SlideShare a Scribd company logo
1 of 26
Operations Budgeting and
    Cost-Volume-Profit Analysis




                           BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
Monday, October 29, 2012                                                                                     Slide 1 /25
Recap of Pricing Methods

• Explain the Subjective Pricing methods.
• Itemize the Objective Pricing methods.
• Recall the formulas for All Simple Mark
  Up pricing methods.
• Recall calculation formulas of Contribution
  Margin Pricing method, Ratio Pricing
  method, Simple Prime cost method and
  Specific Prime cost Method.

                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 2 /25
Scope of the Session

1.    The Budget Process Overview.
2.    Multi-Unit Budgeting.
3.    Calculate Projected Revenue Levels.
4.    Determine Profit requirements.
5.    Calculate Projected Expense Levels.
6.    Budget Development Process.
7.    Variance Analysis.

                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 3 /25
The Budget Process Overview
• The Operating Budget.
• Plan.
• Estimates.
• Meet the financial requirements and
  Goals.
• Long term, Short Term, Capital and Cash.
• Short Term is the most commonly used in
  Food and Beverage Business.
                               BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
    Monday, October 29, 2012                                                                                     Slide 4 /25
The Budget Process Overview
• What happens if the expense category
  gets overshot.
• What happens if the income levels fall
  below the forecasted levels.
• How does one compare Income and
  Expense with the actual % age levels.
• Why is it important to have a reasonable
  budget projection in the F & B business.

                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 5 /25
The Budget Process Overview
• The Main Goals set are for:
1. Revenue.
2. Profit Requirements.
3. Operating Expenses.
• Goals must be attainable and must not
   compromise with establishments quality
   requirements.

                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 6 /25
The Budget Process Overview
• The Budget evaluates the past to plan
  corrective actions for the future as well.
• The current period budget is used often to
  develop budgets for the next fiscal period.
• It helps in defining responsibilities, and
  empowers management personnel to
  meet the financial ends and be
  accountable for their actions.
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 7 /25
Multi-Unit Budgeting
Bottom-up budgeting
• Operating budgets assembled at unit level
• Unit-level budgets “rolled” up the
  organization
• Budgets geared specifically to individual
  operations
• Creates “ownership” at unit manager level


                           BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
Monday, October 29, 2012                                                                                     Slide 8 /25
Bottom Up Budgeting
• Bottom-up budgeting, also called
  participatory budgeting, is a somewhat
  modern approach to planning the use of a
  company's financial resources.
• Reserved for somewhat larger
  organizations, it differs from top-down
  budgeting where the high level executives


                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 9 /25
Top Down Budgeting
• Operating Budgets developed at
  Corporate Levels.
• Budgets are passed down to unit levels.
• Corporate profit requirements made part
  of individual unit plans.




                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 10 /25
The Top Down Budget
• A top-down budget process means that a
  binding decision on budget aggregates is
  taken before allocating expenditure within
  that aggregate.
• In each step of the budget process, the
  allocation of expenditure is subject to the
  constraints that have been set at the
  previous stage.
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 11 /25
Top Down and Bottom Up




                           BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
Monday, October 29, 2012                                                                                     Slide 12 /25
Budget Development Process
• The Budget development process is
  based on three important steps to
  minimize reforecasting unless the
  revenue earned reduces.
• Calculate Projected revenue levels.
• Determine profit requirements.
• Calculate project expense levels

