SlideShare a Scribd company logo
1 of 7
//JAY BABA SWAMI//
APPLICATION FOR THE POST OF “ “
Senior Manager, Asst. Manager, Engineer
(operation/maintenance/planning/project) of Static / Rotating /Utility
in Petrochemical ,Refinery ,Pharma , Oil and Gas, Power
**********************************
CURRICULUM VITAE ( RESUME )
LAD HANISHKUMAR KIKUBHAI
MOBILE NO : + 91 9825078545
(ANY TIME SMS OR READY TELIPHONIC INTERVIEW)
E MAIL : lad_hanish@yahoo.com OR ladhanish76@gmail.com
[ B.E.(Degreee) MECHANICAL ENGINEERING,
TOTAL 20 YEARS Experience AS
“MAINTENANCE/PLANNING ENGINEER
(STATIC, ROTATING & UTILITY) “
in BIG PETROCHEMICAL INDUSTIRES ]
CURRENT LOCATION: VADODARA, STATE : GUJARAT
PRESENT ADDRESS: A 37,Surayadarshan Township, Near Vishawamitri Rly.
Station,Manjalpur, City : Vadodara. State:Gujarat, Country : India
***Passport no: J4580125 (VALID 17/01/2011 TO 16/01/2021) AHMEDABAD
_______________________________________________________________________
****SKILL :****
“operation &Maintenance/planning engineer (static ,roating & utility)”
“Senior /assistant Manager (maintenance &planning)”
“ operation & maintenence Utility Mechanical engineer”
******CURRENT COMPANY*****
M/S. NIRMA LTD.,(BIG PETROCHEMICAL IND. )
Alindra, Village: Alindra , Tal:Savli ,City: Baroda, GUJARAT, INDIA
CURRENT TO TILL DATE :
16/12/2004 to till date ( 12year to present)
CURRENT DESIGNATION :
“ ENGINEER [mechanical planning & maintenance] “
HEAD OFFICE : Nirma House , Ashram road,city : Ahmedabad,State:Gujarat,India
Company 75,000 MTPA Linear Alkyl Benzene (LAB) project, the 65,000 MTPA Normal Paraffin
project around Rs.700 Crores. UOP LLC of USA,consultants including M/s SNC LAVALIN,
Canada and M/s. UHDE, India.
*********** History Employment******************
(1)ENGINEER ASSISTANT 08.04.2002 to 15.12.2004 ( 2.5 years )
COMED CHEM. LTD , Savli, Baroda(FORMULATION)
WHO, granulation, tablet, capsule, strip and vacuum, UTILITY EQUIPMENTS: CHILLER(Reciprocating
& VAC),AHU,DHU,FCU,DM PLANT,N2 PLANT, , Preparation Of Plant Layout. Finalization Of Area design,
HVAC & Water System .Finalization Of DQ for Equipments. Installation & Commissioning of new
Equipments. Monitoring Of Area Qualification & Equipment
(2)SHIFT ENGINEER 11.05.1998 to 07.04.2002 ( 4 years )
NIRAYU PVT.LTD,(BULK DRUG) ALEMBIC GROUP, Panelav, Halol,Baroda
Maintenance of brine chilling plant, boiler -5c ,cooling tower, DM plant, AHU, DHU, FCU, pilot plant,
glass tube & column type reactor with cooling & heating coil
EQUIPMENT MAINTENANCE :-
Monitoring Operation and Maintenance of Utilities includes IBR Boilers, Chilling Plant,
Air Handling Units (HVAC), Dehumidifiers, Water System Containing Of (Purified Water
Generation, Soft Water Plant, Steam Generator, Nitrogen Generator, Air compressors, Cooling
Towers, Maintenance of Plant Machinery like Dry Heat Sterilizer, Autoclaves, Washing m/c,
Filling m/c (Vial, Ampoules, Plastic bottles), Capping m/c, Printing and labeling m/c, Blenders,
Sifters, Granulators, fluid bed dryers, Tablet Compression machines, Coating m/c, Blister pack
m/c, Sticker labeling m/c.Vacuum Transferring System.
Updating & Preparation Of Engineering Records like Preventive Maintenance records, History
cards
(3) APPRENTICE ENGINEER/MECH ENGINEER 11.05.1997 To 10.05.1998 ( 1 years )
INDU NISSAN OXO CHEM LTD. BARODA(PETROCHEMICAL)
***PRESENT & REQUIRED SALARY :***
Present salary : INDIA Rs. 48,000 per month [ 6.5 lacks rs. CTC ]
Expected salary : Rs. 65,000 per month in india + OTHER ALLOW
salary would be on negotiable basis { 8 TO 10 LACKS CTC}
***WORK LOCATION :
Yes – I will relocate International & any where
**AVAILABLE (NOTICE PERIOD) : ONE MONTH NOTICE OR 30 DAYS OR 5 WEEK
**********QUALIFICATIONS*********
Highest qualification
*2010: B.E. [degree] in Mechanical Engineering in Nov. 2010 with first class 64.7 %
THE MAHARAJA SAYAJIRAO UNIVERSITY , BARODA ,GUJARAT ,INDIA
*1996:Diploma Mechanical Engineer in AUGUST 1996 with first class 71.5 % from
THE MAHARAJA SAYAJIRAO UNIVERSITY , BARODA,GUJARAT , INDIA
*1993:XII Science H.Sc : March 1993 with 55 % from THE GUJARAT SECONDARY
EDUCTION BOARD,GANDHINAGAR
*1991:X Science S.Sc : March 1991 with 64 % from THE GUJARAT SECONDARY
EDUCTION BOARD, GANDHINAGAR
*** COMPUTER SKILL : MS OFFICE , C, C++ , VC++ , JAVA , VISUAL BASIC ,TALLY , HTML ,
INTERNET , E-COMMERCE , BUSINESS SYSTEM ,SYSTEM ANALYSIS & DESIGN
