Moving toward the Perfect Order by automating your Procure To Pay Process 
An in-depth look in to the PTP process as it relates to automation and EDI 
November 6th, 2014 
You Innovation and Support Company 
For companies leveraging SAP solutions
a member of The Business Maturity Group 
Q Data SAP Supply Chain Webinar Series 
3 Thursdays at 11am CST 
•10/29: Small Parcel Packing Exception Monitoring 
•11/6: EDI Automation – Procure to Pay 
–Striving for the perfect order from your supplier 
•11/13: EDI Automation – Order to Cash 
–Striving to present the perfect order to your customer 
http://www.qdatausa.com 
Register at Q Data USA’s website 
http://www.qdatausa.com/resources#upcoming
a member of The Business Maturity Group 
Q Data SAP EM Webinar Series 
http://www.qdatausa.com 
Viewing this and previous webinars
a member of The Business Maturity Group 
About the Speaker – Kevin Wilson 
Kevin Wilson has more than 24 years’ experience in business analysis, solution architecture, project management, solution development & implementation. 18 years of SAP experience covering supply chain, retail, utilities & manufacturing, amongst others. Business case and value engineering expertise covering multiple, integrated SAP solutions with a strategic focus on Supply Chain Management and providing visibility to the extended Supply Chain. Author and thought leader in SAP supply chain execution processes. 
Principle SAP Solution Engineer 
Q Data USA, Inc. 
Email: kwilson@qdatausa.com 
Website: www.qdatausa.com 
Author: “SAP Event Management 
SAP’s best kept secret…”
a member of The Business Maturity Group 
About the Company - Q Data USA 
•Privately held company established in 1994 
•SAP centric focus, Best Practice Philosophy 
•Manufacturing, Distribution, Oil & Gas, Transportation, Pharma, High Tech 
•Methodology to Achieve Business Maturity 
We provide pre-go-live implementation and post go-live support services that give our clients the highest-level of Business Performance 
As Trusted Advisors, we are continually bridging the gap between IT and the Supply Chain 
By following our proven methodologies, we develop innovative solutions and concepts that ensure our clients a high degree of Implementation Maturity from their SAP (ERP) environment 
You Innovation and Support Company 
For companies leveraging SAP solutions
a member of The Business Maturity Group 
Agenda 
1.Describing Supply Chain Maturity 
2.About EDI 
3.The PTP Process 
4.Vendor Compliance 
5.Summary
a member of The Business Maturity Group 
Global Trends and Their Impact on the Supply Chain 
Unprofitable demand and supply synchronization 
–Poor visibility into customer demand, supply fluctuations & channel inventory 
–Demand/Supply not aligned 
–Escalating costs and inefficient operations 
Inefficient Inflexible execution 
–Lack of visibility & collaboration across manufacturing & logistics network 
–Ineffective capacity & asset utilization 
–Escalating transportation & logistics costs 
Increasing number of supply chain disruptions 
–Recurring supplier failure, supply shortages, and inventory liabilities 
–Rising number of product recalls, counterfeits, and quality issues 
–Increased government regulations and global trade and compliance requirements 
–Growing focus on sustainability and carbon and greenhouse gas emission control 
Increased demand and supply volatility 
Global pressure on margins 
Increased risk and compliance
a member of The Business Maturity Group 
Key Trends 
•Deliver a Supply Chain Execution platform 
–Single solution for all logistics needs 
–Provide end-to-end visibility across the supply chain 
•Enable Sustainable Supply Networks 
–Ability to set, measure and monitor performance across the supply chain 
–Provide end-to-end visibility across the extended supply network 
–Green and sustainable practices 
–Product traceability and recall management across the supply chain
a member of The Business Maturity Group 
Supply Chain Maturity Work How well are you matching supply with demand? How “real” are your supply and demand forecasts? Is your master data and system driving the execution of the process? Are all the tasks in the process being performed in a timely fashion by the correct people? Is the system doing most of the work? People 
How well are you or your partners performing? Are you improving? 
Are you addressing issues in a timely fashion? 
Can you measure success and failure? 
How are you notifying users of exceptions? 
How are people doing their work? In the system? 
Are your people empowered in their day to day responsibilities? System How well are your systems working? Are they integrated with each other? Is there one source of truth in your process? Is the process automated as far as possible? How many manual touches are made in your process? Is the solution mobile enabled? Can you access your information while not wired in? Is the system process aligned with your business process? Reporting, Information Is your organization streamlined to handle the exceptions to the process or are they maintaining the process? Are your people educated in the process? Are the users analytical in focus or custodian in focus? Is change management conducted efficiently in your organization? Are KPIs in place? Can you measure success or failure? Are the reports visible to all necessary parties? 
Working together towards a common goal – Scalable, Agile, Efficient, Effective Supply Chain
a member of The Business Maturity Group 
The value of a mature Supply Chain 
•The goals of a mature Supply Chain – We aim to: 
–Reduce the cost of the supply chain 
–Improve Service Levels 
–Collapse the Supply Chain through automation 
–Manage exceptions proactively in a timely fashion 
–Enjoy End-to-End status visibility 
–Reduce compliance errors from vendors 
–Achieve the Perfect Order 
–Have our work, people, system and information aligned 
–Decrease the “Time to insight” 
•To provide insightful information to the right people at the right time
a member of The Business Maturity Group 
Focus of this session…. 
• Perfect order 
–On Time 
–Complete 
–Free from damage 
•Readable format 
–Accurate documentation 
–Compliant 
• Vendor compliance 
–Eliminate gaps in the supply chain 
–Align people, process and system 
• Visibility to process and performance 
Cost SLA
a member of The Business Maturity Group 
What main processes drive the Vendor Supply Chain? 
1.Vendor Management 
–Vendor Negotiations 
–Vendor Contracts 
–On boarding vendors 
–Master data capture 
•Vendor master 
•Material master 
•Pricing 
2.Procure to Pay (PTP) 
–Supply and Demand forecasting 
–Purchase Order management 
•Acknowledgement 
–Inbound deliveries 
•ASNs 
•Goods receipt 
•Drop ships 
–Invoice Receipts 
–Returns
a member of The Business Maturity Group 
Agenda 
1.Describing Supply Chain Maturity 
2.About EDI 
3.The PTP Process 