                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 13 /25
1. Calculate Projected Revenue
             Levels
1. The easiest way is to first take the
   average check and multiply by Projected
   customers.
    • Revenue histories
    • Current factors
    • Economic variables
    • Other factors
    • Special concerns in forecasting
      beverage revenue
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 14 /25
1. Calculate Projected Revenue
             Levels
• Revenue Histories: Past revenue level
  analysis and trends, commonly in times
  where there is a consistent rise every
  year.
• Current factors: New competition,
  Government projects, liability laws.
• Economic Variables: Inflation, Public
  Habits and life style change.
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 15 /25
1. Calculate Projected Revenue
              Levels
• Other factors: Mix between connected
  revenue from Room and derived revenue
  of F & B. Any mix of revenue like F & B
  connected to banquet revenue if not
  documented separately may lead to a
  merger.
• Special Concerns: Mix in the beverage
  product sales estimates because there is
  no segregation of Beverage sales.
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 16 /25
2. Determine Profit
                               requirements
• Two basic ways to treat profits when
   budgets are developed:
1. Profit = Revenue – Expenses.
2. Revenue - Required Profit = Allowable
   operating expenses.
a. Treats Profit as a cost b. Generates
   revenue.
c. Plan for desired profit. d. Have money to
   meet the expenses required to generate
   revenue.
                             BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                      Slide 17 /25
3. Calculate Projected Expense
             Levels
• Fixed Costs:                                                     •        Variable Costs:
• Management                                                       •        Food Costs.
  Salaries                                                         •        Beverage Costs.
• Rent Expense.                                                    •        Labor Costs.
• Insurance.                                                       •        Supplies Costs.
• Property Taxes
• Depreciation.
• Interest Expense
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 18 /25
3. Calculate Projected Expense
             Levels
• Profits
• Profit Margin Ratio =  Net Income
                         Total Revenue
• Return on Investment= Net Income
                  Average Owners Equity
• Return on Assets =     Net Income
                    Average Total Assets
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 19 /25
Budget Development Process
     Calculate projected expense levels.
     • Simple mark-up method
     • Percentage method
     • Zero-based budget calculations.
     • Special Concerns in estimating
        beverage expenses in beverage
        revenue.
     • Estimating other expenses.
                           BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
Monday, October 29, 2012                                                                                     Slide 20 /25
Estimating Expenses—Mark-Up
                  Method
• Estimates future expenses on basis of current
  expense levels.
• Amounts of current expense levels are
  increased/decreased for new operating budget.
• Assumes all costs were reasonable during
  current year.
• Inefficiency could be extended into the
  new budget.
                              BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
   Monday, October 29, 2012                                                                                     Slide 21 /25
Estimating Expenses—Percentage
             Method
• Based on current percentage of each
  expense relative to revenue
• Applies same cost percentages of current
  year to upcoming year
• Assumes all costs were reasonable
  during current year
• Inefficiency could be extended into the
  new budget
                           BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
Monday, October 29, 2012                                                                                     Slide 22 /25
Estimating Expenses—Zero-Based
             Method
• Builds new budgeted expenses from a zero
  base
• Current and previous years’
  amounts/percentages are ignored
• Each expense item justified on its own
  merit
• Avoids extending inefficiency into new
  budget but requires considerable time/effort
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 23 /25
Example
• Exhibit-2,3, 4,5 & 6- Page 109 Operations
  Budgeting and Cost-Volume- Profit
  analysis.
• Planning and Control for Food and
  Beverage Operations 7th Edition, 2009
  American Hotel and Lodging Association
  2113 N High street, Lansing Michigan
  48906-4221. ISBN: 978-0-86612-339-6
• Jack. D. Ninemeir
                            BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                     Slide 24 /25
Variance Analysis
Identifies differences between budgeted
plans and actual results
Equations below: positive variances are
favorable; negative variances are
unfavorable
        Revenue Variances = Actual Amount −
        Budgeted Amount
        Expense Variances = Budgeted Amount −
        Actual Amount
                             BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
 Monday, October 29, 2012                                                                                      Slide 25 /25
Questions
                     
                   Comments
                           BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting
Monday, October 29, 2012                                                                                     Slide 26 /25

More Related Content

What's hot

1. principles of accounting
1. principles of accounting1. principles of accounting
1. principles of accountingAmaan Hussain
 
Financial Forecasting & Planning
Financial Forecasting & PlanningFinancial Forecasting & Planning
Financial Forecasting & Planningtintin_leo
 
Basic Financial Management for Small Businesses
Basic Financial Management for Small BusinessesBasic Financial Management for Small Businesses
Basic Financial Management for Small BusinessesBizcentralUSA
 
