FREYSSINET INTERNATIONAL & Cie – TECHNICAL DEPARTMENT
1 bis rue du Petit Clamart – B.P. 135
78148 VELIZY-VILLACOUBLAY
Tel. : 33 1 46 01 85 10 – Fax : 33 1 46 01 86 52
PROJET, LOT, TITRE, TYPE DE DOC. / PROJECT, SCOPE, TITLE, DOC. TYPE__
BARDDHAMAN
Stay Cables
Damper
Working Procedure
PAYS / COUNTRY MOA / CLIENT MOE / CONTRACTOR
India
FREYSSINET INTERNAL REVISION STATUS_
E
D
C
B
A 03/01/14 ADN MBS IZC FIRST ISSUE
REV. DATE
RÉDIGÉ PAR
/ WRITTEN BY
VÉRIFIÉ PAR
/ CHECKED BY
APPROUVÉ PAR
/ APPROVED BY
MODIFICATION
FREYSSINET DOCUMENT N° REVISION
M13-014E1–PRA 006 A
Quality Management System certified by BUREAU VERITAS Certification
PAGE / SHEET
1 / 9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 2/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
CONTENTS
1. SCOPE OF WORKS ........................................................................................3
2. ABREVIATIONS ..............................................................................................3
3. INTERNAL RADIAL DAMPER ........................................................................3
3.1 General description...................................................................................3
3.2 Ressources...............................................................................................4
3.3 Installation of the IRD................................................................................4
3.4 Crucial points............................................................................................7
3.5 ITP ............................................................................................................8
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 3/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
1. SCOPE OF WORKS
The purpose of this document is to describe the different operations to be carried out for
the installation of the Internal Radial Dampers (IRD) for Barddhaman Bridge.
IRD are installed on cables whose length is above 80m. Therefore, IRD shall be installed
on the following cables:
- 7001 to 7004 on the main span of the central plane,
- 7018 on the back span of the central plane,
- 6001 to 6004 and 5001 to 5004 on the main span of the side plane,
- 6018 and 5018 on the back span of the side plane.
2. ABREVIATIONS
IRD Internal Radial Damper
AVT Anti-Vandalism Tube
GT Guide Tube
ITP Inspection and Test Plan
3. INTERNAL RADIAL DAMPER
3.1 General description
The IRD (Internal Radial Damper) are fabricated in factory. They are made of 4 main
components:
- the compacting collar that comes around the strand bundle and transfers the load
to the pistons,
- the three hydraulic pistons ensuring the damping,
- the three caps connecting the pistons to the guide tube,
- the guide tube attached to the deck.
Guide tubeThree Hydraulic Pistons
Cap
Compacting Collar
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 4/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
3.2 Ressources
Workforce
1 Chief operator
2 Labourers
Plant and equipment
Crane or lifting device.
3.3 Installation of the IRD
The main stages of the IRD installation are the following:
- Preliminary works,
- Compacting collar installation,
- Guide tube centering,
- Preparation and installation of the hydraulic pistons
- Finishing works.
3.3.1 Preliminary works
Before installing the damper, the following operations shall be done:
- Lifting of the GT and securing it with safety bars,
- Marking of the collar position onto the strand bundle (refer to ITP for the correct
distance),
- Compacting of the strand bundle with straps,
- Installation of dummy strands (if the strand bundle is not fully completed).
Figure 1: Lifting the guide tube Figure 2: Marking the position of the damper
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 5/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
3.3.2 Compacting collar installation
For the collar installation, the following operations shall be performed:
- Installation of the 2 half shells of the compacting collar between the 2 marks,
- Checking of the dummy strand position,
- Closing of the gap between the 2 half shells,
- Partial tightening of 2 bolts M16 to well place the collar in front of each other.
- Final tightening of the 6 bolts M16 (refer to ITP for the required torque).
- Installation of the 6 collar damper connectors with the 12 screws M12,
- Full screwing of the 6 adjusting pistons and nuts onto the 6 threaded rods of the
collar and installation of the 6 adjusting caps.
Figure 3: Compacting collar installed around the bundle
3.3.3 Guide Tube Centering
In order to allow the same stroke of the pistons in every direction, the guide tube shall be
centred around the strand bundle. The steps to do so are the following:
- Removal of the safety bars and lowering of the guide tube.
- Lifting of the AVT.
- Centering the guide tube around the strand bundle thanks to the oblong holes,
- Partial tightening of the 8 bolts M20 of the flange with the special washers,
- Settling of the 6 adjusting pistons at 40mm from the guide tube internal diameter,
- Lowering of the AVT with a crane.
Figure 4: lifting of the AVT Figure 5: GT centring
Compacting
collar
Collar
damper
connector Adjusting
pistons, nuts
and caps
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 6/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
3.3.4 Preparation and installation of the hydraulic pistons
Hydraulic pistons shall be prepared in advance:
- Threading of the cap axle through the external end of the hydraulic piston, spacers
and cap connector,
- Threading of the collar axle through the internal end of the piston,
- Marking of the hydraulic piston at mid stroke and fully compressed.
Once all pistons are prepared, they can be installed on the compacting collar according to
the following operations:
- Placing of the collar axle into the collar connector grooves,
- Tightening of the 4 collar connector screws M12,
- Settling of the piston to mid stroke,
- Installation of the cap and fixation to the cap connector,
- Fixation of the cap to the guide tube.
Figure 6: Cap Installation
3.3.5 Finishing Works
To finish the installation of IRD, the following operations shall be performed:
- Lowering the AVT,
- Fully tightening the 8 M20 bolts without modifying the GT orientation (the required
torque is indicated in the ITP),
- Application of sealant for waterproofness of the flange.
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 7/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
3.4 Crucial points
• ITP: Refer to relevant ITP for installation data records (see §3.5).
• Hydraulic piston orientation:
o Top/bottom orientation
The hydraulic piston can be delivered with or without cap.
The top end shall always be higher than the bottom end.
WITHOUT CAP
o Angular orientation
The longitudinal orientation shall be controlled: the piston body shall be rotated
such that the marking at the lower end of the piston is oriented down.
Note : All the damper pistons shall be delivered with the indication “DOWN” that
shall be oriented down.
DOWN
indication
Gravity
Bottom end
Top end
Up
Down
Down
Gravity
Up
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 8/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.
3.5 ITP
BARDDHAMAN – Stay Cables
Damper – Working Procedure
M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 9/9
This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any
form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
REV.

