SlideShare a Scribd company logo
1 of 15
Download to read offline
M
M
VFD
VFD
M
(NOTE 2)
M
M
1011
FIC
0002
LIT
1011
FIT
0005
PIT
I LCS
I AG700M
XU
I
I PP702M
XU
PP701M
XU
1027
ZS
1026
ZS
1030
LSH
1029
LSM
1021
PDIT
1022
PIT
M TURBIDITY
I
I
M
0005
FIT
0005
FIC
FAH
0002
LIC
LAH
LAHH
1024
AE
1024
AIT
1025
LSL
LCS
LCS
0005
PI
0005
PSH
1028
ZS
0002
LSLL
0010
LIT
0010
LAHL
0010
LI
ILCS
PP715M
XU
0010
LE
I
0025
AE
0025
AIT
0025
AI AAH
AAL
1023
PI
II
I I LCS
PP703M
XU
2213
FROM RESIDUE THICKENER
OVERFLOW PUMPS
284-PP-085/086
284-PI-T-004
2164
TO PLS TANKS
291-TK-705/706
291-PI-T-003
2158
FROM RAW WATER HEADER
262-PI-T-007
2159
FROM HYDROMET AREA
PLANT AIR DISTRIBUTION
265-PI-T-006
1947
FROM ACD SOLUTION PUMPS
284-PP-081/082
284-PI-T-001
2157
FROM PLS FILTER
PRECOAT TANK
291-TK-704
291-PI-T-002
2163
TO PLS FILTER SLUICE TANK
291-TK-707
291-PI-T-002
2155
FROM CAUSTIC BOIL FIRST
BOTTOMS COOLER
288-HX-114
288-PI-T-104
2161
TO PLS TANKS
291-TK-705/706
291-PI-T-003
2162
TO PLS FILTER PRECOAT TANK
291-TK-704
291-PI-T-002
2454
TO ACD FILTRATE
TRANSFER TANK
284-TK-076
284-PI-T-007
2511
FROM 291-LIC-0041
291-PI-T-002
2762
TO COLLECTION DITCH
255-PI-T-007
LAL
LALL
TO FLOOR
OVERFLOW
OVERFLOW
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. REMOVABLE SPLIT COVER.
TO FLOOR
PAH
FAL
VENT TO ATM
(STANDBY)
S/D
V
V
V
FC
V
FC
HV
1005
+
V
FC
V
FC
V
V
V
V
FE
1011
+
FV
1011
+
V
SLOPE
6"x4"6"x4"
291-AG-700
291-TK-700
PLS MIX TANK
291-TK-701
PLS FILTER
FEED TANK
291-AG-700
PLS MIX TANK
AGITATOR
291-PP-701
PLS FILTER
FEED PUMP
291-PP-702
PLS FILTER
FEED PUMP
(STANDBY)
FC
V
V
FC
V
3"-C-22
V
V
V
3"-SPH-15
291-PP-701
291-PP-702
291-FL-701
291-TK-700
291-TK-701
6"x3"
6"x3"
HV
1007
+
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
FILTRATION
291-PI-T-001
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-001MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
SOLVENT EXTRACTION FLOWSHEET291-FS-T-001
INSTRUMENTATION LEGEND, P&ID
PLS
291-PI-T-001
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
07/27/10
RC
DD/JHL
MMB
ZDM / EAD
01/28/11JHLDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND, P&ID000-PI-T-001
4
6"-C-23
6"-C-23
6"-A-15A-GO
HV
1008
+
PCV
1016
+
HV
1009
+
HV
1003
+
HV
1004
+
6"-ASLL-291-052-S1
291-FL-701
PLS FILTER
PACKAGE
291-PP-715
PLS SUBMERSIBLE
SUMP PUMP
FE
0005
+
2"
4"
1"-AA-291-014-L6-PP
-PP
6"-ASLL-291-045-S1
6"-ASLL-291-045-S1
6"-ASLL-291-044-S1
1"-A-15
1"-A-15
1"-A-15
NC
NC
NC
NC
V
V
4"-RW-291-048-L1B
6"-PD-291-025-P1
4"-A-85
2"-A-85
4"-A-15A
8"-PD-291-026-P1
8"-ASLH-291-042-F5
6"-ASLL-291-046-S1
6"-ASLL-291-047-S1
3"-PA-265-148-L8B
6"-ASLL-291-001-S1
6"-ASLL-291-030-S1
1"-A-15
1"-A-15
NC
1"-A-15
NC
6"-A-15-GO
6"-A-15-GO
6"-A-15-GO
NC
4"-A-15
4"-C-224"-A-16A
NC
09-05-2012 9:00:31
V
FC
FC
V
V
291-PK-001
291-PK-001
PLS FILTER
FEED PUMP
SKID PACKAGE
LFF1
291-PP-715
LFF1
LVF1
LVF1
V1Z
3"-A-15A
HV
0024
+
3"-A-15
3"-A-15
V1Z
V1ZV1Z
V1Z HV
0022
+
HV
0021
+
HV
0023
+
6"-PSH-291-003-S1
HV
1001
+
pH
V
3"-A-16A
4"-SPJ-1H
4"-SPJ-1H6"x4"
6"x4"
3"-K-1
3"-C-23
3"-SU-291-024-P7
FV
1010
+
V
HV
1002
+NC
6"x4"
6"-A-16
4"x3"
4"-SPJ-1
LFF1
6"-RW-262-044-L1B
291-PP-703
291-PP-703
PLS FILTER
FEED PUMP
3"x1-1/2"
6"-A-15-GO 6"-A-15-GO
6"-PSH-291-002-S1
3"-SLN-284-003-L5
4"-ASH-284-003-F5
3"-SU-291-020-P73"-SU-291-020-P7
3"x2"
4
4
4
4
M
M
M
M
VFD
VSD
I
PP707M
XU
I PP704M
XU
I
LCS
0047
LSL
0046
PIT
0041
LIT
I
0041
LIC
LALL
LAHH
AG704M
XU
I
LCS
I
0047
LE
0047
LIT
0047
LSH
ILCS
I
AG707M
XU
LCS
LCS
IIBG704M
XU
0046
PI
PAH
PAL
0048
FI
0049
PI
PAH
0049
PIT
0041
LSLL
0049
PSHH
PAHH
BG704M
SIC
M
0048
FIT
0041
LSL
2157
TO PLS FILTER
291-FL-701
291-PI-T-001
2162
FROM PLS FILTER
291-FL-701
291-PI-T-001
2163
FROM PLS FILTER
291-FL-701
291-PI-T-001
2460
TO RESIDUE REPULP TANK
284-TK-071
284-PI-T-005
2166
TO ACD FILTRATE
TRANSFER TANK
284-TK-076
284-PI-T-007
2511
TO PLS FILTER PLC
291-PI-T-001
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 00-PI-T-001.
2. REMOVABLE SPLIT COVER, FRP.
START
STOP
TO FLOOR
TO FLOOR
LAHH
(NOTE 2)
(NOTE 2)
1 M
08-05-2012 17:11:38
291-TK-704
PLS FILTER
PRECOAT TANK
291-AG-704
PLS FILTER PRECOAT
TANK AGITATOR
291-PP-704
PLS FILTER
PRECOAT PUMP
291-TK-707
PLS FILTER
SLUICE TANK
291-AG-707
PLS FILTER SLUICE
TANK AGITATOR
291-PP-707
PLS FILTER
SLUICE PUMP
LVF1
LFF1
291-PP-707
291-TK-707
291-AG-707
LFF1
LFF1
291-TK-704
291-AG-704
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
PRECOAT AND SLUICE
291-PI-T-002
291-SOLVENT EXTRACTION
P & ID
3
2
B
1
0
05/05/12RCMMBAPPOBM
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION
UPDATED & RE-ISSUED FOR CONSTRUCTION
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-002MECHANICAL EQUIPMENT LIST, REV. U000-EL-M-001
SOLVENT EXTRACTION FLOWSHEET291-FS-T-001
INSTRUMENTATION LEGEND, P&ID
PLS FILTER
291-PI-T-002
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
07/27/10
RC
JHL
MMB
ZDM / EAD
01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND, P&ID000-PI-T-001
3
2"-A-15
2"-A-15
NC
3"x1-1/2" 2"x1-1/2"
2"-ASLL-291-034-S1
291-PP-704
4"-A-15A-GO
6"-C-23
6"-PSH-291-003-S1
8"-PD-291-027-P1
4"-A-15A 2"-A-15
2"-A-15
NC
NC
6"-ASLL-291-030-S1
2"-ASLL-291-032-S1
1"-A-15
6"-ASLL-291-052-S1
6"-A-15-GO
1"-A-15
NC
6"-A-15-GO
8"-PD-291-028-P1
4"-A-15A
NC
3"-A-15A
3"-ASLL-291-031-S1
1"-A-15 1"-A-15
NC NC
1"-A-15
8"x4"
3"-A-15A
LFF1
FE
0048
+
NC
1"-A-151"-A-15
NC
1"-A-15
NC
1"-A-15
NC
6"x4" 6"x4"
3"
4"-ASLL-291-051-S1
291-PK-002
291-PK-002
PLS FILTER
PRECOAT PUMP
SKID PACKAGE
6"-ASLL-291-052-S1
6"-ASLL-291-052-S1
M
291-BG-704
291-SC-704
291-CH-704
291-BG-704
PLS FILTER PRECOAT
BAG UNLOADER
291-SC-704
PLS FILTER PRECOAT
SCREW FEEDER
291-CH-704
PLS FILTER PRECOAT
TANK FEED CHUTE
291-HS-704
291-HS-704
PLS FILTER PRECOAT
HOIST
6"x4"
3
3
M
M
VFD
VFD
0085
FIC
FAL
0082
LIT
0083
LIT
0082
LIC
LAHH
0083
LIC
LAHH
LAH
LAL
I
I
I
I
PP706M
XU
PP705M
XU
LCS
LCS
M
0085
FIT
0082
LSL
0089
TE
0088
TE
RTD
0088
TIT
0089
TIT
0089
TI LAH
0088
TI TAH
0083
LSL
I
0085
HS
2164
FROM PLS FILTER
BYPASS
291-PI-T-001
2210
TO E-1 PUMP MIX TANK
291-TK-713
291-PI-T-004
2161
FROM PLS FILTER
291-FL-701
291-PI-T-001
2462
RATIO CONTROL
TO 291-FFIC-0186
291-PI-T-008
2470
MANUAL RATIO CONTROL
TO 291-FDI-0131/0132
291-PI-T-005
LAH
LAL
8" X 8" 8" X 8"
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK
TABLE, 000-LT-I-205, AT A LATER DATE.
TO FLOOR
TO FLOOR
(STANDBY)
SAMPLING
NC
6"-PSH-291-037-S1
291-SA-011
291-SA-011
Mo SX PLS FEED
SAMPLER
NC
NC
1"-SPH-6A
6"-PSH-291-033-S1
1"-A-15
6"-A-15-GO
6"-A-15-GO 6"-A-15-GO
1"-A-15
1"-A-15
6"-A-15-GO
1"-A-15
6"-PSH-291-034-S1
6"-PSH-291-036-S1
6"-PSH-291-002-S1
6"-PSH-291-030-S1
6"-A-15A-GO 6"-A-15A-GO
6"-A-15A-GO
6"-A-15A-GO
6"-A-15A-GO
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
PLS FEED
291-PI-T-003
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/30/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-003
MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
INSTRUMENTATION LEGEND, P&ID
291-PI-T-003
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
08/20/10
RC
JHL
MMB
ZDM / EAD
01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND, P&ID000-PI-T-001
4
FE
0085
+
NC NC
NC
NC
NC
NC
NC
4" 4"
6"-PSH-291-037-S1
291-PP-705
291-PP-706
291-PP-705
PLS FEED PUMP
291-PP-706
PLS FEED PUMP
(STANDBY)
6"-PSH-291-032-S1
6"-A-15-GO6"-C-23
6"-C-23
6"-A-15-GO
1"-A-15
1"-A-15
6"x4"
6"x4"
28-04-2012 13:58:28
6"-ASLL-291-001-S1
6"-PSH-291-035-S1
6"-A-15-GO
6"-PSH-291-031-S1
1"-A-15
1"-A-15
NC
NC
291-PK-003
291-PK-003
PLS FEED PUMP
SKID PACKAGE
PP
3"-A-15A
LVF1
6"-A-15A-GO
LVF1
NC
3"-A-15A
291-TK-705 291-TK-706
291-TK-705
PLS TANK
291-TK-706
PLS TANK
6"x4" 6"x4"
8"-PD-291-029-P1
RTD
6"-PSH-291-002-S1
6"-PSH-291-002-S1
8"-PD-291-030-P1
3029
(VENDOR FOAM SYSTEM)
FROM SX PLANT
S/D INTERLOCK
(NOTE 2)
S/D
S/D
S/D
3
3
6"-SPJ-1H
6"-SPJ-1H
4
4
4
4
M M
VFD VFD
M M
VFDVFD
AQ OR AQ OR
(NOTE 3)
LCSLCS II
I
I
0111
CI CAH
I
I
0113
LSHH
LAL
0113
LS
AG711M
XU
AG710M
XU
I
LCS
AG714M
XU
AG713M
XU
LCSI
0115
LS
0115
LSHH
LAL
I
I
0120
LIT
PP710M
XU
0120
LE
I
0120
LAH
0120
LI
ILCS
AG710M
SIC SAH
SAL AG711M
SIC SAH
SAL AG713M
SIC SAH
SAL
AG714M
SIC SAH
SAL
0111
CE
0111
CIT
0114
CI CAH
0114
CIT
0114
CE
0112
CI
0112
CE
0112
CIT
0116
CE
0116
CIT
0116
CI
0118
LE
0118
LIT
0118
LI
0117
LI
0117
LE
0117
LIT
2219
TO SCRUB MIX TANK
291-TK-716
291-PI-T-005
2222
TO EXTRACTION
CRUD TANK
291-TK-738 VIA
291-PI-T-005
2210
FROM PLS FEED PUMPS
291-PP-705/706
291-PI-T-003
2225
FROM BARREN ORGANIC
PUMPS
291-PP-733/734
291-PI-T-008
2252
TO EXTRACTION CRUD TANK
291-TK-738
291-PI-T-014
2253
TO RAFFINATE TANKS
291-TK-707/709
291-PI-T-010
2434
FROM RAFFINATE ORGANIC
RECOVERY PUMP
291-PP-745
291-PI-T-010
2435
TO RAFFINATE
DIVERSION BOX
291-DI-708
291-PI-T-010
2691
VIA COLLECTION DITCH
TO EMERGENCY POND
255-PD-001
255-PI-T-007
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. ORGANIC RECOVERY DISCHARGE TO SETTLER
FEED LAUNDER.
3. SEE MECHANICAL DRAWINGS FOR WEIR ACCESS
HATCH DETAILS.
LAH
LAHH LAHH
LAH
(NOTE 2)
( NOTE 3)
M
CAH
CAL
TO SX PLANT
S/D INTERLOCK
TO SX PLANT
S/D INTERLOCK
3"-SPH-20
3"-C-23
3"x2"
NC
2"-A-15
2"-A-15
NC
2"-A-15
NC
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
EXTRACTION
291-PI-T-004
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-004
MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
INSTRUMENTATION LEGEND P&ID
MOLYBDENUM
291-PI-T-004
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
08/25/10
RC
JHL
MMB
ZDM/EAD
01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND P&ID000-PI-T-001
4
6"-PSH-291-037-S1
2"
4"-A-15
2"-A-15
NC
NC
6"-B-4-GO-E72
6"-B-4-GO-E72
NC
291-AG-710
4"-A-15
6"-B-4-GO
6"-B-4-GO
291-TK-712
291-TK-711291-TK-710
291-AG-711 291-AG-713
6"-B-4-GO
6"-B-4-GO-E72
291-TK-715
6"-B-4-GO
4"-A-15
4"-A-15
291-AG-714
291-TK-713
2"-A-15
6"-B-4-GO-E72
291-TK-714
NC
NC
NC
NC
2"-A-15
6"-WBO-291-004-S1
6"-WBO-291-005-S1
4"-LO-291-060-S1
6"-PSH-291-004-S1
6"-LO-291-001-S1
6"-ABS-291-010-S1
4"-LO-291-002-S1 6"-LO-291-003-S1
6"-ABS-291-010-S1
2"-ACC-291-001-S1
2"-ACC-291-002-S1
2"-ACC-291-001-S1
4"-B-4-GO-E72
NC
4"-B-4-GO-E72
NC
3"-ACC-291-020-S1
3"-ABS-291-007-S1
NC
NC
NC
1"-A-15
1"-A-15
291-PP-710
3"-A-15
3"-A-15
LFF1
6"-B-4-GO
NC
4"-ABS-291-013-S1
6"-PSH-291-014-S1
6"-PSH-291-009-S1
6"-B-4-GO
6"-B-4-GO
6"-B-4-GO
NC
NC
NC
291-TK-710
E-2 PUMP MIX
TANK
291-AG-710
E-2 PUMP MIX
TANK AGITATOR
291-TK-711
E-2 AUXILIARY
MIX TANK
291-AG-711
E-2 AUXILIARY
MIX TANK
AGITATOR
291-TK-712
E-2 SETTLER
TANK
291-TK-713
E-1 PUMP
MIX TANK
291-AG-713
E-1 PUMP
MIX TANK
AGITATOR
291-TK-714
E-1 AUXILIARY
MIX TANK
291-AG-714
E-1 AUXILIARY
MIX TANK
AGITATOR
291-TK-715
E-1 SETTLER
TANK
SLOPE
LVF1 LVF1 LVF1 LVF1
07-05-2012 14:59:32
1"-A-15
NC
1"-A-15
NC
2"-SPH-6A
3"-ABS-291-003-S1
291-PP-710
SX EXTRACTION
SUBMERSIBLE SUMP PUMP
3"-A-15
3"-A-15
3"-A-15
3"-ACC-291-020-S1
3"-ABS-291-007-S1
2"-SPH-6A
NC
4
4
4
4
4 4
VFD
MM M M
VFD VFD VFD
AQ OR
( NOTE 2)
AQ OR
0123
LSHH
0124
AI
AAL
AAH
0123
LI
LAL
0123
LE
0127
LE
0123
LIT
0127
LIT
0128
AE
0124
AIT
0128
AIT
0124
AE
0128
AIC
AAH
AAL
0127
LI
LAHH
LAH
0121
CE
0125
CE
0125
CIT
M
0121
CIT
I
I
LCS
AG717M
XU
I
LCS
AG719M
XU
I
AG720M
XU
I
LCSI
0131
FIT
0122
CI CAH
0122
CIT
0122
CE
M
0129
FIT
0129
FI
0130
FIT
0130
FIC
0121
CI
CAH
0125
CI CAH
0127
LSHH
I
I LCS
AG716M
XU
0126
CI
CAL
0126
CE
0126
CIT
0131
FI FAH
FAL
M
0132
FI
FAL
FAH
M
0131
FD
FDAL
0132
FD
FDAL
AG716M
SIC
AG717M
SIC
AG719M
SIC
AG720M
SIC
0128
HIC
0131
HIC
0132
HIC
0132
FIT
2219
FROM E-1 SETTLER TANK
291-TK-715
291-PI-T-004
2220
FROM LOADED ORGANIC
SCRUB WATER PUMPS
291-PP-725/726
291-PI-T-013
2222
FROM ACID CRUD
COLLECTION PUMP
291-PP-738
291-PI-T-004
2215
TO SCRUB 1
PUMP MIX TANK
291-TK-722
291-PI-T-006
2216
TO RAFFINATE TANKS
291-TK-708/709
291-PI-T-010
2218
TO EXTRACTION CRUD
TANK
291-TK-738
291-PI-T-014
2467
TO 291-PP-725/726
291-PI-T-013
2469
FROM SCRUB AQUEOUS
METERING PUMP
291-MP-749
291-PI-T-006
2470
PLS FEED
FROM 291-FIC-0085
291-PI-T-003
2635
FROM SODIUM HYDROXIDE
METERING PUMP
284-MP-711
284-PI-T-006
2636
TO SODIUM HYDROXIDE
METERING PUMPS
284-MP-711/712
284-PI-T-006
SAMPLING
SAMPLING
NOTES:
1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001
2. AQUEOUS ADVANCE INTAKE THROUGH A STAND PIPE IN AQ WEIR.
3. VORTEX BREAKER LOCATED IN AQ RECYCLE INTAKE.
4. AQUEOUS RECLAIM DISCHARGE INTO SETTLER FEED LAUNDER.
5. SEE MECHANICAL DETAIL DRAWINGS FOR WEIR ACESS DETAILS.
LAH
LAL
DRAIN
LAHHTO SX PLANT
S/D INTERLOCK
TO SX PLANT
S/D INTERLOCK
TO SX PLANT
S/D INTERLOCK
TO SX PLANT
S/D INTERLOCK
( NOTE 3) ( NOTE 3)( NOTE 2)
(NOTE 4)
FDAH
FDAH
RATIO SP
RATIO SP
COLLECTION
WAND
(TYPICAL )
pH
pH
pH
pH
pH
pH
07-05-2012 8:56:13
FE
0130
+
291-TK-721
SCRUB 2
SETTLER TANK
291-TK-719
SCRUB 2 PUMP
MIX TANK
291-TK-718
SCRUB 1
SETTLER TANK
291-TK-717
SCRUB 1 AUXILIARY
MIX TANK
291-TK-716
SCRUB 1 PUMP
MIX TANK
291-AG-716
SCRUB 1 PUMP
MIX TANK
AGITATOR
291-TK-716
4"-LO-291-008-S1
NC
2"-ACC-291-001-S1
6"-LO-291-006-S1
2"-CSS-291-004-S1
2"-CSS-291-004-S1
6"-LO-291-006-S1
3"-SSS-291-026-S1
2"-LCD-291-044-S1
2"-ACC-291-003-S12"-ACC-291-003-S1
2"x1"
291-SA-013
291-SA-013
SCRUB RAFFINATE
SAMPLER
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
SCRUB
291-PI-T-005
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-005
MECHANICAL EQUIPMENT LIST REV. T000-EL-M-001
INSTRUMENTATION LEGEND P & ID
LOADED ORGANIC
291-PI-T-005
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
08/06/10
RC
JHL
MMB
ZDM
01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND P & ID000-PI-T-001
4
2"-ACC-291-004-S1
SLOPE
291-AG-716
291-TK-717
291-AG-717
291-TK-718
291-TK-719
291-AG-719 291-TK-720
291-AG-720
291-TK-721
291-AG-720
SCRUB 2 AUXILIARY
MIX TANK
AGITATOR
291-AG-717
SCRUB 1 AUXILIARY
MIX TANK
AGITATOR
291-TK-720
SCRUB 2 AUXILIARY
MIX TANK
291-AG-719
SCRUB 2 PUMP
MIX TANK
AGITATOR
FE
0129
+
2" 2"
2"x1"
1/2"-A-37
NC
2"-A-15 2"-A-15
NC
2"-SPH-6A
6"-LO-291-003-S1
2"-CSS-291-004-S1
6"-SSS-291-028-S1
4"-LO-291-008-S1
2"-CSS-291-004-S1
6"-LO-291-010-S1
2"-ACC-291-004-S1
2"-A-15
6"-B-4-GO-E72
3"-B-4-GO
6"-B-4-GO
6"-B-4-GO-E72
4"-B-4-GO-E72 2"-A-15
2"-A-15
2"-A-15
3"-A-15
6"-B-4-GO
6"-B-4-GO
4"-A-15
4"-A-15
2"-A-15
6"-B-4-GO
2"-A-15
NC
NC
NC
NC
NC
NC
NC
NC
NC
2"-A-15
6"-B-4-GO
NC
NC
NC
NC
2"-A-15
NC
6"-LO-291-009-S1
6"-LO-291-004-S1
3"-SSS-291-026-S1
V
FE
0131
+
FE
0132
+
LVF1
LVF1
LVF1 LVF1
1"-A-15
NC
1"-A-15
NC
1"-C-10
2"-C-10
V
291-MX-701
291-MX-701
SODIUM HYDROXIDE
IN LINE MIXER
1"-A-15
2"-SH-291-016-S1
1"-CSS-291-001-S1
2"-LCD-291-037-S1
2"-C-10
6"-SSS-291-024-S1
2"-A-15
6"-B-4-GO-E72
2"-E-18
1"-SH-284-019-S1
1"-A-15
NC
1"-A-15
NC
4"-B-4-GO-E72
NC
2"-A-15
2"-C-10
2"-A-15
6"-B-4-GO-E72
1"-A-15
NC
2"-SPH-6A
4"-LO-291-005-S1
6"-SSS-291-024-S1
3"-SSS-291-026-S1
4"-LO-291-005-S1
2"-A-15
291-PP-738
291-PP-738
ACID CRUD
COLLECTION PUMP
2"-ACC-291-001-S1
2"x1"
2"x1"
6"x4"6"x4" 6"x4"6"x4"
SLOPE
6"-B-4-GO 6"-B-4-GO
NC 2"-A-15
NC
4
4
M
M
VFD
VFD
M
VSD
M M
0141
LIT
0141
LIC
0141
LE
LCS
PP747M
XU
LCS
I
I
PP748M
XU
I
S/D
I
0142
FIC
FAH
FAL
0142
FIT
0144
PIT
0144
PSHH
0145
PSHH
0145
PIT
0145
PI
0144
PI
0143
LG
2"
I MP749M
XU
LCS
I
0120
HIC
0142
HIC
M
0146
FI
0146
FI
0146
FIQ
VENT
2215
FROM SCRUB 2 SETTLER
291-TK-721
291-PI-T-005
2436
TO S-1 PUMP MIX TANK
291-TK-723
291-PI-T-011
2469
TO SCRUB 2
SETTLER TANK
291-TK-721
291-PI-T-005
2520
TO S-2 AQUEOUS ADVANCE PUMPS
291-PP-730/731
291-FIC-0169
291-PI-T-007
2519
W-1 AQUEOUS RECYCLE
291-FIC-0188
291-PI-T-008
2517
TO BARREN ORGANIC
WASH WATER PUMPS
291-PP-727/728
291-PI-T-013
2"
ISOTAINER LAHH
LAH
LAL
(STANDBY)
(NOTES 3 & 4)
2"-A-15
291-PP-795 291-PP-796
291-PP-795
REAGENT DRUM PUMP
291-PP-796
REAGENT DRUM PUMP
291-PP-747
LOADED ORGANIC
PUMP
291-PP-748
LOADED ORGANIC
PUMP
(STANDBY)
291-PP-794
291-PP-794
DILUENT PUMP
AND METERING SKID
1"-CSS-291-001-S1
2"-C-10
V
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
AFTER SETTLER TANK
291-PI-T-006
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-006
MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
INSTRUMENTATION LEGEND P & ID
LOADED ORGANIC
291-PI-T-006
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
01/28/11
RC
JHL
MMB
ZDM/MKM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001
4
FE
0146
+
1"-SPH-20 1"-SPH-20
3"-SPH-20
1"-A-15 1"-A-15
3"-A-15
08-05-2012 17:28:03
291-TK-747
291-TK-747
LOADED ORGANIC
AFTER SETTLER TANK
LVF1
NC
NC
6"-A-15
1"-A-15
1"-A-15
6"-A-15
291-PP-748