Financial planning
Financial planningFinancial planning
Financial planningByju Antony
 
Consolidated Financial Statements and Outside Ownership
Consolidated Financial Statements and Outside OwnershipConsolidated Financial Statements and Outside Ownership
Consolidated Financial Statements and Outside Ownershipsadraus
 
Flexible Budgets and Standard Costs
Flexible Budgets and Standard CostsFlexible Budgets and Standard Costs
Flexible Budgets and Standard CostsPatrina Hibbert
 
Introduction to financial accounting
Introduction to financial accountingIntroduction to financial accounting
Introduction to financial accountingNayyar Kazmi
 
Time value of money ppt.
Time value of money ppt.Time value of money ppt.
Time value of money ppt.priya sinha
 
Introduction to Basic Accounting Concept
Introduction to Basic Accounting ConceptIntroduction to Basic Accounting Concept
Introduction to Basic Accounting ConceptKamrul Hasan
 
Wiley financial accounting 9e by Weygandt Kimmel Kieso
Wiley financial accounting 9e by Weygandt Kimmel KiesoWiley financial accounting 9e by Weygandt Kimmel Kieso
Wiley financial accounting 9e by Weygandt Kimmel KiesoAbrar Malik
 
Time Value Of Money -Finance
Time Value Of Money -FinanceTime Value Of Money -Finance
Time Value Of Money -FinanceZoha Qureshi
 
Understanding Basics of Financial Statements
Understanding Basics of Financial StatementsUnderstanding Basics of Financial Statements
Understanding Basics of Financial StatementsAnkita6745
 
Mba 2 fm u 3 cost of capital
Mba 2 fm u 3 cost of capital Mba 2 fm u 3 cost of capital
Mba 2 fm u 3 cost of capital Rai University
 
Irr ( internal rate of return)
Irr ( internal rate of return)Irr ( internal rate of return)
Irr ( internal rate of return)Xhtisaam Javed
 
Basic Bookkeeping
Basic BookkeepingBasic Bookkeeping
Basic Bookkeepingmdesmond
 
Basic bookkeeping terms sbdc
Basic bookkeeping terms sbdcBasic bookkeeping terms sbdc
Basic bookkeeping terms sbdcAnita R Johnson
 
Time value of money
Time value of moneyTime value of money
Time value of moneyhanumandas88
 

What's hot (20)

1. principles of accounting
1. principles of accounting1. principles of accounting
1. principles of accounting
 
Financial Forecasting & Planning
Financial Forecasting & PlanningFinancial Forecasting & Planning
Financial Forecasting & Planning
 
Time value concepts
Time value conceptsTime value concepts
Time value concepts
 
6. bond valuation
6. bond valuation6. bond valuation
6. bond valuation
 
Basic Financial Management for Small Businesses
Basic Financial Management for Small BusinessesBasic Financial Management for Small Businesses
Basic Financial Management for Small Businesses
 
Financial planning
Financial planningFinancial planning
Financial planning
 
Consolidated Financial Statements and Outside Ownership
Consolidated Financial Statements and Outside OwnershipConsolidated Financial Statements and Outside Ownership
Consolidated Financial Statements and Outside Ownership
 
Flexible Budgets and Standard Costs
Flexible Budgets and Standard CostsFlexible Budgets and Standard Costs
Flexible Budgets and Standard Costs
 
Introduction to financial accounting
Introduction to financial accountingIntroduction to financial accounting
Introduction to financial accounting
 
Time value of money ppt.
Time value of money ppt.Time value of money ppt.
Time value of money ppt.
 