*******JOB RESPONSIBILITY*******
***ROTARY EQUIPMENT LIKES ALL TYPES PUMP, COMPRESSOR,AIR FIN
FAN,ID & FD FAN,GEAR BOX,DIFF. TYPE MECHANICAL SEAL OF COOLING&
PLANT,LAPPING SEAL ,BALANCING,VIBRATION ANALYSIS,MECHANICAL
ADVISE,ALL TYPE CLEARANCE , BLOWER ,TURBINE,AGITATOR,ETC
*** STATIC EQUIPMENT LIKES ALL TYPE HEAT EXCHANGER, REACTOR,
VESSEL, TANK, COLUMN,BOILER,DAMPER,SPRING SUPPORT,HEATER,ETC
*** UTILITY[ HVAC] EQUIPMENT LIKES DM PLANT, , DUCT,N2 ,RO
PLANT,,DHU,AHU,VAC & RECIPROCATING PLANT,COOLING TOWER,RELATIVE
HUMIDITY,OPRATING PARAMETER,HEATING AND VENTILATION SYSTER,ETC
## Process plant general maintenance, Routine maintenance of all types
rotating & overhauling of all types rotating equipments, Co-operating
with operation peoples for solving the overcoming problems and
reporting to maintenance area manager.
## Planning and execution all the maintenance activities such as
Preventive,PREDUCTIVE and Breakdown maint. of the ROTORY and STATIC equip.
Overhauling of the mechanical equipments, Condition monitoring of critical
equipments.
##YEARLY ALL SHUTDOWN MAINTENANCE ACTIVITY
BARCHART,MATERIAL,MANPOWER,BILLING,COTATION,ETC.
## All working report to Head Maintenance ( HOD mechanical)
## Preparations of work schedule, work reports, equipment spare requirements
and do the entire job planning..Developing preventive and predictive
maintenance Schedules for all compressors by taking various inputs such as
Condition Monitoring results, Criticality of machinery, Manufactures Data and
executing the job at site
## To do Alignment of all Rotary Equipments after Maintenance by Dial gauge
method and fast (laser kit) alignment kit.
## To do plant shutdown related activities and jobs and also boiler
shutdown related activities and jobs with all safety
## To maintain and update the ISO & IMS formats/documents, history card,
lubrication schedule, spare list and spare stock. WIM ,DOMAP ISO , IMS
## OBJICTIVE, SOP,WIM,OSHAS , DEVIATION REPORT, MECHANICAL
ADVICE, MONTHLY REPORT,HISTORY ENTRY
## JOB SAFETY ANALYSIS ,COLD WORK,HOT WORK, EXTRIGUTION,
LOCK OUT,SAFETY PERMITS
### ENERGY CONSERVATION MONITOR AND CONTROL FOR OPTIMUM
USE OF RESOURCES ( WATER,ELECTRICAL ENERGY CONSURVATION,
N2,AIR, STEAM )
##PROPER PERSONAL PROTECTIVE EQUIPMENT PROVIDE AT TIME
JOBS ALLOCATION
##MOGEDRIL IN PLNAT AND IMERGENCY AND REPAIR TEAM
## To work out continuously on Improvement Projects such as reduction in
maintenance cost, manpower required, to reduce breakdowns, M/C down time,
power (electricity) to the equipment etc.
##Trouble shooting ,Thickness measurement, hydrotesting equipment static &
rotating
## Manpower handling like engineer, technician , rigger ,etc[ 35 PERSON ]
## Daily meeting with production , instrument, fire safety and electrical sic
## Drawing P & I diagram & Isometric
## Lapping seals & valves testing
## Housekeeping proper area & Training given to new employers
## Contracter billing & meeting ,Outside Party contact and following
##INSPECTION AND TESTING CERTIFICATE :LIFTING TOOL AND
TRACKLES ( FORM NO 10) & VESSEL ( FORM NO 11), PSV SMPV RULES 18
## PIPE & PIPE FITTING : HOT WORK INCLUDING NEW SCHEME & MODIFICATION
*** FAMILIAR WITH STANDARDS- DIN, ASME, ANSI, API,ASTM, TEMA , ISO , NFPA , OSHA
OCCUPATIONAL SAFETY AND HEATH ADMISTATION ,etc.
*** NEA BASE SOFT WARE SAME AS SAP
************ROTATING EQUIPMENT************
**CENTRIFUGLE ( API 610 ): MAKE: KSB, KHIMLINE, FLOW SERVE,SULZER( water,
acid, alkaly , hydrocarbon, etc) OVER HANG PUMP, BETWEEN BEARING, VERTICAL
SUSPENDED PUMP, Horizontal & Vertical High Speed Centrifugal Pump, Single and
Multi Split Casing Centrifugal Pump ,Single and Multi stage Vertical and Horizontal
Centrifugal pump , Back pull out type Centrifugal pump , Rotary piston and liquid ring
vacuum pump ,screw pump
*** MECHANICAL SEAL :Make: DURA,SEALOL,LEAK PROOF,ETC [ lapping, installation
as per drawing, seal port, sfc] BALANCE AND UNBALANCE SEAL, INTERNAL EXTERNAL
MOUNTED, FACE TO FACE ,BACK TO BACK, TANDEM,CARTIGE
*** API 682-PUMP SHAFT SEALING SYSTEM :orifice,sfc, seal port ,quenching
,pedestal Plant 11,12,13,21,22,23,31,32,41,52,62 COOLING PLANT PUMP jacket, cooler ,
bearing housing, stuffing box ,pedestal as A,B,C,D,E,F,G,H,I,J,K
***** KSB PUMP CENTRIFUGAL PUMP
MODEL RPK E M 50 – 200,PUMP SIZE DN 40 TO 200 MM,Q UP TO 8000 M3/HR,H
