Running Head: THE PROJECT CLOSURE PHASE 1 THE
PROJECT CLOSURE PHASE
2
The Project Closure Phase William Fiedler Columbia Southern
University The Project Closure Phase Inside this paperwork, I
am going to make a discussion regarding the closing project. I
will also extend to discussing the lesson learned towards the
end of the project. 1 THE FOURTH AND LAST PROJECT
LIFECYCLE STAGE IS THE PROJECT CLOSURE PHASE. IT
IS IN THIS STAGE THAT YOU WILL BE ABLE TO YOUR
PROJECT FORMALLY CLOSES AFTER THE REPORT
SUCCESS LEVEL OF THE SPONSOR YOU HAVE. The
exercises that are needed in closing the task in brought in to be
by the Project Closure Report and this guarantees the project a
conclusion that is embraced productively and comfortably. Once
the report is brought into action and acknowledged by the
individuals, the reports of the completion of the inside exercises
indicated are attempted (Larson, 2014). As a result, the project
closure comes into effect formally. 1 AFTER THE CLOSING
OF THE TASK IN A PERIOD OF AT LEAST ONE TO THREE
MONTHS, THE BUSINESS IS BELIEVED TO START
GAINING THE ADVANTAGES GIVEN BY THE PROJECT
WHICH MAKE IT MORE ESSENTIAL TO ALLUDE THE
POST IMPLEMENTATION REVIEW (PIR)
EVALUATION. This provides the business with a wide range of
view towards recognizing its achievements level of different
tasks as well as offer the education on the future projects that
will arise.
2 PROCESS FOR CLOSING THE PROJECT THE PROJECT
TRANSITION TASK CONTROL DOCUMENT WILL RECORD
THE VICTORIES AND DISAPPOINTMENTS OF THE
TASK. It gives a chronicled record of the orchestrated and
unique spending plan and schedule, proposals for future
endeavors of practically identical size and unpredictability,
information on staffing and aptitudes used to meet errand
targets and destinations, how the client wants were managed,
exercises learned, and an official undertaking close down. One
reason for the conclusion understanding system is to offer the
sellers a formal warning to the structures that may have been
created which has a high expectation that is elegant and
commendable or that may have been rejected as a result. If the
business does not meet its goals, it ought to make the
amendment that hinders them from this achievement, and the
individual or the dealer responsible for this should try to fix or
eradicate any errors that may have caused it with a formal
affirmation (Larson, 2014).
Before the closure of the agreement, all the minor things are
fixed, and the competed expectation is to strike the depressed.
Over rages of errands, the world has audited quality
performance, and the vendor was allowed to influence changes
before the procedure than the conclusion to organize. The issue
is not a keen idea to hold up until the specific end of the effort
and after that fastened each subject and the matters on the carter
drastically. It is possible to significantly stable in considering
the dealer you may have in trying to take the best way for the
progress because it accepts the amendment when the issues
happen. By utilizing following the means, we can properly close
the project:
· Customer’s formal Sign-off.
· Product scope final analysis.
· The resources release.
· Contract closure or the procurement.
· Project files Indexing.
· Documentation of the lessons learned
Lesson Learned Document My group and as a task director, I
took in numerous things from this end undertaking, for example,
how to deal with the venture. 3 FOR EXAMPLE, EXPANDED
EFFICIENCY AND EXECUTION, BUNCHES THAT WORK
THAT CAPACITY SPLENDIDLY TOGETHER CAN ACHIEVE
SIGNIFICANTLY MORE THAN INDIVIDUALS WEARING
DOWN THEIR OWN. A FULL EXTENT OF APTITUDES CAN
BE ASSOCIATED WITH DOWN TO EARTH ACTIVITIES
AND OFFER AND DISCUSSING MUSINGS CAN ACCEPT A
FUNDAMENTAL PART IN BUILDING UP YOUR
APPRECIATION OF A SPECIFIC BRANCH OF
KNOWLEDGE.
Aptitudes Advancement: 3 BEING A BIT OF A GROUP WILL
ENABLE YOU TO DEVELOP YOUR RELATIONAL
CAPACITIES, FOR INSTANCE, TALKING AND TUNING IN
AND FURTHERMORE BUNCH WORKING APTITUDES, FOR
EXAMPLE, ORGANIZATION, AND WORKING WITH AND
ENERGIZING OTHERS. A portion of these demeanors will be
useful all through your academic job, and managers regard all
(Serra, 2015). 1 WHAT'S MORE, KNOWING MORE ABOUT
YOURSELF: collaborating with others will perceive your
characteristics and weaknesses (for example, you may be a
prevalent pioneer than the gathering of people, or you might be
incredible at thinking about the 'tremendous contemplations' yet
not too impressive at putting them
energetically). 3 ENHANCED CARE WILL BOTH HELP
YOUR APPROACH TO MANAGE TO LEARN AND WILL BE
VALUABLE WHEN YOU COME TO CREATE YOUR CV OR
FINISH OCCUPATION APPLICATION SHAPES. It enhances
the accompanying things:
· Better services delivery efficiency.
· Increased, enhanced and improved the satisfaction of the
customer.
· Enhancement of services delivery effectiveness.
· Growth and Development should be highly improved inside
your group or team.
· Greater competitive and Edge
Some turned out badly are Flexibility, Risk Assessment,
diminishing in Quantity. 1 I RECOMMENDED THAT FUTURE
VENTURE MUST SPOTLIGHT ON THE EXPANSION THE
FLEXIBILITY, REDUCE THE RISK ASSESSMENT AND
EXPANDED THE QUANTITY. Since the quality administration
is a method of constant change that consolidates picking up
from past errands and taking off upgrades to improve the next
endeavor. This strategy is recorded as an affirmation that
quality administration hones are being utilized. A couple of
affiliations have formal systems for changing work techniques
and fusing the exercises picked up from the wander so
individual assignments can benefit. A couple of alliances are
less formal in the procedure and foresee that individuals will
pick up from experience and take the experience to their next
endeavor and confer what they made sense of how to others
coolly. Whatever kind of strategy is used, the going with parts
should be surveyed, and the results shortened in reports for
outside and inside utilize (Watt, n.d.).
3 ENCOURAGE FOR FUTURE PROJECTS I CAN EMPOWER
COLLEAGUES BY PERSUADING THE COLLEAGUES FOR
FUTURE TASKS. FOR EXAMPLE, SOME COLLEAGUES
ARE CONFIDENT AND CONFIDENT, WHILE OTHERS ARE
GENERALLY HUMBLE AND QUIET. A PARTICULAR AND
CONFIDENT INDIVIDUAL ENHANCES MUSINGS THAN A
MODEST, AND CALM INDIVIDUAL, BE THAT AS IT MAY,
DYNAMIC INDIVIDUALS, ARE ALTOGETHER MORE
SLANTED TO BE HEARD AND TO HAVE THEIR
THOUGHTS FOLLOWED UP ON. TO GET THE BEST OUT
OF YOUR QUIETER ASSOCIATES, STRUCTURE YOUR
SOCIAL OCCASIONS WITH THE GOAL THAT EVERYONE
HAS AN EQUIVALENT OPPORTUNITY TO TALK. GIVE
PEOPLE TIME TO CLARIFY THEIR CONSIDERATIONS
ALTOGETHER (LOCK, 2017). EXERTION TO REVIEW
EACH SUGGESTION AS IMPARTIALLY AS COULD BE
PERMITTED GIVEN THE IDEA ITSELF AND NOT THE
CHARACTER OF THE PARTNER PROPOSING IT. ON THE
OFF CHANCE THAT YOU COULDN'T CARE LESS FOR A
PROPOSAL OR PICK NOT TO MAKE USE OF IT, DON'T
CRITICIZE IT TOO GENUINELY (TIPPING, 2015). A
HUMBLE ASSOCIATE MAY ACCEPT POSITIVE INPUT AS
EXPULSION AND MAY SWEAR OFF MAKING PROPOSALS
LATER ON. MAKE A GROUP OVERFLOWING WITH
PIONEERS BY USING A NETWORK RATHER THAN AN
ENTIRELY DIFFERENT LEVELED ESTABLISHMENT.
The pioneer in any association is the careful individual, so
pioneers are significantly vigorous for the social affair to
succeed. In a mounting structure, emerge leads at each level of
the affiliation. In an agreeable arrangement, each from the
group has an expert part in precisely a player in the assignment.
Designate each right associate obligation concerning some piece
of the wander given that accomplice's characteristics and
capacities. Give partners a level of control over their regions of
the venture. For example, one part might be responsible for
making applications for the wander. On any issue doing with
applications progression, that associate would be the pioneer.
Regardless, on any request doing with the inventive structure
for the endeavor, another associate would be the pioneer
(Tipping, 2015). Instead of a strict division among pioneers and
supporters, every partner would be a pioneer in one association
and a fan in others. This backing a sentiment of proprietorship
and ethical commitment.
References
Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini,
D. (2014). Project management: The managerial process (Vol.
6). Grandview Heights, OH: 4 MCGRAW-HILL EDUCATION.