More Related Content

What's hot

Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...
Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...
Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...fusjefjkskem
 
Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...
Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...
Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...ToniSiahaan
 
Yale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manualYale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manualjkemmd eudkms
 
Yale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manualYale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manualfjsefksemmm
 
Yale b888 erp15 vc lift truck service repair manual
Yale b888 erp15 vc lift truck service repair manualYale b888 erp15 vc lift truck service repair manual
Yale b888 erp15 vc lift truck service repair manualfjjksekfksmem
 
Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...
Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...
Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...jfjkskekemm
 
Isuzu trooper 20workshop_20manual
Isuzu trooper 20workshop_20manualIsuzu trooper 20workshop_20manual
Isuzu trooper 20workshop_20manualbiggwallyy
 
Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...
Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...
Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...ujfjjskekfmmde
 

What's hot (8)

Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...
Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...
Caterpillar cat 320 d2 excavator (prefix ybk) service repair manual (ybk00001...
 
Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...
Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...
Quick start-guide-rosemount-3051-pressure-transmitter-3051cf-series-flowmeter...
 
Yale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manualYale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manual
 
Yale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manualYale b888 erp13 vc lift truck service repair manual
Yale b888 erp13 vc lift truck service repair manual
 
Yale b888 erp15 vc lift truck service repair manual
Yale b888 erp15 vc lift truck service repair manualYale b888 erp15 vc lift truck service repair manual
Yale b888 erp15 vc lift truck service repair manual
 
Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...
Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...
Claas axion 800 hexashift tractor (type a60) service repair manual (serial no...
 