4.Vendor Compliance 
5.Summary
a member of The Business Maturity Group 
What is EDI? 
•“Electronic Data Interchange (EDI) refers to a system providing global standards for the exchange of structured data, electronically between 2 parties” 
•EDI Standards were developed to document the needed business transactions 
–ANSI X12 and EDIFACT 
•Mapping – Transform to / from EDI format to / from internal format 
•Communication – Envelope for message delivery between 2 partners 
ANSI 
EDIFACT 
Description 
850 
ORDERS 
Purchase Order 
855 
ORDRSP 
PO Acknowledgement 
856 
DESADV 
Advance Ship Notice 
810 
INVOIC 
Invoice 
Common EDI PTP Transactions:
a member of The Business Maturity Group 
Why EDI? 
•Reduction in data capture errors 
•Reduction in handling costs for paper documents 
•Faster execution of the process 
–Collapsing the supply Chain – Time between the end of one activity and the start of the next activity is reduced 
–Reduction in Supply Chain Cycle Time 
Common hurdles to overcome when implementing EDI 
1. Change Management – “We do it this way” 
2. Cost – Time and Money to enable the functionality 
3. EDI Perception: EDI is technical!!! 
You can only automate a GOOD MANUAL process 
EDI is not the silver bullet to fix your issues in the process 
0% 
50% 
100% 
2008 
2013 
34% 
62% 
% EDI Adoption for 
Purchase Order 
$- 
$20.00 
$40.00 
Paper 
EDI 
$37.45 
$23.83 
Cost of doing a PO via EDI vs. Paper
a member of The Business Maturity Group 
Agenda 
1.Describing Supply Chain Maturity 
2.About EDI 
3.The PTP Process 
4.Vendor Compliance 
5.Summary
a member of The Business Maturity Group 
Describing the PTP Process 
Purchase Order (PO): 
•Vendor, Price, Quantity, Material 
•Requested Delivery Date 
PO Acknowledgment (Confirmation) 
•“Signature” of confirmation of the order. I.e. The binding agreement to delivery the correct materials, at the right quantity, at the agreed price on the required date 
Advanced Ship Notice (ASN) 
•Document that the vendor sends the customer telling them what material and quantity are being shipped 
•Carrier / Tracking information are also sent so that in-transit status can be obtained 
•Packing and Serial numbers 
•Becomes an Inbound Delivery in SAP 
Goods Receipt (GR) 
•Receive goods in to the warehouse against the inbound delivery (the vendor ASN) 
Invoice Receipt (IR) 
•Receive the invoice from the vendor to pay based on what was agreed on in the PO Acknowledgment
a member of The Business Maturity Group 
Issues 
Recommendations 
•PO has incorrect details 
–Master data discrepancies 
•Dates, quantities, terms, product 
•PO acknowledgments aren’t accurate 
•PO changes are not systemically driven 
–Can be untimely 
•Automation of the process is not a priority (EDI) 
–Untimely 
•Fully utilize the PO acknowledgement 
•Establish audit function 
–Ensure process is followed 
•Master Data Management 
–Master Data governance 
•Understand the financial impact of non-compliance 
–Quantify disruptions 
•Strive for fewer PO changes 
–More accurate demand / forecast 
•Automate the process 
–Fully utilize EDI where possible 
•Early warning of potential issues 
–Reduced customer impact 
–Correct timely info is reflected on the Sales Order schedule for drop ship POs 
•PO Changes don’t lead to “surprises” 
•PO Rejections are immediately re-sourced 
•Back-office process savings 
–Account Payable deal with discrepancies 
PTP - PO Management Process 
Advantages of a mature process
a member of The Business Maturity Group 
PTP - PO Management EDI 
Process 
Procure to Pay PO EDI Process 
Customer Supplier 
Purchase Order Process 
850 
855 
860 
865 Ack. Order Ch. 
Sales Order 
Process Ack. 
Process Ack. 
Change Order 
PO 
Order Ack. 
Ack. Order 
PO Change 
Order Ack. 
– 850 – Purchase Order 
• Ensure vendor compliance 
– 855 – Acknowledge Purchase 
Order (Vendor agrees to the 
terms and detail in the PO) 
• Workflow exceptions 
• Thresholds 
• Impact on SO schedule 
– 860 – Purchase Order changes 
• Change in the system drives 
communication 
– 865 – Purchase Order Change 
Acknowledgement 
• Vendor acceptance of the 
change 
• Workflow exceptions 
It all begins with a signed Purchase Order?
a member of The Business Maturity Group 
Issues 
Recommendations 
•ASN Inaccuracy 
–Picking, labeling, illegible, PO discrepancy 
•Vendor process not aligned with the customer process 
–Packing / Labeling -> Receiving / Put away 
•Ineffective PO process 
–Master data discrepancies 
•PO Changes 
•No automation of the process 
•Integration vs. Interface – Best of Breed approach 
•Master Data Management 
–Master Data Governance 
•Document the meaning of ASN error and ASN compliance 
•Understand the financial impact of non-compliance 
–Basis for charge-backs 
•Strive for fewer PO changes 
•Initiate formal audit process 
–Ensure vendor compliance 
–Physical audit 
•Vendor collaboration 
•Focus on exception management 
•Automate the process - Vendor & Carrier EDI 
•Receive against an ASN 
–Can reduce costs up to 40% 
•Discrepancies known earlier 
–Prior to goods receipt 
–Less customer impact 
•Fewer discrepancies in downstream processes 
–GR and AP / Invoice Receipt process 
•Drop ship  Can send ASN to customer 
•Visibility in to Vendor compliance 
PTP – ASN Process 
Advantages of a good process 
Why are we here?
a member of The Business Maturity Group 
PTP – ASN EDI Process 
Procure to Pay ASN EDI Process 
Customer Client Supplier Carrier 
856 -> Dlv. Idoc 
214 -> Ship Status Idoc 
214 -> Ship Status Idoc 
214 -> Ship Status Idoc 
824 – Reject ASN 
Receive 
Product 
Process Shipping 
Status 
Send Status 
Deliver Product 
Process Shipping 
Status 
Ceate Inv. 
Receive ASN Send ASN Send ASN 
Process Inb. 
Dlv 
Pickup 
Process Shipping 
Status 
Reprocess 
ASN 
Send Status 
Send Status 
Pickup 
Receive Inv. 
Inb. Dlv 
Ship Product 
Send Inv. 
POD 
Transport Product 
vPO 
Pickup Product 
– 856 – Advanced Ship Notification 
 Full details are to be sent by the 
Vendor 
–GTIN must match shipment 
with ASN 
 Inbound delivery 
– 997 – Functional Acknowledgement 
 Reject an ASN if the structure is 
incorrect or required information 
is incorrect 
–Missing carton level or pallet 
level information 
– 824 – Application Advice 
 Communicate a functional 
rejection of an 856 
– E.g. Unknown PO, Duplicate 
ASN 
– 214 – Tracking status messages to 
transact the carrier status messages 
to the customers ERP application 
 Pickup 
The Advanced Ship Notice is key to the receiving process  Proof Of Delivery (POD)
a member of The Business Maturity Group 
Issues 
Recommendations 
•Invalid charges 
–Freight, tax 
•EDI related issues 
–Amount discrepancies, PO mismatch 
–Rejections not communicated automatically 
•Duplicate checking 
•PO Cancellations 
•Past due invoice 
•No impact on Vendor compliance 
–Scorecard 
•3 way match 
–IR, GR / ASN, Carrier pickup 