Lock, D. (2017). 5 THE ESSENTIALS OF PROJECT
MANAGEMENT. Routledge.
Serra, C. E. 6 M., & KUNC, M. (2015). 7 BENEFITS
REALISATION MANAGEMENT AND ITS INFLUENCE ON
PROJECT SUCCESS AND ON THE EXECUTION OF
BUSINESS STRATEGIES. INTERNATIONAL JOURNAL OF
PROJECT MANAGEMENT, 33(1), 53-66.
Tipping, J., Boogaard, F., Jaeger, R., Duffy, A., Klomp, T., &
Manenschijn, M. (2015). Climatescan. nl: the development of a
web-based map application to encourage knowledge-sharing of
climate-proofing and urban resilient projects. International
waterweek, 3.
Citations (7/7)
1. 1Another student's paper
2. 2Another student's paper
3. 3Another student's paper
4. 4Another student's paper
5. 5https://www.gristprojectmanagement.us/project-
management.html
6. 6Another student's paper
7. 7Another student's paper
Matched Text
Suspected Entry: 93% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
THE FOURTH AND LAST PROJECT LIFECYCLE STAGE IS
THE PROJECT CLOSURE PHASE
Source - Another student's paper
INTRODUCTION The Project Closure Phase is the fourth and
last stage of the project lifecycle
Suspected Entry: 74% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
IT IS IN THIS STAGE THAT YOU WILL BE ABLE TO YOUR
PROJECT FORMALLY CLOSES AFTER THE REPORT
SUCCESS LEVEL OF THE SPONSOR YOU HAVE
Source - Another student's paper
In this stage, you will formally close your project and after that
report its general level of success to your sponsor
Suspected Entry: 63% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
AFTER THE CLOSING OF THE TASK IN A PERIOD OF AT
LEAST ONE TO THREE MONTHS, THE BUSINESS IS
BELIEVED TO START GAINING THE ADVANTAGES
GIVEN BY THE PROJECT WHICH MAKE IT MORE
ESSENTIAL TO ALLUDE THE POST IMPLEMENTATION
REVIEW (PIR) EVALUATION
Source - Another student's paper
One to three months after the task has been closed and the
business has started to encounter the advantages gave the
project, it is essential to attempt an Evaluation, frequently
alluded to as a Post Implementation Review (PIR)
Suspected Entry: 73% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
WHAT'S MORE, KNOWING MORE ABOUT YOURSELF
Source - Another student's paper
And Knowing more about yourself
Suspected Entry: 64% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
I RECOMMENDED THAT FUTURE VENTURE MUST
SPOTLIGHT ON THE EXPANSION THE FLEXIBILITY,
REDUCE THE RISK ASSESSMENT AND EXPANDED THE
QUANTITY
Source - Another student's paper
I suggested that future projects must focus on the increase the
Flexibility, Reduce the Risk Assessment and increased the
Quantity
Suspected Entry: 70% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
PROCESS FOR CLOSING THE PROJECT THE PROJECT
TRANSITION TASK CONTROL DOCUMENT WILL RECORD
THE VICTORIES AND DISAPPOINTMENTS OF THE TASK
Source - Another student's paper
Project Closure Project Closing Process The Undertaking
Change Assignment Control Report will record the victories and
disappointments of the task
Suspected Entry: 84% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
FOR EXAMPLE, EXPANDED EFFICIENCY AND
EXECUTION, BUNCHES THAT WORK THAT CAPACITY
SPLENDIDLY TOGETHER CAN ACHIEVE SIGNIFICANTLY
MORE THAN INDIVIDUALS WEARING DOWN THEIR OWN
Source - Another student's paper
For example, expanded efficiency and execution, bunches that
work that capacity honourably together can fulfil significantly
more than individuals wearing down their own (Thompson,
2010)
Suspected Entry: 82% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
A FULL EXTENT OF APTITUDES CAN BE ASSOCIATED
WITH DOWN TO EARTH ACTIVITIES AND OFFER AND
DISCUSSING MUSINGS CAN ACCEPT A FUNDAMENTAL
PART IN BUILDING UP YOUR APPRECIATION OF A
SPECIFIC BRANCH OF KNOWLEDGE
Source - Another student's paper
A more broad extent of aptitudes can be associated with down
to earth activities and offer and discussing considerations can
expect a fundamental part in building up your perception of a
specific branch of knowledge
Suspected Entry: 88% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
BEING A BIT OF A GROUP WILL ENABLE YOU TO
DEVELOP YOUR RELATIONAL CAPACITIES, FOR
INSTANCE, TALKING AND TUNING IN AND
FURTHERMORE BUNCH WORKING APTITUDES, FOR
EXAMPLE, ORGANIZATION, AND WORKING WITH AND
ENERGIZING OTHERS
Source - Another student's paper
being a bit of a gathering will enable you to develop your
relational capacities, for instance, talking and tuning in and
furthermore bunch working aptitudes, for instance,
organization, and working with and awakening others
Suspected Entry: 95% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
ENHANCED CARE WILL BOTH HELP YOUR APPROACH
TO MANAGE TO LEARN AND WILL BE VALUABLE WHEN
YOU COME TO CREATE YOUR CV OR FINISH
OCCUPATION APPLICATION SHAPES
Source - Another student's paper
Enhanced care will both help your approach to manage learning
and will be valuable when you come to create your CV or finish
occupation application shapes
Suspected Entry: 81% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
ENCOURAGE FOR FUTURE PROJECTS I CAN EMPOWER
COLLEAGUES BY PERSUADING THE COLLEAGUES FOR
FUTURE TASKS
Source - Another student's paper
Encouragement for Future Projects I can empower colleagues by
propelling the colleagues for future tasks
Suspected Entry: 82% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
FOR EXAMPLE, SOME COLLEAGUES ARE CONFIDENT
AND CONFIDENT, WHILE OTHERS ARE GENERALLY
HUMBLE AND QUIET
Source - Another student's paper
For example, some colleagues are confident and confident,
while others are normally unassuming and quiet
Suspected Entry: 80% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
A PARTICULAR AND CONFIDENT INDIVIDUAL
ENHANCES MUSINGS THAN A MODEST, AND CALM
INDIVIDUAL, BE THAT AS IT MAY, DYNAMIC
INDIVIDUALS, ARE ALTOGETHER MORE SLANTED TO BE
HEARD AND TO HAVE THEIR THOUGHTS FOLLOWED UP
ON
Source - Another student's paper
A sure and confident individual enhances musings than a
constrained, and calm individual, nonetheless, dynamic
individuals are essentially more slanted to be heard and to have
their thoughts followed up on
Suspected Entry: 79% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
TO GET THE BEST OUT OF YOUR QUIETER ASSOCIATES,
STRUCTURE YOUR SOCIAL OCCASIONS WITH THE GOAL
THAT EVERYONE HAS AN EQUIVALENT OPPORTUNITY
TO TALK
Source - Another student's paper
To get the best out of your more quiet partners, structure your
social events with the goal that everyone has an equivalent
opportunity to talk
Suspected Entry: 69% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
GIVE PEOPLE TIME TO CLARIFY THEIR
CONSIDERATIONS ALTOGETHER (LOCK, 2017)
Source - Another student's paper
Give people time to clarify their considerations completely
Suspected Entry: 81% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
EXERTION TO REVIEW EACH SUGGESTION AS
IMPARTIALLY AS COULD BE PERMITTED GIVEN THE
IDEA ITSELF AND NOT THE CHARACTER OF THE
PARTNER PROPOSING IT
Source - Another student's paper
Endeavour to overview each suggestion as impartially as could
be permitted given the idea itself and not the personality of the
partner proposing it
Suspected Entry: 75% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
ON THE OFF CHANCE THAT YOU COULDN'T CARE LESS
FOR A PROPOSAL OR PICK NOT TO MAKE USE OF IT,
DON'T CRITICIZE IT TOO GENUINELY (TIPPING, 2015)
Source - Another student's paper
In the event that you couldn't care less for a proposal or pick
not to make usage of it, don't criticize it too genuinely (Watt,
2009)
Suspected Entry: 81% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
A HUMBLE ASSOCIATE MAY ACCEPT POSITIVE INPUT
AS EXPULSION AND MAY SWEAR OFF MAKING
PROPOSALS LATER ON
Source - Another student's paper
A humble associate may take positive input as an expulsion and
may avoid making proposals later on
Suspected Entry: 67% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
MAKE A GROUP OVERFLOWING WITH PIONEERS BY
USING A NETWORK RATHER THAN AN ENTIRELY
DIFFERENT LEVELED ESTABLISHMENT
Source - Another student's paper
Make a group overflowing with pioneers by using a group rather
than a completely different levelled show
Suspected Entry: 100% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
MCGRAW-HILL EDUCATION
Source - Another student's paper
McGraw-Hill Education
Suspected Entry: 63% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
THE ESSENTIALS OF PROJECT MANAGEMENT