Isuzu trooper 20workshop_20manual
Isuzu trooper 20workshop_20manualIsuzu trooper 20workshop_20manual
Isuzu trooper 20workshop_20manual
 
Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...
Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...
Caterpillar cat 277 multi terrain loader (prefix cnc) service repair manual (...
 

Viewers also liked

Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Rajesh Prasad
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhiRajesh Prasad
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
 
Bridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemBridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemRajesh Prasad
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
 
60 ασκησεισ ολοκληρωτικοσ λογισμοσ
60 ασκησεισ ολοκληρωτικοσ λογισμοσ60 ασκησεισ ολοκληρωτικοσ λογισμοσ
60 ασκησεισ ολοκληρωτικοσ λογισμοσΜάκης Χατζόπουλος
 
οι λύσεις επαναληπτικών εξετάσεων γπ Doc
οι λύσεις επαναληπτικών εξετάσεων γπ Docοι λύσεις επαναληπτικών εξετάσεων γπ Doc
οι λύσεις επαναληπτικών εξετάσεων γπ DocΜάκης Χατζόπουλος
 
Meptraining 20090424
Meptraining 20090424Meptraining 20090424
Meptraining 20090424Damond Nollan
 
θεωρήματα γεωμετρίας α λυκειου σαράφης γιάννης
θεωρήματα   γεωμετρίας α λυκειου σαράφης γιάννηςθεωρήματα   γεωμετρίας α λυκειου σαράφης γιάννης
θεωρήματα γεωμετρίας α λυκειου σαράφης γιάννηςΜάκης Χατζόπουλος
 
2014 SEO and Social Media Basics - DBRFF Conference
2014 SEO and Social Media Basics - DBRFF Conference2014 SEO and Social Media Basics - DBRFF Conference
2014 SEO and Social Media Basics - DBRFF ConferenceBill Hartzer
 
OLYMPICS 2008 OPENING CEREMONY
OLYMPICS 2008 OPENING CEREMONYOLYMPICS 2008 OPENING CEREMONY
OLYMPICS 2008 OPENING CEREMONYJITHIN CHANDRAN
 
Design School data in the BE
Design School data in the BEDesign School data in the BE
Design School data in the BEDuncan Wilson
 
Mom Central Consulting Capabilities
Mom Central Consulting CapabilitiesMom Central Consulting Capabilities
Mom Central Consulting CapabilitiesMegan Maguire
 
προαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολή
προαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολήπροαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολή
προαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολήΜάκης Χατζόπουλος
 

Viewers also liked (20)

Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
Cable stay bridge  05.01.16-IPWE seminar NewDelhiCable stay bridge  05.01.16-IPWE seminar NewDelhi
Cable stay bridge 05.01.16-IPWE seminar NewDelhi
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...
 
Bridge Structure Health Monitoring system
Bridge Structure Health Monitoring systemBridge Structure Health Monitoring system
Bridge Structure Health Monitoring system
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
60 ασκησεισ ολοκληρωτικοσ λογισμοσ
60 ασκησεισ ολοκληρωτικοσ λογισμοσ60 ασκησεισ ολοκληρωτικοσ λογισμοσ
60 ασκησεισ ολοκληρωτικοσ λογισμοσ
 
α΄λ πιθανοτητεσ 2014 15
α΄λ πιθανοτητεσ 2014 15α΄λ πιθανοτητεσ 2014 15
α΄λ πιθανοτητεσ 2014 15
 
οι λύσεις επαναληπτικών εξετάσεων γπ Doc
οι λύσεις επαναληπτικών εξετάσεων γπ Docοι λύσεις επαναληπτικών εξετάσεων γπ Doc
οι λύσεις επαναληπτικών εξετάσεων γπ Doc
 