291-PP-747
FE
0142
+
3"-A-15
4"-A-15
NC
NC
4"-SPH-6A
3"-SPH-6A
NC
NC
6"-LO-291-010-S1
6"-B-4-GO
4"-A-151"-A-15
NC
6"-SLO-291-007-S1
6"-SLO-291-008-S1
6"-SLO-291-009-S1
6"-A-156"-C-23
1"-A-15
6"-A-15 6"-A-15
6"-A-15
6"-A-15
6"-A-15
1"-A-15
NC
NC
6"x4"
6"x4"
6"-C-23
1"-A-15
1"-A-15
NC
LVF1
1"-SPH-6A
1"-SPH-6A
1"-SPH-6A
1"-SPH-6A
1"-TAE-291-001-S1 1"-TAE-291-002-S1
3"-DIL-291-001-S1
291-PK-794
DILUENT PUMP AND
METERING SKID PACKAGE
LFF1
NC
1"-SPH-6A
1"-SPH-6A
NC
291-MP-749
291-MP-749
SCRUB AQUEOUS
METERING PUMP
4"-SPH-6A
NC
6"-SPJ-1H
6"-SPJ-1H
2"
2491
FROM BARREN ORGANC PUMPS
291-PP-733/734
291-FFIC-0186
291-PI-T-008
(NOTE 3)
(NOTE 2)
(NOTE 2)
291-PK-004
LOADED ORGANIC
PUMP
SKID PACKAGE
291-PK-004
1"-A-151"-C-10
1"-A-15
1"-CSS-291-005-S1
1"-CSS-291-005-S1
2"x1"
2"x1"
M
2"-TAE-291-003-S1
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. PUMPS START AUTOMATICALLY WITH BARREN ORGANIC PUMPS.
3. TANK IS DRAINED TO EXTRACTION CRUD SUMP (291-PP-721) VIA
CONDUCTIVE STAINLESS STEEL BRAIDED HOSE.
4. SCRUB AQUEOUS METERING PUMP SUCTION AND DRAIN NOZZELS
ARE LOCATED AT THE BOTTOM OF THE TANK.
5. ALL REAGENT CONTAINERS AND UNLOADING ELEMENTS NEED TO
BE BONDED AND GROUNDED.
6. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE.
I LCS
3"x1"
I
PP794M
XU
LFF1291-PK-794
3"-DIL-291-002-S1
3030
(VENDOR FOAM SYSTEM)
FROM SX PLANT
S/D INTERLOCK
S/D
(NOTE 6)
S/D
6"-SLO-291-006-S1
1-1/2"x1"
1-1/2"x1"
3"x1/2"
4
4
4
4
4
4
VFDVFD
M M
M
M
VFD
VFD
M
VFD
AG728M
XU
LCSI
0163
CI
CAL
LCS
LCS I PP730M
XU
LCS
0160
LI
LAH
LAL 0160
LE
I
M
M
0169
FIT
0169
FIC FAH
FAL
0169
HIC
0162
HIC
I
PP731M
XU
AG727M
XU
0165
CIT
LCS
0165
CE
I
0165
CI
CAL
0163
CIT
0163
CE
LCS I
0162
FIT
0162
FIC
0167
LE
0167
LIT
0167
LI
LAHH
LAL
0168
LIT
0168
LIC
LAHH
0168
LE
PP714M
XU
0167
LSHH
I
I
TM730M
XU
LCS
AG727M
SIC SAH
SAL AG728M
SIC SAH
SAL
TM730M
SIC SAH
SAL
0168
LSHH
0160
LIT
0167
LI
2386
FROM W-1 TANKS
291-PI-T-0082387
TO S-1 STRIP
291-PI-T-011
2389
FROM BARREN ORGANIC
WASH WATER PUMPS
291-PP-727/728
291-PI-T-013
2390
TO STRIP S-1 PUMP
MIX TANK
291-TK-723
291-PI-T-011
2396
FROM AQUA
AMMONIA PUMPS
291-PP-765/766
291-PI-T-011
2392
FROM W-1 AQUEOUS
ADVANCE PUMPS
291-PP-776/777
291-PI-T-008
2698
TO RAFFINATE TANK
291-DI-708
291-PI-T-010
2699
VIA COLLECTION DITCH
TO EMERGENCY POND
255-PD-001
255-PI-T-007
2394
TO STRIP CRUD
COLLECTION TANK
291-TK-737
291-PI-T-014
2399
TO WASH W-1 PUMP
MIXER TANK
291-TK-731
291-PI-T-008
2400
FROM STRIP S-1
CLARIFIER SETTLER TANK
291-TK-726
291-PI-T-011
2403
TO STRIP CRUD
COLLECTION TANK
291-TK-737 VIA
291-PI-T-0112417
FROM V-1 CLARIFIER
SETTLER TANK
291-TK-733
291-PI-T-008
2518
FROM 291-FIC-0262
291-PI-T-012
2520
FROM LOADED ORGANIC FLOW
291-FIC-0142
291-PI-T-006
TO SX PLANT
S/D INTERLOCK
TO SX PLANT
S/D INTERLOCK
LAH
(STANDBY)
NOTE:
1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001
LAH
LAL
LALL
DRAIN
FAH
FAL
M
291-TK-727
291-AG-728
291-PP-714
291-PP-714
SX STRIP
SUMP PUMP
3"-A-15 3"-A-15
3"-B-4
2"-A-15
4"-B-4-GO-E72
3"-RS-291-002-S1
4"-SBO-291-19971-S1
4"-AMS-291-025-S1
4"-PV-291-018-P1
3"-PV-291-019-P1
3"-PV-291-017-P1
3"-PV-291-016-P1
4"x2"4"x2"
1"-A-15
291-AG-727
S-2 PUMP MIX
AGITATOR
291-TK-727
S-2 PUMP
MIX TANK
291-AG-727
291-TK-728
291-TK-728
S-2 AUXILIARY
MIX TANK
291-AG-728
S-2 AUXILIARY MIX
AGITATOR
FE
0169
+
FE
0162
+
3"-AMS-291-008-S1
3"x2"
291-PK-005
291-PK-005
S-2 AQUEOUS
ADVANCE PUMP
SKID PACKAGE
6"-PV-291-015-P1
1"-LCD-291-005-S1
2"-AMC-291-001-S1
3"-PV-291-016-P1
4"-PV-291-018-P1
4"-A-15
4"-AMS-291-027-S1
3"-AMS-291-008-S1
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
S-2 STRIP
291-PI-T-007
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-007
MECHANICAL EQUIPMENT LIST, REV.T000-M-EL-001
INSTRUMENTATION LEGEND P & ID
291-PI-T-007
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
01/28/11
RC
JHL
MMB
ZDM/MKM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P-& ID000-PI-T-001
4
4"-B-4-GO-E72
3"-B-11
3"-B-11
3"-B-11
4"-B-11
3"-B-11
NC
NC
NC
NC 4"-AMS-291-026-S1
3"-AMS-291-029-S1
FV
0262A
+
V6
LFF1
2"-AQA-291-059-S1
3"-AMS-291-036-S1
3"-AMS-291-037-S1
291-CO-714
291-CO-714
STRIP SUMP COVER
3"-SPH-6A
LVF1
LVF1
3"-C-23
3"-C-23
NC
NC
NC
NC
3"-A-15
1"-A-15
291-PP-730
1"-A-15
291-PP-731
1"-A-15
1"-A-15
3"-SPJ-1H
3"-SPJ-1H
3"-A-15
4"-A-15
3"x1-1/2"
4"x3"
3"x1-1/2"
4"x3"
32 CM
INSPECTION
FLANGE
291-TK-730
S-2 CLARIFIER
SETTLER TANK
291-TM-730
S-2 SETTLER
MECHANISM
291-PP-731
S-2 AQUEOUS
ADVANCE PUMP
(STANDBY)
291-PP-730
S-2 AQUEOUS
ADVANCE PUMP
291-TK-776
S-2 SETTLER
AQ OVERFLOW TANK
291-TK-730
291-TM-730
291-TK-776
FV
0162
+
6"-SBO-291-001-S1
2"-AMC-291-001-S1
2"-AMC-291-002-S1
2"-A-15
NC
2"-SPH-6A
2"-A-15
NC
2"-SPH-6A
6"-B-4-GO
6"-B-4-GO-E72
NC
2"-A-15
6"-SLO-291-010-S1
6"-B-4-GO-E72
6"-SLO-291-011-S1
3"-B-4-GO
NC
3"-B-4-GO
3"-AMS-291-028-S1
4"-A-15
07-05-2012 10:17:19
2"-A-15
2"-A-15
NC
NC
3"-C-23
SLOPE
3"-PV-291-014-P1
2" 2"
1"-A-15
NC
3"-SPH-6A
V6
LVF1 LVF1
LVF1
NC
291-MX-727
291-MX-727
S-2 NH3
INLINE MIXER
V6
4"-B-4-GO-E72
3"-AMS-291-005-S1
3"-AMS-291-020-S1
3"-A-153"-A-15
3"-A-15
NC
2"x1"
1"-A-15
NC
NC
NC
3"x2" 3"x2"
V
V
4
4
I I
I
I
I
M
VFD
M
M
M
VFD
M
M
M
VFD VFD
VFD
VFD
VFD
I
I
M
LCS
I
S/D
LCS
LCS
0188
FIT
0189
FIT
0183
LSHH
LCS
0181
CI
CAL
AG732M
XU
AG731M
XU
0181
CE
LCS
0186
HIC
M
0188
HIC
0186
FIT
0186
FIC
I PP733M
XU
I ILCS
PP734M
XU
I
I
I
LCS
I
I
PP777M
XU
0183
LIT
LCS
0183
LE
II
0187
FIC
0187
FIT
0187
FI
M
M
I
0188
FIC
FAH
FAL
0182
CE
0190
FIC
0189
FIC
0190
FIT
AG731M
SIC SAH
SAL
0184
LIC LAH
AG732M
SIC SAH
SAL
0184
LIT
PP776M
XU
0184
LE
0181
CIT
0182
CI
CAL
0182
CIT
0185
LIT
0185
LI
LAHH
0185
LSLL
LCS I
TM733M
SIC
SAL
SAH
I
TM733M
XU
0192
PIT
0192
PSHH
0191
PSHH
0191
PIT
0185
LSHH
0194
LG
0192
PI
0191
PI
0189
FI
2421
FROM STRIP CRUD SUMP PUMP
291-PP-722
291-PI-T-014
2386
TO S-2 STRIP
291-PI-T-007
2637
TO 291-FIC-0283
291-PI-T-013
2392
TO S-2 PUMP MIX TANK
291-TK-727
291-PI-T-007
3031
(VENDOR FOAM SYSTEM)
FROM SX PLANT S/D INTERLOCK
(NOTE 3)
2225
TO E-2 PUMP MIX TANK
291-TK-710
291-PI-T-004
2399
FROM S-2 CLARIFIER
SETTLER TANK
291-TK-730
291-PI-T-007
2417
TO STRIP CRUD
COLLECTION TANK VIA
291-TK-737
291-PI-T-007
2419
FROM BARREN ORGANIC
WASH WATER PUMPS
291-PP-727/728
291-PI-T-013
2426
FROM ORGANIC HOLDING
TANK PUMP
291-PP-741
291-PI-T-015
2462
FROM 291-FIC-0085
291-PI-T-003
2491
TO 291-FIC-0142 RATIO CONTROL
291-PI-T-006
2497
TO ORGANIC HOLDING TANK
PUMP 291-PP-741
291-PI-T-016
2519
FROM LOADED ORGANIC FLOW
291-FIC-0142
291-PI-T-006
2521
TO 291-FIC-0262 RATIO CONTROL
291-PI-T-012
2590
FROM PURIFICATION WASH
RETURN PUMPS
292-PP-780/781
292-PI-T-007
2638
TO 291-FIC-0283
291-PI-T-013
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. AQUEOUS RETURN FROM CRUD PLANT DISCHARGES
INTO SETTLER FEED LAUNDER.
3. TO BE SPECIFIED BT AKER SOLUTIONS INTERLACK TABLE.
(NOTE 2)
(STANDBY)
(STANDBY)
LAHH
LAH
LAL
S/D
LAL
LALL
LAH
PAHH
PAH
PAHH
PAH
LAHH
LAL
LALL
TO S/D
INTERLOCK
TO S/D
INTERLOCK
RSP
COLLECTION
WAND
S/D
S/D
FE
0190
+
NC
NC
3"-A-15
4"-A-15
2"-SPH-6A
3"-SPH-6A
6"-WBO-291-004-S1
4"-AMS-291-034-S1
3"-AMS-291-035-S1
3"-AMS-291-036-S1
4"-AMS-291-033-S1
291-PK-006
291-TK-731
WASH W-1 PUMP
MIXER TANK
291-AG-731
W-1 PUMP MIXER
TANK AGITATOR
291-TK-732
WASH W-1 AUXILIARY 1
MIXER TANK
291-AG-732
W-1 AUXILIARY MIXER
TANK AGITATOR
291-TK-733
W-1 CLARIFIER
SETTLER TANK
291-PP-737
AMMONIA CRUD
COLLECTION PUMP
291-TM-733
W-1 SETTLER
MECHANISM
291-TK-777
W-1 SETTLER
AQ OVERFLOW TANK
3"-AMS-291-043-S1
4"x2"4"x2"
1"-A-15
NC
4"-B-4-GO-E72
3"x2" 3"x2"
6"-WBO-291-002-S1
6"-WBO-291-003-S1
6"-WBO-291-001-S1
6"-WBO-291-004-S1
2"-LCD-291-045-S1
4"-PV-291-023-P1
HV
0197
+
HV
0198
+
V1ZV1Z
291-PK-007
2"-A-15
2"-A-15
NC
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
ORGANIC WASH
291-PI-T-008
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/05/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-008
MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
INSTRUMENTATION LEGEND P & ID
W-1
291-PI-T-008
02/03/11RCJHLDDZDMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
01/28/11
RC
JHL
MMB
ZDM/MKM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001
4
NC
3"-B-11
3"-B-11
4"-B-11
3"-B-11
3"-WBO-291-009-S1
2"-ACO-292-056-S1
3"-ABS-291-061-S1
2"-AMC-291-001-S1
2"-LCD-291-041-S1
4"-WBO-291-010-S1
6"-SBO-291-001-S1
2"-AMC-291-003-S1
6"-PV-291-020-P1
3"-AMS-291-036-S1
3"-PV-291-021-P1
3"-PV-291-022-P1
3"-PV-291-024-P1
291-TK-777
291-TM-733
291-TK-733291-TK-732
291-AG-731
LVF1
LVF1
4"x1-1/2"
6"-B-4-GO-E72
291-TK-731
291-AG-732
NC
291-PP-777
NC
NC
NC
1"-A-15
1"-A-15
1"-A-15
1"-A-15
1-1/2"-SPJ-1H
1-1/2"-SPJ-1H
2-1/2"x1"
4"x1-1/2"
2-1/2"x1"
2-1/2"-C-23
2-1/2"-C-23
FE
0188
+
291-PP-776
FE
0189
+
LVF1
LVF1
6"-SPJ-1H
6"-SPJ-1H
6"-C-23
6"-C-23
6"x4"
6"x4"
291-PP-733
1"-A-15
NC
1"-A-15
NC
1"-A-15
NC1"-A-15
NC
6"-A-15-GO
6"-A-15-GO
6"-A-15-GO
291-PP-734
V6
FV
0188
+
V6
FV
0187
+
FE
0186
+
V6 FV
0189
+
291-TK-734
6"-A-15-GO
2"-A-15
6"-B-4-GO-E72
4"-B-4-GO-E72
291-PP-737
3"-AMS-291-042-S1
6"-WBO-291-006-S1
2"-SPH-6A
2"-A-15
NC
3"-B-4
3"-A-15
1"-A-15
2"-A-15
2"x1/2" 2"x1/2"
2"-A-15
NC
NC
2"
2"
NC
4"-A-15
4"-B-4-GO
6"-B-4-GO
NC
1"-A-15
6"-A-15-GO
1"-A-15
2"-A-15
LVF1 LVF1
05-05-2012 10:50:11
NC
4"-AMS-291-038-S1
2"-A-15
4"-B-4-GO-E72
NC
NC
NC
2"-A-15
V1Z
V1Z
HV
0199
+
HV
200
+
FE
0187
+
3"-A-15
2"-A-15
NC
SLOPE
V
291-TK-734
BARREN ORGANIC
TANK
291-PP-733
BARREN ORGANIC
PUMP
291-PP-734
BARREN ORGANIC
PUMP
(STANDBY)
291-PK-006
BARREN ORGANIC
PUMP
SKID PACKAGE
291-PP-776
W-1 AQUEOUS
ADVANCE PUMP
291-PP-777
W-1 AQUEOUS
ADVANCE PUMP
(STANDBY)
291-PK-007
W-1 AUQEOUS
ADVANCE PUMP
SKID PACKAGE
2"x1/2"
2"x1/2"
3"-A-15
2"-A-15
2"-A-15
4
0183
LI
4
3"x2-1/2"
4
4
3"x2-1/2"
4 4
4
4
4
4
V
V
0183
LI
VFD
VFD
M
MM
LCS
PP751M
XU
ILCS
PP752M
XU
LCS I
I I
I
IPP743M
XU
I LCSI LCS
0201
LI LAHH
LALL 0201
LIT
0201
LE
0202
LIC LAHH
LALL
0202
LIT
0202
LE
0201
LSHL
0207
FIT
0207
FIC
0021
LI
0021
LAHL
PP759M
XU
0021
LIT
LCS I
I
0021
LE
2227
TO PURIFICATION SURGE
TANKS
292-TK-757/758
292-PI-T-001
1815
FROM PLANT AIR
DISTRIBUTION
265-PI-T-006
2743
TO PURIFICATION
SURGE TANKS
292-TK-757/758
292-PI-T-001
2744
TO P-1 PURFICATION TANK
292-TK-752
292-PI-T-002
2413
STRIP RICH
AQUEOUS PUMPS
291-PP-735/736
291-PI-T-011
NOTE:
1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001
M
3"-A-15
3"-A-15
3"-A-15
NC
NC
NC
3"-RS-291-024-S1
3"-RS-291-012-S1
3"-C-233"-PV-291-002-P1
291-ZM-735
291-ZM-735
STRIP ORGANIC
RECOVERY SPARGER
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
AND ORGANIC RECOVERY
291-PI-T-009
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/02/12RCMMBAPPOBM
09/14/11RCJHLJHLCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-009
MECHANICAL EQUIPMENT LIST R, REV. T000-EL-M-001
INSTRUMENTATION LEGEND & P & ID
SX AMMONIA SCRUBBER
291-PI-T-009
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
01/28/11
RC
JHL
MMB
ZDM/MKM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001
4
2"-A-15
1"-A-15
NC
1"-A-15 2"-A-15
4"-RS-291-004-S1
3"-RS-291-005-S1
3"-RS-291-011-S1
4"x3"
3"-SPJ-1H
3"-SPJ-1H
3"x1-1/2"
3"x1-1/2"
NC
4"x3"
4"-A-15
1"-A-15
1"-A-15
1"-A-15
NC
1"-A-15
NC 3"-A-15
3"-C-23
NC
3"-A-15
LVF1
LVF1
3"-C-23
3"-A-15
NC
NC
3"x1-1/2"
3"x1"
1"-A-15
1-1/2"-SPJ-1H
291-PP-743
291-PP-743
STRIP ORGANIC
RECOVERY PUMP
291-TK-735
STRIP RICH
AQUEOUS TANK
291-TK-735
291-PP-752
PURIFICATION
FEED PUMP
(STANDBY)
291-PP-751
PURIFICATION
FEED PUMP
291-PP-751
3"-RS-291-021-S1
3"-RS-291-016-S1
2"-RS-291-017-S1
3"-RS-291-015-S1
3"-RS-291-006-S1
4"-A-15
LVF1
3"-A-15
01-05-2012 12:51:27
NC
4"-A-15
2"-A-15
2"-C-10
FE
0207
+ FV
0207
+
V6 PCV
0210
+
291-PP-752
4"-PV-291-015-P1
NCNC
3"-SPH-6A
292-PP-759
LFF1
292-PP-759
PURIFICATION
SUBMERSIBLE
SUMP PUMP
2501
TO S-1 AUXILARY
MIX TANK LAUNDER
291-TK-724
291-PI-T-011
2432
TO STRIP CRUD TANK
291-TK-737
291-PI-T-014
3"-PD-291-031-P1
2" 2"
3"-B-11
3"-B-11
NC
3"-RS-291-011-S1
3"-PV-291-041-P13"-PV-291-041-P1
292-CO-759
292-CO-759
PURIFICATION
SUMP COVER
2429
TO AMMONIA VENT
291-PI-T-012
(STANDBY)
291-PK-015
4"-RS-291-003-S1
3"-RS-291-006-S1
291-PK-015
PURIFICATION
FEED PUMP
SKID PACKAGE
3001
TO COLLECTION DITCH
EMERGENCY POND
255-PD-001
255-PI-T-007
3"x2"
3"-PA-265-117-L8B
2"-PA-265-076-S1
3"x2"
3039
TO SX CRUD FILTER
291-FL-702
291-PI-T-015
3"-PA-265-117-L8B
4
VFD
VFD
M
M
VFD
M
0225
FIC
0225
FIT
0224
FIT
0221
LE
0222
LE
LAHH
LAH
I
I
0222
LIT0221
LIT
0224
FIC
FAL
0222
LIC
LAL
0221
LIC
LAL
0223
PIT
LCS
LCS
PP708M
XU
PP709M
XU
I
I
0226
FIC
0226
FIT
PP745M
XU
LCS
I
I
0223
PI
PAL
PAH
M
0227
LIC LAHH
0227
LE
0227
LIT
2698
FROM S-2 STRIP SUMP PUMP
291-PP-714
291-PI-T-007
2216
FROM SCRUB-1 SETTLER
291-TK-718
291-PI-T-005
2253
FROM SX EXTRACTION
SUMP PUMP
291-PP-710
291-PI-T-004
2434
TO E-2 SETTLER
291-TK-712
291-PI-T-004
2435
FROM E-2 SETTLER
291-TK-712
291-PI-T-004
2444
TO GYPSUM SEEDING TANK
285-TK-094
285-PI-T-020
2445
TO EXTRACTION CRUD
COLLECTION TANK
291-TK-738
291-PI-T-014
2447
FROM STRIP CRUD SUMP PUMP
291-PP-722
291-PI-T-014
2448
FROM EXTRACTION CRUD SUMP
PUMP 291-PP-721
291-PI-T-014
OVERFLOW
SAMPLING
30"
MH
LAH
LAHH
(NOTE 2)
(STANDBY)
3"-AMS-291-005-S1
LV
0222
+
4"-A-15
291-DI-708
291-DI-708
RAFFINATE
DIVERSION BOX
8"-ABS-291-005-S1
8"-ABS-291-006-S1
291-SA-012
6"-ABS-291-021-P7
291-SA-012
RAFFINATE
SAMPLER
3"-A-15
SLOPE
SLOPE
6"x4"
4"-A-16
4"-A-16
4"-C-22
4"-C-22
4"-A-164"-A-16
8"-B-4-GO 8"-B-4-GO
6"x4"
4"x3"
8"x4"
6"x3"
8"x4"
6"x3"
4"-A-15
3"-ASU-291-032-S1-HC
NC
6"-A-15A-GO 6"-A-15A-GO
4"-SPJ-1H
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
SYSTEM
291-PI-T-010
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/07/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-010MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
SOLVANT EXTRACTION FLOWSHEET291-FS-T-001
INSTRUMENTATION LEGEND, P&ID
SX RAFFINATE
291-PI-T-010
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
01/28/11
RC
JHL
MMB
ZDM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND, P&ID000-PI-T-001
4
LV
0221
+
291-PP-709
291-PP-708
291-PP-709
RAFFINATE PUMP
(STANDBY)
291-PP-708
RAFFINATE PUMP
291-TK-709
RAFFINATE TANK
NC
291-TK-708
RAFFINATE TANK
FV
0225
+
291-TK-709
FE
0225
+
291-TK-708
NCNC
NC
NC
NC
NC
291-TK-745
RAFFINATE ORGANIC
RECOVERY TANK
291-TK-745
FE
0226
+
NC
NC 291-PP-745
291-PP-745
RAFFINATE ORGANIC
RECOVERY PUMP
8"-ABS-291-019-S1
8"-ABS-291-018-S1
4"-ABS-291-014-S1
4"-ABS-291-013-S1
6"-ABS-291-010-S1
3"-SSS-291-026-S1
4"-ABS-291-047-S1
3"-ABS-291-007-S1
8"-ABS-291-011-S1
8"-ABS-291-016-S1
2"-PA-291-151-L8B
6"-ABS-291-020-S1
8"-A-15A-GO
8"-A-15-GO8"-A-15-GO
1"-A-15
1"-A-15
6"-C-23
1"-A-15
8"-A-15-GO
1"-A-15 4"-SPJ-1H
6"-C-23 1"-A-15
8"-A-15-GO
1"-A-15
4"-SPJ-1H
4"-C-23 1"-A-15
4"-A-15
4"-ABS-291-031-S1
8"-B-4-GO8"-B-4-GO
4"-A-15
4"-A-15
2"-A-15
6"-A-15-GO
NC
SLOPE
6"-ABS-291-009-S1
2"
4"-A-15A
NC
4"-ABS-291-022-S1
09-05-2012 10:02:48
1"-SPH-6A
1"-SPH-6A
V6
V6
V6
LVF1
LVF1
LVF11"-SPH-6A
1"-SPH-6A
1"-SPH-6A
1"-SPH-6A
6"-A-15
3"-A-15
4"-A-15
4"-A-15
3"-A-15
3"-A-15
8"x4"
FE
0224
+
NC
PCV
0232
+
PCV
0231
+
V6
3"-A-15
3"-SU-288-023-P7
S1 P7
6"-ABS-291-009-S16"-ABS-291-015-S1
NOTES:
1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001.
2. RECOVERED ORGANIC PUMPED INTO THE E-2 SETTLER
FEED LAUNDER.
3. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE.
291-PK-008
291-PK-008
RAFFINATE PUMP
SKID PACKAGE
NC
8"-ABS-291-017-S1
8"-A-15-GO
8"-A-15-GO
8"-ABS-291-002-S18"-ABS-291-001-S1 8"-ABS-291-020-S1
6"-A-15-GO
6"-ABS-291-015-S1
291-PK-009
291-PK-009
RAFFINATE ORGANIC
RECOVERY PUMP
SKID PACKAGE
1932
FROM AMMONIA RECOVERY
SUMP PUMP
288-PP-430
288-PI-T-110
1828
FROM AMMONIA
SCRUBBER PUMPS
288-PP-233/234
288-PI-T-101
-HC
2430
TO AMMONIA SCRUBBER
288-DC-130
288-PI-T-101
2446
FROM HYDROMET PLANT
AIR RECEIVER
265-AR-009
265-PI-T-006
2"-PA-265-150-L8B
4"-ABS-291-013-S1
6"-ABS-291-012-S1
4"x2" 4"x2"
S/D
3032
(VENDOR FOAM SYSTEM)
FROM SX PLANT S/D INTERLOCK
(NOTE 3)
4"x3"
4"x3"
4"x3"
FV
0226
+
8"x6"
4
4
8"x6"4
4 4
4
4
4
4
VFD
M
M
M MM
VFD VFD
VFD
VFD
0246
FIT
0246
FIC FAH
FAL
M
0247
WI
0246
HS
I
I
I
0247
FIT
LCS
LCS
0241
CI
AG724M
XU
AG723M
XU
0241
CE
LCS I
I
LCS
0242
CE
0247
FI FAH
FAL
I
I
PP736M
XU
LAHH
0243
LIT
LCS
0243
LE
II
AG723M
SIC SAH
SAL
0244
LIC LAH
LAL
724M
SIC
SAH
SAL
0244
LIT
PP735M
XU
0244
LE
0241
CIT
0242
CI
CAH
0242
CIT
I
TM726M
XU
LCS
TM726M
SIC
SAL
SAH
I
0243
LSHH
C
0247
DI
0247
TI
2387
FROM S-2 STRIP TANKS
291-PI-T-007
2390
FROM S-2 AQUEOUS ADVANCE
