PUBLIC PRIVATE PARTNERSHIP CASE STUDY
The present landfill sites that are being utilized for disposing the garbage are approaching their full
capacity and even with the envisaged capacity addition, the situation is unlikely to improve. The
Municipal Corporation of Delhi (MCD) has thus embarked on a project to reduce the amount of MSW
being disposed in the landfill sites and utilizing the waste for productive purposes such as generation of
power from waste
The following facilities are to be developed as a part of the integrated municipal waste handling
project:
1. Plants for converting MSW to Refuse Derived Fuel (RDF), capable of processing 1300 TPD at Okhla
and 650 TPD at Timarpur.
2. A bio-methanation plant capable of handling of 100 TPD of green waste at Okhla.
3. A water recovery plant capable of handling up to 6 MLD of treated sewage at the Okhla site for
recycling into process water and cooling water.
4. A Power plant with a generation capacity of 16 MW at Okhla
THE PROJECT
The successful bidder M/s Jindal Urban Infrastructure Limited (JUIL) acquired 100% equity in the SPV -
TOWMCL. The following were the agreements executed by the SPV for this project
1. The SPV signed a lease agreement with New Delhi Municipal Council (NDMC) for the land at Okhla
for 25 years. NDMC had taken this land on lease from the Delhi Development Authority.
2. The SPV entered into agreements with the MCD and NDMC for the supply of municipal waste.
3. It entered into an agreement with the Delhi Jal Board (DJB) for receiving sewage and disposing
treated effluent.
4. The SPV entered into a Power Purchase Agreement with BSES Rajdhani Power Limited.
Current Status
M/s Jindal Urban Infrastructure limited (JUIL), was awarded the project in January 2008. JUIL was
among the six bidders which had submitted their bids from 30 potential bidders. JUIL was awarded the
contract on the basis of the lowest levelised power tariff of ` 2.83 per unit, which was the financial bid
parameter as per the bidding documents. The project is currently under development and is expected to
commence operations with a delay of six months. Accordingly, the original start date of mid-2010 has
now been postponed to the end of calendar 2010.
Financing Information
JUIL had estimated the project cost to be ` 200 crores, ` 25 crores more than the stated DPR cost of ` 175
crores. The increase in cost was principally due to the increase in the capacity of the power plant from 16
MW to 20 MW.JUIL arranged finance through a mixture of equity and debt, with the debt being raised
from financial institutions. Axis bank was the lead consortium bank for lending towards the project
Key Learning
 Project Preparedness: Good project preparation is critical to ensure project attractiveness and
faster financial closure. Clarity on the contractual and regulatory framework reduces the extent of
uncertainty faced by the private investors.
 Technology: When there is a choice of technology or method to achieve the said output, the
benefits and losses by adopting that particular method or technology should be thoroughly
assessed by way of a comparative study

More Related Content

What's hot

BCM's Environmental Working Group Meeting
BCM's Environmental Working Group MeetingBCM's Environmental Working Group Meeting
BCM's Environmental Working Group MeetingJAMBAA Lkhagva
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
GRC - State of the Geothermal Industry - January 2019
GRC - State of the Geothermal Industry - January 2019GRC - State of the Geothermal Industry - January 2019
GRC - State of the Geothermal Industry - January 2019Geothermal Resources Council
 
Development of Small Hydro Power in India
Development of Small Hydro Power in IndiaDevelopment of Small Hydro Power in India
Development of Small Hydro Power in Indiaijsrd.com
 
Solar Power 2020: India On A National Solar Mission
Solar Power 2020: India On A National Solar MissionSolar Power 2020: India On A National Solar Mission
Solar Power 2020: India On A National Solar MissionHIMADRI BANERJI
 
Hydro power scenario in india 2013
Hydro power scenario in india 2013Hydro power scenario in india 2013
Hydro power scenario in india 2013Vipul Kumar
 
Third renewable energy auction 2021
Third renewable energy auction 2021Third renewable energy auction 2021
Third renewable energy auction 2021ProColombia
 