UP TO 240 MT, P UP TO 40 BAR, T -70 TO 400 C, SPEED 2900,1400 RPM
***VERTICAL HIGH SPEED CENT. PUMP
SUNDYNE LMV 311-132-113-SCTSP, Q 49.1 M3/HR, SUC/ DIS. PR. 4.6/36.5 KSC,
NPSH 4.5,NPSH 3 , SPEED 11500 RPM,HEAD 405 M, KW 87.7, EFF 50%
**** DAVID BROWN MULT. CENT. PUMP
MODEL 3X6XPXCDBB4 , NO OF STAGE 9, Q 109.7 M3/HR, SUC/DIS. PR 2.4/38.11
KSC, SPEED 2970 RPM, 149 KW, 72%
*** RECIPROCATING PUMP( API 674) : SWELORE
DIAPHRAGM , PLUNGER ,SINGLE AND MULTI STAGE REC. PUMP
****HIGH POWER PUMP (HORIZONTAL ,RECP. MULT. )
MODEL NO : T5SV-1150-121SF,CAP. 3 M3/HR, SUC/DIS. PR. 0/ 60 KSC, STROCK
LENTH: 50 MM , SPEED 181 TO 19 RPM, EFFI. 94 % GEAR BOX 1 : 6.6 ,
## CENTRIFUGAL FAN, ID/FD FAN , COOLING TOWER FAN , SOOT BLOWER ,GEAR
BOX , TWIN LOBE AIR BLOWER , AIR FIN COOLER FAN
*** CENTRIFUGAL & RECIPROCATING COMPRESSOR :
makes : KOBELCO, INGERSOLL RAND, M.S. ,NEUMAN AND ESSER, IHI , CORKEN , AILAS
COPCO, K.G. KHOSLA Single and Multi Stage Vertical and Horizontal Reciprocating
Compressor ,Single and Multi Screw Compressor
OVERHAULING OF COMPRESSOR, ALL TYPE OF CLEARANCE, LAPPING & SERVICE
OF VALVES,REPLACEMENT OF PARTS, ALIGNMENT ,PISTON RING, RIDER RING,
UNLOADER, RUNOUT, RADIAL,TANGEN PACKING ,OIL SCRAPER RING
****SCEW COMPRESSOR 74000NM3 / HR ,INLER PR. 0.87 KG/ CM2, 7000LT
OIL,DICH. PR. 3.46KG/CM2 ,2640 KW,4000RMP
****IHI COMPRESSOR 4 STAGE DOUBLE ACTING COMP. ,3850 M3/HR, MOTOR
555KW,500 RPM,SUCTION PR. 2.63/7.05/17.5/40.3, DIS.PR 7.42/18.3/41.6/87.4
KKG/CM2 ,BORE MM 340/220/220/155,STOCK 200 MM
TURBINE as per API 611-STEAM TURBINE, API 616-GAS TURBINE
_
********STANORY EQUIPMENT ********
# diff. type of COLUMN, cooler, Economizer, Heater ,VESSEL,Tank
# HEAT EXCHANGER( API 660 ) :
AS PER TEMA STANANDARD CHENEL END , SHELL , DOME COVER inspection,
testing of all types ,HYDROJETING , CLEANING,PLUGED TUBE, HYDRO TEST OF
SHELL AND TUBE SIDE TYPE AES BLINDING AND DEBLING maintenance fix tube,
floating head, U-tube, Plate Heat exchanger
( floating head, fix tube, hair pin ,etc,front head types A,B,C,D/SHELL TYPES
E,F,G,H,J/REAR END HEAD TYPES L,M,N,P,S,T,U,W )
## Non IBR and IBR Boiler , TWIN DRUM 3 PASS SMOKE TUBE BOILER :
( IBR 180 tonn/hr,11.5 kg/cm2 , hp, lp and mp steam,NON IBR 600 kg/ hr ) all type
fire tube and water tube boiler, hp and lp dosing pump,feed water pump 13 stage ,
35 kgcm2 pressure
Annual inspection as per boiler inspector, cleaning of tube and economizer,
hydrotest of steam drum,steam generator and economizer in present of inspector ,
all part open and check by inspector, safety valve testing, blowdown valve lapping,
fusible plug ,stop valve
*** BOILER MAKES THERMAX LTD, 180TON / HR, FUEL FO LDO NG, 1038 KG/CM
2,99.5 DRYNESS FACOT, OD 2420 MM, K 660 MM, T 1+6 MM, LP DOSING , HP
DOSING , 12.5 KG/ CM2 PRESSOR, FIRE TUBE , FORCE DRAFT, 188 C STEAM
## chain load testing, vessel presser serve, thickness measurements
## PSV, POSV,RUPTURE DISC INSPECTION AS RULE SMPV RULE 18
**** UTILITY EQUIPMENT *****
OPERATION AND MAINTENANCE
##RECIPROCATING , CENTRIFUGAL SCREW COPRESSOR AND VAPOUR
ABSOURPTION PLANTS( FREON,AMMONIA,THARMEX 100 TONN]
##Duct and Ducting , Dehumidification, AHU and FCU
##DM Water Plant (DEGGESER , ACTIVATED CARBON , STRONG BASE ANION,
WEAK BASE CATA ION, MIX BAD, ANION, CATION), Soft Water Plant, RO
PLANT
##### PERSONAL PROTECTIVE EQUIPMENT FIRE AND SAFETY,ELETRIC,
INSTUMENT
####### WORKSHOP EQUIPMENT
Test Bench, Mecanical Seal Lapping Macnine, Lath m/c, Drilling , Hacksaw , Milling m/c,
Hydraulic Press , Welding and Griddling m/c , Hydraulic Puller
****************PERSONALS DETAIL *****************
Name HANISHKUMAR KIKUBHAI LAD
Father’s Name KIKUBHAI DEVEGIBHAI LAD
Nationality/Religion Indian / hindu
Date of Birth 15 / 02 / 1976 ( age : 40YEARS )
Marriage Status MARRIED
Known language English, Hindi, Gujarati [Read,Write & Speak fluently]
Personality Strong character, emotionally stable & easily locatable
Native place KOPARLI, VAPI DIST: VALSAD,GUJARAT , INDIA.
I consider myself with mechanical engineer graduate aspect I am also confident of
my abilities to work in a team ,all department and as team leader. I here by declare
that the information furnished above is true to the best of my knowledge.
Need any more information feel free to call on my mobile OR SMS
DATE :
(HANISHKUMAR KIKUBHAI LAD )