PUMPS
291-PP-730/731
291-PI-T-007
2388
FROM AQUEOUS AMMONIA PUMPS
291-PP-765/766
291-PI-T-012 2396
TO S-2 PUMP MIX TANK
291-TK-727
291-PI-T-007
2501
FROM STRIP ORGANIC RECOVERY
PUMP 291-PP-743
291-PI-T-009
2412
TO TANK VENT COMPRESSOR
KNOCKOUT DRUM
288-VL-101
286-PI-T-008
2413
TO STRIP RICH
AQUEOUS TANK
291-TK-735
291-PI-T-009
2400
TO S-2 PUMP MIX TANK
291-TK-727
291-PI-T-007
2403
FROM AMMONIA CRUD COLLECTION
PUMP 291-PP-738
291-PI-T-007
2436
FROM LOADED ORGANIC PUMPS
291-PP-747/748
291-PI-T-006
2438
TO STRIP CRUD
COLLECTION TANK
291-TK-737
291-PI-T-014
2529
FROM 291-FIC-0262
291-PI-T-012
CAH
(STANDBY)
NOTE:
1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001.
2. RECOVERED ORGANIC DISCHARGES TO SETTLER
FEED LAUNDER.
LAH
LAL
DRAIN
TO SX PLANT
S/D INTERLOCK
TO SX PLANT
S/D INTERLOCK
SAMPLING
SAMPLING
(NOTE2)
32 CM INSPECTION
FLANGE
3"-SPH-6A
291-PP-735
291-PP-736
RICH AQUEOUS
PUMP
(STANDBY)
291-TM-726
S-1 SETTLER
MECHANISM
LVF1
LVF1
4"x3"
291-TK-726
STRIP S-1 CLARIFIER
SETTLER TANK
3"-A-15
FE
0247
+
6"-A-15
FE
0246
+
291-SA-014
291-SA-014
SETTLER
SAMPLER
1/2"-A-15
NC
NC
NC
3"-B-11 3"-B-114"-B-11 3"-B-11
3"x2" 3"x2"
NC
NC
4"x2"4"x2"
4"-B-4-GO
4"-RS-291-019-S1
4"-RS-291-018-S1
3"-RS-291-021-S1
3"-PV-291-028-P1
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
4"-AMS-291-050-S1
3"-AMS-291-030-S1
6"-SLO-291-009-S1
4"-SBO-291-003-S1
4"-SBO-291-003-S1
6"-SLO-291-010-S1
2"-AMC-291-053-S1
4"-AMS-291-050-S1
LVF1
LVF1 LVF1
3"-AMS-291-029-S1
3"-RS-291-016-S1
291-TK-723
291-AG-724
NC
291-PP-736
6"-B-4-GO-E72
NC
NCNC
3"-A-15
1"-A-15
1"-A-15
1"-A-151"-A-15
3"-SPJ-1H
3"-SPJ-1H
3"-A-15
4"-A-15 3"x1-1/2"
4"x3"
3"x1-1/2"
3"-C-23
3"-C-23
291-TK-775
291-AG-724
S-1 AUXILIARY MIXER
TANK AGITATOR
291-TM-726
291-TK-724
STRIP S-1 AUXILIARY
MIXER TANK
291-TK-726291-TK-724
291-TK-775
S-1 SETTLER
AQ OVERFLOW TANK
291-AG-723
291-PP-735
RICH AQUEOUS
PUMP
291-TK-723
STRIP S-1 PUMP
MIXER TANK
291-AG-723
S-1 PUMP MIXER
TANK AGITATOR
6"-SLO-291-010-S1
2"-AQA-291-059-S1
2"-AMC-291-001-S12"-AMC-291-001-S1
6"-SLO-291-009-S1
2"-AMC-291-053-S1
6"-PV-291-015-P1 6"-PV-291-015-P1
3"-PV-291-027-P1
3"-PV-291-028-P1
4"-PV-291-029-P1
3"-PV-291-030-P1
3"-A-15
2"-AQA-291-062-S1
3"-RS-291-020-S1
2"-A-15
4"-A-154"-A-15
2"-A-15
2"-A-15
2"-A-15
2"-A-15
4"-B-4-GO-E72
NC
3"-A-15 3"-A-15
3"-B-4
3"-RS-291-023-S1
3"-RS-291-022-S1
6"-B-4-GO
NC
FV
0262B
+
FV
0246
+
4"-B-4-GO-E72
SLOPE
NCNC
V6
04-05-2012 11:54:02
V6
2"-C-10
NC
1"-A-15
NC
291-MX-723
291-MX-723
S-1 NH3
INLINE MIXER
4"-B-4-GO-E72
NC
NC
1"-A-15
2"-SPH-6A
S-1 STRIP
291-PI-T-011
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/02/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/30/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & RE-ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-011
MECHANICAL EQUIPMENT LIST, REV. T000-M-EL-001
INSTRUMENTATION LEGEND P & ID
291-PI-T-011
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
01/28/11
RC
JHL
MMB
ZDM/MKM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001
4
2" 2"
3"-RS-291-021-S1
291-PK-010
291-PK-010
STRIP RICH
AQUEOUS PUMP
SKID PACKAGE
0243
LI
0243
LI
V
V
4
4
4
M
VFD
M
VFD
M
0765
TE
0765
TIT
0765
TI TAHH
TAH
0262
HIC
I
ILCS
PP766M
XU
LCS
PP765M
XU
I
I
0262
FIT
0262
FIC
LCS
PP767M
XU
I
I
0260
LIT
0260
LI LAH
C
C
0261
FIC
0261
FIT
0261
DIC
0260
LSHH
0263
TIT
0263
TE
0263
TI
1938
FROM ANHYDROUS AMMONIA
ISOTAINERS
289-PI-T-001
2388
TO S-1 PUMP MIX TANK
291-TK-723
291-PI-T-011
1794
FROM CAUSTIC BOIL
DISTILLATE COOLER
298-HX-115
288-PI-T-105
1796
FROM AMMONIA ABSORBER
BOTTOMS COOLER
288-CK-200
288-PI-T-106
2956
TO TANK VENT COMPRESSOR
KNOCKOUT DRUM VIA
6"-PV-292-025-P1
292-PI-T-003
2625
TO PURIFICATION AMMONIA
WASSH BOOSTER TANK
292-TK-764
292-PI-T-004
2429
FROM STRIP RICH
AQUEOUS TANK
291-TK-735
291-PI-T-009
2505
FROM AMMONIA STRIPPER
DISTILLATE COOLER
288-HX-112
288-PI-T-112
2507
FROM AMMONIA CONDENSATE
ADVANCE PUMPS
292-PP-783/784
292-PI-T-004
2518
TO 291-FV-0262A
291-PI-T-007
2521
FROM 291-FIC-0186
291-PI-T-008
2529
TO 291-FV-0262B
291-PI-T-011
(STANDBY)
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
LAL
S1
4"-PV-291-015-P1
4"-A-8
291-PV-701
291-PV-701
AQUA AMMONIA
STORAGE VESSEL
1-1/2"-AQA-291-058-S1
08-05-2012 10:16:47
3"-AQA-291-058-S1
3"-AQA-291-060-S1
2"-AQA-291-061-S1
2"-AQA-291-059-S13"-AQA-291-058-S1
2"-AQA-291-059-S1
NC
NC
NC
4"-PV-291-015-P1
4"-PV-291-010-P1
1/2"-AQA-291-007-S1
2"-A-5
2"-C-5
1-1/2"-C-10
1"-C-5
1-1/2"-C-5
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
AMMONIA SUPPLY
07/07/11TO 291-PI-T-012
291-SOLVENT EXTRACTION
P & ID
5 05/05/12RCMMBAPPOBMUPDATED AND RE-ISSUED FOR CONSTRUCTION
4
3
2
B
1
0
08/26/11RCJHLMMBCAC
07/20/11RCJHLMMBCAC
07/07/11RCJHLJHLMKM
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION
UPDATED & RE-ISSUED FOR CONSTRUCTION
REVISED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-012
MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
INSTRUMENTATION LEGEND P&ID
AQUEOUS
291-PI-T-012
02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/20/11
07/20/11
07/20/11
12/11/10
RC
JHL
MMB
ZDM/EAD
01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND P&ID000-PI-T-001
5
1"-SPH-6A 1"-SPH-6A
291-PP-766
3"-A-15
1"-A-15
NC
NC
2"x1"
2"-C-10
NC
1"-A-15
2"-A-15
291-PP-765
NC
NC
1"-A-152"-C-10
1"-A-15
2"x1"
3"-A-15
2"-A-15
2"-AQA-291-059-S1
291-PP-767
NC NC
1"-A-152"x1-1/2" 1-1/2"-C-10
1"-A-152"-A-15
1-1/2"-A-15
291-MX-702
3"-A-15
1-1/2"-A-15
DV
0261
+
291-PP-767
AQUA AMMONIA
RECYCLE PUMP
291-PP-765
AQUA AMMONIA
PUMP
291-PP-766
AQUA AMMONIA
PUMP
(STANDBY)
291-MX-702
AMMONIA
IN-LINE MIXER
2"-AQA-288-050-L6
2"-AHA-289-006-A3
1-1/2"-ACO-292-051-S1
1"-AQA-288-052-L6
1-1/2"-AQA-288-005-L6
2"-E-4
FE
0262
+
LFF1
LVF1
LVF1
FE
0261
+
2"-A-5
2"-A-5
4"-A-85
1/2"-A-15
PSV
0264
+
V6
1"-SPH-6A
1"-SPH-6A
1"-SPH-6A
1"-SPH-6A
291-PK-011
291-PK-011
AQUEOUS AMMONIA
PUMP
SKID PACKAGE
1-1/2"-AQA-291-056-S1
1-1/2"-AQA-291-056-S1
2"-AQA-291-055-S1
291-PK-014
291-PK-014
AQUEOUS AMMONIA
RECYCLE PUMP
SKID PACKAGE
2"-AHA-289-006-A3
4"-AMV-291-030-P1
4"-B-11
L6
3077
TO CALCINER VENT
KNOCKOUT DRUM
288-VL-103
287-PI-T-005
5
1-1/2"x1"
5
5
3"x2"
3"x2"
5
5
5
5
VFD
M
M
M
VFD
VFD
M
VFD
2"
2"
0281
LIC
LAL
LAH
PP725M
XU
0281
LE
LCS
0281
LIT
I I
I
PP727M
XU
I
0283
FIC
I
PP728M
XU
0283
FIT
M
I LCS
LCS
PP726M
XU
I I LCS
0281
LSL
0283
HIC
0284
LI
0281
LSLL
0130
HIC
2389
TO S-2 SETTLER AQUEOUS
OVERFLOW TANK
291-TK-776
291-PI-T-007
2637
FROM 291-FI-0189
291-PI-T-008
2220
TO SCRUB 1 PUMP MIX TANK
291-TK-716
291-PI-T-005
2419
WASH W-1 PUMP MIXER TANK
291-TK-731
291-PI-T-008
2467
FLOW CONTROL 291-FIC-0130
291-PI-T-005
2517
FROM 291-FIC-0142
291-PI-T-006
2585
FROM STRIPPER BOTTOMS
WATER ADVANCE PUMPS
292-PP-778/779
292-PI-T-006
2638
FROM 291-FI-0187
291-PI-T-008
TO FLOOR
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE,
000-LT-I-205, AT A LATER DATE.
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
2"-A-15 2"-A-15
2"-A-15
NC
WATER TANK
291-PI-T-013
291-SOLVENT EXTRACTION
P & ID
4
3
2
B
1
0
05/07/12RCMMBAPPOBM
08/26/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
04/04/11RCJHLDDMKM
03/10/11RCJHLDDMKM
A
REVISED AS NOTED
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
UPDATED & ISSUED FOR CONSTRUCTION
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CONSTRUCTION
000-PI-T-002
560-291-PI-T-012MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001
SX RO WATER, CAUSTIC, & AMMONIA SUPPLY FLOWSHEET291-FS-T-002
INSTRUMENTATION LEGEND P&ID
SX WASH & SCRUB
291-PI-T-013
02/03/04RCJHLDDMKMISSUED FOR CLIENT APPROVAL
07/19/11
07/19/11
07/19/11
12/13/10
RC
JHL
MMB
ZDM
01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P&ID000-PI-T-001
4
NC
NC
NC
NC
291-PP-725
LOADED ORGANIC
SCRUB WATER PUMP
291-PP-726
LOADED ORGANIC
SCRUB WATER PUMP
(STANDBY)
291-PP-727
BARREN ORGANIC
WASH WATER PUMP
291-PP-728
BARREN ORGANIC
WASH WATER PUMP
(STANDBY)
291-PP-725
291-TK-742
6"-PD-291-008-P1
24"
MANHOLE
2"-A-15A3"-A-15A
1"-A-15
NC
2"x1-1/2"
1"-A-15
2"x1"
LVF1
NC
NC
2"-C-10
2"-A-15A
291-PP-726
1"-A-15
NC
2"x1"
1"-A-152"-C-10
NC
2"x1-1/2"
LVF1
2"-A-15
2"-A-15
2"-A-15
2"-A-15
2"-LCD-291-040-S1
2"-LCD-291-038-S1
2"-LCD-291-039-S1
2"-LCD-291-041-S1
2"-LCD-291-037-S1
291-PP-727
2"-LCD-291-022-S1
2"-LCD-291-043-S1
291-PP-728
2"-A-151"-A-15
NC
2"-A-15
2"x1"
2"-C-10
NC
2"-C-10
NC
LVF1
LVF1
NC
2"x1"
2"-A-15
2"-A-15
1"-A-15
1"-A-15
1"-A-15
291-TK-742
SX WATER
TANK
FE
0283
+
2"-LCD-292-032-S1
1"-LCD-291-005-S1
1"-A-15
02-05-2012 12:01:55
LV
0281 A
+
4"
2"x1/2"2"x1/2"
2515
FROM RO UTILITY WATER
PUMPS
280-PP-009/010
280-PI-T-003
2"-RO-280-002-S1
LV
0281 B
+
V1Z
FC
3"
(STANDBY)
(STANDBY)
291-PK-013
2"-LCD-291-041-S1
2"-LCD-291-041-S1
2"-LCD-291-040-S1
2"-LCD-291-037-S1
2"-LCD-291-036-S1
291-PK-012
291-PK-012
BARREN ORGANIC
SCRUB WATER PUMP
SKID PACKAGE
291-PK-013
LOADED ORGANIC
SCRUB WATER PUMP
SKID PACKAGE
S/D
S/D
S/D
S/D
3033
(VENDOR FOAM SYSTEM)
FROM SX PLANT S/D INTERLOCK
(NOTE 2)
S/D
4
4
4
4
4
M M
M
M
M
LCS
0305
LI
0305
LIT
0305
LE
0305
LAHL
I
PP721M
XU
I
0306
LE
LCS
I
I
0306
LIT
PP722M
XU
0306
LAHL
0306
LI
0302
LSLL
0302
LSLLAH
0302
LI
I
LCS
I
I
PP719M
XU
I
PP720M
XU
LCS
0301
LE
RADAR
0301
LIT
0302
LIT
0302
LE
RADAR
II
AG738M
XU
LCS
I
I
AG736M
XU
0301
LI
LAH
0301
LSLL
0301
LSL
0033
LG 0034
LG
2878
FROM ORGANIC
HOLDING TANK PUMP
291-PP-741
291-PI-T-015
2421
TO W-1 CLARIFIER
SETTLER TANK
291-PI-T-008
2218
FROM ACID CRUD
COLLECTION PUMPS
291-PP-738
291-PI-T-005
2252
FROM SX EXTRACTION
SUMP PUMP
291-PP-710
291-PI-T-004
2394
FROM SX STRIP
SUMP PUMP
291-PP-714
291-PI-T-007
2432
FROM STRIP ORGANIC
RECOVERY PUMP
291-PP-743
291-PI-T-009
2438
FROM AMMONIA CRUD
COLLECTION PUMP
291-PP-737
291-PI-T-011
2445
FROM RAFFINATE
ORGANIC RECOVERY PUMP
291-PP-745
291-PI-T-010
2447
TO RAFFINATE DIVERSION BOX
291-DI-708
291-PI-T-010
2448
TO RAFFINATE
DIVERSION BOX
291-DI-708
291-PI-T-010
2702
TO SX CRUD FILTER
291-FL-702
291-PI-T-015
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001
CLAY ADDITION
BY HAND
CLAY ADDITION
BY HAND
4" OVERFLOW4" OVERFLOW
02-05-2012 14:24:11
2"-A-15
3"-ABS-291-052-S1
2"-ABS-291-053-S1
4"-ABS-291-24133-S1
3"-A-15
4"-A-15
3"-A-15
3"-A-15
NC
2"-C-10
2"-C-10
2"-A-15
2"-A-15
NC
3"-A-15
3"-A-15
2"-ABS-291-055-S1
2"-ABS-291-060-S1
3"-ABS-291-054-S1
STRIP CRUD TANKS
07/25/11RBR/TO 291-PI-T-014
291-SOLVENT EXTRACTION
P & ID
1
B
0
C
05/07/12RCMMBAPPOBM
09/14/11RCJHLMMBCAC
07/19/11RCJHLMMBCAC
A
ISSUED FOR CONSTRUCTION.
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CLIENT APPROVAL
000-PI-T-002
560-291-014
MECHANICAL EQUIPMENT LIST, REV. U000-EL-M-001
INSTRUMENTATION LEGEND P & ID
ORGANIC TREATMENT
291-PI-T-014
04/14/11RCJHLDDMKMISSUED FOR APPROVAL
07/19/11
07/19/11
07/19/11
07/27/10
RC
JHL
MMB
MKM
04/04/11RCJHLDDMKMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001
1
NC
NC
3"-PV-291-012-P1
NC
2"-A-15
2"-A-15
LFF1
LFF1
LFF1
LFF1
LFF1
LFF1
3"-PV-291-011-P1
2"-A-15
2"-WBO-291-014-S1
3"-WBO-291-011-S1
2"-WBO-291-012-S1
291-CO-722
291-CO-722
STRIP CRUD
SUMP COVER
NC
1"-A-15
2"-A-15
2"-A-15
1"-A-15
NC
NC
NC
NC
2"-A-15
NC
3"-A-15
4"-A-15
3"-A-15
3"-SPJ-1H
3"-SPJ-1H
2"-A-152"-A-15
NC NC
2"-A-15
NC
291-CH-737291-CH-738
291-CH-738
STRIP CRUD
CLAY ADDITION CHUTE
291-CH-737
STRIP CRUD
CLAY ADDITION CHUTE
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EM BODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
4"-PD-291-032-P1
4"-PD-291-033-P1
291-TK-738
291-TK-738
EXTRACTION CRUD
COLLECTION TANK
3"-AMS-291-008-S1
2"-RS-291-017-S1
3"-A-153"-A-15
4"-ABS-291-24133-S1
4"-ABS-291-047-S1
3"-ABS-291-061-S1
4"-ABS-291-24133-S1
4"-ABS-291-014-S1
2"-ACC-291-001-S1
3"-ACC-291-020-S1
2"-AMC-291-001-S1
291-PP-720
291-PP-720
STRIP CRUD
FILTER FEED PUMP
291-PP-719
291-PP-719
EXTRACTION CRUD
FILTER FEED PUMP
291-TK-737
291-TK-737
STRIP CRUD
COLLECTION TANK
291-AG-737
291-AG-738
291-AG-738
EXTRACTION CRUD
TANK AGITATOR
291-AG-737
STRIP CRUD
TANK AGITATOR
291-PP-721
291-PP-721
EXTRACTION CRUD
SUBMERSIBLE SUMP PUMP
3"-ABS-291-059-S1
3"-ABS-291-057-S1
2"-ABS-291-058-S1
2"-ABS-291-049-S1
2"-WBO-291-013-S1
4"-C-23
4"-C-10
2"-A-15
2"-A-15
2"-A-15
2"-A-15
2"-ABS-291-046-S1
3"-ABS-291-051-S1
3"-ABS-291-056-S1
2"-ABS-291-032-S1
3"-B-11 3"-B-11
2217
FROM ORGANIC HOLDING TANK
291-TK-741
291-PI-T-015
2951
FROM ORGANIC HOLDING TANK
291-TK-741
291-PI-T-015
M
4"-SPH-6A
291-PP-722
4"-SPH-6A
291-PP-722
STRIP CRUD
SUBMERSIBLE SUMP PUMP
2"-WBO-291-014-S1
2"-ABS-291-060-S1
3"-PV-291-012-P1
2"-ABS-291-029-S1
3"-WBO-291-011-S1
2"-AMC-291-001-S1
3"-AMS-291-008-S1
2"-RS-291-017-S1
2"-WBO-291-013-S1
LCS
3"-A-15
2"-A-15
8"-PV-291-025-P1
2705
TO PURIFICATION TANKS
292-TK-752/755
292-PI-T-002
4"x3"
4"x2"
4"x2"
2"-ABS-291-048-S1
1
1
1
1
1
1
1
1
1
1
1
1 1
M M
M
LCS I
PP723M
XU
I I
PP741M
XU
LCSI
I
AG740M
XU
ILCS
0321
LE
0321
LIT
0321
LI
0321
LSLL
0322
LIT
0322
LI
0322
LE
0322
LSLL
0320
PI
0320
PIT
2878
TO CRUD TANKS
291-TK-737/738
291-PI-T-014
2951
TO EXTRACTION CRUD
COLLECTION TANK
291-TK-738
291-PI-T-014
3039
FROM PLANT AIR
DISTRIBUTION
291-PI-T-009
2217
TO STRIP CRUD
COLLECTION TANK
291-TK-737
291-PI-T-014
2426
TO BARREN
ORGANIC TANK
291-TK-734
291-PI-T-008
2702
FROM STRIP CRUD FILTER
FEED PUMP
291-PP-720
291-PI-T-014
NOTES:
1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001.
2. REMOVABLE CART.
3. OPEN/CLOSE HAND SWITCH WITH INDICATION GAUGES.
DE
BY HAND
COLLECTION
3"-A-15 3"-A-15
NCNC
3"-A-153"-A-15A
291-CH-740
3"-A-15
3"-WBO-291-007-S1
3"x1-1/2"
2"-WBO-291-014-S1
2"x1/2"
1"x3/8"
1"-A-15
2"-PA-265-116-S1
3/8"-PA-291-128-S1
NOTICER E F E R E N C E S
TOROMOCHO PROJECT
C-560 REVISION
DWG. NO.
AREA
CAD NO.
MINERA CHINALCO PERU S.A.
TITLE
AREA
PROJECT
SIGN AND STAMP
SIGN
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL
NAME
DOCUMENT CONTROL
DISCIPLINE MANAGER NAME
QUALITY CONTROL
A1
SHEET SIZE
DATE :
DATE :
DATE :
DATE :
DATE :DRAWN BY:
CHECKED BY:
APPROVED BY:
AUTHORIZED BY:
MCP APPROVED:
SCALE :
THIS IS A COMPUTER GENERATED DRAWING. ALL
CHANGES HERE TO SHALL BE PERFORMED USING
CADD ONLY.
THIS DRAWING IS THE PROPERTY OF AND EMBODIES
PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY
UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE
OR IN PART, NOR THE INFORMATION SHOWN THERE
ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE
WRITTEN PERMISSION.
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
DATEAPPROVEDCHECKBYDESCRIPTIONNO.
R E V I S I O N S
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
T I T L EDWG. NO.
NC
1"-A-15 NC
1"-A-15
09-05-2012 10:19:11
2"-PA-291-162-S1
2"-A-15
LFF1
291-PP-723
2"-C-23
NC
291-AG-740
1-1/2"-SPJ-1H1"-A-15
NC
1"-A-15
291-TK-740 291-TK-741
LFF1
291-PP-741
2"-WBO-291-001-S1
2"-A-15
2"-A-15
3"x2"
3"-DRIP TRAY
3"-PD-291-012-P1
3"-PD-291-006-P1
3"-ASL-291-004-S1
3"-WBO-291-009-S1
2"-A-15
2"-A-15
CRUD FILTER
07/25/11RBR/TO 291-PI-T-015
291-SOLVENT EXTRACTION
P & ID
1
B
0
C
05/07/12RCMMBAPPOBM
09/14/11RCJHLJHLCAC
07/19/11RCJHLMMBCAC
A
ISSUED FOR CONSTRUCTION.
UPDATED AND RE-ISSUED FOR CONSTRUCTION.
ISSUED FOR CLIENT APPROVAL
000-PI-T-002
560-291-015
MECHANICAL EQUIPMENT LIST, REV. U000-EL-M-001
INSTRUMENTATION LEGEND P & ID
ORGANIC TREATMENT
291-PI-T-015
04/22/11RCJHLDDZDMISSUED FOR APPROVAL
07/19/11
07/19/11
07/19/11
03/10/11
RC
JHL
MMB
MKM
04/14/11RCJHLDDMKMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001
1
3"-A-15A
NC
2"-A-15
2"-A-15
2"-WBO-291-008-S1
2"-PA-291-065-S1
3"-SPJ-1H
3"-WBO-291-011-S1
2"x1"
LFF1
2"-A-15
2"-A-15
291-ZM-702
2"-A-15
NC
NC
3"-PA-291-117-L8B3"-PA-291-117-L8B
3"x2"
3"x2"
2"-ABS-291-058-S1
3"-C-22
3"-A-15
2"-WBO-291-001-S1
2"-WBO-291-013-S1
2"x1-1/2" 2"x1-1/2"
(NOTE 3)
2"-ABS-291-058-S1
2"-ABS-291-035-S1
2"-PA-291-162-S1
2"-ABS-291-037-S1
2"-ABS-291-033-S1
2"-PA-291-163-S1
2"-ABS-291-058-S1
2"-ASL-291-005-S1
2"-ASL-291-005-S1
2"-ABS-291-037-S1
2"-ABS-291-036-S1
2"-ABS-291-038-S1
VENDOR
PACKAGE
V
V
V
V
V V
V
V
VV
291-FL-702
(NOTE 2)
2"-ABS-291-038-S1
2"-ABS-291-036-S1
2"-ABS-291-040-S1
2"-ABS-291-034-S1
2"-PA-291-064-S1
2"-ABS-291-041-S1
2"-ABS-291-042-S1
291-FL-702
SX CRUD FILTER
291-ZM-702
CRUD FILTER
CAKE PAN
291-TK-740
SX CRUD FILTER
PRECOAT TANK
291-AG-740
SX CRUD FILTER
PRECOAT TANK
AGITATOR
291-PP-723
SX CRUD FILTER
PRECOAT PUMP
291-TK-741
ORGANIC HOLDING
TANK
291-PP-741
ORGANIC HOLDING
TANK PUMP
V
3/8"
FNPT
CONN.
1323
HS
1323
ZO
1323
ZC
CLOSE OPEN
291-CH-740
CRUD FILTER
PRECOAT D.E.
ADDITION CHUTE
3"x1-1/2"
1
1