Source - https://www.gristprojectmanagement.us/project-
management.html
The Nature of Project Management
Suspected Entry: 100% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
M., & KUNC, M
Source - Another student's paper
M., & Kunc, M
Suspected Entry: 100% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
BENEFITS REALISATION MANAGEMENT AND ITS
INFLUENCE ON PROJECT SUCCESS AND ON THE
EXECUTION OF BUSINESS STRATEGIES
Source - Another student's paper
Benefits Realisation Management and its influence on project
success and on the execution of business strategies
Suspected Entry: 100% match
Uploaded - mba 6941 unit VIII reflection Paper.doc
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT,
33(1), 53-66
Source - Another student's paper
MBA 6941, Managing Project Teams 1
Course Learning Outcomes for Unit VIII
Upon completion of this unit, students should be able to:
5. Describe the process of leadership when leading project
teams.
5.1 Determine the role of the project team in the closing
processes.
5.2 Discuss how to successfully adjourn or disband a project
team.
Reading Assignment
Chapter 18:
Closeout
Unit Lesson
If you remember at the beginning of the class, we agreed that
one of the elements of a project is that every
project must come to an end. The project has gone through the
initiating phase where we created the project
charter that authorized the beginning of the project. Then we
moved to the planning phase of the project. In
the planning phase, the project hired the teams and started to
formulate the project plan. The project
management plan that includes the scope of the project, the cost
, the schedule, the quality plan, the risk
plan, the procurement and human resources plans, the
communication plan, and the stakeholder
management plan.
Once the project management plan is complete, the project then
moves to the executing phase. This is the
phase where the project team does all the implementations
based on what was planned. Indeed, the primary
purpose of the executing phase is create the project deliverables
based on all the plans documented in the
project plan. Like every other plan, the output of the executing
phase (deliverables) may or may not manifest
precisely as planned, and the control and monitoring process
helps the project to correct the variances and
bring the project back to achieving its objectives.
Once the project has completed the development of all the
deliverables, the project now moves from the
executing phase of the project to the closing phase. In this case,
the project is closed because the project has
achieved its objectives and been accepted by the project
sponsor. However, a project can be terminated if,
during the course of the project, the sponsor deems that the
project is not achieving its strategic objectives in
terms of cost, schedule, or market considerations. Projects can
also be terminated if the purpose of the
project has been overcome by events. For example, some of the
projects that were started by the U.S. Army
Health Corps to help with the Ebola disease in West Africa were
recently closed because of new medicines
and because the disease has ceased to be an epidemic.
Projects can also be terminated if the return on investment
(ROI) is perceived as negative. In addition,
sometimes changes in legislation or market demand may cause a
project to be terminated. Fundamentally,
there are many reasons (positive or negative) for a project to be
terminated. Irrespective of the reason for
termination, it is important for a project team to perform core
closing phase activities. Some of these activities
that a project team must perform during the closing phase
include the following:
ng payments due to
the project and also make payments to
all outstanding dues.
and provide final constructive and
positive feedbacks to team members.
-project evaluations to
determine if it met their success criteria.
UNIT VIII STUDY GUIDE
Project Closeout and Team
MBA 6941, Managing Project Teams 2
UNIT x STUDY GUIDE
Title
project must then finalize, organize, and archive all
project related documents.
Of all these closing phase activities that a project team must
perform, one of the most critical is the creation of
the “Lessons Learned” document. The “Lessons Learned”
document is one of the major deliverables of the
project closure. The goal of the “Lessons Learned” document is
to document all that went well in the course of
the project and all that went wrong in the project. Finally, the
“Lessons Learned” document should propose
suggestions for future projects based on the collective
experience of the project team. Documenting an
effective “Lessons Learned” document could be a challenge for
the project because the documentation is
done during the closing phase when most of the experienced
team members may have left the project.
Sometimes, the project team might perceive that the project
“Lessons Learned” document is a document
used for finger pointing or assigning blame, and therefore, team
members may not be forthcoming in
documenting what went wrong in the project. A well-
documented and well written “Lessons Learned”
document helps the organization to prepare more effectively for
future similar projects through the
documentation of suggestions based on what went right and
what went wrong in the previous project. The
overall objective of the “Lessons Learned” document is to help
the project team answer some important
questions about the project and provide a pathway to successful
future projects.
Also, as the project comes to a closure, the project team must
ensure that all outstanding works are
completed on time and efficiently and that project assets are
transferred properly by doing the following:
ar
understanding and a plan on how to transfer the
project from the project manager to the operations manager. If
this transition is not properly
managed, it might negatively impact the project deliverables in
terms of performance or operational
ability.
sponsor to reject the final deliverable at
the closing phase if the sponsor and the end user have not been
properly informed throughout the
process. It is important that final deliverable expectations are
managed so that the acceptance
experience is positive for the project team and sponsor.
operational team that is now getting the
project may not be familiar with how to use the application or
facility or the final product. A
consideration should be made as part of the closing process on
the level of training that must be
given to the operational team to make the acceptance
successful.
Adjourning the Project Team
As the project comes to end, the team members are anxiously
looking for future projects or simply concerned
about to do next. It is important that a project manager takes all
the necessary steps within his or her power to
ensure that the disbanding of the team is smooth and less
stressful to the team members. If you think of the
stages that your project team has gone through from the forming
stage to storming, norming, and performing,
a lot of training and bonding must have occurred by now that
must be managed carefully because as a project
manager, you may need the same team members for another
project in the future. In a matrix organizational
structure, as the project ends, the project manager starts to
transition team members to their home
administrative managers, and the way this transition is done
will be a deciding factor in whether the same
team members work again with the project manager in the
future. Here are some consideration when
adjourning your project team members:
nager, be sure to give each one of your team a
final evaluation.
to transition back to their original work
team.
approved and paid.
members are rewarded (Project Management
Institute [PMI], 2013).
MBA 6941, Managing Project Teams 3
UNIT x STUDY GUIDE
Title
Reference
Project Management Institute. (2013). A guide to the project
management body of knowledge (5th ed.).
Newton Square, PA: Project Management Institute.
Suggested Reading
In order to access the resource below, you must first log into
the myCSU Student Portal and access the
Business Source Complete database within the CSU Online
Library.
This article gives you an insight on how to close a project
successfully:
How to kill an IT project. (2004). Computerworld, 38(39), 46-
47.