•EDI automation 
–Carrier 214 – Pickup / POD 
–Invoice Receipt rejection 824 
•Workflow error handling 
•Master data governance 
•Transactional data awareness – PO process 
•Timely IR posting 
–Pay within terms 
•Vendor performance measured 
–Charge backs enacted 
•Efficient IR posting 
–Less analysis required to resolve issues 
PTP – IR Process 
Advantages of a good process 
Why are we here? 
Open the way to standard and effective IR process
a member of The Business Maturity Group 
PTP - IR EDI Process 
Procure to Pay IR EDI Process 
Customer Client Supplier Carrier 
214 -> Ship Status Idoc 
214 -> Ship Status Idoc 
Receive 
Product 
Process Shipping 
Status 
Deliver Product 
Ceate Inv. 
Pickup 
Process Shipping 
Status 
Send Status 
Send Status 
Pickup 
Receive Inv. 
Inb. Dlv 
Send Inv. 
POD 
vPO 
Pickup Product 
Send Inv. 
Accounting 
Inv. Rec. Process Inv. 
Receipt 
810 -> Inv. IDoc 
824 – IR Rejection 
Reprocess IR 
–810 – Invoice Receipt 
 Parking 
 Invoice and CR / DR 
Memos 
–997 – Functional 
Acknowledgement 
 Reject an IR if the structure is 
incorrect or required 
information is incorrect 
–824 – Application Advice 
 Communicate a functional 
rejection of an 810 
– E.g. Unknown PO, 
Duplicate IR 
–214 – Tracking status 
messages to transact the carrier 
status messages to the 
customers ERP application 
 Pickup, POD
a member of The Business Maturity Group 
PTP process – Points to note and KPIS 
•PO Creation 
–MRP – Based on Supply and Demand 
–Master data driven 
–Resources manage exceptions 
•PO Confirmation – May change (24hrs) 
–SKU, Qty, Date, Price 
–Decide rules 
•Backorders, … 
–Workflow Exceptions 
•(KPI: Confirmations without changes %, Ack’d within SLA %, Ack Errors %) 
•Ship product -> send an ASN (EDI 856) 1-2 hrs 
–Create inbound delivery 
•Inbound delivery date = 855 PO response schedule (KPI: Fill Rate) 
–Warehouse receives against the inbound delivery and not individually 
•(KPI: Receiving Errors, Damage %, Wrong SKUs, OTIF, Receipts without ASNs)
a member of The Business Maturity Group 
PTP – An understanding
a member of The Business Maturity Group 
PTP – An understanding
a member of The Business Maturity Group 
PTP – An understanding
a member of The Business Maturity Group 
Normalized EDI PTP process
a member of The Business Maturity Group 
Normalized EDI PTP process
a member of The Business Maturity Group 
Agenda 
1.Describing Supply Chain Maturity 
2.About EDI 
3.The PTP Process 
4.Vendor Compliance 
5.Summary
a member of The Business Maturity Group 
Vendor Management 
•No KPIs 
–No vendor scorecard 
–No visibility to vendor compliance 
•No confidence in the data 
–Redundant attributes 
–Run BI queries to check stock levels 
–Data governance 
•Incorrect master data entered 
–Parts manually entered 
•Need to improve vendor compliance 
•Does not embrace the EDI / automation culture 
•No visibility or transparency of process and issues to / from supplier 
•Major parts of the process are conducted outside of SAP 
•Strive towards vendor compliance (Process): 
–Set up vendor guidelines 
•EDI requirements 
–Communicate guidelines 
–Monitor, Measure  Publish 
•Vendor portal 
–Enforce compliance 
•Charge backs 
–Packing process must align with our receiving process 
•Labeling 
•Integrate rather than Interface 
–Use SAP where possible 
•Catalog, Forecasting 
•Data Governance 
–Single source of truth 
•Instill automation culture 
–Strive for EDI compliance 
Described Issues 
Recommendations
a member of The Business Maturity Group 
What is Vendor Compliance? 
1. Shipments are: 
– Accurate according to our order 
• On time 
• Correct quantity 
• Complete 
– Communicated 
• Timely communication 
• Electronically (EDI) 
– To our specification 
• Communication matches actual 
shipment detail 
– Packaged correctly 
– Labeled correctly 
• Legible 
• In support of our process 
2. Products are: 
– Good quality 
• Damage free 
– Correctly labeled 
3. Regulations 
– Comply with safety regulations 
– Comply with social and 
environmental regulations 
– Comply with legal terms and 
conditions 
How well are our suppliers performing?
a member of The Business Maturity Group 
Path to Vendor Compliance 
Develop Guidelines 
•Goes in SBA 
•Clear and unambiguous 
•EDI automation 
requirements 
•Performance SLA 
•Chargeback agreement 
•Clear expectations 
•Determine non-compliance 
cost 
Communicate 
Guidelines 
•Accessible through 
Supplier portal 
•FAQs available on 
Supplier portal 
•Begin enforcement 
“culture” 
•Communicate cost of 
non-compliance 
Monitor, Measure & 
Publish 
•Measure compliance 
against the target 
•Communicate 
compliance values 
against target to 
supplier 
•Stakeholder visibility 
•Allow but track 
exceptions 
Enforce Compliance 
•Violation management 
- Chargebacks 
•Performance trending 
•KPI visibility 
•Vendor coaching 
opportunity 
•Revise guideline for 
supplier as required 
•Audits – Warehouse 
and system 
Normalize System and 
Process 
•Standardize SAP EDI 
interface / IDocs 
•Develop mapping 
templates for IDocs 
<-> EDI 
•Update vendor EDI 
specifications 
•Implement workflow 
error handling 
Normalized process 
Realization 
•Publish specifications 
to Supplier portal 
•Enable PTP process 
through EDI and IDocs 
via PI 
•Enable KPI reporting 
•Update on-boarding 
procedure 
Support process 
•Ensure efficient use of 
workflow and IDoc 
technology 
•Manage relationship 
with EDI service 
partner 
•Execute on-boarding 
procedure 
Compliance Support 
•Ensure status 
management is 
performed at EDI 
service partner 
IT 
Business
a member of The Business Maturity Group 
Agenda 
1.Describing Supply Chain Maturity 
2.About EDI 
3.The PTP Process 
4.Vendor Compliance 
5.Summary
a member of The Business Maturity Group 
To summarize what is needed 
1.Vendor management 
–Instill EDI culture 
–Document meaning of errors 
–Charge backs 
–Collaboration 
2.EDI Automation 
–Normalize SAP EDI PTP process 
•PO Ack, PO Changes, ASN, IR 
–New vendor guidelines 
–Communicate / publish guidelines 
–Exception management focus 
3.Data governance 
–Vendor, Material 
4.Financial impact 
–Non compliance 
5.Receiving process 
–Vendor packing process aligned with DC receiving 
–Audit function 
–Receive against ASN 
6.Integration 
–Carrier collaboration
a member of The Business Maturity Group 
SAP Logistics and Fulfillment Management - Innovation 
Optimize transportation to decrease spend, increase asset utilization, and improve customer service 
–SAP TM 
Manage all global aspects of inventory movement, including export and import compliance 
–SAP GTS 
Enable supply chain collaboration – PTP transaction collaboration, inventory movements, and asset optimization 
–SAP SNC 
PTP Status Visibility and “Track and Trace” 
–SAP Event Management
a member of The Business Maturity Group 
Next Steps 
•Contact us to discuss details / provide clarity 
 