More Related Content

What's hot

Selection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsSelection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsGerard B. Hawkins
 
Absorption stripping
Absorption strippingAbsorption stripping
Absorption strippingjogeman
 
Diethyl Ether (DEE): Site Selection and Plant Layout
Diethyl Ether (DEE): Site Selection and Plant LayoutDiethyl Ether (DEE): Site Selection and Plant Layout
Diethyl Ether (DEE): Site Selection and Plant LayoutPratik Patel
 
Bucket elevator-safety
Bucket elevator-safetyBucket elevator-safety
Bucket elevator-safetyManish Thakur
 
Cooling tower full report
Cooling tower full reportCooling tower full report
Cooling tower full reportAzlan Skool
 
Prof.n.nagraj pneumatic control
Prof.n.nagraj pneumatic controlProf.n.nagraj pneumatic control
Prof.n.nagraj pneumatic controlPraveen Djadhav
 
Practical control valve sizing, selection and maintenance
Practical control valve sizing, selection and maintenancePractical control valve sizing, selection and maintenance
Practical control valve sizing, selection and maintenanceSalih Abker Adam Musa
 
Floating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenanceFloating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenanceKarnav Rana
 
Flexible Gravity conveyor
Flexible Gravity conveyorFlexible Gravity conveyor
Flexible Gravity conveyorcowboysiva
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger designhossie
 
Shell and Tube Heat Exchanger
Shell and Tube Heat Exchanger Shell and Tube Heat Exchanger
Shell and Tube Heat Exchanger wasihaider16
 
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS Gerard B. Hawkins
 
Styrene Production by Catalytic Dehydrogenation of Ethylbenzene
Styrene Production by Catalytic Dehydrogenation of Ethylbenzene Styrene Production by Catalytic Dehydrogenation of Ethylbenzene
Styrene Production by Catalytic Dehydrogenation of Ethylbenzene Michelle Otutu
 
Steam ejector working principle
Steam ejector working principleSteam ejector working principle
Steam ejector working principleKarnav Rana
 
Valves
ValvesValves
ValvesSABIC
 
Preventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer HamdanPreventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer HamdanEng. Amer Hamdan
 

What's hot (20)

Selection of Internals for Distillation Columns
Selection of Internals for Distillation ColumnsSelection of Internals for Distillation Columns
Selection of Internals for Distillation Columns
 
Absorption stripping
Absorption strippingAbsorption stripping
Absorption stripping
 
Diethyl Ether (DEE): Site Selection and Plant Layout
Diethyl Ether (DEE): Site Selection and Plant LayoutDiethyl Ether (DEE): Site Selection and Plant Layout
Diethyl Ether (DEE): Site Selection and Plant Layout
 
Bucket elevator-safety
Bucket elevator-safetyBucket elevator-safety
Bucket elevator-safety
 
Cooling tower full report
Cooling tower full reportCooling tower full report
Cooling tower full report
 
Prof.n.nagraj pneumatic control
Prof.n.nagraj pneumatic controlProf.n.nagraj pneumatic control
Prof.n.nagraj pneumatic control
 
Practical control valve sizing, selection and maintenance
Practical control valve sizing, selection and maintenancePractical control valve sizing, selection and maintenance
Practical control valve sizing, selection and maintenance
 