Micro Hydro Schemes : Case of Ghandruk VDC, Nepal
Micro Hydro Schemes : Case of Ghandruk VDC, Nepal Micro Hydro Schemes : Case of Ghandruk VDC, Nepal
Micro Hydro Schemes : Case of Ghandruk VDC, Nepal Regmi Milan
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india pptnavreet singh
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In BangladeshSayanton Vhaduri
 
National Solar Mission India
National Solar Mission IndiaNational Solar Mission India
National Solar Mission IndiaSJVijay
 
Hydro Power Developer and Consultant
Hydro Power Developer and ConsultantHydro Power Developer and Consultant
Hydro Power Developer and ConsultantAtul Sareen
 
Solar power in india
Solar power in indiaSolar power in india
Solar power in indiaAmit Goel
 
Future nuclear energy
Future nuclear energyFuture nuclear energy
Future nuclear energyVedant Yogesh
 
On line seminar_1-problem to be addressed
On line seminar_1-problem to be addressedOn line seminar_1-problem to be addressed
On line seminar_1-problem to be addressedSHAREPROJECT
 
Shp development in india
Shp development  in indiaShp development  in india
Shp development in indiaArvind Gupta
 

What's hot (20)

WBPDCL EEA
WBPDCL EEAWBPDCL EEA
WBPDCL EEA
 
BCM's Environmental Working Group Meeting
BCM's Environmental Working Group MeetingBCM's Environmental Working Group Meeting
BCM's Environmental Working Group Meeting
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
GRC - State of the Geothermal Industry - January 2019
GRC - State of the Geothermal Industry - January 2019GRC - State of the Geothermal Industry - January 2019
GRC - State of the Geothermal Industry - January 2019
 
Development of Small Hydro Power in India
Development of Small Hydro Power in IndiaDevelopment of Small Hydro Power in India
Development of Small Hydro Power in India
 
Solar Power 2020: India On A National Solar Mission
Solar Power 2020: India On A National Solar MissionSolar Power 2020: India On A National Solar Mission
Solar Power 2020: India On A National Solar Mission
 
Hydro power scenario in india 2013
Hydro power scenario in india 2013Hydro power scenario in india 2013
Hydro power scenario in india 2013
 
Overview on Hydroelectric Power Plants
Overview on Hydroelectric Power PlantsOverview on Hydroelectric Power Plants
Overview on Hydroelectric Power Plants
 
Third renewable energy auction 2021
Third renewable energy auction 2021Third renewable energy auction 2021
Third renewable energy auction 2021
 
Micro Hydro Schemes : Case of Ghandruk VDC, Nepal
Micro Hydro Schemes : Case of Ghandruk VDC, Nepal Micro Hydro Schemes : Case of Ghandruk VDC, Nepal
Micro Hydro Schemes : Case of Ghandruk VDC, Nepal
 
Power scenario in india ppt
Power scenario in india pptPower scenario in india ppt
Power scenario in india ppt
 
Power Sector In Bangladesh
Power Sector In BangladeshPower Sector In Bangladesh
Power Sector In Bangladesh
 
National Solar Mission India
National Solar Mission IndiaNational Solar Mission India
National Solar Mission India
 
Hydro Power Developer and Consultant
Hydro Power Developer and ConsultantHydro Power Developer and Consultant
Hydro Power Developer and Consultant
 
Solar power in india
Solar power in indiaSolar power in india
Solar power in india
 
Future nuclear energy
Future nuclear energyFuture nuclear energy
Future nuclear energy
 
Policy News And Views January 2009
Policy News And Views January 2009Policy News And Views January 2009
Policy News And Views January 2009
 
On line seminar_1-problem to be addressed
On line seminar_1-problem to be addressedOn line seminar_1-problem to be addressed
On line seminar_1-problem to be addressed
 
Shp development in india
Shp development  in indiaShp development  in india
Shp development in india
 
Microhydro in nepal
Microhydro in nepalMicrohydro in nepal
Microhydro in nepal
 

Viewers also liked

4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_MahobulMahobul Islam Plabon
 