More Related Content

Similar to SafeAssignCheckTest - CSU SafeAssign Plagiarism Check ToolSafeAs.docx

Managing your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environmentManaging your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environmentStephen Hightower
 
System Level Requirements Gathering
System Level Requirements GatheringSystem Level Requirements Gathering
System Level Requirements GatheringComputing Cage
 
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES            .docxRunning head RECRUITMENT AND INTERVIEWING PROCESSES            .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docxcharisellington63520
 
Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...Ann Pilkington
 
1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docxaulasnilda
 
Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...ssuser52fa40
 
590769 Software Testing To Be Or Not To Be
590769 Software Testing To Be Or Not To Be590769 Software Testing To Be Or Not To Be
590769 Software Testing To Be Or Not To BeNeha Thakur
 
Sample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docxSample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docxtodd331
 
Managing the portfolio
Managing the portfolioManaging the portfolio
Managing the portfolioStuart Robb
 
Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015Association for Project Management
 
Implementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning GroupImplementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning GroupFrank Isham
 
00 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation818
00 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation81800 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation818
00 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation818Rich Fierson -CSSGB, CICD
 
Lec : Policy & Strategy Formulation.pptx
Lec : Policy & Strategy Formulation.pptxLec : Policy & Strategy Formulation.pptx
Lec : Policy & Strategy Formulation.pptxJo Balucanag - Bitonio
 
Sophie Walker - Portfolio
Sophie Walker - PortfolioSophie Walker - Portfolio
Sophie Walker - PortfolioSophie Walker
 
How to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP ReplatformingHow to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP ReplatformingBlytheco
 
© 2007, David Po-Chedley & Rob St.Germain - 1 - Originally.docx
© 2007, David Po-Chedley & Rob St.Germain - 1 -  Originally.docx© 2007, David Po-Chedley & Rob St.Germain - 1 -  Originally.docx
© 2007, David Po-Chedley & Rob St.Germain - 1 - Originally.docxdurantheseldine
 
Post Mortems: The Anatomy of Market Research Process Improvement
Post Mortems: The Anatomy of Market Research Process ImprovementPost Mortems: The Anatomy of Market Research Process Improvement
Post Mortems: The Anatomy of Market Research Process ImprovementKathryn Korostoff
 

Similar to SafeAssignCheckTest - CSU SafeAssign Plagiarism Check ToolSafeAs.docx (20)

Managing your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environmentManaging your projects effectively in a shared resource environment
Managing your projects effectively in a shared resource environment
 
System Level Requirements Gathering
System Level Requirements GatheringSystem Level Requirements Gathering
System Level Requirements Gathering
 
system level requirements gathering and analysis
system level requirements gathering and analysissystem level requirements gathering and analysis
system level requirements gathering and analysis
 
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES            .docxRunning head RECRUITMENT AND INTERVIEWING PROCESSES            .docx
Running head RECRUITMENT AND INTERVIEWING PROCESSES .docx
 
Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...Good communication starts from within - workshop giving an introduction to ch...
Good communication starts from within - workshop giving an introduction to ch...
 
1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx
 
Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...Visual project management simplifying project execution to deliver on time an...
Visual project management simplifying project execution to deliver on time an...
 
590769 Software Testing To Be Or Not To Be
590769 Software Testing To Be Or Not To Be590769 Software Testing To Be Or Not To Be
590769 Software Testing To Be Or Not To Be
 
Sample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docxSample ProposalsTypical ApproachProposals can vary a great d.docx
Sample ProposalsTypical ApproachProposals can vary a great d.docx
 
Managing the portfolio
Managing the portfolioManaging the portfolio
Managing the portfolio
 
Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015Stakeholder management in a matrix organisation - 25th August 2015
Stakeholder management in a matrix organisation - 25th August 2015
 
Topic 1 xtra note
Topic 1 xtra noteTopic 1 xtra note
Topic 1 xtra note
 
Implementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning GroupImplementing Change in the Capacity Planning Group
Implementing Change in the Capacity Planning Group
 
00 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation818
00 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation81800 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation818
00 BCG Communications Strategy 091907v3-ORACLE & SAP Implementation818
 
Lec : Policy & Strategy Formulation.pptx
Lec : Policy & Strategy Formulation.pptxLec : Policy & Strategy Formulation.pptx
Lec : Policy & Strategy Formulation.pptx
 
Sophie Walker - Portfolio
Sophie Walker - PortfolioSophie Walker - Portfolio
Sophie Walker - Portfolio
 
Essay On Planning
Essay On PlanningEssay On Planning
Essay On Planning
 
How to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP ReplatformingHow to Build a Business Case for ERP Replatforming
How to Build a Business Case for ERP Replatforming
 
© 2007, David Po-Chedley & Rob St.Germain - 1 - Originally.docx
© 2007, David Po-Chedley & Rob St.Germain - 1 -  Originally.docx© 2007, David Po-Chedley & Rob St.Germain - 1 -  Originally.docx
© 2007, David Po-Chedley & Rob St.Germain - 1 - Originally.docx
 
Post Mortems: The Anatomy of Market Research Process Improvement
Post Mortems: The Anatomy of Market Research Process ImprovementPost Mortems: The Anatomy of Market Research Process Improvement
Post Mortems: The Anatomy of Market Research Process Improvement
 

More from rtodd599

SAGE was founded in 1965 by Sa.docx
SAGE was founded in 1965 by Sa.docxSAGE was founded in 1965 by Sa.docx
SAGE was founded in 1965 by Sa.docxrtodd599
 
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docxSafety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docxrtodd599
 
Sajan Thapa1) Allegory suggests that enlightenment or educatio.docx
Sajan Thapa1) Allegory suggests that enlightenment or educatio.docxSajan Thapa1) Allegory suggests that enlightenment or educatio.docx
Sajan Thapa1) Allegory suggests that enlightenment or educatio.docxrtodd599
 
Safety and Health Providing a safe and secure environment for emplo.docx
Safety and Health Providing a safe and secure environment for emplo.docxSafety and Health Providing a safe and secure environment for emplo.docx
Safety and Health Providing a safe and secure environment for emplo.docxrtodd599
 
SAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docx
SAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docxSAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docx
SAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docxrtodd599
 
Safeby Rachael FabelurinSubmission dat e 07 - Jan- 201.docx
Safeby Rachael FabelurinSubmission dat e  07 - Jan- 201.docxSafeby Rachael FabelurinSubmission dat e  07 - Jan- 201.docx
Safeby Rachael FabelurinSubmission dat e 07 - Jan- 201.docxrtodd599
 
SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docx
SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docxSAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docx
SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docxrtodd599
 
Safe Work Environment  Please respond to the followingRecommen.docx
Safe Work Environment  Please respond to the followingRecommen.docxSafe Work Environment  Please respond to the followingRecommen.docx
Safe Work Environment  Please respond to the followingRecommen.docxrtodd599
 
Sadder and Less Accurate False Memory for NegativeMaterial .docx
Sadder and Less Accurate False Memory for NegativeMaterial .docxSadder and Less Accurate False Memory for NegativeMaterial .docx
Sadder and Less Accurate False Memory for NegativeMaterial .docxrtodd599
 
Safe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docxSafe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docxrtodd599
 
Safe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docxSafe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docxrtodd599
 
S216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docx
S216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docxS216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docx
S216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docxrtodd599
 
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docxSAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docxrtodd599
 