•Perform an on-site Scoping Assessment 
–Understanding full requirements – Match requirements with correct technology stack to address the needs 
–Provide high level design for architectural and budget consideration 
–Answer open questions around available technologies 
–Provide road map to implementation success  Value 
 
•Budget -> Plan -> Execute -> VALUE
a member of The Business Maturity Group 
YOU SAP INNOVATION AND SUPPORT COMPANY 
Kevin Wilson 
kwilson@qdatausa.com 
http://www.qdatausa.com 
THANK YOU

More Related Content

What's hot

International portfolio management basics
International  portfolio management basicsInternational  portfolio management basics
International portfolio management basicsmadydey
 
Wipro Procurement Planning
Wipro Procurement PlanningWipro Procurement Planning
Wipro Procurement PlanningAnaplan
 
Performance and Analysis of Mutual Funds in India
Performance and Analysis of Mutual Funds in IndiaPerformance and Analysis of Mutual Funds in India
Performance and Analysis of Mutual Funds in IndiaAditya Mahindrakar
 
Chopra Meindl Chapter 8
Chopra Meindl Chapter 8Chopra Meindl Chapter 8
Chopra Meindl Chapter 8Rupam Jash l CSCA
 
Rough cut planning
Rough cut planningRough cut planning
Rough cut planningBhupesh Bhole
 
Supply Chain Management - Business Analytics
Supply Chain Management - Business AnalyticsSupply Chain Management - Business Analytics
Supply Chain Management - Business AnalyticsSOURABH1607
 
Equity analysis of telecom sector for anand rathi securities by shilpa mandhan
Equity analysis of telecom sector for anand rathi securities by shilpa mandhanEquity analysis of telecom sector for anand rathi securities by shilpa mandhan
Equity analysis of telecom sector for anand rathi securities by shilpa mandhanRavichandra Ks
 
Dispatch and routing decisions
Dispatch and routing decisionsDispatch and routing decisions
Dispatch and routing decisionsLEEMAJOY
 
107supplier relationship
107supplier relationship107supplier relationship
107supplier relationshipbtecexpert
 
Hepatit Genel Bilgi
Hepatit Genel BilgiHepatit Genel Bilgi
Hepatit Genel Bilgimissdj
 
The investment banking paradigm
The investment banking paradigmThe investment banking paradigm
The investment banking paradigmNikhil Gangadhar
 
PE ratio and it's applications
PE ratio and it's applicationsPE ratio and it's applications
PE ratio and it's applicationsDEEPAK DODDAMANI
 
Comparative analysis on investment in mutual fund
Comparative analysis on investment in mutual fundComparative analysis on investment in mutual fund
Comparative analysis on investment in mutual fundvaibhav belkhude
 
Optimal Portfolio Choice
Optimal Portfolio ChoiceOptimal Portfolio Choice
Optimal Portfolio ChoiceRijish Chandran
 
investors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamc
investors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamcinvestors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamc
investors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamcNitesh sharma
 
Portfolio management
Portfolio managementPortfolio management
Portfolio managementAkash Jeevan
 

What's hot (20)

International portfolio management basics
International  portfolio management basicsInternational  portfolio management basics
International portfolio management basics
 
Wipro Procurement Planning
Wipro Procurement PlanningWipro Procurement Planning
Wipro Procurement Planning
 
Performance and Analysis of Mutual Funds in India
Performance and Analysis of Mutual Funds in IndiaPerformance and Analysis of Mutual Funds in India
Performance and Analysis of Mutual Funds in India
 
Chopra Meindl Chapter 8
Chopra Meindl Chapter 8Chopra Meindl Chapter 8
Chopra Meindl Chapter 8
 
Rough cut planning
Rough cut planningRough cut planning
Rough cut planning
 
Value Stream Mapping (VSM)
Value Stream Mapping (VSM)Value Stream Mapping (VSM)
Value Stream Mapping (VSM)
 
Supply Chain Management - Business Analytics
Supply Chain Management - Business AnalyticsSupply Chain Management - Business Analytics
Supply Chain Management - Business Analytics
 
Equity analysis of telecom sector for anand rathi securities by shilpa mandhan
Equity analysis of telecom sector for anand rathi securities by shilpa mandhanEquity analysis of telecom sector for anand rathi securities by shilpa mandhan
Equity analysis of telecom sector for anand rathi securities by shilpa mandhan
 
Dispatch and routing decisions
Dispatch and routing decisionsDispatch and routing decisions
Dispatch and routing decisions
 
107supplier relationship
107supplier relationship107supplier relationship
107supplier relationship
 
Demand Management for Supply Chain.
Demand Management for Supply Chain.Demand Management for Supply Chain.
Demand Management for Supply Chain.
 
Hepatit Genel Bilgi
Hepatit Genel BilgiHepatit Genel Bilgi
Hepatit Genel Bilgi
 
The investment banking paradigm
The investment banking paradigmThe investment banking paradigm
The investment banking paradigm
 
PE ratio and it's applications
PE ratio and it's applicationsPE ratio and it's applications
PE ratio and it's applications
 
camel model
camel modelcamel model
camel model
 
Comparative analysis on investment in mutual fund
Comparative analysis on investment in mutual fundComparative analysis on investment in mutual fund
Comparative analysis on investment in mutual fund
 
Optimal Portfolio Choice
Optimal Portfolio ChoiceOptimal Portfolio Choice
Optimal Portfolio Choice
 
project
projectproject
project
 
investors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamc
investors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamcinvestors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamc
investors-preferences-towards-mutual-funds-with-reference-to-kotak-kmamc
 
Portfolio management
Portfolio managementPortfolio management
Portfolio management
 

Viewers also liked

Procure to Pay Process
Procure to Pay Process Procure to Pay Process
Procure to Pay Process Sameer Mittal
 
SAP BPM Neoris Bimestral Arquitectura
SAP BPM Neoris Bimestral ArquitecturaSAP BPM Neoris Bimestral Arquitectura
SAP BPM Neoris Bimestral ArquitecturaWulfrano Moreno
 
CASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global Consolidation
CASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global ConsolidationCASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global Consolidation
CASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global ConsolidationSEEBURGER
 
Purchasing overview
Purchasing overviewPurchasing overview
Purchasing overviewb1af94le
 