Introduction to Basic Accounting Concept
Introduction to Basic Accounting ConceptIntroduction to Basic Accounting Concept
Introduction to Basic Accounting Concept
 
Wiley financial accounting 9e by Weygandt Kimmel Kieso
Wiley financial accounting 9e by Weygandt Kimmel KiesoWiley financial accounting 9e by Weygandt Kimmel Kieso
Wiley financial accounting 9e by Weygandt Kimmel Kieso
 
Time Value Of Money -Finance
Time Value Of Money -FinanceTime Value Of Money -Finance
Time Value Of Money -Finance
 
Understanding Basics of Financial Statements
Understanding Basics of Financial StatementsUnderstanding Basics of Financial Statements
Understanding Basics of Financial Statements
 
Mba 2 fm u 3 cost of capital
Mba 2 fm u 3 cost of capital Mba 2 fm u 3 cost of capital
Mba 2 fm u 3 cost of capital
 
Product costing
Product costingProduct costing
Product costing
 
Irr ( internal rate of return)
Irr ( internal rate of return)Irr ( internal rate of return)
Irr ( internal rate of return)
 
Basic Bookkeeping
Basic BookkeepingBasic Bookkeeping
Basic Bookkeeping
 
Basic bookkeeping terms sbdc
Basic bookkeeping terms sbdcBasic bookkeeping terms sbdc
Basic bookkeeping terms sbdc
 
Time value of money
Time value of moneyTime value of money
Time value of money
 

Viewers also liked

Food and Beverage Cost Control
Food and Beverage Cost ControlFood and Beverage Cost Control
Food and Beverage Cost ControlAkmal Hafiz
 
FOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENTFOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENTLawiex21
 
Monitoring food service operations ii daily food cost
Monitoring food service operations ii daily food costMonitoring food service operations ii daily food cost
Monitoring food service operations ii daily food costRajendra Nabar
 
Chapter 12: Planning and Evaluating Operations
Chapter 12: Planning and Evaluating OperationsChapter 12: Planning and Evaluating Operations
Chapter 12: Planning and Evaluating OperationsNicole Hay-Walters
 
Food and beverage_operations
Food and beverage_operationsFood and beverage_operations
Food and beverage_operationslibfsb
 
Menu the foundation for control [compatibility mode]
Menu the foundation for control [compatibility mode]Menu the foundation for control [compatibility mode]
Menu the foundation for control [compatibility mode]Rajendra Nabar
 
Monitoring food service operations iii actual & std costs
Monitoring food service operations iii actual & std costsMonitoring food service operations iii actual & std costs
Monitoring food service operations iii actual & std costsRajendra Nabar
 
Monitoring food service operations 1
Monitoring food service operations 1Monitoring food service operations 1
Monitoring food service operations 1Rajendra Nabar
 
Monitoring beverage operations
Monitoring beverage operationsMonitoring beverage operations
Monitoring beverage operationsRajendra Nabar
 
Food and beverage marketing
Food and beverage marketingFood and beverage marketing
Food and beverage marketingRajendra Nabar
 
HOSPITALITY FOOD & BEVERAGE SERVICE
HOSPITALITY FOOD & BEVERAGE SERVICE HOSPITALITY FOOD & BEVERAGE SERVICE
HOSPITALITY FOOD & BEVERAGE SERVICE Brahmas Pandey
 
Types of food and beverage services
Types of food and beverage servicesTypes of food and beverage services
Types of food and beverage servicesAmaresh Kumar
 
Erp budget (1)
Erp budget (1)Erp budget (1)
Erp budget (1)sakpob
 

Viewers also liked (20)

F&B Budgeting
F&B BudgetingF&B Budgeting
F&B Budgeting
 
Food and Beverage Cost Control
Food and Beverage Cost ControlFood and Beverage Cost Control
Food and Beverage Cost Control
 
FOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENTFOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENT
 
Monitoring food service operations ii daily food cost
Monitoring food service operations ii daily food costMonitoring food service operations ii daily food cost
Monitoring food service operations ii daily food cost
 
Chapter 12: Planning and Evaluating Operations
Chapter 12: Planning and Evaluating OperationsChapter 12: Planning and Evaluating Operations
Chapter 12: Planning and Evaluating Operations
 
Training staff
Training staffTraining staff
Training staff
 
Food and beverage_operations
Food and beverage_operationsFood and beverage_operations
Food and beverage_operations
 
Menu the foundation for control [compatibility mode]
Menu the foundation for control [compatibility mode]Menu the foundation for control [compatibility mode]
Menu the foundation for control [compatibility mode]
 