τ.θ.β αλγεβρα συνδυαστικα
τ.θ.β αλγεβρα συνδυαστικατ.θ.β αλγεβρα συνδυαστικα
τ.θ.β αλγεβρα συνδυαστικα
 
Live Your Dreams
Live Your DreamsLive Your Dreams
Live Your Dreams
 
Meptraining 20090424
Meptraining 20090424Meptraining 20090424
Meptraining 20090424
 
θεωρήματα γεωμετρίας α λυκειου σαράφης γιάννης
θεωρήματα   γεωμετρίας α λυκειου σαράφης γιάννηςθεωρήματα   γεωμετρίας α λυκειου σαράφης γιάννης
θεωρήματα γεωμετρίας α λυκειου σαράφης γιάννης
 
2014 SEO and Social Media Basics - DBRFF Conference
2014 SEO and Social Media Basics - DBRFF Conference2014 SEO and Social Media Basics - DBRFF Conference
2014 SEO and Social Media Basics - DBRFF Conference
 
OLYMPICS 2008 OPENING CEREMONY
OLYMPICS 2008 OPENING CEREMONYOLYMPICS 2008 OPENING CEREMONY
OLYMPICS 2008 OPENING CEREMONY
 
Design School data in the BE
Design School data in the BEDesign School data in the BE
Design School data in the BE
 
Mom Central Consulting Capabilities
Mom Central Consulting CapabilitiesMom Central Consulting Capabilities
Mom Central Consulting Capabilities
 
321 Pdfsam
321 Pdfsam321 Pdfsam
321 Pdfsam
 
LUX
LUXLUX
LUX
 
προαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολή
προαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολήπροαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολή
προαγωγικές γεωμετρία α λυκείου 2011 ευαγγελική σχολή
 

Similar to Provision of dampers to reduce the fatigue in cables of a cable stayed bridge site at Bardhman

Toro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualToro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualdhjfjkmmmde
 
Toro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualToro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualfhsjekkdkem
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualufjjjskekemme
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualfujsjejfkskekem
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualfujsjfjkskekmm
 
Toro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualToro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualfskkkdjskemd
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualfksuekdjsekmmd
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualfusjkkskemmf
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualufjdjfjkskekemm
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualfudfjjjskefkme
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualfusjkkskemmf
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualufjdjfjkskekemm
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualfujdjsfjkskeemem
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualfudfjjjskefkme
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualfujsjejfkskekem
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualfujjfdjjskkfemm
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualfuekdksmemm
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualfjeisldkmemm
 

Similar to Provision of dampers to reduce the fatigue in cables of a cable stayed bridge site at Bardhman (18)

Toro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualToro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manual
 
Toro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualToro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manual
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manual
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manual
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manual
 
Toro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manualToro pro sweep (model 07066) service repair manual
Toro pro sweep (model 07066) service repair manual
 
Toro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manualToro groundsmaster 4000 d service repair manual
Toro groundsmaster 4000 d service repair manual
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manual
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manual
 
Toro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manualToro groundsmaster 3500 d service repair manual
Toro groundsmaster 3500 d service repair manual
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manual
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manual
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manual
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manual
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manual
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manual
 
Toro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manualToro groundsmaster 7210 service repair manual
Toro groundsmaster 7210 service repair manual
 
Toro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manualToro groundsmaster 7200 service repair manual
Toro groundsmaster 7200 service repair manual
 

More from Rajesh Prasad

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Rajesh Prasad
 
20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdfRajesh Prasad
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLRajesh Prasad
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 Rajesh Prasad
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfRajesh Prasad
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...Rajesh Prasad
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Rajesh Prasad
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Rajesh Prasad
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalRajesh Prasad
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Rajesh Prasad
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...Rajesh Prasad
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Rajesh Prasad
 

More from Rajesh Prasad (20)

Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...Opportunities in Railway construction- development operations of infrastructu...
Opportunities in Railway construction- development operations of infrastructu...
 