Automating your EdI Testing in Healthcare | QualiTest Group
Automating your EdI Testing in Healthcare | QualiTest GroupAutomating your EdI Testing in Healthcare | QualiTest Group
Automating your EdI Testing in Healthcare | QualiTest GroupQualitest
 
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer ValueBeyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer ValueCognizant
 
Creating an efficient Procurement & P2P process
Creating an efficient Procurement & P2P processCreating an efficient Procurement & P2P process
Creating an efficient Procurement & P2P processxynergie Ltd
 
The Perfect Order Dashboard
The Perfect Order DashboardThe Perfect Order Dashboard
The Perfect Order Dashboardvaleriepreston
 
Purchase Order En To Slideshare
Purchase Order En   To SlidesharePurchase Order En   To Slideshare
Purchase Order En To SlideshareATI Solution
 
Introducing procure to pay
Introducing procure to payIntroducing procure to pay
Introducing procure to paysbcwebdev
 
AP – A Catalyst for P2P Transformation
AP – A Catalyst for P2P TransformationAP – A Catalyst for P2P Transformation
AP – A Catalyst for P2P TransformationTradeshift
 
Oracle EBS: P2P with EBS Payables and Non-EBS Procurement
Oracle EBS: P2P with EBS Payables and Non-EBS ProcurementOracle EBS: P2P with EBS Payables and Non-EBS Procurement
Oracle EBS: P2P with EBS Payables and Non-EBS ProcurementEric Guether
 
Purchasing and Accounts Payable Future Relationship
Purchasing and Accounts Payable Future RelationshipPurchasing and Accounts Payable Future Relationship
Purchasing and Accounts Payable Future RelationshipBill Kohnen
 
Oracle R-12 Procure To Pay | Oracle R-12 Procure To Pay Training
Oracle R-12 Procure To Pay | Oracle R-12 Procure To Pay TrainingOracle R-12 Procure To Pay | Oracle R-12 Procure To Pay Training
Oracle R-12 Procure To Pay | Oracle R-12 Procure To Pay TrainingOracleTrainings
 
Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...
Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...
Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...SAP Ariba
 
Transform 2014: Trends in Procure to Pay
Transform 2014: Trends in Procure to PayTransform 2014: Trends in Procure to Pay
Transform 2014: Trends in Procure to PayKofax
 
Procure to pay cycle
Procure to pay cycleProcure to pay cycle
Procure to pay cycleAmarnath Kotha
 
IBM BPM & ODM
IBM BPM & ODMIBM BPM & ODM
IBM BPM & ODMIBM Sverige
 

Viewers also liked (20)

Procure to Pay Process
Procure to Pay Process Procure to Pay Process
Procure to Pay Process
 
SAP BPM Neoris Bimestral Arquitectura
SAP BPM Neoris Bimestral ArquitecturaSAP BPM Neoris Bimestral Arquitectura
SAP BPM Neoris Bimestral Arquitectura
 
CASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global Consolidation
CASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global ConsolidationCASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global Consolidation
CASE STUDY: How SCA Hygiene Leveraged SAP NetWeaver for Global Consolidation
 
Purchasing overview
Purchasing overviewPurchasing overview
Purchasing overview
 
Automating your EdI Testing in Healthcare | QualiTest Group
Automating your EdI Testing in Healthcare | QualiTest GroupAutomating your EdI Testing in Healthcare | QualiTest Group
Automating your EdI Testing in Healthcare | QualiTest Group
 
Quick response and ECR
Quick response and ECRQuick response and ECR
Quick response and ECR
 
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer ValueBeyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
 
Creating an efficient Procurement & P2P process
Creating an efficient Procurement & P2P processCreating an efficient Procurement & P2P process
Creating an efficient Procurement & P2P process
 
The Perfect Order Dashboard
The Perfect Order DashboardThe Perfect Order Dashboard
The Perfect Order Dashboard
 
Purchase Order En To Slideshare
Purchase Order En   To SlidesharePurchase Order En   To Slideshare
Purchase Order En To Slideshare
 
Introducing procure to pay
Introducing procure to payIntroducing procure to pay
Introducing procure to pay
 
AP – A Catalyst for P2P Transformation
AP – A Catalyst for P2P TransformationAP – A Catalyst for P2P Transformation
AP – A Catalyst for P2P Transformation
 
Procure to Pay
Procure to Pay Procure to Pay
Procure to Pay
 
Oracle EBS: P2P with EBS Payables and Non-EBS Procurement
Oracle EBS: P2P with EBS Payables and Non-EBS ProcurementOracle EBS: P2P with EBS Payables and Non-EBS Procurement
Oracle EBS: P2P with EBS Payables and Non-EBS Procurement
 
Purchasing and Accounts Payable Future Relationship
Purchasing and Accounts Payable Future RelationshipPurchasing and Accounts Payable Future Relationship
Purchasing and Accounts Payable Future Relationship
 
Oracle R-12 Procure To Pay | Oracle R-12 Procure To Pay Training
Oracle R-12 Procure To Pay | Oracle R-12 Procure To Pay TrainingOracle R-12 Procure To Pay | Oracle R-12 Procure To Pay Training
Oracle R-12 Procure To Pay | Oracle R-12 Procure To Pay Training
 
Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...
Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...
Closing the Procure-to-Pay Loop: How AP Drives Strategic Savings and Complian...
 
Transform 2014: Trends in Procure to Pay
Transform 2014: Trends in Procure to PayTransform 2014: Trends in Procure to Pay
Transform 2014: Trends in Procure to Pay
 
Procure to pay cycle
Procure to pay cycleProcure to pay cycle
Procure to pay cycle
 
IBM BPM & ODM
IBM BPM & ODMIBM BPM & ODM
IBM BPM & ODM
 

Similar to Presentation: Moving toward the perfect order by automating your procure to pay process

Supply chain management satyen
Supply chain management satyenSupply chain management satyen
Supply chain management satyensatyenbharti
 
Lecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurementLecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurementbosp1
 
Lecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurementLecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurementbosp1
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementStudsPlanet.com
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementStudsPlanet.com
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementAchintya Das
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementStudsPlanet.com
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementsimmeekhan
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementDoiyan
 
SCM Project Objectives
SCM Project ObjectivesSCM Project Objectives
SCM Project ObjectivesWilliam Francis
 
supplychainmanagement-100806234344-phpapp02.pdf
supplychainmanagement-100806234344-phpapp02.pdfsupplychainmanagement-100806234344-phpapp02.pdf
supplychainmanagement-100806234344-phpapp02.pdfRakeshKhetrapal1
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementmoressachin
 
Supply chain management (1)
Supply chain management (1)Supply chain management (1)
Supply chain management (1)mohdarshan
 
Supply chain-management
Supply chain-managementSupply chain-management
Supply chain-managementmalathi1992
 
Supply chain-management
Supply chain-managementSupply chain-management
Supply chain-managementNeha Suman
 