More Related Content

Similar to cv_attach_LAD_HANISH_B.E(MECH)_16yrsExp_maintenance & planning Engineer

cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_EngineerHanishkumar Lad
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)Sayed Bessat
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerDeva Narayanan
 
RAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUMERAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUMEGhulam Sarwer
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)jesu lambert
 
k.senthilkumar resume NEW
k.senthilkumar resume NEWk.senthilkumar resume NEW
k.senthilkumar resume NEWSenthil kumar
 
320725879-Process-Engineering-Chiyoda.ppt
320725879-Process-Engineering-Chiyoda.ppt320725879-Process-Engineering-Chiyoda.ppt
320725879-Process-Engineering-Chiyoda.pptMayurkumarpatil1
 
Update Profile Siraj......
Update Profile Siraj......Update Profile Siraj......
Update Profile Siraj......Siraj Ahmed
 
Overview of solutions for machine monitoring
Overview of solutions for machine monitoringOverview of solutions for machine monitoring
Overview of solutions for machine monitoringIvan Zgela
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)wooilindo
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Kamran Saeed
 

Similar to cv_attach_LAD_HANISH_B.E(MECH)_16yrsExp_maintenance & planning Engineer (20)

cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
 
CV-JKGHOSH_23 Jul 2016
CV-JKGHOSH_23 Jul 2016CV-JKGHOSH_23 Jul 2016
CV-JKGHOSH_23 Jul 2016
 
CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016CV-JKGHOSH_04 Jun 2016
CV-JKGHOSH_04 Jun 2016
 
sayed bessat cv last rev (2)
sayed bessat cv last rev (2)sayed bessat cv last rev (2)
sayed bessat cv last rev (2)
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
RAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUMERAJU LETEST UTILITY RESUME
RAJU LETEST UTILITY RESUME
 