S18SOCI111SocialNetworksHomework4DUE66198.docx
S18SOCI111SocialNetworksHomework4DUE66198.docxS18SOCI111SocialNetworksHomework4DUE66198.docx
S18SOCI111SocialNetworksHomework4DUE66198.docxrtodd599
 
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docxSAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docxrtodd599
 
Sadly today police are not often viewed in the best light. Not a.docx
Sadly today police are not often viewed in the best light. Not a.docxSadly today police are not often viewed in the best light. Not a.docx
Sadly today police are not often viewed in the best light. Not a.docxrtodd599
 
S w 909E24 ENGRO CHEMICALS PAKISTAN LIMITED — .docx
S w  909E24    ENGRO CHEMICALS PAKISTAN LIMITED — .docxS w  909E24    ENGRO CHEMICALS PAKISTAN LIMITED — .docx
S w 909E24 ENGRO CHEMICALS PAKISTAN LIMITED — .docxrtodd599
 
SA #1 What is Ekman Divergence Wherewhat are three location.docx
SA #1 What is Ekman Divergence Wherewhat are three location.docxSA #1 What is Ekman Divergence Wherewhat are three location.docx
SA #1 What is Ekman Divergence Wherewhat are three location.docxrtodd599
 
S&J Plumbing, Inc.s 2010 income statement shows a net profit before.docx
S&J Plumbing, Inc.s 2010 income statement shows a net profit before.docxS&J Plumbing, Inc.s 2010 income statement shows a net profit before.docx
S&J Plumbing, Inc.s 2010 income statement shows a net profit before.docxrtodd599
 
S2021Instructions In describing your pro and con arguments, be sure.docx
S2021Instructions In describing your pro and con arguments, be sure.docxS2021Instructions In describing your pro and con arguments, be sure.docx
S2021Instructions In describing your pro and con arguments, be sure.docxrtodd599
 

More from rtodd599 (20)

SAGE was founded in 1965 by Sa.docx
SAGE was founded in 1965 by Sa.docxSAGE was founded in 1965 by Sa.docx
SAGE was founded in 1965 by Sa.docx
 
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docxSafety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
Safety Management System1SMS-1Jeffrey D Carpenter, CSP.docx
 
Sajan Thapa1) Allegory suggests that enlightenment or educatio.docx
Sajan Thapa1) Allegory suggests that enlightenment or educatio.docxSajan Thapa1) Allegory suggests that enlightenment or educatio.docx
Sajan Thapa1) Allegory suggests that enlightenment or educatio.docx
 
Safety and Health Providing a safe and secure environment for emplo.docx
Safety and Health Providing a safe and secure environment for emplo.docxSafety and Health Providing a safe and secure environment for emplo.docx
Safety and Health Providing a safe and secure environment for emplo.docx
 
SAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docx
SAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docxSAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docx
SAGE OpenJuly-September 2013 1 –10© The Author(s) 2013D.docx
 
Safeby Rachael FabelurinSubmission dat e 07 - Jan- 201.docx
Safeby Rachael FabelurinSubmission dat e  07 - Jan- 201.docxSafeby Rachael FabelurinSubmission dat e  07 - Jan- 201.docx
Safeby Rachael FabelurinSubmission dat e 07 - Jan- 201.docx
 
SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docx
SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docxSAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docx
SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL.docx
 
Safe Work Environment  Please respond to the followingRecommen.docx
Safe Work Environment  Please respond to the followingRecommen.docxSafe Work Environment  Please respond to the followingRecommen.docx
Safe Work Environment  Please respond to the followingRecommen.docx
 
Sadder and Less Accurate False Memory for NegativeMaterial .docx
Sadder and Less Accurate False Memory for NegativeMaterial .docxSadder and Less Accurate False Memory for NegativeMaterial .docx
Sadder and Less Accurate False Memory for NegativeMaterial .docx
 
Safe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docxSafe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docx
 
Safe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docxSafe Work Environment  Please respond to the followingRecomme.docx
Safe Work Environment  Please respond to the followingRecomme.docx
 
S216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docx
S216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docxS216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docx
S216 MAN506 ORGANISATIONAL BEHAVIOUR httpsonline.cdu.edu..docx
 
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docxSAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SCIENCESUNIVERSI.docx
 
S18SOCI111SocialNetworksHomework4DUE66198.docx
S18SOCI111SocialNetworksHomework4DUE66198.docxS18SOCI111SocialNetworksHomework4DUE66198.docx
S18SOCI111SocialNetworksHomework4DUE66198.docx
 
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docxSAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docx
SAAD COLLEGE OF NURSING AND ALLIED HEALTH SC.docx
 
Sadly today police are not often viewed in the best light. Not a.docx
Sadly today police are not often viewed in the best light. Not a.docxSadly today police are not often viewed in the best light. Not a.docx
Sadly today police are not often viewed in the best light. Not a.docx
 
S w 909E24 ENGRO CHEMICALS PAKISTAN LIMITED — .docx
S w  909E24    ENGRO CHEMICALS PAKISTAN LIMITED — .docxS w  909E24    ENGRO CHEMICALS PAKISTAN LIMITED — .docx
S w 909E24 ENGRO CHEMICALS PAKISTAN LIMITED — .docx
 
SA #1 What is Ekman Divergence Wherewhat are three location.docx
SA #1 What is Ekman Divergence Wherewhat are three location.docxSA #1 What is Ekman Divergence Wherewhat are three location.docx
SA #1 What is Ekman Divergence Wherewhat are three location.docx
 
S&J Plumbing, Inc.s 2010 income statement shows a net profit before.docx
S&J Plumbing, Inc.s 2010 income statement shows a net profit before.docxS&J Plumbing, Inc.s 2010 income statement shows a net profit before.docx
S&J Plumbing, Inc.s 2010 income statement shows a net profit before.docx
 
S2021Instructions In describing your pro and con arguments, be sure.docx
S2021Instructions In describing your pro and con arguments, be sure.docxS2021Instructions In describing your pro and con arguments, be sure.docx
S2021Instructions In describing your pro and con arguments, be sure.docx
 

Recently uploaded

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...M56BOOKSTORE PRODUCT/SERVICE
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 

Recently uploaded (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
KSHARA STURA .pptx---KSHARA KARMA THERAPY (CAUSTIC THERAPY)————IMP.OF KSHARA ...
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 