Similar to Presentation: Moving toward the perfect order by automating your procure to pay process (20)

Supply chain management satyen
Supply chain management satyenSupply chain management satyen
Supply chain management satyen
 
Lecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurementLecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurement
 
Lecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurementLecture iii (september 2014)the information system and procurement
Lecture iii (september 2014)the information system and procurement
 
Bba 1584 scm
Bba 1584  scmBba 1584  scm
Bba 1584 scm
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Itilv3
Itilv3Itilv3
Itilv3
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
SCM Project Objectives
SCM Project ObjectivesSCM Project Objectives
SCM Project Objectives
 
B-Supply Chain Management
B-Supply Chain ManagementB-Supply Chain Management
B-Supply Chain Management
 
supplychainmanagement-100806234344-phpapp02.pdf
supplychainmanagement-100806234344-phpapp02.pdfsupplychainmanagement-100806234344-phpapp02.pdf
supplychainmanagement-100806234344-phpapp02.pdf
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain management (1)
Supply chain management (1)Supply chain management (1)
Supply chain management (1)
 
Supply chain-management
Supply chain-managementSupply chain-management
Supply chain-management
 
Supply chain-management
Supply chain-managementSupply chain-management
Supply chain-management
 
Scm
Scm Scm
Scm
 
SCM
SCMSCM
SCM
 

Recently uploaded

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Trucks in Minnesota
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 

Recently uploaded (20)

Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 

Presentation: Moving toward the perfect order by automating your procure to pay process