Actual F&B Costs
Actual F&B CostsActual F&B Costs
Actual F&B Costs
 
Monitoring food service operations iii actual & std costs
Monitoring food service operations iii actual & std costsMonitoring food service operations iii actual & std costs
Monitoring food service operations iii actual & std costs
 
Monitoring food service operations 1
Monitoring food service operations 1Monitoring food service operations 1
Monitoring food service operations 1
 
Monitoring beverage operations
Monitoring beverage operationsMonitoring beverage operations
Monitoring beverage operations
 
Food and beverage marketing
Food and beverage marketingFood and beverage marketing
Food and beverage marketing
 
Food and beverage cost control (2nd edition)
Food and beverage cost control (2nd edition)Food and beverage cost control (2nd edition)
Food and beverage cost control (2nd edition)
 
HOSPITALITY FOOD & BEVERAGE SERVICE
HOSPITALITY FOOD & BEVERAGE SERVICE HOSPITALITY FOOD & BEVERAGE SERVICE
HOSPITALITY FOOD & BEVERAGE SERVICE
 
Menu pricing
Menu pricingMenu pricing
Menu pricing
 
Types of food and beverage services
Types of food and beverage servicesTypes of food and beverage services
Types of food and beverage services
 
04 businessfinance v1
04 businessfinance v104 businessfinance v1
04 businessfinance v1
 
Ch2
Ch2Ch2
Ch2
 
Erp budget (1)
Erp budget (1)Erp budget (1)
Erp budget (1)
 

Similar to Operations budgeting

Operationsbudgeting 121029033801-phpapp01
Operationsbudgeting 121029033801-phpapp01Operationsbudgeting 121029033801-phpapp01
Operationsbudgeting 121029033801-phpapp01Dipjyoti Datta
 
Establishing performance standards
Establishing performance standardsEstablishing performance standards
Establishing performance standardsRajendra Nabar
 
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.Illinois ASHRAE
 
Controlling beverage sales
Controlling beverage salesControlling beverage sales
Controlling beverage salesRajendra Nabar
 
Labor cost considerations
Labor cost considerationsLabor cost considerations
Labor cost considerationsRajendra Nabar
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sampleAnnsstand
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframeWesley Opaki
 
Project Cost Management Guide 2022
Project Cost Management Guide 2022Project Cost Management Guide 2022
Project Cost Management Guide 2022Sprintzeal
 
Acumen presentation (final)
Acumen presentation (final)Acumen presentation (final)
Acumen presentation (final)Glen Alleman
 
VC M&E Module 6 - Developing Analysis and Feedback Loops
VC M&E Module 6 - Developing Analysis and Feedback LoopsVC M&E Module 6 - Developing Analysis and Feedback Loops
VC M&E Module 6 - Developing Analysis and Feedback LoopsCARE Economic Development Unit
 
Preventing theft of revenue
Preventing theft of revenuePreventing theft of revenue
Preventing theft of revenueRajendra Nabar
 
Project management-professional-free-sample
Project management-professional-free-sampleProject management-professional-free-sample
Project management-professional-free-sampleReadytoTrain .
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sampleNada Sallam
 
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEHOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEAbraham Ncunge
 
Comlabs-ITB Service Excellence for Institution or Company
Comlabs-ITB Service Excellence for Institution or CompanyComlabs-ITB Service Excellence for Institution or Company
Comlabs-ITB Service Excellence for Institution or CompanyDjadja Sardjana
 

Similar to Operations budgeting (20)

Operationsbudgeting 121029033801-phpapp01
Operationsbudgeting 121029033801-phpapp01Operationsbudgeting 121029033801-phpapp01
Operationsbudgeting 121029033801-phpapp01
 
Establishing performance standards
Establishing performance standardsEstablishing performance standards
Establishing performance standards
 
Revenue control
Revenue controlRevenue control
Revenue control
 
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.
 