Mechanical resume (1)
Mechanical resume (1)Mechanical resume (1)
Mechanical resume (1)
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
k.senthilkumar resume NEW
k.senthilkumar resume NEWk.senthilkumar resume NEW
k.senthilkumar resume NEW
 
RABIGH II Resume ksa
RABIGH II Resume ksaRABIGH II Resume ksa
RABIGH II Resume ksa
 
320725879-Process-Engineering-Chiyoda.ppt
320725879-Process-Engineering-Chiyoda.ppt320725879-Process-Engineering-Chiyoda.ppt
320725879-Process-Engineering-Chiyoda.ppt
 
Update Profile Siraj......
Update Profile Siraj......Update Profile Siraj......
Update Profile Siraj......
 
Overview of solutions for machine monitoring
Overview of solutions for machine monitoringOverview of solutions for machine monitoring
Overview of solutions for machine monitoring
 
dhi.resume 2017
dhi.resume 2017dhi.resume 2017
dhi.resume 2017
 
DVR CV NEW12
DVR CV NEW12DVR CV NEW12
DVR CV NEW12
 
Job1.doc
Job1.docJob1.doc
Job1.doc
 
Company frofile 2015 (wooil)
Company frofile 2015 (wooil)Company frofile 2015 (wooil)
Company frofile 2015 (wooil)
 
Cement-thermocouple
Cement-thermocoupleCement-thermocouple
Cement-thermocouple
 
Hvac chiller Engineer Tech
Hvac chiller Engineer Tech Hvac chiller Engineer Tech
Hvac chiller Engineer Tech
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 