  • 1. A member of The Business Maturity Group Moving toward the Perfect Order by automating your Procure To Pay Process An in-depth look in to the PTP process as it relates to automation and EDI November 6th, 2014 You Innovation and Support Company For companies leveraging SAP solutions
  • 2. a member of The Business Maturity Group Q Data SAP Supply Chain Webinar Series 3 Thursdays at 11am CST •10/29: Small Parcel Packing Exception Monitoring •11/6: EDI Automation – Procure to Pay –Striving for the perfect order from your supplier •11/13: EDI Automation – Order to Cash –Striving to present the perfect order to your customer http://www.qdatausa.com Register at Q Data USA’s website http://www.qdatausa.com/resources#upcoming
  • 3. a member of The Business Maturity Group Q Data SAP EM Webinar Series http://www.qdatausa.com Viewing this and previous webinars
  • 4. a member of The Business Maturity Group About the Speaker – Kevin Wilson Kevin Wilson has more than 24 years’ experience in business analysis, solution architecture, project management, solution development & implementation. 18 years of SAP experience covering supply chain, retail, utilities & manufacturing, amongst others. Business case and value engineering expertise covering multiple, integrated SAP solutions with a strategic focus on Supply Chain Management and providing visibility to the extended Supply Chain. Author and thought leader in SAP supply chain execution processes. Principle SAP Solution Engineer Q Data USA, Inc. Email: kwilson@qdatausa.com Website: www.qdatausa.com Author: “SAP Event Management SAP’s best kept secret…”
  • 5. a member of The Business Maturity Group About the Company - Q Data USA •Privately held company established in 1994 •SAP centric focus, Best Practice Philosophy •Manufacturing, Distribution, Oil & Gas, Transportation, Pharma, High Tech •Methodology to Achieve Business Maturity We provide pre-go-live implementation and post go-live support services that give our clients the highest-level of Business Performance As Trusted Advisors, we are continually bridging the gap between IT and the Supply Chain By following our proven methodologies, we develop innovative solutions and concepts that ensure our clients a high degree of Implementation Maturity from their SAP (ERP) environment You Innovation and Support Company For companies leveraging SAP solutions
  • 6. a member of The Business Maturity Group Agenda 1.Describing Supply Chain Maturity 2.About EDI 3.The PTP Process 4.Vendor Compliance 5.Summary
  • 7. a member of The Business Maturity Group Global Trends and Their Impact on the Supply Chain Unprofitable demand and supply synchronization –Poor visibility into customer demand, supply fluctuations & channel inventory –Demand/Supply not aligned –Escalating costs and inefficient operations Inefficient Inflexible execution –Lack of visibility & collaboration across manufacturing & logistics network –Ineffective capacity & asset utilization –Escalating transportation & logistics costs Increasing number of supply chain disruptions –Recurring supplier failure, supply shortages, and inventory liabilities –Rising number of product recalls, counterfeits, and quality issues –Increased government regulations and global trade and compliance requirements –Growing focus on sustainability and carbon and greenhouse gas emission control Increased demand and supply volatility Global pressure on margins Increased risk and compliance
  • 8. a member of The Business Maturity Group Key Trends •Deliver a Supply Chain Execution platform –Single solution for all logistics needs –Provide end-to-end visibility across the supply chain •Enable Sustainable Supply Networks –Ability to set, measure and monitor performance across the supply chain –Provide end-to-end visibility across the extended supply network –Green and sustainable practices –Product traceability and recall management across the supply chain
  • 9. a member of The Business Maturity Group Supply Chain Maturity Work How well are you matching supply with demand? How “real” are your supply and demand forecasts? Is your master data and system driving the execution of the process? Are all the tasks in the process being performed in a timely fashion by the correct people? Is the system doing most of the work? People How well are you or your partners performing? Are you improving? Are you addressing issues in a timely fashion? Can you measure success and failure? How are you notifying users of exceptions? How are people doing their work? In the system? Are your people empowered in their day to day responsibilities? System How well are your systems working? Are they integrated with each other? Is there one source of truth in your process? Is the process automated as far as possible? How many manual touches are made in your process? Is the solution mobile enabled? Can you access your information while not wired in? Is the system process aligned with your business process? Reporting, Information Is your organization streamlined to handle the exceptions to the process or are they maintaining the process? Are your people educated in the process? Are the users analytical in focus or custodian in focus? Is change management conducted efficiently in your organization? Are KPIs in place? Can you measure success or failure? Are the reports visible to all necessary parties? Working together towards a common goal – Scalable, Agile, Efficient, Effective Supply Chain
  • 10. a member of The Business Maturity Group The value of a mature Supply Chain •The goals of a mature Supply Chain – We aim to: –Reduce the cost of the supply chain –Improve Service Levels –Collapse the Supply Chain through automation –Manage exceptions proactively in a timely fashion –Enjoy End-to-End status visibility –Reduce compliance errors from vendors –Achieve the Perfect Order –Have our work, people, system and information aligned –Decrease the “Time to insight” •To provide insightful information to the right people at the right time
  • 11. a member of The Business Maturity Group Focus of this session…. • Perfect order –On Time –Complete –Free from damage •Readable format –Accurate documentation –Compliant • Vendor compliance –Eliminate gaps in the supply chain –Align people, process and system • Visibility to process and performance Cost SLA
  • 12. a member of The Business Maturity Group What main processes drive the Vendor Supply Chain? 1.Vendor Management –Vendor Negotiations –Vendor Contracts –On boarding vendors –Master data capture •Vendor master •Material master •Pricing 2.Procure to Pay (PTP) –Supply and Demand forecasting –Purchase Order management •Acknowledgement –Inbound deliveries •ASNs •Goods receipt •Drop ships –Invoice Receipts –Returns
  • 13. a member of The Business Maturity Group Agenda 1.Describing Supply Chain Maturity 2.About EDI 3.The PTP Process 4.Vendor Compliance 5.Summary
  • 14. a member of The Business Maturity Group What is EDI? •“Electronic Data Interchange (EDI) refers to a system providing global standards for the exchange of structured data, electronically between 2 parties” •EDI Standards were developed to document the needed business transactions –ANSI X12 and EDIFACT •Mapping – Transform to / from EDI format to / from internal format •Communication – Envelope for message delivery between 2 partners ANSI EDIFACT Description 850 ORDERS Purchase Order 855 ORDRSP PO Acknowledgement 856 DESADV Advance Ship Notice 810 INVOIC Invoice Common EDI PTP Transactions:
  • 15. a member of The Business Maturity Group Why EDI? •Reduction in data capture errors •Reduction in handling costs for paper documents •Faster execution of the process –Collapsing the supply Chain – Time between the end of one activity and the start of the next activity is reduced –Reduction in Supply Chain Cycle Time Common hurdles to overcome when implementing EDI 1. Change Management – “We do it this way” 2. Cost – Time and Money to enable the functionality 3. EDI Perception: EDI is technical!!! You can only automate a GOOD MANUAL process EDI is not the silver bullet to fix your issues in the process 0% 50% 100% 2008 2013 34% 62% % EDI Adoption for Purchase Order $- $20.00 $40.00 Paper EDI $37.45 $23.83 Cost of doing a PO via EDI vs. Paper
  • 16. a member of The Business Maturity Group Agenda 1.Describing Supply Chain Maturity 2.About EDI 3.The PTP Process 4.Vendor Compliance 5.Summary
  • 17. a member of The Business Maturity Group Describing the PTP Process Purchase Order (PO): •Vendor, Price, Quantity, Material •Requested Delivery Date PO Acknowledgment (Confirmation) •“Signature” of confirmation of the order. I.e. The binding agreement to delivery the correct materials, at the right quantity, at the agreed price on the required date Advanced Ship Notice (ASN) •Document that the vendor sends the customer telling them what material and quantity are being shipped •Carrier / Tracking information are also sent so that in-transit status can be obtained •Packing and Serial numbers •Becomes an Inbound Delivery in SAP Goods Receipt (GR) •Receive goods in to the warehouse against the inbound delivery (the vendor ASN) Invoice Receipt (IR) •Receive the invoice from the vendor to pay based on what was agreed on in the PO Acknowledgment
  • 18. a member of The Business Maturity Group Issues Recommendations •PO has incorrect details –Master data discrepancies •Dates, quantities, terms, product •PO acknowledgments aren’t accurate •PO changes are not systemically driven –Can be untimely •Automation of the process is not a priority (EDI) –Untimely •Fully utilize the PO acknowledgement •Establish audit function –Ensure process is followed •Master Data Management –Master Data governance •Understand the financial impact of non-compliance –Quantify disruptions •Strive for fewer PO changes –More accurate demand / forecast •Automate the process –Fully utilize EDI where possible •Early warning of potential issues –Reduced customer impact –Correct timely info is reflected on the Sales Order schedule for drop ship POs •PO Changes don’t lead to “surprises” •PO Rejections are immediately re-sourced •Back-office process savings –Account Payable deal with discrepancies PTP - PO Management Process Advantages of a mature process