SafeAssignCheckTest - CSU SafeAssign Plagiarism Check ToolSafeAs.docx

  • 1. SAFEASSIGNCHECKTEST - CSU SAFEASSIGN PLAGIARISM CHECK TOOL SafeAssign Originality Report Generator I William Fiedler on Mon, Aug 27 2018, 9:46 AM 33% highest match Submission ID: 379b2d26-d065-43d3-b758-c36c7d7e7358 Attachments (1) · mba 6941 unit VIII reflection Paper.doc 33% Word Count: 1,397 Attachment ID: 224883277 mba 6941 unit VIII reflection Paper.doc Running Head: THE PROJECT CLOSURE PHASE 1 THE PROJECT CLOSURE PHASE 2 The Project Closure Phase William Fiedler Columbia Southern University The Project Closure Phase Inside this paperwork, I am going to make a discussion regarding the closing project. I will also extend to discussing the lesson learned towards the end of the project. 1 THE FOURTH AND LAST PROJECT LIFECYCLE STAGE IS THE PROJECT CLOSURE PHASE. IT IS IN THIS STAGE THAT YOU WILL BE ABLE TO YOUR PROJECT FORMALLY CLOSES AFTER THE REPORT SUCCESS LEVEL OF THE SPONSOR YOU HAVE. The exercises that are needed in closing the task in brought in to be by the Project Closure Report and this guarantees the project a conclusion that is embraced productively and comfortably. Once the report is brought into action and acknowledged by the individuals, the reports of the completion of the inside exercises indicated are attempted (Larson, 2014). As a result, the project closure comes into effect formally. 1 AFTER THE CLOSING OF THE TASK IN A PERIOD OF AT LEAST ONE TO THREE MONTHS, THE BUSINESS IS BELIEVED TO START GAINING THE ADVANTAGES GIVEN BY THE PROJECT WHICH MAKE IT MORE ESSENTIAL TO ALLUDE THE
  • 2. POST IMPLEMENTATION REVIEW (PIR) EVALUATION. This provides the business with a wide range of view towards recognizing its achievements level of different tasks as well as offer the education on the future projects that will arise. 2 PROCESS FOR CLOSING THE PROJECT THE PROJECT TRANSITION TASK CONTROL DOCUMENT WILL RECORD THE VICTORIES AND DISAPPOINTMENTS OF THE TASK. It gives a chronicled record of the orchestrated and unique spending plan and schedule, proposals for future endeavors of practically identical size and unpredictability, information on staffing and aptitudes used to meet errand targets and destinations, how the client wants were managed, exercises learned, and an official undertaking close down. One reason for the conclusion understanding system is to offer the sellers a formal warning to the structures that may have been created which has a high expectation that is elegant and commendable or that may have been rejected as a result. If the business does not meet its goals, it ought to make the amendment that hinders them from this achievement, and the individual or the dealer responsible for this should try to fix or eradicate any errors that may have caused it with a formal affirmation (Larson, 2014). Before the closure of the agreement, all the minor things are fixed, and the competed expectation is to strike the depressed. Over rages of errands, the world has audited quality performance, and the vendor was allowed to influence changes before the procedure than the conclusion to organize. The issue is not a keen idea to hold up until the specific end of the effort and after that fastened each subject and the matters on the carter drastically. It is possible to significantly stable in considering the dealer you may have in trying to take the best way for the progress because it accepts the amendment when the issues happen. By utilizing following the means, we can properly close the project: · Customer’s formal Sign-off.
  • 3. · Product scope final analysis. · The resources release. · Contract closure or the procurement. · Project files Indexing. · Documentation of the lessons learned Lesson Learned Document My group and as a task director, I took in numerous things from this end undertaking, for example, how to deal with the venture. 3 FOR EXAMPLE, EXPANDED EFFICIENCY AND EXECUTION, BUNCHES THAT WORK THAT CAPACITY SPLENDIDLY TOGETHER CAN ACHIEVE SIGNIFICANTLY MORE THAN INDIVIDUALS WEARING DOWN THEIR OWN. A FULL EXTENT OF APTITUDES CAN BE ASSOCIATED WITH DOWN TO EARTH ACTIVITIES AND OFFER AND DISCUSSING MUSINGS CAN ACCEPT A FUNDAMENTAL PART IN BUILDING UP YOUR APPRECIATION OF A SPECIFIC BRANCH OF KNOWLEDGE. Aptitudes Advancement: 3 BEING A BIT OF A GROUP WILL ENABLE YOU TO DEVELOP YOUR RELATIONAL CAPACITIES, FOR INSTANCE, TALKING AND TUNING IN AND FURTHERMORE BUNCH WORKING APTITUDES, FOR EXAMPLE, ORGANIZATION, AND WORKING WITH AND ENERGIZING OTHERS. A portion of these demeanors will be useful all through your academic job, and managers regard all (Serra, 2015). 1 WHAT'S MORE, KNOWING MORE ABOUT YOURSELF: collaborating with others will perceive your characteristics and weaknesses (for example, you may be a prevalent pioneer than the gathering of people, or you might be incredible at thinking about the 'tremendous contemplations' yet not too impressive at putting them energetically). 3 ENHANCED CARE WILL BOTH HELP YOUR APPROACH TO MANAGE TO LEARN AND WILL BE VALUABLE WHEN YOU COME TO CREATE YOUR CV OR FINISH OCCUPATION APPLICATION SHAPES. It enhances the accompanying things: · Better services delivery efficiency.
  • 4. · Increased, enhanced and improved the satisfaction of the customer. · Enhancement of services delivery effectiveness. · Growth and Development should be highly improved inside your group or team. · Greater competitive and Edge Some turned out badly are Flexibility, Risk Assessment, diminishing in Quantity. 1 I RECOMMENDED THAT FUTURE VENTURE MUST SPOTLIGHT ON THE EXPANSION THE FLEXIBILITY, REDUCE THE RISK ASSESSMENT AND EXPANDED THE QUANTITY. Since the quality administration is a method of constant change that consolidates picking up from past errands and taking off upgrades to improve the next endeavor. This strategy is recorded as an affirmation that quality administration hones are being utilized. A couple of affiliations have formal systems for changing work techniques and fusing the exercises picked up from the wander so individual assignments can benefit. A couple of alliances are less formal in the procedure and foresee that individuals will pick up from experience and take the experience to their next endeavor and confer what they made sense of how to others coolly. Whatever kind of strategy is used, the going with parts should be surveyed, and the results shortened in reports for outside and inside utilize (Watt, n.d.). 3 ENCOURAGE FOR FUTURE PROJECTS I CAN EMPOWER COLLEAGUES BY PERSUADING THE COLLEAGUES FOR FUTURE TASKS. FOR EXAMPLE, SOME COLLEAGUES ARE CONFIDENT AND CONFIDENT, WHILE OTHERS ARE GENERALLY HUMBLE AND QUIET. A PARTICULAR AND CONFIDENT INDIVIDUAL ENHANCES MUSINGS THAN A MODEST, AND CALM INDIVIDUAL, BE THAT AS IT MAY, DYNAMIC INDIVIDUALS, ARE ALTOGETHER MORE SLANTED TO BE HEARD AND TO HAVE THEIR THOUGHTS FOLLOWED UP ON. TO GET THE BEST OUT OF YOUR QUIETER ASSOCIATES, STRUCTURE YOUR SOCIAL OCCASIONS WITH THE GOAL THAT EVERYONE
  • 5. HAS AN EQUIVALENT OPPORTUNITY TO TALK. GIVE PEOPLE TIME TO CLARIFY THEIR CONSIDERATIONS ALTOGETHER (LOCK, 2017). EXERTION TO REVIEW EACH SUGGESTION AS IMPARTIALLY AS COULD BE PERMITTED GIVEN THE IDEA ITSELF AND NOT THE CHARACTER OF THE PARTNER PROPOSING IT. ON THE OFF CHANCE THAT YOU COULDN'T CARE LESS FOR A PROPOSAL OR PICK NOT TO MAKE USE OF IT, DON'T CRITICIZE IT TOO GENUINELY (TIPPING, 2015). A HUMBLE ASSOCIATE MAY ACCEPT POSITIVE INPUT AS EXPULSION AND MAY SWEAR OFF MAKING PROPOSALS LATER ON. MAKE A GROUP OVERFLOWING WITH PIONEERS BY USING A NETWORK RATHER THAN AN ENTIRELY DIFFERENT LEVELED ESTABLISHMENT. The pioneer in any association is the careful individual, so pioneers are significantly vigorous for the social affair to succeed. In a mounting structure, emerge leads at each level of the affiliation. In an agreeable arrangement, each from the group has an expert part in precisely a player in the assignment. Designate each right associate obligation concerning some piece of the wander given that accomplice's characteristics and capacities. Give partners a level of control over their regions of the venture. For example, one part might be responsible for making applications for the wander. On any issue doing with applications progression, that associate would be the pioneer. Regardless, on any request doing with the inventive structure for the endeavor, another associate would be the pioneer (Tipping, 2015). Instead of a strict division among pioneers and supporters, every partner would be a pioneer in one association and a fan in others. This backing a sentiment of proprietorship and ethical commitment. References Larson, E. W., Gray, C. F., Danlin, U., Honig, B., & Bacarini, D. (2014). Project management: The managerial process (Vol. 6). Grandview Heights, OH: 4 MCGRAW-HILL EDUCATION. Lock, D. (2017). 5 THE ESSENTIALS OF PROJECT
