
Wireless Electronic Notice Board using GSM TechnologyWireless Electronic Notice Board using GSM Technology
Wireless Electronic Notice Board using GSM TechnologySaban Kumar K.C.
 

More from Saban Kumar K.C. (12)

Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...
Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...
Paper: Challenges for Adopting E-Commerce in Agriculture in Nepalese Context ...
 
Minor Project Report: Automatic Door Control System
Minor Project Report: Automatic Door Control SystemMinor Project Report: Automatic Door Control System
Minor Project Report: Automatic Door Control System
 
Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI...
 Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI... Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI...
Presentation on “FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATI...
 
Project Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...
Project  Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...Project  Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...
Project Report- FISHERY PRODUCT MARKETING SYSTEM USING SMARTPHONE APPLICATIO...
 
Scope of Electronics and Communication Engineering in Nepal
Scope of Electronics and Communication Engineering in Nepal Scope of Electronics and Communication Engineering in Nepal
Scope of Electronics and Communication Engineering in Nepal
 
Mine Wonderful experience at Digitronix Nepal
Mine Wonderful experience at Digitronix NepalMine Wonderful experience at Digitronix Nepal
Mine Wonderful experience at Digitronix Nepal
 
Software Maintenance
Software MaintenanceSoftware Maintenance
Software Maintenance
 
Aeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha AirAeroplane Maintenance-A case Study at Buddha Air
Aeroplane Maintenance-A case Study at Buddha Air
 
Critiques on PM Narendra Modi
 Critiques on PM Narendra Modi  Critiques on PM Narendra Modi
Critiques on PM Narendra Modi
 
Presentation on Strategic Management
Presentation on Strategic ManagementPresentation on Strategic Management
Presentation on Strategic Management
 
Project Management of Project-Blood Information Management System
 Project Management of Project-Blood Information Management System  Project Management of Project-Blood Information Management System
Project Management of Project-Blood Information Management System
 
Wireless Electronic Notice Board using GSM Technology
Wireless Electronic Notice Board using GSM TechnologyWireless Electronic Notice Board using GSM Technology
Wireless Electronic Notice Board using GSM Technology
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Major/Minor Project Guidelines for BE-Electronics and Communication