  • 19. a member of The Business Maturity Group PTP - PO Management EDI Process Procure to Pay PO EDI Process Customer Supplier Purchase Order Process 850 855 860 865 Ack. Order Ch. Sales Order Process Ack. Process Ack. Change Order PO Order Ack. Ack. Order PO Change Order Ack. – 850 – Purchase Order • Ensure vendor compliance – 855 – Acknowledge Purchase Order (Vendor agrees to the terms and detail in the PO) • Workflow exceptions • Thresholds • Impact on SO schedule – 860 – Purchase Order changes • Change in the system drives communication – 865 – Purchase Order Change Acknowledgement • Vendor acceptance of the change • Workflow exceptions It all begins with a signed Purchase Order?
  • 20. a member of The Business Maturity Group Issues Recommendations •ASN Inaccuracy –Picking, labeling, illegible, PO discrepancy •Vendor process not aligned with the customer process –Packing / Labeling -> Receiving / Put away •Ineffective PO process –Master data discrepancies •PO Changes •No automation of the process •Integration vs. Interface – Best of Breed approach •Master Data Management –Master Data Governance •Document the meaning of ASN error and ASN compliance •Understand the financial impact of non-compliance –Basis for charge-backs •Strive for fewer PO changes •Initiate formal audit process –Ensure vendor compliance –Physical audit •Vendor collaboration •Focus on exception management •Automate the process - Vendor & Carrier EDI •Receive against an ASN –Can reduce costs up to 40% •Discrepancies known earlier –Prior to goods receipt –Less customer impact •Fewer discrepancies in downstream processes –GR and AP / Invoice Receipt process •Drop ship  Can send ASN to customer •Visibility in to Vendor compliance PTP – ASN Process Advantages of a good process Why are we here?
  • 21. a member of The Business Maturity Group PTP – ASN EDI Process Procure to Pay ASN EDI Process Customer Client Supplier Carrier 856 -> Dlv. Idoc 214 -> Ship Status Idoc 214 -> Ship Status Idoc 214 -> Ship Status Idoc 824 – Reject ASN Receive Product Process Shipping Status Send Status Deliver Product Process Shipping Status Ceate Inv. Receive ASN Send ASN Send ASN Process Inb. Dlv Pickup Process Shipping Status Reprocess ASN Send Status Send Status Pickup Receive Inv. Inb. Dlv Ship Product Send Inv. POD Transport Product vPO Pickup Product – 856 – Advanced Ship Notification  Full details are to be sent by the Vendor –GTIN must match shipment with ASN  Inbound delivery – 997 – Functional Acknowledgement  Reject an ASN if the structure is incorrect or required information is incorrect –Missing carton level or pallet level information – 824 – Application Advice  Communicate a functional rejection of an 856 – E.g. Unknown PO, Duplicate ASN – 214 – Tracking status messages to transact the carrier status messages to the customers ERP application  Pickup The Advanced Ship Notice is key to the receiving process  Proof Of Delivery (POD)
  • 22. a member of The Business Maturity Group Issues Recommendations •Invalid charges –Freight, tax •EDI related issues –Amount discrepancies, PO mismatch –Rejections not communicated automatically •Duplicate checking •PO Cancellations •Past due invoice •No impact on Vendor compliance –Scorecard •3 way match –IR, GR / ASN, Carrier pickup •EDI automation –Carrier 214 – Pickup / POD –Invoice Receipt rejection 824 •Workflow error handling •Master data governance •Transactional data awareness – PO process •Timely IR posting –Pay within terms •Vendor performance measured –Charge backs enacted •Efficient IR posting –Less analysis required to resolve issues PTP – IR Process Advantages of a good process Why are we here? Open the way to standard and effective IR process
  • 23. a member of The Business Maturity Group PTP - IR EDI Process Procure to Pay IR EDI Process Customer Client Supplier Carrier 214 -> Ship Status Idoc 214 -> Ship Status Idoc Receive Product Process Shipping Status Deliver Product Ceate Inv. Pickup Process Shipping Status Send Status Send Status Pickup Receive Inv. Inb. Dlv Send Inv. POD vPO Pickup Product Send Inv. Accounting Inv. Rec. Process Inv. Receipt 810 -> Inv. IDoc 824 – IR Rejection Reprocess IR –810 – Invoice Receipt  Parking  Invoice and CR / DR Memos –997 – Functional Acknowledgement  Reject an IR if the structure is incorrect or required information is incorrect –824 – Application Advice  Communicate a functional rejection of an 810 – E.g. Unknown PO, Duplicate IR –214 – Tracking status messages to transact the carrier status messages to the customers ERP application  Pickup, POD
  • 24. a member of The Business Maturity Group PTP process – Points to note and KPIS •PO Creation –MRP – Based on Supply and Demand –Master data driven –Resources manage exceptions •PO Confirmation – May change (24hrs) –SKU, Qty, Date, Price –Decide rules •Backorders, … –Workflow Exceptions •(KPI: Confirmations without changes %, Ack’d within SLA %, Ack Errors %) •Ship product -> send an ASN (EDI 856) 1-2 hrs –Create inbound delivery •Inbound delivery date = 855 PO response schedule (KPI: Fill Rate) –Warehouse receives against the inbound delivery and not individually •(KPI: Receiving Errors, Damage %, Wrong SKUs, OTIF, Receipts without ASNs)
  • 25. a member of The Business Maturity Group PTP – An understanding
  • 26. a member of The Business Maturity Group PTP – An understanding
  • 27. a member of The Business Maturity Group PTP – An understanding
  • 28. a member of The Business Maturity Group Normalized EDI PTP process
  • 29. a member of The Business Maturity Group Normalized EDI PTP process
  • 30. a member of The Business Maturity Group Agenda 1.Describing Supply Chain Maturity 2.About EDI 3.The PTP Process 4.Vendor Compliance 5.Summary
  • 31. a member of The Business Maturity Group Vendor Management •No KPIs –No vendor scorecard –No visibility to vendor compliance •No confidence in the data –Redundant attributes –Run BI queries to check stock levels –Data governance •Incorrect master data entered –Parts manually entered •Need to improve vendor compliance •Does not embrace the EDI / automation culture •No visibility or transparency of process and issues to / from supplier •Major parts of the process are conducted outside of SAP •Strive towards vendor compliance (Process): –Set up vendor guidelines •EDI requirements –Communicate guidelines –Monitor, Measure  Publish •Vendor portal –Enforce compliance •Charge backs –Packing process must align with our receiving process •Labeling •Integrate rather than Interface –Use SAP where possible •Catalog, Forecasting •Data Governance –Single source of truth •Instill automation culture –Strive for EDI compliance Described Issues Recommendations
  • 32. a member of The Business Maturity Group What is Vendor Compliance? 1. Shipments are: – Accurate according to our order • On time • Correct quantity • Complete – Communicated • Timely communication • Electronically (EDI) – To our specification • Communication matches actual shipment detail – Packaged correctly – Labeled correctly • Legible • In support of our process 2. Products are: – Good quality • Damage free – Correctly labeled 3. Regulations – Comply with safety regulations – Comply with social and environmental regulations – Comply with legal terms and conditions How well are our suppliers performing?
  • 33. a member of The Business Maturity Group Path to Vendor Compliance Develop Guidelines •Goes in SBA •Clear and unambiguous •EDI automation requirements •Performance SLA •Chargeback agreement •Clear expectations •Determine non-compliance cost Communicate Guidelines •Accessible through Supplier portal •FAQs available on Supplier portal •Begin enforcement “culture” •Communicate cost of non-compliance Monitor, Measure & Publish •Measure compliance against the target •Communicate compliance values against target to supplier •Stakeholder visibility •Allow but track exceptions Enforce Compliance •Violation management - Chargebacks •Performance trending •KPI visibility •Vendor coaching opportunity •Revise guideline for supplier as required •Audits – Warehouse and system Normalize System and Process •Standardize SAP EDI interface / IDocs •Develop mapping templates for IDocs <-> EDI •Update vendor EDI specifications •Implement workflow error handling Normalized process Realization •Publish specifications to Supplier portal •Enable PTP process through EDI and IDocs via PI •Enable KPI reporting •Update on-boarding procedure Support process •Ensure efficient use of workflow and IDoc technology •Manage relationship with EDI service partner •Execute on-boarding procedure Compliance Support •Ensure status management is performed at EDI service partner IT Business
  • 34. a member of The Business Maturity Group Agenda 1.Describing Supply Chain Maturity 2.About EDI 3.The PTP Process 4.Vendor Compliance 5.Summary
  • 35. a member of The Business Maturity Group To summarize what is needed 1.Vendor management –Instill EDI culture –Document meaning of errors –Charge backs –Collaboration 2.EDI Automation –Normalize SAP EDI PTP process •PO Ack, PO Changes, ASN, IR –New vendor guidelines –Communicate / publish guidelines –Exception management focus 3.Data governance –Vendor, Material 4.Financial impact –Non compliance 5.Receiving process –Vendor packing process aligned with DC receiving –Audit function –Receive against ASN 6.Integration –Carrier collaboration
  • 36. a member of The Business Maturity Group SAP Logistics and Fulfillment Management - Innovation Optimize transportation to decrease spend, increase asset utilization, and improve customer service –SAP TM Manage all global aspects of inventory movement, including export and import compliance –SAP GTS Enable supply chain collaboration – PTP transaction collaboration, inventory movements, and asset optimization –SAP SNC PTP Status Visibility and “Track and Trace” –SAP Event Management
  • 37. a member of The Business Maturity Group Next Steps •Contact us to discuss details / provide clarity  •Perform an on-site Scoping Assessment –Understanding full requirements – Match requirements with correct technology stack to address the needs –Provide high level design for architectural and budget consideration –Answer open questions around available technologies –Provide road map to implementation success  Value  •Budget -> Plan -> Execute -> VALUE
  • 38. a member of The Business Maturity Group YOU SAP INNOVATION AND SUPPORT COMPANY Kevin Wilson kwilson@qdatausa.com http://www.qdatausa.com THANK YOU