  • 6. MANAGEMENT. Routledge. Serra, C. E. 6 M., & KUNC, M. (2015). 7 BENEFITS REALISATION MANAGEMENT AND ITS INFLUENCE ON PROJECT SUCCESS AND ON THE EXECUTION OF BUSINESS STRATEGIES. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 33(1), 53-66. Tipping, J., Boogaard, F., Jaeger, R., Duffy, A., Klomp, T., & Manenschijn, M. (2015). Climatescan. nl: the development of a web-based map application to encourage knowledge-sharing of climate-proofing and urban resilient projects. International waterweek, 3. Citations (7/7) 1. 1Another student's paper 2. 2Another student's paper 3. 3Another student's paper 4. 4Another student's paper 5. 5https://www.gristprojectmanagement.us/project- management.html 6. 6Another student's paper 7. 7Another student's paper Matched Text Suspected Entry: 93% match Uploaded - mba 6941 unit VIII reflection Paper.doc THE FOURTH AND LAST PROJECT LIFECYCLE STAGE IS THE PROJECT CLOSURE PHASE Source - Another student's paper INTRODUCTION The Project Closure Phase is the fourth and last stage of the project lifecycle Suspected Entry: 74% match Uploaded - mba 6941 unit VIII reflection Paper.doc IT IS IN THIS STAGE THAT YOU WILL BE ABLE TO YOUR PROJECT FORMALLY CLOSES AFTER THE REPORT SUCCESS LEVEL OF THE SPONSOR YOU HAVE Source - Another student's paper In this stage, you will formally close your project and after that report its general level of success to your sponsor
  • 7. Suspected Entry: 63% match Uploaded - mba 6941 unit VIII reflection Paper.doc AFTER THE CLOSING OF THE TASK IN A PERIOD OF AT LEAST ONE TO THREE MONTHS, THE BUSINESS IS BELIEVED TO START GAINING THE ADVANTAGES GIVEN BY THE PROJECT WHICH MAKE IT MORE ESSENTIAL TO ALLUDE THE POST IMPLEMENTATION REVIEW (PIR) EVALUATION Source - Another student's paper One to three months after the task has been closed and the business has started to encounter the advantages gave the project, it is essential to attempt an Evaluation, frequently alluded to as a Post Implementation Review (PIR) Suspected Entry: 73% match Uploaded - mba 6941 unit VIII reflection Paper.doc WHAT'S MORE, KNOWING MORE ABOUT YOURSELF Source - Another student's paper And Knowing more about yourself Suspected Entry: 64% match Uploaded - mba 6941 unit VIII reflection Paper.doc I RECOMMENDED THAT FUTURE VENTURE MUST SPOTLIGHT ON THE EXPANSION THE FLEXIBILITY, REDUCE THE RISK ASSESSMENT AND EXPANDED THE QUANTITY Source - Another student's paper I suggested that future projects must focus on the increase the Flexibility, Reduce the Risk Assessment and increased the Quantity Suspected Entry: 70% match Uploaded - mba 6941 unit VIII reflection Paper.doc PROCESS FOR CLOSING THE PROJECT THE PROJECT TRANSITION TASK CONTROL DOCUMENT WILL RECORD THE VICTORIES AND DISAPPOINTMENTS OF THE TASK Source - Another student's paper Project Closure Project Closing Process The Undertaking Change Assignment Control Report will record the victories and
  • 8. disappointments of the task Suspected Entry: 84% match Uploaded - mba 6941 unit VIII reflection Paper.doc FOR EXAMPLE, EXPANDED EFFICIENCY AND EXECUTION, BUNCHES THAT WORK THAT CAPACITY SPLENDIDLY TOGETHER CAN ACHIEVE SIGNIFICANTLY MORE THAN INDIVIDUALS WEARING DOWN THEIR OWN Source - Another student's paper For example, expanded efficiency and execution, bunches that work that capacity honourably together can fulfil significantly more than individuals wearing down their own (Thompson, 2010) Suspected Entry: 82% match Uploaded - mba 6941 unit VIII reflection Paper.doc A FULL EXTENT OF APTITUDES CAN BE ASSOCIATED WITH DOWN TO EARTH ACTIVITIES AND OFFER AND DISCUSSING MUSINGS CAN ACCEPT A FUNDAMENTAL PART IN BUILDING UP YOUR APPRECIATION OF A SPECIFIC BRANCH OF KNOWLEDGE Source - Another student's paper A more broad extent of aptitudes can be associated with down to earth activities and offer and discussing considerations can expect a fundamental part in building up your perception of a specific branch of knowledge Suspected Entry: 88% match Uploaded - mba 6941 unit VIII reflection Paper.doc BEING A BIT OF A GROUP WILL ENABLE YOU TO DEVELOP YOUR RELATIONAL CAPACITIES, FOR INSTANCE, TALKING AND TUNING IN AND FURTHERMORE BUNCH WORKING APTITUDES, FOR EXAMPLE, ORGANIZATION, AND WORKING WITH AND ENERGIZING OTHERS Source - Another student's paper being a bit of a gathering will enable you to develop your relational capacities, for instance, talking and tuning in and furthermore bunch working aptitudes, for instance,
  • 9. organization, and working with and awakening others Suspected Entry: 95% match Uploaded - mba 6941 unit VIII reflection Paper.doc ENHANCED CARE WILL BOTH HELP YOUR APPROACH TO MANAGE TO LEARN AND WILL BE VALUABLE WHEN YOU COME TO CREATE YOUR CV OR FINISH OCCUPATION APPLICATION SHAPES Source - Another student's paper Enhanced care will both help your approach to manage learning and will be valuable when you come to create your CV or finish occupation application shapes Suspected Entry: 81% match Uploaded - mba 6941 unit VIII reflection Paper.doc ENCOURAGE FOR FUTURE PROJECTS I CAN EMPOWER COLLEAGUES BY PERSUADING THE COLLEAGUES FOR FUTURE TASKS Source - Another student's paper Encouragement for Future Projects I can empower colleagues by propelling the colleagues for future tasks Suspected Entry: 82% match Uploaded - mba 6941 unit VIII reflection Paper.doc FOR EXAMPLE, SOME COLLEAGUES ARE CONFIDENT AND CONFIDENT, WHILE OTHERS ARE GENERALLY HUMBLE AND QUIET Source - Another student's paper For example, some colleagues are confident and confident, while others are normally unassuming and quiet Suspected Entry: 80% match Uploaded - mba 6941 unit VIII reflection Paper.doc A PARTICULAR AND CONFIDENT INDIVIDUAL ENHANCES MUSINGS THAN A MODEST, AND CALM INDIVIDUAL, BE THAT AS IT MAY, DYNAMIC INDIVIDUALS, ARE ALTOGETHER MORE SLANTED TO BE HEARD AND TO HAVE THEIR THOUGHTS FOLLOWED UP ON Source - Another student's paper
  • 10. A sure and confident individual enhances musings than a constrained, and calm individual, nonetheless, dynamic individuals are essentially more slanted to be heard and to have their thoughts followed up on Suspected Entry: 79% match Uploaded - mba 6941 unit VIII reflection Paper.doc TO GET THE BEST OUT OF YOUR QUIETER ASSOCIATES, STRUCTURE YOUR SOCIAL OCCASIONS WITH THE GOAL THAT EVERYONE HAS AN EQUIVALENT OPPORTUNITY TO TALK Source - Another student's paper To get the best out of your more quiet partners, structure your social events with the goal that everyone has an equivalent opportunity to talk Suspected Entry: 69% match Uploaded - mba 6941 unit VIII reflection Paper.doc GIVE PEOPLE TIME TO CLARIFY THEIR CONSIDERATIONS ALTOGETHER (LOCK, 2017) Source - Another student's paper Give people time to clarify their considerations completely Suspected Entry: 81% match Uploaded - mba 6941 unit VIII reflection Paper.doc EXERTION TO REVIEW EACH SUGGESTION AS IMPARTIALLY AS COULD BE PERMITTED GIVEN THE IDEA ITSELF AND NOT THE CHARACTER OF THE PARTNER PROPOSING IT Source - Another student's paper Endeavour to overview each suggestion as impartially as could be permitted given the idea itself and not the personality of the partner proposing it Suspected Entry: 75% match Uploaded - mba 6941 unit VIII reflection Paper.doc ON THE OFF CHANCE THAT YOU COULDN'T CARE LESS FOR A PROPOSAL OR PICK NOT TO MAKE USE OF IT, DON'T CRITICIZE IT TOO GENUINELY (TIPPING, 2015) Source - Another student's paper
  • 11. In the event that you couldn't care less for a proposal or pick not to make usage of it, don't criticize it too genuinely (Watt, 2009) Suspected Entry: 81% match Uploaded - mba 6941 unit VIII reflection Paper.doc A HUMBLE ASSOCIATE MAY ACCEPT POSITIVE INPUT AS EXPULSION AND MAY SWEAR OFF MAKING PROPOSALS LATER ON Source - Another student's paper A humble associate may take positive input as an expulsion and may avoid making proposals later on Suspected Entry: 67% match Uploaded - mba 6941 unit VIII reflection Paper.doc MAKE A GROUP OVERFLOWING WITH PIONEERS BY USING A NETWORK RATHER THAN AN ENTIRELY DIFFERENT LEVELED ESTABLISHMENT Source - Another student's paper Make a group overflowing with pioneers by using a group rather than a completely different levelled show Suspected Entry: 100% match Uploaded - mba 6941 unit VIII reflection Paper.doc MCGRAW-HILL EDUCATION Source - Another student's paper McGraw-Hill Education Suspected Entry: 63% match Uploaded - mba 6941 unit VIII reflection Paper.doc THE ESSENTIALS OF PROJECT MANAGEMENT Source - https://www.gristprojectmanagement.us/project- management.html The Nature of Project Management Suspected Entry: 100% match Uploaded - mba 6941 unit VIII reflection Paper.doc M., & KUNC, M Source - Another student's paper M., & Kunc, M Suspected Entry: 100% match