Controlling beverage sales
Controlling beverage salesControlling beverage sales
Controlling beverage sales
 
Labor cost considerations
Labor cost considerationsLabor cost considerations
Labor cost considerations
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
 
Project Cost Management Guide 2022
Project Cost Management Guide 2022Project Cost Management Guide 2022
Project Cost Management Guide 2022
 
Final_Module_2.ppt
Final_Module_2.pptFinal_Module_2.ppt
Final_Module_2.ppt
 
Acumen presentation (final)
Acumen presentation (final)Acumen presentation (final)
Acumen presentation (final)
 
VC M&E Module 6 - Developing Analysis and Feedback Loops
VC M&E Module 6 - Developing Analysis and Feedback LoopsVC M&E Module 6 - Developing Analysis and Feedback Loops
VC M&E Module 6 - Developing Analysis and Feedback Loops
 
Preventing theft of revenue
Preventing theft of revenuePreventing theft of revenue
Preventing theft of revenue
 
ch01.ppt
ch01.pptch01.ppt
ch01.ppt
 
Project management-professional-free-sample
Project management-professional-free-sampleProject management-professional-free-sample
Project management-professional-free-sample
 
Pmp project management professional free sample
Pmp project management professional free samplePmp project management professional free sample
Pmp project management professional free sample
 
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACEHOW  TO  EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
HOW TO EVALUATE PROJECT BY USING PROJECT APPRAISAL METHOD AT WORKPLACE
 
Comlabs-ITB Service Excellence for Institution or Company
Comlabs-ITB Service Excellence for Institution or CompanyComlabs-ITB Service Excellence for Institution or Company
Comlabs-ITB Service Excellence for Institution or Company
 
VC M&E Module 4 - Select Performance Indicators
VC M&E Module 4 - Select Performance IndicatorsVC M&E Module 4 - Select Performance Indicators
VC M&E Module 4 - Select Performance Indicators
 

More from Rajendra Nabar

Facilities design, décor and cleaning [compatibility mode]
Facilities design, décor and cleaning [compatibility mode]Facilities design, décor and cleaning [compatibility mode]
Facilities design, décor and cleaning [compatibility mode]Rajendra Nabar
 
Club management ood bac 5161 part-2
Club management ood bac 5161 part-2Club management ood bac 5161 part-2
Club management ood bac 5161 part-2Rajendra Nabar
 
Club management ood bac 5161 part 1
Club management ood bac 5161 part 1Club management ood bac 5161 part 1
Club management ood bac 5161 part 1Rajendra Nabar
 
Food purchasing control
Food purchasing controlFood purchasing control
Food purchasing controlRajendra Nabar
 
Security and the lodging industry [compatibility mode]
Security and the lodging industry [compatibility mode]Security and the lodging industry [compatibility mode]
Security and the lodging industry [compatibility mode]Rajendra Nabar
 
The challenge of f&b operations [compatibility mode]
The challenge of f&b operations [compatibility mode]The challenge of f&b operations [compatibility mode]
The challenge of f&b operations [compatibility mode]Rajendra Nabar
 
Controlling food sales
Controlling food  salesControlling food  sales
Controlling food salesRajendra Nabar
 
Beverage production control
Beverage production controlBeverage production control
Beverage production controlRajendra Nabar
 
Food storing and issuing control
Food storing and issuing controlFood storing and issuing control
Food storing and issuing controlRajendra Nabar
 
Food receiving control
Food receiving controlFood receiving control
Food receiving controlRajendra Nabar
 
Food purchasing control
Food purchasing controlFood purchasing control
Food purchasing controlRajendra Nabar
 
Food production control i
Food production control iFood production control i
Food production control iRajendra Nabar
 
Operations budgeting and cvp analysis
Operations budgeting and cvp analysisOperations budgeting and cvp analysis
Operations budgeting and cvp analysisRajendra Nabar
 

More from Rajendra Nabar (16)

Training returns
Training returnsTraining returns
Training returns
 
Facilities design, décor and cleaning [compatibility mode]
Facilities design, décor and cleaning [compatibility mode]Facilities design, décor and cleaning [compatibility mode]
Facilities design, décor and cleaning [compatibility mode]
 