20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf20th_Safety_Convention dt 11.09.2023.pdf
20th_Safety_Convention dt 11.09.2023.pdf
 
Cyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNLCyber Security Action Plan of RVNL
Cyber Security Action Plan of RVNL
 
RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021 RVNL Corporate Governance 26.11.2021
RVNL Corporate Governance 26.11.2021
 
Management Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdfManagement Development programme - 01.07.2022 .pdf
Management Development programme - 01.07.2022 .pdf
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op..."Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
"Protocol for safe execution of Infra Projects" by Rajesh Prasad, Director Op...
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
 
Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....Motivation and Bounce Back after the crisis....
Motivation and Bounce Back after the crisis....
 
Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....Revolution 2020, Crisis.. Change....
Revolution 2020, Crisis.. Change....
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS  BY RAJESH PRASAD ED RVNL DT 04...
PROTOCOL FOR SAFE EXECUTION OF INFRA PROJECTS BY RAJESH PRASAD ED RVNL DT 04...
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
Construction Safety Protocol PPT by Rajesh Prasad, ED RVNL at Lucknow on 26.0...
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
Bridging over river Bhagirathi- a Handbook cum Coffee Table Book by Rajesh Pr...
 

Recently uploaded

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 

Recently uploaded (20)

ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 

Provision of dampers to reduce the fatigue in cables of a cable stayed bridge site at Bardhman