  • 12. Uploaded - mba 6941 unit VIII reflection Paper.doc BENEFITS REALISATION MANAGEMENT AND ITS INFLUENCE ON PROJECT SUCCESS AND ON THE EXECUTION OF BUSINESS STRATEGIES Source - Another student's paper Benefits Realisation Management and its influence on project success and on the execution of business strategies Suspected Entry: 100% match Uploaded - mba 6941 unit VIII reflection Paper.doc INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 33(1), 53-66 Source - Another student's paper MBA 6941, Managing Project Teams 1 Course Learning Outcomes for Unit VIII Upon completion of this unit, students should be able to: 5. Describe the process of leadership when leading project teams. 5.1 Determine the role of the project team in the closing processes. 5.2 Discuss how to successfully adjourn or disband a project team. Reading Assignment Chapter 18:
  • 13. Closeout Unit Lesson If you remember at the beginning of the class, we agreed that one of the elements of a project is that every project must come to an end. The project has gone through the initiating phase where we created the project charter that authorized the beginning of the project. Then we moved to the planning phase of the project. In the planning phase, the project hired the teams and started to formulate the project plan. The project management plan that includes the scope of the project, the cost , the schedule, the quality plan, the risk plan, the procurement and human resources plans, the communication plan, and the stakeholder management plan. Once the project management plan is complete, the project then moves to the executing phase. This is the phase where the project team does all the implementations based on what was planned. Indeed, the primary purpose of the executing phase is create the project deliverables based on all the plans documented in the project plan. Like every other plan, the output of the executing phase (deliverables) may or may not manifest precisely as planned, and the control and monitoring process helps the project to correct the variances and bring the project back to achieving its objectives. Once the project has completed the development of all the deliverables, the project now moves from the executing phase of the project to the closing phase. In this case, the project is closed because the project has
  • 14. achieved its objectives and been accepted by the project sponsor. However, a project can be terminated if, during the course of the project, the sponsor deems that the project is not achieving its strategic objectives in terms of cost, schedule, or market considerations. Projects can also be terminated if the purpose of the project has been overcome by events. For example, some of the projects that were started by the U.S. Army Health Corps to help with the Ebola disease in West Africa were recently closed because of new medicines and because the disease has ceased to be an epidemic. Projects can also be terminated if the return on investment (ROI) is perceived as negative. In addition, sometimes changes in legislation or market demand may cause a project to be terminated. Fundamentally, there are many reasons (positive or negative) for a project to be terminated. Irrespective of the reason for termination, it is important for a project team to perform core closing phase activities. Some of these activities that a project team must perform during the closing phase include the following: ng payments due to the project and also make payments to all outstanding dues. and provide final constructive and positive feedbacks to team members. -project evaluations to determine if it met their success criteria. UNIT VIII STUDY GUIDE
  • 15. Project Closeout and Team MBA 6941, Managing Project Teams 2 UNIT x STUDY GUIDE Title project must then finalize, organize, and archive all project related documents. Of all these closing phase activities that a project team must perform, one of the most critical is the creation of the “Lessons Learned” document. The “Lessons Learned” document is one of the major deliverables of the project closure. The goal of the “Lessons Learned” document is to document all that went well in the course of the project and all that went wrong in the project. Finally, the “Lessons Learned” document should propose suggestions for future projects based on the collective experience of the project team. Documenting an effective “Lessons Learned” document could be a challenge for the project because the documentation is done during the closing phase when most of the experienced team members may have left the project. Sometimes, the project team might perceive that the project “Lessons Learned” document is a document
  • 16. used for finger pointing or assigning blame, and therefore, team members may not be forthcoming in documenting what went wrong in the project. A well- documented and well written “Lessons Learned” document helps the organization to prepare more effectively for future similar projects through the documentation of suggestions based on what went right and what went wrong in the previous project. The overall objective of the “Lessons Learned” document is to help the project team answer some important questions about the project and provide a pathway to successful future projects. Also, as the project comes to a closure, the project team must ensure that all outstanding works are completed on time and efficiently and that project assets are transferred properly by doing the following: ar understanding and a plan on how to transfer the project from the project manager to the operations manager. If this transition is not properly managed, it might negatively impact the project deliverables in terms of performance or operational ability. sponsor to reject the final deliverable at the closing phase if the sponsor and the end user have not been properly informed throughout the process. It is important that final deliverable expectations are managed so that the acceptance experience is positive for the project team and sponsor.
  • 17. operational team that is now getting the project may not be familiar with how to use the application or facility or the final product. A consideration should be made as part of the closing process on the level of training that must be given to the operational team to make the acceptance successful. Adjourning the Project Team As the project comes to end, the team members are anxiously looking for future projects or simply concerned about to do next. It is important that a project manager takes all the necessary steps within his or her power to ensure that the disbanding of the team is smooth and less stressful to the team members. If you think of the stages that your project team has gone through from the forming stage to storming, norming, and performing, a lot of training and bonding must have occurred by now that must be managed carefully because as a project manager, you may need the same team members for another project in the future. In a matrix organizational structure, as the project ends, the project manager starts to transition team members to their home administrative managers, and the way this transition is done will be a deciding factor in whether the same team members work again with the project manager in the future. Here are some consideration when adjourning your project team members: nager, be sure to give each one of your team a final evaluation.
  • 18. to transition back to their original work team. approved and paid. members are rewarded (Project Management Institute [PMI], 2013). MBA 6941, Managing Project Teams 3 UNIT x STUDY GUIDE Title Reference Project Management Institute. (2013). A guide to the project management body of knowledge (5th ed.). Newton Square, PA: Project Management Institute. Suggested Reading In order to access the resource below, you must first log into
  • 19. the myCSU Student Portal and access the Business Source Complete database within the CSU Online Library. This article gives you an insight on how to close a project successfully: How to kill an IT project. (2004). Computerworld, 38(39), 46- 47.