cv_attach_LAD_HANISH_B.E(MECH)_16yrsExp_maintenance & planning Engineer

  • 1. //JAY BABA SWAMI// APPLICATION FOR THE POST OF “ “ Senior Manager, Asst. Manager, Engineer (operation/maintenance/planning/project) of Static / Rotating /Utility in Petrochemical ,Refinery ,Pharma , Oil and Gas, Power ********************************** CURRICULUM VITAE ( RESUME ) LAD HANISHKUMAR KIKUBHAI MOBILE NO : + 91 9825078545 (ANY TIME SMS OR READY TELIPHONIC INTERVIEW) E MAIL : lad_hanish@yahoo.com OR ladhanish76@gmail.com [ B.E.(Degreee) MECHANICAL ENGINEERING, TOTAL 20 YEARS Experience AS “MAINTENANCE/PLANNING ENGINEER (STATIC, ROTATING & UTILITY) “ in BIG PETROCHEMICAL INDUSTIRES ] CURRENT LOCATION: VADODARA, STATE : GUJARAT PRESENT ADDRESS: A 37,Surayadarshan Township, Near Vishawamitri Rly. Station,Manjalpur, City : Vadodara. State:Gujarat, Country : India ***Passport no: J4580125 (VALID 17/01/2011 TO 16/01/2021) AHMEDABAD _______________________________________________________________________ ****SKILL :**** “operation &Maintenance/planning engineer (static ,roating & utility)” “Senior /assistant Manager (maintenance &planning)” “ operation & maintenence Utility Mechanical engineer”
  • 2. ******CURRENT COMPANY***** M/S. NIRMA LTD.,(BIG PETROCHEMICAL IND. ) Alindra, Village: Alindra , Tal:Savli ,City: Baroda, GUJARAT, INDIA CURRENT TO TILL DATE : 16/12/2004 to till date ( 12year to present) CURRENT DESIGNATION : “ ENGINEER [mechanical planning & maintenance] “ HEAD OFFICE : Nirma House , Ashram road,city : Ahmedabad,State:Gujarat,India Company 75,000 MTPA Linear Alkyl Benzene (LAB) project, the 65,000 MTPA Normal Paraffin project around Rs.700 Crores. UOP LLC of USA,consultants including M/s SNC LAVALIN, Canada and M/s. UHDE, India. *********** History Employment****************** (1)ENGINEER ASSISTANT 08.04.2002 to 15.12.2004 ( 2.5 years ) COMED CHEM. LTD , Savli, Baroda(FORMULATION) WHO, granulation, tablet, capsule, strip and vacuum, UTILITY EQUIPMENTS: CHILLER(Reciprocating & VAC),AHU,DHU,FCU,DM PLANT,N2 PLANT, , Preparation Of Plant Layout. Finalization Of Area design, HVAC & Water System .Finalization Of DQ for Equipments. Installation & Commissioning of new Equipments. Monitoring Of Area Qualification & Equipment (2)SHIFT ENGINEER 11.05.1998 to 07.04.2002 ( 4 years ) NIRAYU PVT.LTD,(BULK DRUG) ALEMBIC GROUP, Panelav, Halol,Baroda Maintenance of brine chilling plant, boiler -5c ,cooling tower, DM plant, AHU, DHU, FCU, pilot plant, glass tube & column type reactor with cooling & heating coil EQUIPMENT MAINTENANCE :- Monitoring Operation and Maintenance of Utilities includes IBR Boilers, Chilling Plant, Air Handling Units (HVAC), Dehumidifiers, Water System Containing Of (Purified Water Generation, Soft Water Plant, Steam Generator, Nitrogen Generator, Air compressors, Cooling Towers, Maintenance of Plant Machinery like Dry Heat Sterilizer, Autoclaves, Washing m/c, Filling m/c (Vial, Ampoules, Plastic bottles), Capping m/c, Printing and labeling m/c, Blenders, Sifters, Granulators, fluid bed dryers, Tablet Compression machines, Coating m/c, Blister pack m/c, Sticker labeling m/c.Vacuum Transferring System. Updating & Preparation Of Engineering Records like Preventive Maintenance records, History cards (3) APPRENTICE ENGINEER/MECH ENGINEER 11.05.1997 To 10.05.1998 ( 1 years ) INDU NISSAN OXO CHEM LTD. BARODA(PETROCHEMICAL) ***PRESENT & REQUIRED SALARY :*** Present salary : INDIA Rs. 48,000 per month [ 6.5 lacks rs. CTC ] Expected salary : Rs. 65,000 per month in india + OTHER ALLOW salary would be on negotiable basis { 8 TO 10 LACKS CTC} ***WORK LOCATION : Yes – I will relocate International & any where **AVAILABLE (NOTICE PERIOD) : ONE MONTH NOTICE OR 30 DAYS OR 5 WEEK