  • 1. FREYSSINET INTERNATIONAL & Cie – TECHNICAL DEPARTMENT 1 bis rue du Petit Clamart – B.P. 135 78148 VELIZY-VILLACOUBLAY Tel. : 33 1 46 01 85 10 – Fax : 33 1 46 01 86 52 PROJET, LOT, TITRE, TYPE DE DOC. / PROJECT, SCOPE, TITLE, DOC. TYPE__ BARDDHAMAN Stay Cables Damper Working Procedure PAYS / COUNTRY MOA / CLIENT MOE / CONTRACTOR India FREYSSINET INTERNAL REVISION STATUS_ E D C B A 03/01/14 ADN MBS IZC FIRST ISSUE REV. DATE RÉDIGÉ PAR / WRITTEN BY VÉRIFIÉ PAR / CHECKED BY APPROUVÉ PAR / APPROVED BY MODIFICATION FREYSSINET DOCUMENT N° REVISION M13-014E1–PRA 006 A Quality Management System certified by BUREAU VERITAS Certification PAGE / SHEET 1 / 9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract.
  • 2. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 2/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. CONTENTS 1. SCOPE OF WORKS ........................................................................................3 2. ABREVIATIONS ..............................................................................................3 3. INTERNAL RADIAL DAMPER ........................................................................3 3.1 General description...................................................................................3 3.2 Ressources...............................................................................................4 3.3 Installation of the IRD................................................................................4 3.4 Crucial points............................................................................................7 3.5 ITP ............................................................................................................8
  • 3. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 3/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. 1. SCOPE OF WORKS The purpose of this document is to describe the different operations to be carried out for the installation of the Internal Radial Dampers (IRD) for Barddhaman Bridge. IRD are installed on cables whose length is above 80m. Therefore, IRD shall be installed on the following cables: - 7001 to 7004 on the main span of the central plane, - 7018 on the back span of the central plane, - 6001 to 6004 and 5001 to 5004 on the main span of the side plane, - 6018 and 5018 on the back span of the side plane. 2. ABREVIATIONS IRD Internal Radial Damper AVT Anti-Vandalism Tube GT Guide Tube ITP Inspection and Test Plan 3. INTERNAL RADIAL DAMPER 3.1 General description The IRD (Internal Radial Damper) are fabricated in factory. They are made of 4 main components: - the compacting collar that comes around the strand bundle and transfers the load to the pistons, - the three hydraulic pistons ensuring the damping, - the three caps connecting the pistons to the guide tube, - the guide tube attached to the deck. Guide tubeThree Hydraulic Pistons Cap Compacting Collar
  • 4. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 4/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. 3.2 Ressources Workforce 1 Chief operator 2 Labourers Plant and equipment Crane or lifting device. 3.3 Installation of the IRD The main stages of the IRD installation are the following: - Preliminary works, - Compacting collar installation, - Guide tube centering, - Preparation and installation of the hydraulic pistons - Finishing works. 3.3.1 Preliminary works Before installing the damper, the following operations shall be done: - Lifting of the GT and securing it with safety bars, - Marking of the collar position onto the strand bundle (refer to ITP for the correct distance), - Compacting of the strand bundle with straps, - Installation of dummy strands (if the strand bundle is not fully completed). Figure 1: Lifting the guide tube Figure 2: Marking the position of the damper
  • 5. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 5/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. 3.3.2 Compacting collar installation For the collar installation, the following operations shall be performed: - Installation of the 2 half shells of the compacting collar between the 2 marks, - Checking of the dummy strand position, - Closing of the gap between the 2 half shells, - Partial tightening of 2 bolts M16 to well place the collar in front of each other. - Final tightening of the 6 bolts M16 (refer to ITP for the required torque). - Installation of the 6 collar damper connectors with the 12 screws M12, - Full screwing of the 6 adjusting pistons and nuts onto the 6 threaded rods of the collar and installation of the 6 adjusting caps. Figure 3: Compacting collar installed around the bundle 3.3.3 Guide Tube Centering In order to allow the same stroke of the pistons in every direction, the guide tube shall be centred around the strand bundle. The steps to do so are the following: - Removal of the safety bars and lowering of the guide tube. - Lifting of the AVT. - Centering the guide tube around the strand bundle thanks to the oblong holes, - Partial tightening of the 8 bolts M20 of the flange with the special washers, - Settling of the 6 adjusting pistons at 40mm from the guide tube internal diameter, - Lowering of the AVT with a crane. Figure 4: lifting of the AVT Figure 5: GT centring Compacting collar Collar damper connector Adjusting pistons, nuts and caps
  • 6. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 6/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. 3.3.4 Preparation and installation of the hydraulic pistons Hydraulic pistons shall be prepared in advance: - Threading of the cap axle through the external end of the hydraulic piston, spacers and cap connector, - Threading of the collar axle through the internal end of the piston, - Marking of the hydraulic piston at mid stroke and fully compressed. Once all pistons are prepared, they can be installed on the compacting collar according to the following operations: - Placing of the collar axle into the collar connector grooves, - Tightening of the 4 collar connector screws M12, - Settling of the piston to mid stroke, - Installation of the cap and fixation to the cap connector, - Fixation of the cap to the guide tube. Figure 6: Cap Installation 3.3.5 Finishing Works To finish the installation of IRD, the following operations shall be performed: - Lowering the AVT, - Fully tightening the 8 M20 bolts without modifying the GT orientation (the required torque is indicated in the ITP), - Application of sealant for waterproofness of the flange.
  • 7. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 7/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. 3.4 Crucial points • ITP: Refer to relevant ITP for installation data records (see §3.5). • Hydraulic piston orientation: o Top/bottom orientation The hydraulic piston can be delivered with or without cap. The top end shall always be higher than the bottom end. WITHOUT CAP o Angular orientation The longitudinal orientation shall be controlled: the piston body shall be rotated such that the marking at the lower end of the piston is oriented down. Note : All the damper pistons shall be delivered with the indication “DOWN” that shall be oriented down. DOWN indication Gravity Bottom end Top end Up Down Down Gravity Up
  • 8. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 8/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV. 3.5 ITP
  • 9. BARDDHAMAN – Stay Cables Damper – Working Procedure M13-014E1–PRA 006 – Rev. A Quality Management System certified by BUREAU VERITAS Certification Page 9/9 This document is the exclusive property of FREYSSINET. It is confidential and may not be used, reproduced or communicated either in whole or in part, in any form or manner without the prior written agreement of FREYSSINET. This document shall not be distributed to third parties except under the terms of the contract. REV.