Floating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenanceFloating head heat exchanger components & maintenance
Floating head heat exchanger components & maintenance
 
Flexible Gravity conveyor
Flexible Gravity conveyorFlexible Gravity conveyor
Flexible Gravity conveyor
 
Shell and tube heat exchanger design
Shell and tube heat exchanger designShell and tube heat exchanger design
Shell and tube heat exchanger design
 
valve maintenance
valve maintenancevalve maintenance
valve maintenance
 
Control Valves Book.pdf
Control Valves Book.pdfControl Valves Book.pdf
Control Valves Book.pdf
 
Shell and Tube Heat Exchanger
Shell and Tube Heat Exchanger Shell and Tube Heat Exchanger
Shell and Tube Heat Exchanger
 
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
DESIGN OF VENT GAS COLLECTION AND DESTRUCTION SYSTEMS
 
Styrene Production by Catalytic Dehydrogenation of Ethylbenzene
Styrene Production by Catalytic Dehydrogenation of Ethylbenzene Styrene Production by Catalytic Dehydrogenation of Ethylbenzene
Styrene Production by Catalytic Dehydrogenation of Ethylbenzene
 
HAZOP Basics
HAZOP BasicsHAZOP Basics
HAZOP Basics
 
Steam ejector working principle
Steam ejector working principleSteam ejector working principle
Steam ejector working principle
 
Valves
ValvesValves
Valves
 
FR MULTIPLE EFFECT EVAPORATION
FR MULTIPLE EFFECT EVAPORATIONFR MULTIPLE EFFECT EVAPORATION
FR MULTIPLE EFFECT EVAPORATION
 
Preventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer HamdanPreventive Maintenance for CP by Eng. Amer Hamdan
Preventive Maintenance for CP by Eng. Amer Hamdan
 

Similar to Pid area 291

Catalogo_de_Partes_de_Xpulse_200_May_2019.pdf
Catalogo_de_Partes_de_Xpulse_200_May_2019.pdfCatalogo_de_Partes_de_Xpulse_200_May_2019.pdf
Catalogo_de_Partes_de_Xpulse_200_May_2019.pdfCamilo Cordova
 
Turbine Engineering Services Parts
Turbine Engineering Services PartsTurbine Engineering Services Parts
Turbine Engineering Services PartsPrismecs LLC
 
UENR4505-00.pdf
UENR4505-00.pdfUENR4505-00.pdf
UENR4505-00.pdfthang tong
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawingsbibimisael
 
Appron feeder common ckt-diagram
Appron feeder common ckt-diagramAppron feeder common ckt-diagram
Appron feeder common ckt-diagramyogagivananda
 
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015William Irving
 
qsc_rmx5050.pdf power amplifier qsc 5050
qsc_rmx5050.pdf power amplifier qsc 5050qsc_rmx5050.pdf power amplifier qsc 5050
qsc_rmx5050.pdf power amplifier qsc 5050Carlos Hernandez
 
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...Emily Tan
 
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upKomatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upfusfejskekem
 
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upKomatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upfjskeksemm
 
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upKomatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upfujjsefkksemmm
 
COMOS Instrument Index
COMOS Instrument IndexCOMOS Instrument Index
COMOS Instrument IndexTheko Letsie
 
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...ujkfdkkmsmd
 
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...jnnfnjsdnnd
 
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...ujdjksmdmdm
 
Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...
Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...
Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...ujkfdkkmsmd
 

Similar to Pid area 291 (19)

Catalogo_de_Partes_de_Xpulse_200_May_2019.pdf
Catalogo_de_Partes_de_Xpulse_200_May_2019.pdfCatalogo_de_Partes_de_Xpulse_200_May_2019.pdf
Catalogo_de_Partes_de_Xpulse_200_May_2019.pdf
 
Turbine Engineering Services Parts
Turbine Engineering Services PartsTurbine Engineering Services Parts
Turbine Engineering Services Parts
 
D61 ex 15e0 engine
D61 ex 15e0 engineD61 ex 15e0 engine
D61 ex 15e0 engine
 
UENR4505-00.pdf
UENR4505-00.pdfUENR4505-00.pdf
UENR4505-00.pdf
 
START UP by Rekind
START UP by RekindSTART UP by Rekind
START UP by Rekind
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
Appron feeder common ckt-diagram
Appron feeder common ckt-diagramAppron feeder common ckt-diagram
Appron feeder common ckt-diagram
 
GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015GWOS_Week_of_03-23-2015
GWOS_Week_of_03-23-2015
 
qsc_rmx5050.pdf power amplifier qsc 5050
qsc_rmx5050.pdf power amplifier qsc 5050qsc_rmx5050.pdf power amplifier qsc 5050
qsc_rmx5050.pdf power amplifier qsc 5050
 
Fadal 104D Wiring Diagram - ITSCNC.com
Fadal 104D Wiring Diagram - ITSCNC.comFadal 104D Wiring Diagram - ITSCNC.com
Fadal 104D Wiring Diagram - ITSCNC.com
 
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
Lam Research ,Novellus, Gasonics, Tel ,Tokyo Electron Ltd, Matrix etc. Spare ...
 
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upKomatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
 
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upKomatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
 
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and upKomatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
Komatsu hm300 2 articulated dump truck parts catalogue manual - sn a11001 and up
 
COMOS Instrument Index
COMOS Instrument IndexCOMOS Instrument Index
COMOS Instrument Index
 
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
 
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
 
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
Kubota B1241D-EC-F2-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA516...
 
Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...
Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...
Kubota B1241D-EC-M-S5 Tractor Parts Catalogue Manual (Publishing ID BKIDA5162...
 