  • 1. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 1 Minor Project/Major Project Course Code: EX645, EX707 Year: BEX-III/I, IV/I Project is one of the subjects of four year Bachelor’s degree in Engineering. Here a student needs to form a group and plan and complete a work (system design, development, study, simulations, survey, feasibility study, economic analysis, detailed design, etc according to individual department) under the supervision of a supervisor. The group needs to prepare written reports and give oral presentation. Each member of the group will be evaluated individually. Procedure Formation of Group Each group should consist of 3-4 students and they should have equal participation. The group should inform to the department with written application to access the facilities provided by college. Proposal Defense The group should do a number of literature reviews and select a topic for the Project. The group should submit a proposal to the department within stipulated timeframe provided by the department and should give oral defense too. Mid-Term Defense The group should prepare a written report under the guideline within the timeframe provided by the Department. The group should give oral presentation and face viva to supervisor and his committee. Final defense The group should prepare a written report under the guideline and deadline provided by the Department. The group should give oral presentation, viva and project demonstration to external examiner and supervisor.
  • 2. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 2 Proposal Report Contents Cover page Abstract Table of Contents List of Figures List of Tables Acronyms/List of Abbreviations 1. Introduction 1.1 Background 1.2 Problem Statement 1.3 Objectives 2. Literature Review 3. Feasibility Study 3. Project Methodology 3.1 Block diagram of proposed system 3.2 Description of working flow of proposed system 4. Implementation Plan 4.1 Schedule (Gantt chart) 4.2 Hardware and Software requirements 4.3 Cost Estimation 5. Expected Outcomes 6. References
  • 3. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 3 KATHFORD INTERNATIONAL COLLEGE OF ENGINEERING AND MANAGEMENT Balkumari, Lalitpur A Minor/Major Project Proposal On “Project Title Here” [Subject Code: 123456] Project Members Abc Surname (XX/BCT/20 XX) Acb Surname (XX/BCT/20 XX) Xxd Surname (XX/BCT/20 XX) Xyz Surname (XX/BCT/20 XX) DEPARTMENT OF COMPUTER AND ELECTRONICS & COMMUNICATION ENGINEERING LALITPUR, NEPAL OCTOBER, 2017
  • 4. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 4 Abstract: This is the most important part of the proposal because it is the reviewer’s first impression. Even though it appears at first, write it at last because it is the summary of the proposal. Abstract is a concise description of project covering objectives, need, methodology and dissemination plans. It should identify the expected outcomes of the project. An ideal abstract should be less than 500 words and fit in one page. Abstract contains: • The problem statement; • The project’s objectives; • Key project activities; and • The total project budget. • Keywords: the internet searchable words Background: Background of the project will be stated here. Elaborate on why you are doing this project. Problem Statement: Well-documented description of the problem to be addressed and what it is important. Elaborate on what are the problems in existing system. Objectives: Indicate the expected outcomes of the project, preferably in measurable terms. This shows what you will do, for whom, by how much and by when. When the project is completed, you will be able to evaluate it and determine whether the project succeeded or not in achieving its objectives. Identify short-term and long-term objectives Literature Review: In this section you should describe literature that you studied before making final decision about doing this project work. You should be able to list similar work that have already been done and the outcome of those works. References should be given while citing the algorithms, principles, theories, works, results outcome etc. Feasibility Study: While doing the project various unexpected problems may arise. So you should be able to predict them. Feasibility study is about the evaluation of sustainability of your project from the different prospect of cost, technology and equipment, academic knowledge and time. Methodology: How will you be doing it? It is the critical part of the proposal and is the longest part and worth the most points. It is a plan of action for how the objectives will be achieved. This section usually starts with a description of the overall approach, its relevance, effectiveness and innovativeness. Then it gives details on methodology, the population being addressed and how anticipated problems will be managed.
  • 5. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 5 Schedule (Gantt chart): Describe how long specific tasks or components of the project will take. Include graphical chart representation. Hardware/software requirements: List the required hardware/software that the project going to use. Cost Estimation: Show the overall cost of the project. Expected Outcomes: State about what may be the result. Reference- IEEE Style [University paper with two authors] [1] R. Gowarishankar and M. F. Demirkol, “Adaptive M-QAM Modulation for MIMO Systems”, IEEE 2005, University of Hawaii at Manoa, Honolulu, USA, 2005 [Proceeding of Conference] [2] A. Svensson, “An Introduction to Adaptive QAM Modulation Schemes for Known and Predicted Channels”, Proceedings of the IEEE | Vol. 95, No. 12, December 2007 [Book] [3] T. S. Rappaport, “Wireless Communications: Principles and Practice” Second Edition, Prentice Hall, 2003 [Website or Document from any electronic source] [4] Quantil, "Data Transmission – Parallel vs Serial," 2017. [Online]. Available: https://www.quantil.com/content-delivery-insights/content-acceleration/data- transmission/. Report format guidelines Your report should meet following standards: Font Name: Times New Roman Font Size: 12 pt (for normal text) Left Margin: 1.5 inch Right Margin: 1 inch Top Margin: 1 inch Bottom Margin: 1 inch Header and Footer: 0.5 inch Line Spacing: 1.5 All the text should be justified. Before Paragraph: 6 Pt Heading should be in following standard 1. Heading1 (16 pt, Bold) 1.1 Heading2 (14 pt, Bold)
  • 6. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 6 1.1.1 Heading3 (13 pt, Bold) 1.1.1.1 Heading4 (12 pt, Bold) Numbering sections, subsections, equations, figures etc: A word on numbering scheme used in the project is in order. It is common practice to use decimal numbering in the project. If the chapter number is 2, the section numbers will be 2.1, 2.2, 2.3 etc. The subsections in section 2.2 will be numbered as 2.2.1, 2.2.2 etc. Unless essential, it is not necessary to use numbers to lower levels than three stages. Similarly, it is useful and convenient to number the figures also chapter-wise. The figures in chapter 4 will be numbered as Figure 4.1: Figure Name, Figure 4.2: Figure Name etc. This helps you in assembling the figures and putting it in proper order. Similarly, the tables are also numbered as Table 4.1: Table Name, Table 4.2: Table Name etc. All figures and tables should have proper captions. Usually the figure captions are written below the figure and table captions on top of the table. All figures should have proper description by legends, title of the axes and any other information to make the figures self-explanatory. The same numbering scheme can be used for equations also. Only thing to be remembered is that references to the figures are made like Figure 4.2: Figure Name and equations as Eqn (5.8). Chapters – The main text will be divided into several chapters and each chapter may be further divided into several divisions and sub-divisions as per the requirement.
  • 7. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 7 Mid Term- Progress Report Contents Cover page Abstract Table of Contents List of Figures List of Tables Acronyms/List of Abbreviations 1. Introduction 1.1 Background 1.2 Problem Statement 1.3 Objectives 2. Literature Review 3. Project Methodology 3.1 Block diagram of the system 3.2 Description of working flow of the system 4. Work Completed 5. Work in Progress 5. Conclusion 6. References Important Notes:  Students should add sub-section such as Design of circuit, Simulation graphs, figures & description of some experimental work in “Work Completed” section.  Students should mention about the tasks you are currently working on and tasks remained to do in “Work in Progress” section.
  • 8. Major/Minor Project Guidelines Compiled By: Er. Saban Kumar K.C., Project Coordinator (BEX) 8 Final Report Contents Cover page Inner cover page Copyright Page for External, Supervisor & Coordinator Departmental acceptance Acknowledgement Abstract Table of Contents List of Figures List of Tables Acronyms/List of Abbreviations 1. Introduction 1.1 Background 1.2 Problem Statements 1.3 Objectives 1.3.1 Main objective 1.3.2 Specific objectives 1.4 Scopes and Applications 2. Literature Review 2.1 Historical background 2.2 Review of related literatures 2.3 Review of existing systems 3. Methodology 3.1 Flow diagram of methodology adopted (with description) 3.2 Block diagram of the system (with description) 3.3 Flow chart of the system (with description) 4. Hardware and Software Requirement 4. Results and Discussion 5. Conclusion 6. Limitation and Future Enhancement 7. References Appendices Note: Result should contain results of simulation (Proteus Snapshots) and hardware testings (Output) of the designed system. Design of circuit, simulation graphs, figures, images of system, and important datasheets of hardware components should be included in Appendices section in relevant appendix.