  • 3. **********QUALIFICATIONS********* Highest qualification *2010: B.E. [degree] in Mechanical Engineering in Nov. 2010 with first class 64.7 % THE MAHARAJA SAYAJIRAO UNIVERSITY , BARODA ,GUJARAT ,INDIA *1996:Diploma Mechanical Engineer in AUGUST 1996 with first class 71.5 % from THE MAHARAJA SAYAJIRAO UNIVERSITY , BARODA,GUJARAT , INDIA *1993:XII Science H.Sc : March 1993 with 55 % from THE GUJARAT SECONDARY EDUCTION BOARD,GANDHINAGAR *1991:X Science S.Sc : March 1991 with 64 % from THE GUJARAT SECONDARY EDUCTION BOARD, GANDHINAGAR *** COMPUTER SKILL : MS OFFICE , C, C++ , VC++ , JAVA , VISUAL BASIC ,TALLY , HTML , INTERNET , E-COMMERCE , BUSINESS SYSTEM ,SYSTEM ANALYSIS & DESIGN *******JOB RESPONSIBILITY******* ***ROTARY EQUIPMENT LIKES ALL TYPES PUMP, COMPRESSOR,AIR FIN FAN,ID & FD FAN,GEAR BOX,DIFF. TYPE MECHANICAL SEAL OF COOLING& PLANT,LAPPING SEAL ,BALANCING,VIBRATION ANALYSIS,MECHANICAL ADVISE,ALL TYPE CLEARANCE , BLOWER ,TURBINE,AGITATOR,ETC *** STATIC EQUIPMENT LIKES ALL TYPE HEAT EXCHANGER, REACTOR, VESSEL, TANK, COLUMN,BOILER,DAMPER,SPRING SUPPORT,HEATER,ETC *** UTILITY[ HVAC] EQUIPMENT LIKES DM PLANT, , DUCT,N2 ,RO PLANT,,DHU,AHU,VAC & RECIPROCATING PLANT,COOLING TOWER,RELATIVE HUMIDITY,OPRATING PARAMETER,HEATING AND VENTILATION SYSTER,ETC ## Process plant general maintenance, Routine maintenance of all types rotating & overhauling of all types rotating equipments, Co-operating with operation peoples for solving the overcoming problems and reporting to maintenance area manager. ## Planning and execution all the maintenance activities such as Preventive,PREDUCTIVE and Breakdown maint. of the ROTORY and STATIC equip. Overhauling of the mechanical equipments, Condition monitoring of critical equipments. ##YEARLY ALL SHUTDOWN MAINTENANCE ACTIVITY BARCHART,MATERIAL,MANPOWER,BILLING,COTATION,ETC. ## All working report to Head Maintenance ( HOD mechanical) ## Preparations of work schedule, work reports, equipment spare requirements and do the entire job planning..Developing preventive and predictive maintenance Schedules for all compressors by taking various inputs such as Condition Monitoring results, Criticality of machinery, Manufactures Data and executing the job at site
  • 4. ## To do Alignment of all Rotary Equipments after Maintenance by Dial gauge method and fast (laser kit) alignment kit. ## To do plant shutdown related activities and jobs and also boiler shutdown related activities and jobs with all safety ## To maintain and update the ISO & IMS formats/documents, history card, lubrication schedule, spare list and spare stock. WIM ,DOMAP ISO , IMS ## OBJICTIVE, SOP,WIM,OSHAS , DEVIATION REPORT, MECHANICAL ADVICE, MONTHLY REPORT,HISTORY ENTRY ## JOB SAFETY ANALYSIS ,COLD WORK,HOT WORK, EXTRIGUTION, LOCK OUT,SAFETY PERMITS ### ENERGY CONSERVATION MONITOR AND CONTROL FOR OPTIMUM USE OF RESOURCES ( WATER,ELECTRICAL ENERGY CONSURVATION, N2,AIR, STEAM ) ##PROPER PERSONAL PROTECTIVE EQUIPMENT PROVIDE AT TIME JOBS ALLOCATION ##MOGEDRIL IN PLNAT AND IMERGENCY AND REPAIR TEAM ## To work out continuously on Improvement Projects such as reduction in maintenance cost, manpower required, to reduce breakdowns, M/C down time, power (electricity) to the equipment etc. ##Trouble shooting ,Thickness measurement, hydrotesting equipment static & rotating ## Manpower handling like engineer, technician , rigger ,etc[ 35 PERSON ] ## Daily meeting with production , instrument, fire safety and electrical sic ## Drawing P & I diagram & Isometric ## Lapping seals & valves testing ## Housekeeping proper area & Training given to new employers ## Contracter billing & meeting ,Outside Party contact and following ##INSPECTION AND TESTING CERTIFICATE :LIFTING TOOL AND TRACKLES ( FORM NO 10) & VESSEL ( FORM NO 11), PSV SMPV RULES 18 ## PIPE & PIPE FITTING : HOT WORK INCLUDING NEW SCHEME & MODIFICATION *** FAMILIAR WITH STANDARDS- DIN, ASME, ANSI, API,ASTM, TEMA , ISO , NFPA , OSHA OCCUPATIONAL SAFETY AND HEATH ADMISTATION ,etc. *** NEA BASE SOFT WARE SAME AS SAP ************ROTATING EQUIPMENT************ **CENTRIFUGLE ( API 610 ): MAKE: KSB, KHIMLINE, FLOW SERVE,SULZER( water, acid, alkaly , hydrocarbon, etc) OVER HANG PUMP, BETWEEN BEARING, VERTICAL SUSPENDED PUMP, Horizontal & Vertical High Speed Centrifugal Pump, Single and Multi Split Casing Centrifugal Pump ,Single and Multi stage Vertical and Horizontal Centrifugal pump , Back pull out type Centrifugal pump , Rotary piston and liquid ring vacuum pump ,screw pump *** MECHANICAL SEAL :Make: DURA,SEALOL,LEAK PROOF,ETC [ lapping, installation as per drawing, seal port, sfc] BALANCE AND UNBALANCE SEAL, INTERNAL EXTERNAL MOUNTED, FACE TO FACE ,BACK TO BACK, TANDEM,CARTIGE