Recently uploaded

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Pid area 291

  • 1. M M VFD VFD M (NOTE 2) M M 1011 FIC 0002 LIT 1011 FIT 0005 PIT I LCS I AG700M XU I I PP702M XU PP701M XU 1027 ZS 1026 ZS 1030 LSH 1029 LSM 1021 PDIT 1022 PIT M TURBIDITY I I M 0005 FIT 0005 FIC FAH 0002 LIC LAH LAHH 1024 AE 1024 AIT 1025 LSL LCS LCS 0005 PI 0005 PSH 1028 ZS 0002 LSLL 0010 LIT 0010 LAHL 0010 LI ILCS PP715M XU 0010 LE I 0025 AE 0025 AIT 0025 AI AAH AAL 1023 PI II I I LCS PP703M XU 2213 FROM RESIDUE THICKENER OVERFLOW PUMPS 284-PP-085/086 284-PI-T-004 2164 TO PLS TANKS 291-TK-705/706 291-PI-T-003 2158 FROM RAW WATER HEADER 262-PI-T-007 2159 FROM HYDROMET AREA PLANT AIR DISTRIBUTION 265-PI-T-006 1947 FROM ACD SOLUTION PUMPS 284-PP-081/082 284-PI-T-001 2157 FROM PLS FILTER PRECOAT TANK 291-TK-704 291-PI-T-002 2163 TO PLS FILTER SLUICE TANK 291-TK-707 291-PI-T-002 2155 FROM CAUSTIC BOIL FIRST BOTTOMS COOLER 288-HX-114 288-PI-T-104 2161 TO PLS TANKS 291-TK-705/706 291-PI-T-003 2162 TO PLS FILTER PRECOAT TANK 291-TK-704 291-PI-T-002 2454 TO ACD FILTRATE TRANSFER TANK 284-TK-076 284-PI-T-007 2511 FROM 291-LIC-0041 291-PI-T-002 2762 TO COLLECTION DITCH 255-PI-T-007 LAL LALL TO FLOOR OVERFLOW OVERFLOW NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. REMOVABLE SPLIT COVER. TO FLOOR PAH FAL VENT TO ATM (STANDBY) S/D V V V FC V FC HV 1005 + V FC V FC V V V V FE 1011 + FV 1011 + V SLOPE 6"x4"6"x4" 291-AG-700 291-TK-700 PLS MIX TANK 291-TK-701 PLS FILTER FEED TANK 291-AG-700 PLS MIX TANK AGITATOR 291-PP-701 PLS FILTER FEED PUMP 291-PP-702 PLS FILTER FEED PUMP (STANDBY) FC V V FC V 3"-C-22 V V V 3"-SPH-15 291-PP-701 291-PP-702 291-FL-701 291-TK-700 291-TK-701 6"x3" 6"x3" HV 1007 + NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. FILTRATION 291-PI-T-001 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-001MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 SOLVENT EXTRACTION FLOWSHEET291-FS-T-001 INSTRUMENTATION LEGEND, P&ID PLS 291-PI-T-001 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 07/27/10 RC DD/JHL MMB ZDM / EAD 01/28/11JHLDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND, P&ID000-PI-T-001 4 6"-C-23 6"-C-23 6"-A-15A-GO HV 1008 + PCV 1016 + HV 1009 + HV 1003 + HV 1004 + 6"-ASLL-291-052-S1 291-FL-701 PLS FILTER PACKAGE 291-PP-715 PLS SUBMERSIBLE SUMP PUMP FE 0005 + 2" 4" 1"-AA-291-014-L6-PP -PP 6"-ASLL-291-045-S1 6"-ASLL-291-045-S1 6"-ASLL-291-044-S1 1"-A-15 1"-A-15 1"-A-15 NC NC NC NC V V 4"-RW-291-048-L1B 6"-PD-291-025-P1 4"-A-85 2"-A-85 4"-A-15A 8"-PD-291-026-P1 8"-ASLH-291-042-F5 6"-ASLL-291-046-S1 6"-ASLL-291-047-S1 3"-PA-265-148-L8B 6"-ASLL-291-001-S1 6"-ASLL-291-030-S1 1"-A-15 1"-A-15 NC 1"-A-15 NC 6"-A-15-GO 6"-A-15-GO 6"-A-15-GO NC 4"-A-15 4"-C-224"-A-16A NC 09-05-2012 9:00:31 V FC FC V V 291-PK-001 291-PK-001 PLS FILTER FEED PUMP SKID PACKAGE LFF1 291-PP-715 LFF1 LVF1 LVF1 V1Z 3"-A-15A HV 0024 + 3"-A-15 3"-A-15 V1Z V1ZV1Z V1Z HV 0022 + HV 0021 + HV 0023 + 6"-PSH-291-003-S1 HV 1001 + pH V 3"-A-16A 4"-SPJ-1H 4"-SPJ-1H6"x4" 6"x4" 3"-K-1 3"-C-23 3"-SU-291-024-P7 FV 1010 + V HV 1002 +NC 6"x4" 6"-A-16 4"x3" 4"-SPJ-1 LFF1 6"-RW-262-044-L1B 291-PP-703 291-PP-703 PLS FILTER FEED PUMP 3"x1-1/2" 6"-A-15-GO 6"-A-15-GO 6"-PSH-291-002-S1 3"-SLN-284-003-L5 4"-ASH-284-003-F5 3"-SU-291-020-P73"-SU-291-020-P7 3"x2" 4 4 4 4
  • 2. M M M M VFD VSD I PP707M XU I PP704M XU I LCS 0047 LSL 0046 PIT 0041 LIT I 0041 LIC LALL LAHH AG704M XU I LCS I 0047 LE 0047 LIT 0047 LSH ILCS I AG707M XU LCS LCS IIBG704M XU 0046 PI PAH PAL 0048 FI 0049 PI PAH 0049 PIT 0041 LSLL 0049 PSHH PAHH BG704M SIC M 0048 FIT 0041 LSL 2157 TO PLS FILTER 291-FL-701 291-PI-T-001 2162 FROM PLS FILTER 291-FL-701 291-PI-T-001 2163 FROM PLS FILTER 291-FL-701 291-PI-T-001 2460 TO RESIDUE REPULP TANK 284-TK-071 284-PI-T-005 2166 TO ACD FILTRATE TRANSFER TANK 284-TK-076 284-PI-T-007 2511 TO PLS FILTER PLC 291-PI-T-001 NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 00-PI-T-001. 2. REMOVABLE SPLIT COVER, FRP. START STOP TO FLOOR TO FLOOR LAHH (NOTE 2) (NOTE 2) 1 M 08-05-2012 17:11:38 291-TK-704 PLS FILTER PRECOAT TANK 291-AG-704 PLS FILTER PRECOAT TANK AGITATOR 291-PP-704 PLS FILTER PRECOAT PUMP 291-TK-707 PLS FILTER SLUICE TANK 291-AG-707 PLS FILTER SLUICE TANK AGITATOR 291-PP-707 PLS FILTER SLUICE PUMP LVF1 LFF1 291-PP-707 291-TK-707 291-AG-707 LFF1 LFF1 291-TK-704 291-AG-704 NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. PRECOAT AND SLUICE 291-PI-T-002 291-SOLVENT EXTRACTION P & ID 3 2 B 1 0 05/05/12RCMMBAPPOBM 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION UPDATED & RE-ISSUED FOR CONSTRUCTION ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-002MECHANICAL EQUIPMENT LIST, REV. U000-EL-M-001 SOLVENT EXTRACTION FLOWSHEET291-FS-T-001 INSTRUMENTATION LEGEND, P&ID PLS FILTER 291-PI-T-002 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 07/27/10 RC JHL MMB ZDM / EAD 01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND, P&ID000-PI-T-001 3 2"-A-15 2"-A-15 NC 3"x1-1/2" 2"x1-1/2" 2"-ASLL-291-034-S1 291-PP-704 4"-A-15A-GO 6"-C-23 6"-PSH-291-003-S1 8"-PD-291-027-P1 4"-A-15A 2"-A-15 2"-A-15 NC NC 6"-ASLL-291-030-S1 2"-ASLL-291-032-S1 1"-A-15 6"-ASLL-291-052-S1 6"-A-15-GO 1"-A-15 NC 6"-A-15-GO 8"-PD-291-028-P1 4"-A-15A NC 3"-A-15A 3"-ASLL-291-031-S1 1"-A-15 1"-A-15 NC NC 1"-A-15 8"x4" 3"-A-15A LFF1 FE 0048 + NC 1"-A-151"-A-15 NC 1"-A-15 NC 1"-A-15 NC 6"x4" 6"x4" 3" 4"-ASLL-291-051-S1 291-PK-002 291-PK-002 PLS FILTER PRECOAT PUMP SKID PACKAGE 6"-ASLL-291-052-S1 6"-ASLL-291-052-S1 M 291-BG-704 291-SC-704 291-CH-704 291-BG-704 PLS FILTER PRECOAT BAG UNLOADER 291-SC-704 PLS FILTER PRECOAT SCREW FEEDER 291-CH-704 PLS FILTER PRECOAT TANK FEED CHUTE 291-HS-704 291-HS-704 PLS FILTER PRECOAT HOIST 6"x4" 3 3
  • 3. M M VFD VFD 0085 FIC FAL 0082 LIT 0083 LIT 0082 LIC LAHH 0083 LIC LAHH LAH LAL I I I I PP706M XU PP705M XU LCS LCS M 0085 FIT 0082 LSL 0089 TE 0088 TE RTD 0088 TIT 0089 TIT 0089 TI LAH 0088 TI TAH 0083 LSL I 0085 HS 2164 FROM PLS FILTER BYPASS 291-PI-T-001 2210 TO E-1 PUMP MIX TANK 291-TK-713 291-PI-T-004 2161 FROM PLS FILTER 291-FL-701 291-PI-T-001 2462 RATIO CONTROL TO 291-FFIC-0186 291-PI-T-008 2470 MANUAL RATIO CONTROL TO 291-FDI-0131/0132 291-PI-T-005 LAH LAL 8" X 8" 8" X 8" NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE, 000-LT-I-205, AT A LATER DATE. TO FLOOR TO FLOOR (STANDBY) SAMPLING NC 6"-PSH-291-037-S1 291-SA-011 291-SA-011 Mo SX PLS FEED SAMPLER NC NC 1"-SPH-6A 6"-PSH-291-033-S1 1"-A-15 6"-A-15-GO 6"-A-15-GO 6"-A-15-GO 1"-A-15 1"-A-15 6"-A-15-GO 1"-A-15 6"-PSH-291-034-S1 6"-PSH-291-036-S1 6"-PSH-291-002-S1 6"-PSH-291-030-S1 6"-A-15A-GO 6"-A-15A-GO 6"-A-15A-GO 6"-A-15A-GO 6"-A-15A-GO NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. PLS FEED 291-PI-T-003 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/30/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-003 MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 INSTRUMENTATION LEGEND, P&ID 291-PI-T-003 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 08/20/10 RC JHL MMB ZDM / EAD 01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND, P&ID000-PI-T-001 4 FE 0085 + NC NC NC NC NC NC NC 4" 4" 6"-PSH-291-037-S1 291-PP-705 291-PP-706 291-PP-705 PLS FEED PUMP 291-PP-706 PLS FEED PUMP (STANDBY) 6"-PSH-291-032-S1 6"-A-15-GO6"-C-23 6"-C-23 6"-A-15-GO 1"-A-15 1"-A-15 6"x4" 6"x4" 28-04-2012 13:58:28 6"-ASLL-291-001-S1 6"-PSH-291-035-S1 6"-A-15-GO 6"-PSH-291-031-S1 1"-A-15 1"-A-15 NC NC 291-PK-003 291-PK-003 PLS FEED PUMP SKID PACKAGE PP 3"-A-15A LVF1 6"-A-15A-GO LVF1 NC 3"-A-15A 291-TK-705 291-TK-706 291-TK-705 PLS TANK 291-TK-706 PLS TANK 6"x4" 6"x4" 8"-PD-291-029-P1 RTD 6"-PSH-291-002-S1 6"-PSH-291-002-S1 8"-PD-291-030-P1 3029 (VENDOR FOAM SYSTEM) FROM SX PLANT S/D INTERLOCK (NOTE 2) S/D S/D S/D 3 3 6"-SPJ-1H 6"-SPJ-1H 4 4 4 4
  • 4. M M VFD VFD M M VFDVFD AQ OR AQ OR (NOTE 3) LCSLCS II I I 0111 CI CAH I I 0113 LSHH LAL 0113 LS AG711M XU AG710M XU I LCS AG714M XU AG713M XU LCSI 0115 LS 0115 LSHH LAL I I 0120 LIT PP710M XU 0120 LE I 0120 LAH 0120 LI ILCS AG710M SIC SAH SAL AG711M SIC SAH SAL AG713M SIC SAH SAL AG714M SIC SAH SAL 0111 CE 0111 CIT 0114 CI CAH 0114 CIT 0114 CE 0112 CI 0112 CE 0112 CIT 0116 CE 0116 CIT 0116 CI 0118 LE 0118 LIT 0118 LI 0117 LI 0117 LE 0117 LIT 2219 TO SCRUB MIX TANK 291-TK-716 291-PI-T-005 2222 TO EXTRACTION CRUD TANK 291-TK-738 VIA 291-PI-T-005 2210 FROM PLS FEED PUMPS 291-PP-705/706 291-PI-T-003 2225 FROM BARREN ORGANIC PUMPS 291-PP-733/734 291-PI-T-008 2252 TO EXTRACTION CRUD TANK 291-TK-738 291-PI-T-014 2253 TO RAFFINATE TANKS 291-TK-707/709 291-PI-T-010 2434 FROM RAFFINATE ORGANIC RECOVERY PUMP 291-PP-745 291-PI-T-010 2435 TO RAFFINATE DIVERSION BOX 291-DI-708 291-PI-T-010 2691 VIA COLLECTION DITCH TO EMERGENCY POND 255-PD-001 255-PI-T-007 NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. ORGANIC RECOVERY DISCHARGE TO SETTLER FEED LAUNDER. 3. SEE MECHANICAL DRAWINGS FOR WEIR ACCESS HATCH DETAILS. LAH LAHH LAHH LAH (NOTE 2) ( NOTE 3) M CAH CAL TO SX PLANT S/D INTERLOCK TO SX PLANT S/D INTERLOCK 3"-SPH-20 3"-C-23 3"x2" NC 2"-A-15 2"-A-15 NC 2"-A-15 NC NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. EXTRACTION 291-PI-T-004 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-004 MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 INSTRUMENTATION LEGEND P&ID MOLYBDENUM 291-PI-T-004 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 08/25/10 RC JHL MMB ZDM/EAD 01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND P&ID000-PI-T-001 4 6"-PSH-291-037-S1 2" 4"-A-15 2"-A-15 NC NC 6"-B-4-GO-E72 6"-B-4-GO-E72 NC 291-AG-710 4"-A-15 6"-B-4-GO 6"-B-4-GO 291-TK-712 291-TK-711291-TK-710 291-AG-711 291-AG-713 6"-B-4-GO 6"-B-4-GO-E72 291-TK-715 6"-B-4-GO 4"-A-15 4"-A-15 291-AG-714 291-TK-713 2"-A-15 6"-B-4-GO-E72 291-TK-714 NC NC NC NC 2"-A-15 6"-WBO-291-004-S1 6"-WBO-291-005-S1 4"-LO-291-060-S1 6"-PSH-291-004-S1 6"-LO-291-001-S1 6"-ABS-291-010-S1 4"-LO-291-002-S1 6"-LO-291-003-S1 6"-ABS-291-010-S1 2"-ACC-291-001-S1 2"-ACC-291-002-S1 2"-ACC-291-001-S1 4"-B-4-GO-E72 NC 4"-B-4-GO-E72 NC 3"-ACC-291-020-S1 3"-ABS-291-007-S1 NC NC NC 1"-A-15 1"-A-15 291-PP-710 3"-A-15 3"-A-15 LFF1 6"-B-4-GO NC 4"-ABS-291-013-S1 6"-PSH-291-014-S1 6"-PSH-291-009-S1 6"-B-4-GO 6"-B-4-GO 6"-B-4-GO NC NC NC 291-TK-710 E-2 PUMP MIX TANK 291-AG-710 E-2 PUMP MIX TANK AGITATOR 291-TK-711 E-2 AUXILIARY MIX TANK 291-AG-711 E-2 AUXILIARY MIX TANK AGITATOR 291-TK-712 E-2 SETTLER TANK 291-TK-713 E-1 PUMP MIX TANK 291-AG-713 E-1 PUMP MIX TANK AGITATOR 291-TK-714 E-1 AUXILIARY MIX TANK 291-AG-714 E-1 AUXILIARY MIX TANK AGITATOR 291-TK-715 E-1 SETTLER TANK SLOPE LVF1 LVF1 LVF1 LVF1 07-05-2012 14:59:32 1"-A-15 NC 1"-A-15 NC 2"-SPH-6A 3"-ABS-291-003-S1 291-PP-710 SX EXTRACTION SUBMERSIBLE SUMP PUMP 3"-A-15 3"-A-15 3"-A-15 3"-ACC-291-020-S1 3"-ABS-291-007-S1 2"-SPH-6A NC 4 4 4 4 4 4
  • 5. VFD MM M M VFD VFD VFD AQ OR ( NOTE 2) AQ OR 0123 LSHH 0124 AI AAL AAH 0123 LI LAL 0123 LE 0127 LE 0123 LIT 0127 LIT 0128 AE 0124 AIT 0128 AIT 0124 AE 0128 AIC AAH AAL 0127 LI LAHH LAH 0121 CE 0125 CE 0125 CIT M 0121 CIT I I LCS AG717M XU I LCS AG719M XU I AG720M XU I LCSI 0131 FIT 0122 CI CAH 0122 CIT 0122 CE M 0129 FIT 0129 FI 0130 FIT 0130 FIC 0121 CI CAH 0125 CI CAH 0127 LSHH I I LCS AG716M XU 0126 CI CAL 0126 CE 0126 CIT 0131 FI FAH FAL M 0132 FI FAL FAH M 0131 FD FDAL 0132 FD FDAL AG716M SIC AG717M SIC AG719M SIC AG720M SIC 0128 HIC 0131 HIC 0132 HIC 0132 FIT 2219 FROM E-1 SETTLER TANK 291-TK-715 291-PI-T-004 2220 FROM LOADED ORGANIC SCRUB WATER PUMPS 291-PP-725/726 291-PI-T-013 2222 FROM ACID CRUD COLLECTION PUMP 291-PP-738 291-PI-T-004 2215 TO SCRUB 1 PUMP MIX TANK 291-TK-722 291-PI-T-006 2216 TO RAFFINATE TANKS 291-TK-708/709 291-PI-T-010 2218 TO EXTRACTION CRUD TANK 291-TK-738 291-PI-T-014 2467 TO 291-PP-725/726 291-PI-T-013 2469 FROM SCRUB AQUEOUS METERING PUMP 291-MP-749 291-PI-T-006 2470 PLS FEED FROM 291-FIC-0085 291-PI-T-003 2635 FROM SODIUM HYDROXIDE METERING PUMP 284-MP-711 284-PI-T-006 2636 TO SODIUM HYDROXIDE METERING PUMPS 284-MP-711/712 284-PI-T-006 SAMPLING SAMPLING NOTES: 1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001 2. AQUEOUS ADVANCE INTAKE THROUGH A STAND PIPE IN AQ WEIR. 3. VORTEX BREAKER LOCATED IN AQ RECYCLE INTAKE. 4. AQUEOUS RECLAIM DISCHARGE INTO SETTLER FEED LAUNDER. 5. SEE MECHANICAL DETAIL DRAWINGS FOR WEIR ACESS DETAILS. LAH LAL DRAIN LAHHTO SX PLANT S/D INTERLOCK TO SX PLANT S/D INTERLOCK TO SX PLANT S/D INTERLOCK TO SX PLANT S/D INTERLOCK ( NOTE 3) ( NOTE 3)( NOTE 2) (NOTE 4) FDAH FDAH RATIO SP RATIO SP COLLECTION WAND (TYPICAL ) pH pH pH pH pH pH 07-05-2012 8:56:13 FE 0130 + 291-TK-721 SCRUB 2 SETTLER TANK 291-TK-719 SCRUB 2 PUMP MIX TANK 291-TK-718 SCRUB 1 SETTLER TANK 291-TK-717 SCRUB 1 AUXILIARY MIX TANK 291-TK-716 SCRUB 1 PUMP MIX TANK 291-AG-716 SCRUB 1 PUMP MIX TANK AGITATOR 291-TK-716 4"-LO-291-008-S1 NC 2"-ACC-291-001-S1 6"-LO-291-006-S1 2"-CSS-291-004-S1 2"-CSS-291-004-S1 6"-LO-291-006-S1 3"-SSS-291-026-S1 2"-LCD-291-044-S1 2"-ACC-291-003-S12"-ACC-291-003-S1 2"x1" 291-SA-013 291-SA-013 SCRUB RAFFINATE SAMPLER NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. SCRUB 291-PI-T-005 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-005 MECHANICAL EQUIPMENT LIST REV. T000-EL-M-001 INSTRUMENTATION LEGEND P & ID LOADED ORGANIC 291-PI-T-005 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 08/06/10 RC JHL MMB ZDM 01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND P & ID000-PI-T-001 4 2"-ACC-291-004-S1 SLOPE 291-AG-716 291-TK-717 291-AG-717 291-TK-718 291-TK-719 291-AG-719 291-TK-720 291-AG-720 291-TK-721 291-AG-720 SCRUB 2 AUXILIARY MIX TANK AGITATOR 291-AG-717 SCRUB 1 AUXILIARY MIX TANK AGITATOR 291-TK-720 SCRUB 2 AUXILIARY MIX TANK 291-AG-719 SCRUB 2 PUMP MIX TANK AGITATOR FE 0129 + 2" 2" 2"x1" 1/2"-A-37 NC 2"-A-15 2"-A-15 NC 2"-SPH-6A 6"-LO-291-003-S1 2"-CSS-291-004-S1 6"-SSS-291-028-S1 4"-LO-291-008-S1 2"-CSS-291-004-S1 6"-LO-291-010-S1 2"-ACC-291-004-S1 2"-A-15 6"-B-4-GO-E72 3"-B-4-GO 6"-B-4-GO 6"-B-4-GO-E72 4"-B-4-GO-E72 2"-A-15 2"-A-15 2"-A-15 3"-A-15 6"-B-4-GO 6"-B-4-GO 4"-A-15 4"-A-15 2"-A-15 6"-B-4-GO 2"-A-15 NC NC NC NC NC NC NC NC NC 2"-A-15 6"-B-4-GO NC NC NC NC 2"-A-15 NC 6"-LO-291-009-S1 6"-LO-291-004-S1 3"-SSS-291-026-S1 V FE 0131 + FE 0132 + LVF1 LVF1 LVF1 LVF1 1"-A-15 NC 1"-A-15 NC 1"-C-10 2"-C-10 V 291-MX-701 291-MX-701 SODIUM HYDROXIDE IN LINE MIXER 1"-A-15 2"-SH-291-016-S1 1"-CSS-291-001-S1 2"-LCD-291-037-S1 2"-C-10 6"-SSS-291-024-S1 2"-A-15 6"-B-4-GO-E72 2"-E-18 1"-SH-284-019-S1 1"-A-15 NC 1"-A-15 NC 4"-B-4-GO-E72 NC 2"-A-15 2"-C-10 2"-A-15 6"-B-4-GO-E72 1"-A-15 NC 2"-SPH-6A 4"-LO-291-005-S1 6"-SSS-291-024-S1 3"-SSS-291-026-S1 4"-LO-291-005-S1 2"-A-15 291-PP-738 291-PP-738 ACID CRUD COLLECTION PUMP 2"-ACC-291-001-S1 2"x1" 2"x1" 6"x4"6"x4" 6"x4"6"x4" SLOPE 6"-B-4-GO 6"-B-4-GO NC 2"-A-15 NC 4 4