Club management ood bac 5161 part-2
Club management ood bac 5161 part-2Club management ood bac 5161 part-2
Club management ood bac 5161 part-2
 
Club management ood bac 5161 part 1
Club management ood bac 5161 part 1Club management ood bac 5161 part 1
Club management ood bac 5161 part 1
 
Food purchasing control
Food purchasing controlFood purchasing control
Food purchasing control
 
Security and the lodging industry [compatibility mode]
Security and the lodging industry [compatibility mode]Security and the lodging industry [compatibility mode]
Security and the lodging industry [compatibility mode]
 
The challenge of f&b operations [compatibility mode]
The challenge of f&b operations [compatibility mode]The challenge of f&b operations [compatibility mode]
The challenge of f&b operations [compatibility mode]
 
Controlling food sales
Controlling food  salesControlling food  sales
Controlling food sales
 
Beverage production control
Beverage production controlBeverage production control
Beverage production control
 
Food storing and issuing control
Food storing and issuing controlFood storing and issuing control
Food storing and issuing control
 
Food receiving control
Food receiving controlFood receiving control
Food receiving control
 
Food purchasing control
Food purchasing controlFood purchasing control
Food purchasing control
 
Food production control i
Food production control iFood production control i
Food production control i
 
The control process
The control processThe control process
The control process
 
Operations budgeting and cvp analysis
Operations budgeting and cvp analysisOperations budgeting and cvp analysis
Operations budgeting and cvp analysis
 