  • 5. *** API 682-PUMP SHAFT SEALING SYSTEM :orifice,sfc, seal port ,quenching ,pedestal Plant 11,12,13,21,22,23,31,32,41,52,62 COOLING PLANT PUMP jacket, cooler , bearing housing, stuffing box ,pedestal as A,B,C,D,E,F,G,H,I,J,K ***** KSB PUMP CENTRIFUGAL PUMP MODEL RPK E M 50 – 200,PUMP SIZE DN 40 TO 200 MM,Q UP TO 8000 M3/HR,H UP TO 240 MT, P UP TO 40 BAR, T -70 TO 400 C, SPEED 2900,1400 RPM ***VERTICAL HIGH SPEED CENT. PUMP SUNDYNE LMV 311-132-113-SCTSP, Q 49.1 M3/HR, SUC/ DIS. PR. 4.6/36.5 KSC, NPSH 4.5,NPSH 3 , SPEED 11500 RPM,HEAD 405 M, KW 87.7, EFF 50% **** DAVID BROWN MULT. CENT. PUMP MODEL 3X6XPXCDBB4 , NO OF STAGE 9, Q 109.7 M3/HR, SUC/DIS. PR 2.4/38.11 KSC, SPEED 2970 RPM, 149 KW, 72% *** RECIPROCATING PUMP( API 674) : SWELORE DIAPHRAGM , PLUNGER ,SINGLE AND MULTI STAGE REC. PUMP ****HIGH POWER PUMP (HORIZONTAL ,RECP. MULT. ) MODEL NO : T5SV-1150-121SF,CAP. 3 M3/HR, SUC/DIS. PR. 0/ 60 KSC, STROCK LENTH: 50 MM , SPEED 181 TO 19 RPM, EFFI. 94 % GEAR BOX 1 : 6.6 , ## CENTRIFUGAL FAN, ID/FD FAN , COOLING TOWER FAN , SOOT BLOWER ,GEAR BOX , TWIN LOBE AIR BLOWER , AIR FIN COOLER FAN *** CENTRIFUGAL & RECIPROCATING COMPRESSOR : makes : KOBELCO, INGERSOLL RAND, M.S. ,NEUMAN AND ESSER, IHI , CORKEN , AILAS COPCO, K.G. KHOSLA Single and Multi Stage Vertical and Horizontal Reciprocating Compressor ,Single and Multi Screw Compressor OVERHAULING OF COMPRESSOR, ALL TYPE OF CLEARANCE, LAPPING & SERVICE OF VALVES,REPLACEMENT OF PARTS, ALIGNMENT ,PISTON RING, RIDER RING, UNLOADER, RUNOUT, RADIAL,TANGEN PACKING ,OIL SCRAPER RING ****SCEW COMPRESSOR 74000NM3 / HR ,INLER PR. 0.87 KG/ CM2, 7000LT OIL,DICH. PR. 3.46KG/CM2 ,2640 KW,4000RMP ****IHI COMPRESSOR 4 STAGE DOUBLE ACTING COMP. ,3850 M3/HR, MOTOR 555KW,500 RPM,SUCTION PR. 2.63/7.05/17.5/40.3, DIS.PR 7.42/18.3/41.6/87.4 KKG/CM2 ,BORE MM 340/220/220/155,STOCK 200 MM TURBINE as per API 611-STEAM TURBINE, API 616-GAS TURBINE _ ********STANORY EQUIPMENT ******** # diff. type of COLUMN, cooler, Economizer, Heater ,VESSEL,Tank # HEAT EXCHANGER( API 660 ) : AS PER TEMA STANANDARD CHENEL END , SHELL , DOME COVER inspection, testing of all types ,HYDROJETING , CLEANING,PLUGED TUBE, HYDRO TEST OF SHELL AND TUBE SIDE TYPE AES BLINDING AND DEBLING maintenance fix tube, floating head, U-tube, Plate Heat exchanger ( floating head, fix tube, hair pin ,etc,front head types A,B,C,D/SHELL TYPES E,F,G,H,J/REAR END HEAD TYPES L,M,N,P,S,T,U,W )
  • 6. ## Non IBR and IBR Boiler , TWIN DRUM 3 PASS SMOKE TUBE BOILER : ( IBR 180 tonn/hr,11.5 kg/cm2 , hp, lp and mp steam,NON IBR 600 kg/ hr ) all type fire tube and water tube boiler, hp and lp dosing pump,feed water pump 13 stage , 35 kgcm2 pressure Annual inspection as per boiler inspector, cleaning of tube and economizer, hydrotest of steam drum,steam generator and economizer in present of inspector , all part open and check by inspector, safety valve testing, blowdown valve lapping, fusible plug ,stop valve *** BOILER MAKES THERMAX LTD, 180TON / HR, FUEL FO LDO NG, 1038 KG/CM 2,99.5 DRYNESS FACOT, OD 2420 MM, K 660 MM, T 1+6 MM, LP DOSING , HP DOSING , 12.5 KG/ CM2 PRESSOR, FIRE TUBE , FORCE DRAFT, 188 C STEAM ## chain load testing, vessel presser serve, thickness measurements ## PSV, POSV,RUPTURE DISC INSPECTION AS RULE SMPV RULE 18 **** UTILITY EQUIPMENT ***** OPERATION AND MAINTENANCE ##RECIPROCATING , CENTRIFUGAL SCREW COPRESSOR AND VAPOUR ABSOURPTION PLANTS( FREON,AMMONIA,THARMEX 100 TONN] ##Duct and Ducting , Dehumidification, AHU and FCU ##DM Water Plant (DEGGESER , ACTIVATED CARBON , STRONG BASE ANION, WEAK BASE CATA ION, MIX BAD, ANION, CATION), Soft Water Plant, RO PLANT ##### PERSONAL PROTECTIVE EQUIPMENT FIRE AND SAFETY,ELETRIC, INSTUMENT ####### WORKSHOP EQUIPMENT Test Bench, Mecanical Seal Lapping Macnine, Lath m/c, Drilling , Hacksaw , Milling m/c, Hydraulic Press , Welding and Griddling m/c , Hydraulic Puller ****************PERSONALS DETAIL ***************** Name HANISHKUMAR KIKUBHAI LAD Father’s Name KIKUBHAI DEVEGIBHAI LAD Nationality/Religion Indian / hindu Date of Birth 15 / 02 / 1976 ( age : 40YEARS ) Marriage Status MARRIED Known language English, Hindi, Gujarati [Read,Write & Speak fluently] Personality Strong character, emotionally stable & easily locatable Native place KOPARLI, VAPI DIST: VALSAD,GUJARAT , INDIA. I consider myself with mechanical engineer graduate aspect I am also confident of my abilities to work in a team ,all department and as team leader. I here by declare that the information furnished above is true to the best of my knowledge.
  • 7. Need any more information feel free to call on my mobile OR SMS DATE : (HANISHKUMAR KIKUBHAI LAD )