  • 6. M M VFD VFD M VSD M M 0141 LIT 0141 LIC 0141 LE LCS PP747M XU LCS I I PP748M XU I S/D I 0142 FIC FAH FAL 0142 FIT 0144 PIT 0144 PSHH 0145 PSHH 0145 PIT 0145 PI 0144 PI 0143 LG 2" I MP749M XU LCS I 0120 HIC 0142 HIC M 0146 FI 0146 FI 0146 FIQ VENT 2215 FROM SCRUB 2 SETTLER 291-TK-721 291-PI-T-005 2436 TO S-1 PUMP MIX TANK 291-TK-723 291-PI-T-011 2469 TO SCRUB 2 SETTLER TANK 291-TK-721 291-PI-T-005 2520 TO S-2 AQUEOUS ADVANCE PUMPS 291-PP-730/731 291-FIC-0169 291-PI-T-007 2519 W-1 AQUEOUS RECYCLE 291-FIC-0188 291-PI-T-008 2517 TO BARREN ORGANIC WASH WATER PUMPS 291-PP-727/728 291-PI-T-013 2" ISOTAINER LAHH LAH LAL (STANDBY) (NOTES 3 & 4) 2"-A-15 291-PP-795 291-PP-796 291-PP-795 REAGENT DRUM PUMP 291-PP-796 REAGENT DRUM PUMP 291-PP-747 LOADED ORGANIC PUMP 291-PP-748 LOADED ORGANIC PUMP (STANDBY) 291-PP-794 291-PP-794 DILUENT PUMP AND METERING SKID 1"-CSS-291-001-S1 2"-C-10 V NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. AFTER SETTLER TANK 291-PI-T-006 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-006 MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 INSTRUMENTATION LEGEND P & ID LOADED ORGANIC 291-PI-T-006 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 01/28/11 RC JHL MMB ZDM/MKM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001 4 FE 0146 + 1"-SPH-20 1"-SPH-20 3"-SPH-20 1"-A-15 1"-A-15 3"-A-15 08-05-2012 17:28:03 291-TK-747 291-TK-747 LOADED ORGANIC AFTER SETTLER TANK LVF1 NC NC 6"-A-15 1"-A-15 1"-A-15 6"-A-15 291-PP-748 291-PP-747 FE 0142 + 3"-A-15 4"-A-15 NC NC 4"-SPH-6A 3"-SPH-6A NC NC 6"-LO-291-010-S1 6"-B-4-GO 4"-A-151"-A-15 NC 6"-SLO-291-007-S1 6"-SLO-291-008-S1 6"-SLO-291-009-S1 6"-A-156"-C-23 1"-A-15 6"-A-15 6"-A-15 6"-A-15 6"-A-15 6"-A-15 1"-A-15 NC NC 6"x4" 6"x4" 6"-C-23 1"-A-15 1"-A-15 NC LVF1 1"-SPH-6A 1"-SPH-6A 1"-SPH-6A 1"-SPH-6A 1"-TAE-291-001-S1 1"-TAE-291-002-S1 3"-DIL-291-001-S1 291-PK-794 DILUENT PUMP AND METERING SKID PACKAGE LFF1 NC 1"-SPH-6A 1"-SPH-6A NC 291-MP-749 291-MP-749 SCRUB AQUEOUS METERING PUMP 4"-SPH-6A NC 6"-SPJ-1H 6"-SPJ-1H 2" 2491 FROM BARREN ORGANC PUMPS 291-PP-733/734 291-FFIC-0186 291-PI-T-008 (NOTE 3) (NOTE 2) (NOTE 2) 291-PK-004 LOADED ORGANIC PUMP SKID PACKAGE 291-PK-004 1"-A-151"-C-10 1"-A-15 1"-CSS-291-005-S1 1"-CSS-291-005-S1 2"x1" 2"x1" M 2"-TAE-291-003-S1 NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. PUMPS START AUTOMATICALLY WITH BARREN ORGANIC PUMPS. 3. TANK IS DRAINED TO EXTRACTION CRUD SUMP (291-PP-721) VIA CONDUCTIVE STAINLESS STEEL BRAIDED HOSE. 4. SCRUB AQUEOUS METERING PUMP SUCTION AND DRAIN NOZZELS ARE LOCATED AT THE BOTTOM OF THE TANK. 5. ALL REAGENT CONTAINERS AND UNLOADING ELEMENTS NEED TO BE BONDED AND GROUNDED. 6. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE. I LCS 3"x1" I PP794M XU LFF1291-PK-794 3"-DIL-291-002-S1 3030 (VENDOR FOAM SYSTEM) FROM SX PLANT S/D INTERLOCK S/D (NOTE 6) S/D 6"-SLO-291-006-S1 1-1/2"x1" 1-1/2"x1" 3"x1/2" 4 4 4 4 4 4
  • 7. VFDVFD M M M M VFD VFD M VFD AG728M XU LCSI 0163 CI CAL LCS LCS I PP730M XU LCS 0160 LI LAH LAL 0160 LE I M M 0169 FIT 0169 FIC FAH FAL 0169 HIC 0162 HIC I PP731M XU AG727M XU 0165 CIT LCS 0165 CE I 0165 CI CAL 0163 CIT 0163 CE LCS I 0162 FIT 0162 FIC 0167 LE 0167 LIT 0167 LI LAHH LAL 0168 LIT 0168 LIC LAHH 0168 LE PP714M XU 0167 LSHH I I TM730M XU LCS AG727M SIC SAH SAL AG728M SIC SAH SAL TM730M SIC SAH SAL 0168 LSHH 0160 LIT 0167 LI 2386 FROM W-1 TANKS 291-PI-T-0082387 TO S-1 STRIP 291-PI-T-011 2389 FROM BARREN ORGANIC WASH WATER PUMPS 291-PP-727/728 291-PI-T-013 2390 TO STRIP S-1 PUMP MIX TANK 291-TK-723 291-PI-T-011 2396 FROM AQUA AMMONIA PUMPS 291-PP-765/766 291-PI-T-011 2392 FROM W-1 AQUEOUS ADVANCE PUMPS 291-PP-776/777 291-PI-T-008 2698 TO RAFFINATE TANK 291-DI-708 291-PI-T-010 2699 VIA COLLECTION DITCH TO EMERGENCY POND 255-PD-001 255-PI-T-007 2394 TO STRIP CRUD COLLECTION TANK 291-TK-737 291-PI-T-014 2399 TO WASH W-1 PUMP MIXER TANK 291-TK-731 291-PI-T-008 2400 FROM STRIP S-1 CLARIFIER SETTLER TANK 291-TK-726 291-PI-T-011 2403 TO STRIP CRUD COLLECTION TANK 291-TK-737 VIA 291-PI-T-0112417 FROM V-1 CLARIFIER SETTLER TANK 291-TK-733 291-PI-T-008 2518 FROM 291-FIC-0262 291-PI-T-012 2520 FROM LOADED ORGANIC FLOW 291-FIC-0142 291-PI-T-006 TO SX PLANT S/D INTERLOCK TO SX PLANT S/D INTERLOCK LAH (STANDBY) NOTE: 1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001 LAH LAL LALL DRAIN FAH FAL M 291-TK-727 291-AG-728 291-PP-714 291-PP-714 SX STRIP SUMP PUMP 3"-A-15 3"-A-15 3"-B-4 2"-A-15 4"-B-4-GO-E72 3"-RS-291-002-S1 4"-SBO-291-19971-S1 4"-AMS-291-025-S1 4"-PV-291-018-P1 3"-PV-291-019-P1 3"-PV-291-017-P1 3"-PV-291-016-P1 4"x2"4"x2" 1"-A-15 291-AG-727 S-2 PUMP MIX AGITATOR 291-TK-727 S-2 PUMP MIX TANK 291-AG-727 291-TK-728 291-TK-728 S-2 AUXILIARY MIX TANK 291-AG-728 S-2 AUXILIARY MIX AGITATOR FE 0169 + FE 0162 + 3"-AMS-291-008-S1 3"x2" 291-PK-005 291-PK-005 S-2 AQUEOUS ADVANCE PUMP SKID PACKAGE 6"-PV-291-015-P1 1"-LCD-291-005-S1 2"-AMC-291-001-S1 3"-PV-291-016-P1 4"-PV-291-018-P1 4"-A-15 4"-AMS-291-027-S1 3"-AMS-291-008-S1 NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. S-2 STRIP 291-PI-T-007 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-007 MECHANICAL EQUIPMENT LIST, REV.T000-M-EL-001 INSTRUMENTATION LEGEND P & ID 291-PI-T-007 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 01/28/11 RC JHL MMB ZDM/MKM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P-& ID000-PI-T-001 4 4"-B-4-GO-E72 3"-B-11 3"-B-11 3"-B-11 4"-B-11 3"-B-11 NC NC NC NC 4"-AMS-291-026-S1 3"-AMS-291-029-S1 FV 0262A + V6 LFF1 2"-AQA-291-059-S1 3"-AMS-291-036-S1 3"-AMS-291-037-S1 291-CO-714 291-CO-714 STRIP SUMP COVER 3"-SPH-6A LVF1 LVF1 3"-C-23 3"-C-23 NC NC NC NC 3"-A-15 1"-A-15 291-PP-730 1"-A-15 291-PP-731 1"-A-15 1"-A-15 3"-SPJ-1H 3"-SPJ-1H 3"-A-15 4"-A-15 3"x1-1/2" 4"x3" 3"x1-1/2" 4"x3" 32 CM INSPECTION FLANGE 291-TK-730 S-2 CLARIFIER SETTLER TANK 291-TM-730 S-2 SETTLER MECHANISM 291-PP-731 S-2 AQUEOUS ADVANCE PUMP (STANDBY) 291-PP-730 S-2 AQUEOUS ADVANCE PUMP 291-TK-776 S-2 SETTLER AQ OVERFLOW TANK 291-TK-730 291-TM-730 291-TK-776 FV 0162 + 6"-SBO-291-001-S1 2"-AMC-291-001-S1 2"-AMC-291-002-S1 2"-A-15 NC 2"-SPH-6A 2"-A-15 NC 2"-SPH-6A 6"-B-4-GO 6"-B-4-GO-E72 NC 2"-A-15 6"-SLO-291-010-S1 6"-B-4-GO-E72 6"-SLO-291-011-S1 3"-B-4-GO NC 3"-B-4-GO 3"-AMS-291-028-S1 4"-A-15 07-05-2012 10:17:19 2"-A-15 2"-A-15 NC NC 3"-C-23 SLOPE 3"-PV-291-014-P1 2" 2" 1"-A-15 NC 3"-SPH-6A V6 LVF1 LVF1 LVF1 NC 291-MX-727 291-MX-727 S-2 NH3 INLINE MIXER V6 4"-B-4-GO-E72 3"-AMS-291-005-S1 3"-AMS-291-020-S1 3"-A-153"-A-15 3"-A-15 NC 2"x1" 1"-A-15 NC NC NC 3"x2" 3"x2" V V 4 4 I I I I I
  • 8. M VFD M M M VFD M M M VFD VFD VFD VFD VFD I I M LCS I S/D LCS LCS 0188 FIT 0189 FIT 0183 LSHH LCS 0181 CI CAL AG732M XU AG731M XU 0181 CE LCS 0186 HIC M 0188 HIC 0186 FIT 0186 FIC I PP733M XU I ILCS PP734M XU I I I LCS I I PP777M XU 0183 LIT LCS 0183 LE II 0187 FIC 0187 FIT 0187 FI M M I 0188 FIC FAH FAL 0182 CE 0190 FIC 0189 FIC 0190 FIT AG731M SIC SAH SAL 0184 LIC LAH AG732M SIC SAH SAL 0184 LIT PP776M XU 0184 LE 0181 CIT 0182 CI CAL 0182 CIT 0185 LIT 0185 LI LAHH 0185 LSLL LCS I TM733M SIC SAL SAH I TM733M XU 0192 PIT 0192 PSHH 0191 PSHH 0191 PIT 0185 LSHH 0194 LG 0192 PI 0191 PI 0189 FI 2421 FROM STRIP CRUD SUMP PUMP 291-PP-722 291-PI-T-014 2386 TO S-2 STRIP 291-PI-T-007 2637 TO 291-FIC-0283 291-PI-T-013 2392 TO S-2 PUMP MIX TANK 291-TK-727 291-PI-T-007 3031 (VENDOR FOAM SYSTEM) FROM SX PLANT S/D INTERLOCK (NOTE 3) 2225 TO E-2 PUMP MIX TANK 291-TK-710 291-PI-T-004 2399 FROM S-2 CLARIFIER SETTLER TANK 291-TK-730 291-PI-T-007 2417 TO STRIP CRUD COLLECTION TANK VIA 291-TK-737 291-PI-T-007 2419 FROM BARREN ORGANIC WASH WATER PUMPS 291-PP-727/728 291-PI-T-013 2426 FROM ORGANIC HOLDING TANK PUMP 291-PP-741 291-PI-T-015 2462 FROM 291-FIC-0085 291-PI-T-003 2491 TO 291-FIC-0142 RATIO CONTROL 291-PI-T-006 2497 TO ORGANIC HOLDING TANK PUMP 291-PP-741 291-PI-T-016 2519 FROM LOADED ORGANIC FLOW 291-FIC-0142 291-PI-T-006 2521 TO 291-FIC-0262 RATIO CONTROL 291-PI-T-012 2590 FROM PURIFICATION WASH RETURN PUMPS 292-PP-780/781 292-PI-T-007 2638 TO 291-FIC-0283 291-PI-T-013 NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. AQUEOUS RETURN FROM CRUD PLANT DISCHARGES INTO SETTLER FEED LAUNDER. 3. TO BE SPECIFIED BT AKER SOLUTIONS INTERLACK TABLE. (NOTE 2) (STANDBY) (STANDBY) LAHH LAH LAL S/D LAL LALL LAH PAHH PAH PAHH PAH LAHH LAL LALL TO S/D INTERLOCK TO S/D INTERLOCK RSP COLLECTION WAND S/D S/D FE 0190 + NC NC 3"-A-15 4"-A-15 2"-SPH-6A 3"-SPH-6A 6"-WBO-291-004-S1 4"-AMS-291-034-S1 3"-AMS-291-035-S1 3"-AMS-291-036-S1 4"-AMS-291-033-S1 291-PK-006 291-TK-731 WASH W-1 PUMP MIXER TANK 291-AG-731 W-1 PUMP MIXER TANK AGITATOR 291-TK-732 WASH W-1 AUXILIARY 1 MIXER TANK 291-AG-732 W-1 AUXILIARY MIXER TANK AGITATOR 291-TK-733 W-1 CLARIFIER SETTLER TANK 291-PP-737 AMMONIA CRUD COLLECTION PUMP 291-TM-733 W-1 SETTLER MECHANISM 291-TK-777 W-1 SETTLER AQ OVERFLOW TANK 3"-AMS-291-043-S1 4"x2"4"x2" 1"-A-15 NC 4"-B-4-GO-E72 3"x2" 3"x2" 6"-WBO-291-002-S1 6"-WBO-291-003-S1 6"-WBO-291-001-S1 6"-WBO-291-004-S1 2"-LCD-291-045-S1 4"-PV-291-023-P1 HV 0197 + HV 0198 + V1ZV1Z 291-PK-007 2"-A-15 2"-A-15 NC NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. ORGANIC WASH 291-PI-T-008 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/05/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-008 MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 INSTRUMENTATION LEGEND P & ID W-1 291-PI-T-008 02/03/11RCJHLDDZDMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 01/28/11 RC JHL MMB ZDM/MKM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001 4 NC 3"-B-11 3"-B-11 4"-B-11 3"-B-11 3"-WBO-291-009-S1 2"-ACO-292-056-S1 3"-ABS-291-061-S1 2"-AMC-291-001-S1 2"-LCD-291-041-S1 4"-WBO-291-010-S1 6"-SBO-291-001-S1 2"-AMC-291-003-S1 6"-PV-291-020-P1 3"-AMS-291-036-S1 3"-PV-291-021-P1 3"-PV-291-022-P1 3"-PV-291-024-P1 291-TK-777 291-TM-733 291-TK-733291-TK-732 291-AG-731 LVF1 LVF1 4"x1-1/2" 6"-B-4-GO-E72 291-TK-731 291-AG-732 NC 291-PP-777 NC NC NC 1"-A-15 1"-A-15 1"-A-15 1"-A-15 1-1/2"-SPJ-1H 1-1/2"-SPJ-1H 2-1/2"x1" 4"x1-1/2" 2-1/2"x1" 2-1/2"-C-23 2-1/2"-C-23 FE 0188 + 291-PP-776 FE 0189 + LVF1 LVF1 6"-SPJ-1H 6"-SPJ-1H 6"-C-23 6"-C-23 6"x4" 6"x4" 291-PP-733 1"-A-15 NC 1"-A-15 NC 1"-A-15 NC1"-A-15 NC 6"-A-15-GO 6"-A-15-GO 6"-A-15-GO 291-PP-734 V6 FV 0188 + V6 FV 0187 + FE 0186 + V6 FV 0189 + 291-TK-734 6"-A-15-GO 2"-A-15 6"-B-4-GO-E72 4"-B-4-GO-E72 291-PP-737 3"-AMS-291-042-S1 6"-WBO-291-006-S1 2"-SPH-6A 2"-A-15 NC 3"-B-4 3"-A-15 1"-A-15 2"-A-15 2"x1/2" 2"x1/2" 2"-A-15 NC NC 2" 2" NC 4"-A-15 4"-B-4-GO 6"-B-4-GO NC 1"-A-15 6"-A-15-GO 1"-A-15 2"-A-15 LVF1 LVF1 05-05-2012 10:50:11 NC 4"-AMS-291-038-S1 2"-A-15 4"-B-4-GO-E72 NC NC NC 2"-A-15 V1Z V1Z HV 0199 + HV 200 + FE 0187 + 3"-A-15 2"-A-15 NC SLOPE V 291-TK-734 BARREN ORGANIC TANK 291-PP-733 BARREN ORGANIC PUMP 291-PP-734 BARREN ORGANIC PUMP (STANDBY) 291-PK-006 BARREN ORGANIC PUMP SKID PACKAGE 291-PP-776 W-1 AQUEOUS ADVANCE PUMP 291-PP-777 W-1 AQUEOUS ADVANCE PUMP (STANDBY) 291-PK-007 W-1 AUQEOUS ADVANCE PUMP SKID PACKAGE 2"x1/2" 2"x1/2" 3"-A-15 2"-A-15 2"-A-15 4 0183 LI 4 3"x2-1/2" 4 4 3"x2-1/2" 4 4 4 4 4 4 V V 0183 LI
  • 9. VFD VFD M MM LCS PP751M XU ILCS PP752M XU LCS I I I I IPP743M XU I LCSI LCS 0201 LI LAHH LALL 0201 LIT 0201 LE 0202 LIC LAHH LALL 0202 LIT 0202 LE 0201 LSHL 0207 FIT 0207 FIC 0021 LI 0021 LAHL PP759M XU 0021 LIT LCS I I 0021 LE 2227 TO PURIFICATION SURGE TANKS 292-TK-757/758 292-PI-T-001 1815 FROM PLANT AIR DISTRIBUTION 265-PI-T-006 2743 TO PURIFICATION SURGE TANKS 292-TK-757/758 292-PI-T-001 2744 TO P-1 PURFICATION TANK 292-TK-752 292-PI-T-002 2413 STRIP RICH AQUEOUS PUMPS 291-PP-735/736 291-PI-T-011 NOTE: 1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001 M 3"-A-15 3"-A-15 3"-A-15 NC NC NC 3"-RS-291-024-S1 3"-RS-291-012-S1 3"-C-233"-PV-291-002-P1 291-ZM-735 291-ZM-735 STRIP ORGANIC RECOVERY SPARGER NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. AND ORGANIC RECOVERY 291-PI-T-009 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/02/12RCMMBAPPOBM 09/14/11RCJHLJHLCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-009 MECHANICAL EQUIPMENT LIST R, REV. T000-EL-M-001 INSTRUMENTATION LEGEND & P & ID SX AMMONIA SCRUBBER 291-PI-T-009 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 01/28/11 RC JHL MMB ZDM/MKM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001 4 2"-A-15 1"-A-15 NC 1"-A-15 2"-A-15 4"-RS-291-004-S1 3"-RS-291-005-S1 3"-RS-291-011-S1 4"x3" 3"-SPJ-1H 3"-SPJ-1H 3"x1-1/2" 3"x1-1/2" NC 4"x3" 4"-A-15 1"-A-15 1"-A-15 1"-A-15 NC 1"-A-15 NC 3"-A-15 3"-C-23 NC 3"-A-15 LVF1 LVF1 3"-C-23 3"-A-15 NC NC 3"x1-1/2" 3"x1" 1"-A-15 1-1/2"-SPJ-1H 291-PP-743 291-PP-743 STRIP ORGANIC RECOVERY PUMP 291-TK-735 STRIP RICH AQUEOUS TANK 291-TK-735 291-PP-752 PURIFICATION FEED PUMP (STANDBY) 291-PP-751 PURIFICATION FEED PUMP 291-PP-751 3"-RS-291-021-S1 3"-RS-291-016-S1 2"-RS-291-017-S1 3"-RS-291-015-S1 3"-RS-291-006-S1 4"-A-15 LVF1 3"-A-15 01-05-2012 12:51:27 NC 4"-A-15 2"-A-15 2"-C-10 FE 0207 + FV 0207 + V6 PCV 0210 + 291-PP-752 4"-PV-291-015-P1 NCNC 3"-SPH-6A 292-PP-759 LFF1 292-PP-759 PURIFICATION SUBMERSIBLE SUMP PUMP 2501 TO S-1 AUXILARY MIX TANK LAUNDER 291-TK-724 291-PI-T-011 2432 TO STRIP CRUD TANK 291-TK-737 291-PI-T-014 3"-PD-291-031-P1 2" 2" 3"-B-11 3"-B-11 NC 3"-RS-291-011-S1 3"-PV-291-041-P13"-PV-291-041-P1 292-CO-759 292-CO-759 PURIFICATION SUMP COVER 2429 TO AMMONIA VENT 291-PI-T-012 (STANDBY) 291-PK-015 4"-RS-291-003-S1 3"-RS-291-006-S1 291-PK-015 PURIFICATION FEED PUMP SKID PACKAGE 3001 TO COLLECTION DITCH EMERGENCY POND 255-PD-001 255-PI-T-007 3"x2" 3"-PA-265-117-L8B 2"-PA-265-076-S1 3"x2" 3039 TO SX CRUD FILTER 291-FL-702 291-PI-T-015 3"-PA-265-117-L8B 4
  • 10. VFD VFD M M VFD M 0225 FIC 0225 FIT 0224 FIT 0221 LE 0222 LE LAHH LAH I I 0222 LIT0221 LIT 0224 FIC FAL 0222 LIC LAL 0221 LIC LAL 0223 PIT LCS LCS PP708M XU PP709M XU I I 0226 FIC 0226 FIT PP745M XU LCS I I 0223 PI PAL PAH M 0227 LIC LAHH 0227 LE 0227 LIT 2698 FROM S-2 STRIP SUMP PUMP 291-PP-714 291-PI-T-007 2216 FROM SCRUB-1 SETTLER 291-TK-718 291-PI-T-005 2253 FROM SX EXTRACTION SUMP PUMP 291-PP-710 291-PI-T-004 2434 TO E-2 SETTLER 291-TK-712 291-PI-T-004 2435 FROM E-2 SETTLER 291-TK-712 291-PI-T-004 2444 TO GYPSUM SEEDING TANK 285-TK-094 285-PI-T-020 2445 TO EXTRACTION CRUD COLLECTION TANK 291-TK-738 291-PI-T-014 2447 FROM STRIP CRUD SUMP PUMP 291-PP-722 291-PI-T-014 2448 FROM EXTRACTION CRUD SUMP PUMP 291-PP-721 291-PI-T-014 OVERFLOW SAMPLING 30" MH LAH LAHH (NOTE 2) (STANDBY) 3"-AMS-291-005-S1 LV 0222 + 4"-A-15 291-DI-708 291-DI-708 RAFFINATE DIVERSION BOX 8"-ABS-291-005-S1 8"-ABS-291-006-S1 291-SA-012 6"-ABS-291-021-P7 291-SA-012 RAFFINATE SAMPLER 3"-A-15 SLOPE SLOPE 6"x4" 4"-A-16 4"-A-16 4"-C-22 4"-C-22 4"-A-164"-A-16 8"-B-4-GO 8"-B-4-GO 6"x4" 4"x3" 8"x4" 6"x3" 8"x4" 6"x3" 4"-A-15 3"-ASU-291-032-S1-HC NC 6"-A-15A-GO 6"-A-15A-GO 4"-SPJ-1H NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. SYSTEM 291-PI-T-010 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/07/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-010MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 SOLVANT EXTRACTION FLOWSHEET291-FS-T-001 INSTRUMENTATION LEGEND, P&ID SX RAFFINATE 291-PI-T-010 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 01/28/11 RC JHL MMB ZDM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND, P&ID000-PI-T-001 4 LV 0221 + 291-PP-709 291-PP-708 291-PP-709 RAFFINATE PUMP (STANDBY) 291-PP-708 RAFFINATE PUMP 291-TK-709 RAFFINATE TANK NC 291-TK-708 RAFFINATE TANK FV 0225 + 291-TK-709 FE 0225 + 291-TK-708 NCNC NC NC NC NC 291-TK-745 RAFFINATE ORGANIC RECOVERY TANK 291-TK-745 FE 0226 + NC NC 291-PP-745 291-PP-745 RAFFINATE ORGANIC RECOVERY PUMP 8"-ABS-291-019-S1 8"-ABS-291-018-S1 4"-ABS-291-014-S1 4"-ABS-291-013-S1 6"-ABS-291-010-S1 3"-SSS-291-026-S1 4"-ABS-291-047-S1 3"-ABS-291-007-S1 8"-ABS-291-011-S1 8"-ABS-291-016-S1 2"-PA-291-151-L8B 6"-ABS-291-020-S1 8"-A-15A-GO 8"-A-15-GO8"-A-15-GO 1"-A-15 1"-A-15 6"-C-23 1"-A-15 8"-A-15-GO 1"-A-15 4"-SPJ-1H 6"-C-23 1"-A-15 8"-A-15-GO 1"-A-15 4"-SPJ-1H 4"-C-23 1"-A-15 4"-A-15 4"-ABS-291-031-S1 8"-B-4-GO8"-B-4-GO 4"-A-15 4"-A-15 2"-A-15 6"-A-15-GO NC SLOPE 6"-ABS-291-009-S1 2" 4"-A-15A NC 4"-ABS-291-022-S1 09-05-2012 10:02:48 1"-SPH-6A 1"-SPH-6A V6 V6 V6 LVF1 LVF1 LVF11"-SPH-6A 1"-SPH-6A 1"-SPH-6A 1"-SPH-6A 6"-A-15 3"-A-15 4"-A-15 4"-A-15 3"-A-15 3"-A-15 8"x4" FE 0224 + NC PCV 0232 + PCV 0231 + V6 3"-A-15 3"-SU-288-023-P7 S1 P7 6"-ABS-291-009-S16"-ABS-291-015-S1 NOTES: 1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001. 2. RECOVERED ORGANIC PUMPED INTO THE E-2 SETTLER FEED LAUNDER. 3. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE. 291-PK-008 291-PK-008 RAFFINATE PUMP SKID PACKAGE NC 8"-ABS-291-017-S1 8"-A-15-GO 8"-A-15-GO 8"-ABS-291-002-S18"-ABS-291-001-S1 8"-ABS-291-020-S1 6"-A-15-GO 6"-ABS-291-015-S1 291-PK-009 291-PK-009 RAFFINATE ORGANIC RECOVERY PUMP SKID PACKAGE 1932 FROM AMMONIA RECOVERY SUMP PUMP 288-PP-430 288-PI-T-110 1828 FROM AMMONIA SCRUBBER PUMPS 288-PP-233/234 288-PI-T-101 -HC 2430 TO AMMONIA SCRUBBER 288-DC-130 288-PI-T-101 2446 FROM HYDROMET PLANT AIR RECEIVER 265-AR-009 265-PI-T-006 2"-PA-265-150-L8B 4"-ABS-291-013-S1 6"-ABS-291-012-S1 4"x2" 4"x2" S/D 3032 (VENDOR FOAM SYSTEM) FROM SX PLANT S/D INTERLOCK (NOTE 3) 4"x3" 4"x3" 4"x3" FV 0226 + 8"x6" 4 4 8"x6"4 4 4 4 4 4 4