Tobacco
TobaccoTobacco
Tobacco
 

Operations budgeting

  • 1. Operations Budgeting and Cost-Volume-Profit Analysis BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 1 /25
  • 2. Recap of Pricing Methods • Explain the Subjective Pricing methods. • Itemize the Objective Pricing methods. • Recall the formulas for All Simple Mark Up pricing methods. • Recall calculation formulas of Contribution Margin Pricing method, Ratio Pricing method, Simple Prime cost method and Specific Prime cost Method. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 2 /25
  • 3. Scope of the Session 1. The Budget Process Overview. 2. Multi-Unit Budgeting. 3. Calculate Projected Revenue Levels. 4. Determine Profit requirements. 5. Calculate Projected Expense Levels. 6. Budget Development Process. 7. Variance Analysis. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 3 /25
  • 4. The Budget Process Overview • The Operating Budget. • Plan. • Estimates. • Meet the financial requirements and Goals. • Long term, Short Term, Capital and Cash. • Short Term is the most commonly used in Food and Beverage Business. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 4 /25
  • 5. The Budget Process Overview • What happens if the expense category gets overshot. • What happens if the income levels fall below the forecasted levels. • How does one compare Income and Expense with the actual % age levels. • Why is it important to have a reasonable budget projection in the F & B business. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 5 /25
  • 6. The Budget Process Overview • The Main Goals set are for: 1. Revenue. 2. Profit Requirements. 3. Operating Expenses. • Goals must be attainable and must not compromise with establishments quality requirements. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 6 /25
  • 7. The Budget Process Overview • The Budget evaluates the past to plan corrective actions for the future as well. • The current period budget is used often to develop budgets for the next fiscal period. • It helps in defining responsibilities, and empowers management personnel to meet the financial ends and be accountable for their actions. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 7 /25
  • 8. Multi-Unit Budgeting Bottom-up budgeting • Operating budgets assembled at unit level • Unit-level budgets “rolled” up the organization • Budgets geared specifically to individual operations • Creates “ownership” at unit manager level BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 8 /25
  • 9. Bottom Up Budgeting • Bottom-up budgeting, also called participatory budgeting, is a somewhat modern approach to planning the use of a company's financial resources. • Reserved for somewhat larger organizations, it differs from top-down budgeting where the high level executives BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 9 /25
  • 10. Top Down Budgeting • Operating Budgets developed at Corporate Levels. • Budgets are passed down to unit levels. • Corporate profit requirements made part of individual unit plans. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 10 /25
  • 11. The Top Down Budget • A top-down budget process means that a binding decision on budget aggregates is taken before allocating expenditure within that aggregate. • In each step of the budget process, the allocation of expenditure is subject to the constraints that have been set at the previous stage. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 11 /25
  • 12. Top Down and Bottom Up BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 12 /25
  • 13. Budget Development Process • The Budget development process is based on three important steps to minimize reforecasting unless the revenue earned reduces. • Calculate Projected revenue levels. • Determine profit requirements. • Calculate project expense levels BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 13 /25
  • 14. 1. Calculate Projected Revenue Levels 1. The easiest way is to first take the average check and multiply by Projected customers. • Revenue histories • Current factors • Economic variables • Other factors • Special concerns in forecasting beverage revenue BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 14 /25
  • 15. 1. Calculate Projected Revenue Levels • Revenue Histories: Past revenue level analysis and trends, commonly in times where there is a consistent rise every year. • Current factors: New competition, Government projects, liability laws. • Economic Variables: Inflation, Public Habits and life style change. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 15 /25
  • 16. 1. Calculate Projected Revenue Levels • Other factors: Mix between connected revenue from Room and derived revenue of F & B. Any mix of revenue like F & B connected to banquet revenue if not documented separately may lead to a merger. • Special Concerns: Mix in the beverage product sales estimates because there is no segregation of Beverage sales. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 16 /25
  • 17. 2. Determine Profit requirements • Two basic ways to treat profits when budgets are developed: 1. Profit = Revenue – Expenses. 2. Revenue - Required Profit = Allowable operating expenses. a. Treats Profit as a cost b. Generates revenue. c. Plan for desired profit. d. Have money to meet the expenses required to generate revenue. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 17 /25
  • 18. 3. Calculate Projected Expense Levels • Fixed Costs: • Variable Costs: • Management • Food Costs. Salaries • Beverage Costs. • Rent Expense. • Labor Costs. • Insurance. • Supplies Costs. • Property Taxes • Depreciation. • Interest Expense BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 18 /25
  • 19. 3. Calculate Projected Expense Levels • Profits • Profit Margin Ratio = Net Income Total Revenue • Return on Investment= Net Income Average Owners Equity • Return on Assets = Net Income Average Total Assets BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 19 /25
  • 20. Budget Development Process Calculate projected expense levels. • Simple mark-up method • Percentage method • Zero-based budget calculations. • Special Concerns in estimating beverage expenses in beverage revenue. • Estimating other expenses. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 20 /25
  • 21. Estimating Expenses—Mark-Up Method • Estimates future expenses on basis of current expense levels. • Amounts of current expense levels are increased/decreased for new operating budget. • Assumes all costs were reasonable during current year. • Inefficiency could be extended into the new budget. BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 21 /25
  • 22. Estimating Expenses—Percentage Method • Based on current percentage of each expense relative to revenue • Applies same cost percentages of current year to upcoming year • Assumes all costs were reasonable during current year • Inefficiency could be extended into the new budget BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 22 /25
  • 23. Estimating Expenses—Zero-Based Method • Builds new budgeted expenses from a zero base • Current and previous years’ amounts/percentages are ignored • Each expense item justified on its own merit • Avoids extending inefficiency into new budget but requires considerable time/effort BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 23 /25
  • 24. Example • Exhibit-2,3, 4,5 & 6- Page 109 Operations Budgeting and Cost-Volume- Profit analysis. • Planning and Control for Food and Beverage Operations 7th Edition, 2009 American Hotel and Lodging Association 2113 N High street, Lansing Michigan 48906-4221. ISBN: 978-0-86612-339-6 • Jack. D. Ninemeir BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 24 /25
  • 25. Variance Analysis Identifies differences between budgeted plans and actual results Equations below: positive variances are favorable; negative variances are unfavorable Revenue Variances = Actual Amount − Budgeted Amount Expense Variances = Budgeted Amount − Actual Amount BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 25 /25
  • 26. Questions  Comments BAC-5132 Food and Beverage Management-II-Menu Engineering: Operations Budgeting Monday, October 29, 2012 Slide 26 /25