A case study on characteristics of solid waste & leachate treatment of ok...
A case study on characteristics of solid waste & leachate treatment of ok...A case study on characteristics of solid waste & leachate treatment of ok...
A case study on characteristics of solid waste & leachate treatment of ok...eSAT Journals
 
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELSOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELIAEME Publication
 
Public Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in IndiaPublic Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in IndiaBashir Shirazi
 
Case studies ppp
Case studies pppCase studies ppp
Case studies pppamityasum23
 
Incineration method of solid waste disposal
Incineration method of solid waste disposalIncineration method of solid waste disposal
Incineration method of solid waste disposalRajendra Naik
 

Viewers also liked (9)

"waste to energy"
"waste to energy""waste to energy"
"waste to energy"
 
4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul4 PPP lead municipal waste to biogas_Revised_Mahobul
4 PPP lead municipal waste to biogas_Revised_Mahobul
 
A case study on characteristics of solid waste & leachate treatment of ok...
A case study on characteristics of solid waste & leachate treatment of ok...A case study on characteristics of solid waste & leachate treatment of ok...
A case study on characteristics of solid waste & leachate treatment of ok...
 
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODELSOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
SOLID WASTE MANAGEMENT THROUGH PUBLIC-PRIVATE PARTNERSHIP MODEL
 
Public Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in IndiaPublic Private Partnership in Municipal Solid Waste Management in India
Public Private Partnership in Municipal Solid Waste Management in India
 
Case studies ppp
Case studies pppCase studies ppp
Case studies ppp
 
Public private partnerships in India
Public private partnerships in IndiaPublic private partnerships in India
Public private partnerships in India
 
WASTE TO ENERGY
WASTE TO ENERGYWASTE TO ENERGY
WASTE TO ENERGY
 
Incineration method of solid waste disposal
Incineration method of solid waste disposalIncineration method of solid waste disposal
Incineration method of solid waste disposal
 

Similar to Public private Partnership case study

18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...The Business Council of Mongolia
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010Amit Bharti
 
Ne base 20 april 2018 energy news issue 1162 by khaled al awadi
Ne base 20 april 2018 energy news issue   1162  by khaled al awadiNe base 20 april 2018 energy news issue   1162  by khaled al awadi
Ne base 20 april 2018 energy news issue 1162 by khaled al awadiKhaled Al Awadi
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...RituSaha3
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBanaDurga
 
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...IAEME Publication
 
Dabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxDabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxNIHALTYAGI5
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Oswar Mungkasa
 
Power sector ,devlopment
Power sector ,devlopmentPower sector ,devlopment
Power sector ,devlopmentBhakti Parida
 
WATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdfWATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdfssuser493fb4
 

Similar to Public private Partnership case study (20)

18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
18.11.2014 How is Mongolia developing a robust energy sector and reducing its...
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010
 
Energy project report on hydropower
Energy project report on hydropowerEnergy project report on hydropower
Energy project report on hydropower
 
Ne base 20 april 2018 energy news issue 1162 by khaled al awadi
Ne base 20 april 2018 energy news issue   1162  by khaled al awadiNe base 20 april 2018 energy news issue   1162  by khaled al awadi
Ne base 20 april 2018 energy news issue 1162 by khaled al awadi
 
Solutions for power sector
Solutions for power sectorSolutions for power sector
Solutions for power sector
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
Consultancy Projects - Presentation
Consultancy Projects - Presentation Consultancy Projects - Presentation
Consultancy Projects - Presentation
 
Energy sector
Energy sectorEnergy sector
Energy sector
 
Nl energy sep 5 - 11, 2015
Nl energy sep 5 - 11, 2015Nl energy sep 5 - 11, 2015
Nl energy sep 5 - 11, 2015
 
Hydro power presentation
Hydro power presentationHydro power presentation
Hydro power presentation
 
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
Analysis and Review of EIA of 2x (500 660) mw Coal Based Thermal Power Plant ...
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORE...
 
Nl energy oct 10 - oct 16, 2015
Nl energy oct 10 - oct 16, 2015Nl energy oct 10 - oct 16, 2015
Nl energy oct 10 - oct 16, 2015
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 
NTPC LTD.
NTPC LTD.NTPC LTD.
NTPC LTD.
 
Dabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptxDabhol-Power-Company PF,M.pptx
Dabhol-Power-Company PF,M.pptx
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
Power sector ,devlopment
Power sector ,devlopmentPower sector ,devlopment
Power sector ,devlopment
 
WATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdfWATER-BUSINESS-GROUP-PERFORMANCE.pdf
WATER-BUSINESS-GROUP-PERFORMANCE.pdf
 

More from Rishabh Bhandari

More from Rishabh Bhandari (7)

Airtel outsourcing case study
Airtel outsourcing case studyAirtel outsourcing case study
Airtel outsourcing case study
 
Pascal Triangle
Pascal TrianglePascal Triangle
Pascal Triangle
 
Image formation
Image formation Image formation
Image formation
 
Image formation
Image formationImage formation
Image formation
 
Rise of nationalism in India
Rise of nationalism in IndiaRise of nationalism in India
Rise of nationalism in India
 
Old Age home
Old Age homeOld Age home
Old Age home
 
Medical Tourism
Medical TourismMedical Tourism
Medical Tourism
 

Recently uploaded

Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 

Recently uploaded (20)

Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 

Public private Partnership case study

  • 1. PUBLIC PRIVATE PARTNERSHIP CASE STUDY The present landfill sites that are being utilized for disposing the garbage are approaching their full capacity and even with the envisaged capacity addition, the situation is unlikely to improve. The Municipal Corporation of Delhi (MCD) has thus embarked on a project to reduce the amount of MSW being disposed in the landfill sites and utilizing the waste for productive purposes such as generation of power from waste The following facilities are to be developed as a part of the integrated municipal waste handling project: 1. Plants for converting MSW to Refuse Derived Fuel (RDF), capable of processing 1300 TPD at Okhla and 650 TPD at Timarpur. 2. A bio-methanation plant capable of handling of 100 TPD of green waste at Okhla. 3. A water recovery plant capable of handling up to 6 MLD of treated sewage at the Okhla site for recycling into process water and cooling water. 4. A Power plant with a generation capacity of 16 MW at Okhla THE PROJECT The successful bidder M/s Jindal Urban Infrastructure Limited (JUIL) acquired 100% equity in the SPV - TOWMCL. The following were the agreements executed by the SPV for this project 1. The SPV signed a lease agreement with New Delhi Municipal Council (NDMC) for the land at Okhla for 25 years. NDMC had taken this land on lease from the Delhi Development Authority. 2. The SPV entered into agreements with the MCD and NDMC for the supply of municipal waste. 3. It entered into an agreement with the Delhi Jal Board (DJB) for receiving sewage and disposing treated effluent. 4. The SPV entered into a Power Purchase Agreement with BSES Rajdhani Power Limited.
  • 2. Current Status M/s Jindal Urban Infrastructure limited (JUIL), was awarded the project in January 2008. JUIL was among the six bidders which had submitted their bids from 30 potential bidders. JUIL was awarded the contract on the basis of the lowest levelised power tariff of ` 2.83 per unit, which was the financial bid parameter as per the bidding documents. The project is currently under development and is expected to commence operations with a delay of six months. Accordingly, the original start date of mid-2010 has now been postponed to the end of calendar 2010. Financing Information JUIL had estimated the project cost to be ` 200 crores, ` 25 crores more than the stated DPR cost of ` 175 crores. The increase in cost was principally due to the increase in the capacity of the power plant from 16 MW to 20 MW.JUIL arranged finance through a mixture of equity and debt, with the debt being raised from financial institutions. Axis bank was the lead consortium bank for lending towards the project
  • 3. Key Learning  Project Preparedness: Good project preparation is critical to ensure project attractiveness and faster financial closure. Clarity on the contractual and regulatory framework reduces the extent of uncertainty faced by the private investors.  Technology: When there is a choice of technology or method to achieve the said output, the benefits and losses by adopting that particular method or technology should be thoroughly assessed by way of a comparative study