  • 11. VFD M M M MM VFD VFD VFD VFD 0246 FIT 0246 FIC FAH FAL M 0247 WI 0246 HS I I I 0247 FIT LCS LCS 0241 CI AG724M XU AG723M XU 0241 CE LCS I I LCS 0242 CE 0247 FI FAH FAL I I PP736M XU LAHH 0243 LIT LCS 0243 LE II AG723M SIC SAH SAL 0244 LIC LAH LAL 724M SIC SAH SAL 0244 LIT PP735M XU 0244 LE 0241 CIT 0242 CI CAH 0242 CIT I TM726M XU LCS TM726M SIC SAL SAH I 0243 LSHH C 0247 DI 0247 TI 2387 FROM S-2 STRIP TANKS 291-PI-T-007 2390 FROM S-2 AQUEOUS ADVANCE PUMPS 291-PP-730/731 291-PI-T-007 2388 FROM AQUEOUS AMMONIA PUMPS 291-PP-765/766 291-PI-T-012 2396 TO S-2 PUMP MIX TANK 291-TK-727 291-PI-T-007 2501 FROM STRIP ORGANIC RECOVERY PUMP 291-PP-743 291-PI-T-009 2412 TO TANK VENT COMPRESSOR KNOCKOUT DRUM 288-VL-101 286-PI-T-008 2413 TO STRIP RICH AQUEOUS TANK 291-TK-735 291-PI-T-009 2400 TO S-2 PUMP MIX TANK 291-TK-727 291-PI-T-007 2403 FROM AMMONIA CRUD COLLECTION PUMP 291-PP-738 291-PI-T-007 2436 FROM LOADED ORGANIC PUMPS 291-PP-747/748 291-PI-T-006 2438 TO STRIP CRUD COLLECTION TANK 291-TK-737 291-PI-T-014 2529 FROM 291-FIC-0262 291-PI-T-012 CAH (STANDBY) NOTE: 1. FOR GENERAL NOTES SEE DRAWING 000-PI-T-001. 2. RECOVERED ORGANIC DISCHARGES TO SETTLER FEED LAUNDER. LAH LAL DRAIN TO SX PLANT S/D INTERLOCK TO SX PLANT S/D INTERLOCK SAMPLING SAMPLING (NOTE2) 32 CM INSPECTION FLANGE 3"-SPH-6A 291-PP-735 291-PP-736 RICH AQUEOUS PUMP (STANDBY) 291-TM-726 S-1 SETTLER MECHANISM LVF1 LVF1 4"x3" 291-TK-726 STRIP S-1 CLARIFIER SETTLER TANK 3"-A-15 FE 0247 + 6"-A-15 FE 0246 + 291-SA-014 291-SA-014 SETTLER SAMPLER 1/2"-A-15 NC NC NC 3"-B-11 3"-B-114"-B-11 3"-B-11 3"x2" 3"x2" NC NC 4"x2"4"x2" 4"-B-4-GO 4"-RS-291-019-S1 4"-RS-291-018-S1 3"-RS-291-021-S1 3"-PV-291-028-P1 NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. 4"-AMS-291-050-S1 3"-AMS-291-030-S1 6"-SLO-291-009-S1 4"-SBO-291-003-S1 4"-SBO-291-003-S1 6"-SLO-291-010-S1 2"-AMC-291-053-S1 4"-AMS-291-050-S1 LVF1 LVF1 LVF1 3"-AMS-291-029-S1 3"-RS-291-016-S1 291-TK-723 291-AG-724 NC 291-PP-736 6"-B-4-GO-E72 NC NCNC 3"-A-15 1"-A-15 1"-A-15 1"-A-151"-A-15 3"-SPJ-1H 3"-SPJ-1H 3"-A-15 4"-A-15 3"x1-1/2" 4"x3" 3"x1-1/2" 3"-C-23 3"-C-23 291-TK-775 291-AG-724 S-1 AUXILIARY MIXER TANK AGITATOR 291-TM-726 291-TK-724 STRIP S-1 AUXILIARY MIXER TANK 291-TK-726291-TK-724 291-TK-775 S-1 SETTLER AQ OVERFLOW TANK 291-AG-723 291-PP-735 RICH AQUEOUS PUMP 291-TK-723 STRIP S-1 PUMP MIXER TANK 291-AG-723 S-1 PUMP MIXER TANK AGITATOR 6"-SLO-291-010-S1 2"-AQA-291-059-S1 2"-AMC-291-001-S12"-AMC-291-001-S1 6"-SLO-291-009-S1 2"-AMC-291-053-S1 6"-PV-291-015-P1 6"-PV-291-015-P1 3"-PV-291-027-P1 3"-PV-291-028-P1 4"-PV-291-029-P1 3"-PV-291-030-P1 3"-A-15 2"-AQA-291-062-S1 3"-RS-291-020-S1 2"-A-15 4"-A-154"-A-15 2"-A-15 2"-A-15 2"-A-15 2"-A-15 4"-B-4-GO-E72 NC 3"-A-15 3"-A-15 3"-B-4 3"-RS-291-023-S1 3"-RS-291-022-S1 6"-B-4-GO NC FV 0262B + FV 0246 + 4"-B-4-GO-E72 SLOPE NCNC V6 04-05-2012 11:54:02 V6 2"-C-10 NC 1"-A-15 NC 291-MX-723 291-MX-723 S-1 NH3 INLINE MIXER 4"-B-4-GO-E72 NC NC 1"-A-15 2"-SPH-6A S-1 STRIP 291-PI-T-011 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/02/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/30/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & RE-ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-011 MECHANICAL EQUIPMENT LIST, REV. T000-M-EL-001 INSTRUMENTATION LEGEND P & ID 291-PI-T-011 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 01/28/11 RC JHL MMB ZDM/MKM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001 4 2" 2" 3"-RS-291-021-S1 291-PK-010 291-PK-010 STRIP RICH AQUEOUS PUMP SKID PACKAGE 0243 LI 0243 LI V V 4 4 4
  • 12. M VFD M VFD M 0765 TE 0765 TIT 0765 TI TAHH TAH 0262 HIC I ILCS PP766M XU LCS PP765M XU I I 0262 FIT 0262 FIC LCS PP767M XU I I 0260 LIT 0260 LI LAH C C 0261 FIC 0261 FIT 0261 DIC 0260 LSHH 0263 TIT 0263 TE 0263 TI 1938 FROM ANHYDROUS AMMONIA ISOTAINERS 289-PI-T-001 2388 TO S-1 PUMP MIX TANK 291-TK-723 291-PI-T-011 1794 FROM CAUSTIC BOIL DISTILLATE COOLER 298-HX-115 288-PI-T-105 1796 FROM AMMONIA ABSORBER BOTTOMS COOLER 288-CK-200 288-PI-T-106 2956 TO TANK VENT COMPRESSOR KNOCKOUT DRUM VIA 6"-PV-292-025-P1 292-PI-T-003 2625 TO PURIFICATION AMMONIA WASSH BOOSTER TANK 292-TK-764 292-PI-T-004 2429 FROM STRIP RICH AQUEOUS TANK 291-TK-735 291-PI-T-009 2505 FROM AMMONIA STRIPPER DISTILLATE COOLER 288-HX-112 288-PI-T-112 2507 FROM AMMONIA CONDENSATE ADVANCE PUMPS 292-PP-783/784 292-PI-T-004 2518 TO 291-FV-0262A 291-PI-T-007 2521 FROM 291-FIC-0186 291-PI-T-008 2529 TO 291-FV-0262B 291-PI-T-011 (STANDBY) NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. LAL S1 4"-PV-291-015-P1 4"-A-8 291-PV-701 291-PV-701 AQUA AMMONIA STORAGE VESSEL 1-1/2"-AQA-291-058-S1 08-05-2012 10:16:47 3"-AQA-291-058-S1 3"-AQA-291-060-S1 2"-AQA-291-061-S1 2"-AQA-291-059-S13"-AQA-291-058-S1 2"-AQA-291-059-S1 NC NC NC 4"-PV-291-015-P1 4"-PV-291-010-P1 1/2"-AQA-291-007-S1 2"-A-5 2"-C-5 1-1/2"-C-10 1"-C-5 1-1/2"-C-5 NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. AMMONIA SUPPLY 07/07/11TO 291-PI-T-012 291-SOLVENT EXTRACTION P & ID 5 05/05/12RCMMBAPPOBMUPDATED AND RE-ISSUED FOR CONSTRUCTION 4 3 2 B 1 0 08/26/11RCJHLMMBCAC 07/20/11RCJHLMMBCAC 07/07/11RCJHLJHLMKM 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION UPDATED & RE-ISSUED FOR CONSTRUCTION REVISED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-012 MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 INSTRUMENTATION LEGEND P&ID AQUEOUS 291-PI-T-012 02/03/11RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/20/11 07/20/11 07/20/11 12/11/10 RC JHL MMB ZDM/EAD 01/28/11DDDDZDMISSUED FOR INTERNAL REVIEWPIPING LEGEND P&ID000-PI-T-001 5 1"-SPH-6A 1"-SPH-6A 291-PP-766 3"-A-15 1"-A-15 NC NC 2"x1" 2"-C-10 NC 1"-A-15 2"-A-15 291-PP-765 NC NC 1"-A-152"-C-10 1"-A-15 2"x1" 3"-A-15 2"-A-15 2"-AQA-291-059-S1 291-PP-767 NC NC 1"-A-152"x1-1/2" 1-1/2"-C-10 1"-A-152"-A-15 1-1/2"-A-15 291-MX-702 3"-A-15 1-1/2"-A-15 DV 0261 + 291-PP-767 AQUA AMMONIA RECYCLE PUMP 291-PP-765 AQUA AMMONIA PUMP 291-PP-766 AQUA AMMONIA PUMP (STANDBY) 291-MX-702 AMMONIA IN-LINE MIXER 2"-AQA-288-050-L6 2"-AHA-289-006-A3 1-1/2"-ACO-292-051-S1 1"-AQA-288-052-L6 1-1/2"-AQA-288-005-L6 2"-E-4 FE 0262 + LFF1 LVF1 LVF1 FE 0261 + 2"-A-5 2"-A-5 4"-A-85 1/2"-A-15 PSV 0264 + V6 1"-SPH-6A 1"-SPH-6A 1"-SPH-6A 1"-SPH-6A 291-PK-011 291-PK-011 AQUEOUS AMMONIA PUMP SKID PACKAGE 1-1/2"-AQA-291-056-S1 1-1/2"-AQA-291-056-S1 2"-AQA-291-055-S1 291-PK-014 291-PK-014 AQUEOUS AMMONIA RECYCLE PUMP SKID PACKAGE 2"-AHA-289-006-A3 4"-AMV-291-030-P1 4"-B-11 L6 3077 TO CALCINER VENT KNOCKOUT DRUM 288-VL-103 287-PI-T-005 5 1-1/2"x1" 5 5 3"x2" 3"x2" 5 5 5 5
  • 13. VFD M M M VFD VFD M VFD 2" 2" 0281 LIC LAL LAH PP725M XU 0281 LE LCS 0281 LIT I I I PP727M XU I 0283 FIC I PP728M XU 0283 FIT M I LCS LCS PP726M XU I I LCS 0281 LSL 0283 HIC 0284 LI 0281 LSLL 0130 HIC 2389 TO S-2 SETTLER AQUEOUS OVERFLOW TANK 291-TK-776 291-PI-T-007 2637 FROM 291-FI-0189 291-PI-T-008 2220 TO SCRUB 1 PUMP MIX TANK 291-TK-716 291-PI-T-005 2419 WASH W-1 PUMP MIXER TANK 291-TK-731 291-PI-T-008 2467 FLOW CONTROL 291-FIC-0130 291-PI-T-005 2517 FROM 291-FIC-0142 291-PI-T-006 2585 FROM STRIPPER BOTTOMS WATER ADVANCE PUMPS 292-PP-778/779 292-PI-T-006 2638 FROM 291-FI-0187 291-PI-T-008 TO FLOOR NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. TO BE SPECIFIED BY AKER SOLUTIONS INTERLOCK TABLE, 000-LT-I-205, AT A LATER DATE. NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. 2"-A-15 2"-A-15 2"-A-15 NC WATER TANK 291-PI-T-013 291-SOLVENT EXTRACTION P & ID 4 3 2 B 1 0 05/07/12RCMMBAPPOBM 08/26/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC 04/04/11RCJHLDDMKM 03/10/11RCJHLDDMKM A REVISED AS NOTED UPDATED AND RE-ISSUED FOR CONSTRUCTION. UPDATED & ISSUED FOR CONSTRUCTION UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CONSTRUCTION 000-PI-T-002 560-291-PI-T-012MECHANICAL EQUIPMENT LIST, REV. T000-EL-M-001 SX RO WATER, CAUSTIC, & AMMONIA SUPPLY FLOWSHEET291-FS-T-002 INSTRUMENTATION LEGEND P&ID SX WASH & SCRUB 291-PI-T-013 02/03/04RCJHLDDMKMISSUED FOR CLIENT APPROVAL 07/19/11 07/19/11 07/19/11 12/13/10 RC JHL MMB ZDM 01/28/11DDDDZDMISSUED FOR REVIEWPIPING LEGEND P&ID000-PI-T-001 4 NC NC NC NC 291-PP-725 LOADED ORGANIC SCRUB WATER PUMP 291-PP-726 LOADED ORGANIC SCRUB WATER PUMP (STANDBY) 291-PP-727 BARREN ORGANIC WASH WATER PUMP 291-PP-728 BARREN ORGANIC WASH WATER PUMP (STANDBY) 291-PP-725 291-TK-742 6"-PD-291-008-P1 24" MANHOLE 2"-A-15A3"-A-15A 1"-A-15 NC 2"x1-1/2" 1"-A-15 2"x1" LVF1 NC NC 2"-C-10 2"-A-15A 291-PP-726 1"-A-15 NC 2"x1" 1"-A-152"-C-10 NC 2"x1-1/2" LVF1 2"-A-15 2"-A-15 2"-A-15 2"-A-15 2"-LCD-291-040-S1 2"-LCD-291-038-S1 2"-LCD-291-039-S1 2"-LCD-291-041-S1 2"-LCD-291-037-S1 291-PP-727 2"-LCD-291-022-S1 2"-LCD-291-043-S1 291-PP-728 2"-A-151"-A-15 NC 2"-A-15 2"x1" 2"-C-10 NC 2"-C-10 NC LVF1 LVF1 NC 2"x1" 2"-A-15 2"-A-15 1"-A-15 1"-A-15 1"-A-15 291-TK-742 SX WATER TANK FE 0283 + 2"-LCD-292-032-S1 1"-LCD-291-005-S1 1"-A-15 02-05-2012 12:01:55 LV 0281 A + 4" 2"x1/2"2"x1/2" 2515 FROM RO UTILITY WATER PUMPS 280-PP-009/010 280-PI-T-003 2"-RO-280-002-S1 LV 0281 B + V1Z FC 3" (STANDBY) (STANDBY) 291-PK-013 2"-LCD-291-041-S1 2"-LCD-291-041-S1 2"-LCD-291-040-S1 2"-LCD-291-037-S1 2"-LCD-291-036-S1 291-PK-012 291-PK-012 BARREN ORGANIC SCRUB WATER PUMP SKID PACKAGE 291-PK-013 LOADED ORGANIC SCRUB WATER PUMP SKID PACKAGE S/D S/D S/D S/D 3033 (VENDOR FOAM SYSTEM) FROM SX PLANT S/D INTERLOCK (NOTE 2) S/D 4 4 4 4 4
  • 14. M M M M M LCS 0305 LI 0305 LIT 0305 LE 0305 LAHL I PP721M XU I 0306 LE LCS I I 0306 LIT PP722M XU 0306 LAHL 0306 LI 0302 LSLL 0302 LSLLAH 0302 LI I LCS I I PP719M XU I PP720M XU LCS 0301 LE RADAR 0301 LIT 0302 LIT 0302 LE RADAR II AG738M XU LCS I I AG736M XU 0301 LI LAH 0301 LSLL 0301 LSL 0033 LG 0034 LG 2878 FROM ORGANIC HOLDING TANK PUMP 291-PP-741 291-PI-T-015 2421 TO W-1 CLARIFIER SETTLER TANK 291-PI-T-008 2218 FROM ACID CRUD COLLECTION PUMPS 291-PP-738 291-PI-T-005 2252 FROM SX EXTRACTION SUMP PUMP 291-PP-710 291-PI-T-004 2394 FROM SX STRIP SUMP PUMP 291-PP-714 291-PI-T-007 2432 FROM STRIP ORGANIC RECOVERY PUMP 291-PP-743 291-PI-T-009 2438 FROM AMMONIA CRUD COLLECTION PUMP 291-PP-737 291-PI-T-011 2445 FROM RAFFINATE ORGANIC RECOVERY PUMP 291-PP-745 291-PI-T-010 2447 TO RAFFINATE DIVERSION BOX 291-DI-708 291-PI-T-010 2448 TO RAFFINATE DIVERSION BOX 291-DI-708 291-PI-T-010 2702 TO SX CRUD FILTER 291-FL-702 291-PI-T-015 NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001 CLAY ADDITION BY HAND CLAY ADDITION BY HAND 4" OVERFLOW4" OVERFLOW 02-05-2012 14:24:11 2"-A-15 3"-ABS-291-052-S1 2"-ABS-291-053-S1 4"-ABS-291-24133-S1 3"-A-15 4"-A-15 3"-A-15 3"-A-15 NC 2"-C-10 2"-C-10 2"-A-15 2"-A-15 NC 3"-A-15 3"-A-15 2"-ABS-291-055-S1 2"-ABS-291-060-S1 3"-ABS-291-054-S1 STRIP CRUD TANKS 07/25/11RBR/TO 291-PI-T-014 291-SOLVENT EXTRACTION P & ID 1 B 0 C 05/07/12RCMMBAPPOBM 09/14/11RCJHLMMBCAC 07/19/11RCJHLMMBCAC A ISSUED FOR CONSTRUCTION. UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CLIENT APPROVAL 000-PI-T-002 560-291-014 MECHANICAL EQUIPMENT LIST, REV. U000-EL-M-001 INSTRUMENTATION LEGEND P & ID ORGANIC TREATMENT 291-PI-T-014 04/14/11RCJHLDDMKMISSUED FOR APPROVAL 07/19/11 07/19/11 07/19/11 07/27/10 RC JHL MMB MKM 04/04/11RCJHLDDMKMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001 1 NC NC 3"-PV-291-012-P1 NC 2"-A-15 2"-A-15 LFF1 LFF1 LFF1 LFF1 LFF1 LFF1 3"-PV-291-011-P1 2"-A-15 2"-WBO-291-014-S1 3"-WBO-291-011-S1 2"-WBO-291-012-S1 291-CO-722 291-CO-722 STRIP CRUD SUMP COVER NC 1"-A-15 2"-A-15 2"-A-15 1"-A-15 NC NC NC NC 2"-A-15 NC 3"-A-15 4"-A-15 3"-A-15 3"-SPJ-1H 3"-SPJ-1H 2"-A-152"-A-15 NC NC 2"-A-15 NC 291-CH-737291-CH-738 291-CH-738 STRIP CRUD CLAY ADDITION CHUTE 291-CH-737 STRIP CRUD CLAY ADDITION CHUTE NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EM BODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. 4"-PD-291-032-P1 4"-PD-291-033-P1 291-TK-738 291-TK-738 EXTRACTION CRUD COLLECTION TANK 3"-AMS-291-008-S1 2"-RS-291-017-S1 3"-A-153"-A-15 4"-ABS-291-24133-S1 4"-ABS-291-047-S1 3"-ABS-291-061-S1 4"-ABS-291-24133-S1 4"-ABS-291-014-S1 2"-ACC-291-001-S1 3"-ACC-291-020-S1 2"-AMC-291-001-S1 291-PP-720 291-PP-720 STRIP CRUD FILTER FEED PUMP 291-PP-719 291-PP-719 EXTRACTION CRUD FILTER FEED PUMP 291-TK-737 291-TK-737 STRIP CRUD COLLECTION TANK 291-AG-737 291-AG-738 291-AG-738 EXTRACTION CRUD TANK AGITATOR 291-AG-737 STRIP CRUD TANK AGITATOR 291-PP-721 291-PP-721 EXTRACTION CRUD SUBMERSIBLE SUMP PUMP 3"-ABS-291-059-S1 3"-ABS-291-057-S1 2"-ABS-291-058-S1 2"-ABS-291-049-S1 2"-WBO-291-013-S1 4"-C-23 4"-C-10 2"-A-15 2"-A-15 2"-A-15 2"-A-15 2"-ABS-291-046-S1 3"-ABS-291-051-S1 3"-ABS-291-056-S1 2"-ABS-291-032-S1 3"-B-11 3"-B-11 2217 FROM ORGANIC HOLDING TANK 291-TK-741 291-PI-T-015 2951 FROM ORGANIC HOLDING TANK 291-TK-741 291-PI-T-015 M 4"-SPH-6A 291-PP-722 4"-SPH-6A 291-PP-722 STRIP CRUD SUBMERSIBLE SUMP PUMP 2"-WBO-291-014-S1 2"-ABS-291-060-S1 3"-PV-291-012-P1 2"-ABS-291-029-S1 3"-WBO-291-011-S1 2"-AMC-291-001-S1 3"-AMS-291-008-S1 2"-RS-291-017-S1 2"-WBO-291-013-S1 LCS 3"-A-15 2"-A-15 8"-PV-291-025-P1 2705 TO PURIFICATION TANKS 292-TK-752/755 292-PI-T-002 4"x3" 4"x2" 4"x2" 2"-ABS-291-048-S1 1 1 1 1 1 1 1 1 1 1 1 1 1
  • 15. M M M LCS I PP723M XU I I PP741M XU LCSI I AG740M XU ILCS 0321 LE 0321 LIT 0321 LI 0321 LSLL 0322 LIT 0322 LI 0322 LE 0322 LSLL 0320 PI 0320 PIT 2878 TO CRUD TANKS 291-TK-737/738 291-PI-T-014 2951 TO EXTRACTION CRUD COLLECTION TANK 291-TK-738 291-PI-T-014 3039 FROM PLANT AIR DISTRIBUTION 291-PI-T-009 2217 TO STRIP CRUD COLLECTION TANK 291-TK-737 291-PI-T-014 2426 TO BARREN ORGANIC TANK 291-TK-734 291-PI-T-008 2702 FROM STRIP CRUD FILTER FEED PUMP 291-PP-720 291-PI-T-014 NOTES: 1. FOR GENERAL NOTES, SEE DRAWING 000-PI-T-001. 2. REMOVABLE CART. 3. OPEN/CLOSE HAND SWITCH WITH INDICATION GAUGES. DE BY HAND COLLECTION 3"-A-15 3"-A-15 NCNC 3"-A-153"-A-15A 291-CH-740 3"-A-15 3"-WBO-291-007-S1 3"x1-1/2" 2"-WBO-291-014-S1 2"x1/2" 1"x3/8" 1"-A-15 2"-PA-265-116-S1 3/8"-PA-291-128-S1 NOTICER E F E R E N C E S TOROMOCHO PROJECT C-560 REVISION DWG. NO. AREA CAD NO. MINERA CHINALCO PERU S.A. TITLE AREA PROJECT SIGN AND STAMP SIGN DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL NAME DOCUMENT CONTROL DISCIPLINE MANAGER NAME QUALITY CONTROL A1 SHEET SIZE DATE : DATE : DATE : DATE : DATE :DRAWN BY: CHECKED BY: APPROVED BY: AUTHORIZED BY: MCP APPROVED: SCALE : THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES HERE TO SHALL BE PERFORMED USING CADD ONLY. THIS DRAWING IS THE PROPERTY OF AND EMBODIES PROPRIETARY INFORMATION BELONGING TO AKER SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED TO THIRD PARTIES EXCEPT WITH THE WRITTEN PERMISSION. DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S DATEAPPROVEDCHECKBYDESCRIPTIONNO. R E V I S I O N S THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN T I T L EDWG. NO. NC 1"-A-15 NC 1"-A-15 09-05-2012 10:19:11 2"-PA-291-162-S1 2"-A-15 LFF1 291-PP-723 2"-C-23 NC 291-AG-740 1-1/2"-SPJ-1H1"-A-15 NC 1"-A-15 291-TK-740 291-TK-741 LFF1 291-PP-741 2"-WBO-291-001-S1 2"-A-15 2"-A-15 3"x2" 3"-DRIP TRAY 3"-PD-291-012-P1 3"-PD-291-006-P1 3"-ASL-291-004-S1 3"-WBO-291-009-S1 2"-A-15 2"-A-15 CRUD FILTER 07/25/11RBR/TO 291-PI-T-015 291-SOLVENT EXTRACTION P & ID 1 B 0 C 05/07/12RCMMBAPPOBM 09/14/11RCJHLJHLCAC 07/19/11RCJHLMMBCAC A ISSUED FOR CONSTRUCTION. UPDATED AND RE-ISSUED FOR CONSTRUCTION. ISSUED FOR CLIENT APPROVAL 000-PI-T-002 560-291-015 MECHANICAL EQUIPMENT LIST, REV. U000-EL-M-001 INSTRUMENTATION LEGEND P & ID ORGANIC TREATMENT 291-PI-T-015 04/22/11RCJHLDDZDMISSUED FOR APPROVAL 07/19/11 07/19/11 07/19/11 03/10/11 RC JHL MMB MKM 04/14/11RCJHLDDMKMISSUED FOR REVIEWPIPING LEGEND P & ID000-PI-T-001 1 3"-A-15A NC 2"-A-15 2"-A-15 2"-WBO-291-008-S1 2"-PA-291-065-S1 3"-SPJ-1H 3"-WBO-291-011-S1 2"x1" LFF1 2"-A-15 2"-A-15 291-ZM-702 2"-A-15 NC NC 3"-PA-291-117-L8B3"-PA-291-117-L8B 3"x2" 3"x2" 2"-ABS-291-058-S1 3"-C-22 3"-A-15 2"-WBO-291-001-S1 2"-WBO-291-013-S1 2"x1-1/2" 2"x1-1/2" (NOTE 3) 2"-ABS-291-058-S1 2"-ABS-291-035-S1 2"-PA-291-162-S1 2"-ABS-291-037-S1 2"-ABS-291-033-S1 2"-PA-291-163-S1 2"-ABS-291-058-S1 2"-ASL-291-005-S1 2"-ASL-291-005-S1 2"-ABS-291-037-S1 2"-ABS-291-036-S1 2"-ABS-291-038-S1 VENDOR PACKAGE V V V V V V V V VV 291-FL-702 (NOTE 2) 2"-ABS-291-038-S1 2"-ABS-291-036-S1 2"-ABS-291-040-S1 2"-ABS-291-034-S1 2"-PA-291-064-S1 2"-ABS-291-041-S1 2"-ABS-291-042-S1 291-FL-702 SX CRUD FILTER 291-ZM-702 CRUD FILTER CAKE PAN 291-TK-740 SX CRUD FILTER PRECOAT TANK 291-AG-740 SX CRUD FILTER PRECOAT TANK AGITATOR 291-PP-723 SX CRUD FILTER PRECOAT PUMP 291-TK-741 ORGANIC HOLDING TANK 291-PP-741 ORGANIC HOLDING TANK PUMP V 3/8" FNPT CONN. 1323 HS 1323 ZO 1323 ZC CLOSE OPEN 291-CH-740 CRUD FILTER PRECOAT D.E. ADDITION CHUTE 3"x1-1/2" 1 1