This document summarizes an interview with Mr. Syahril, a senior architect with over 10 years of experience. It outlines his educational journey, starting with SPM examinations in 1998 and eventually earning his architecture degree. It describes his experience working for various architecture companies since 2005. It also discusses the construction process and challenges Mr. Syahril has faced in projects being canceled. He emphasizes that architecture involves vision, customer requirements, and following legal regulations.
Presentation on how to chat with PDF using ChatGPT code interpreter
MR SYAHRIL'S JOURNEY AS AN ARCHITECT
1. INTERVIEW OF THE ARCHITECT
Ar’s
Digest
MR SYAHRIL
Anuar Aziz Architect company
Architecture
beyond the expectation
Taylor’s student Visit
Experience
the Difference.
April 2013 Malaysia RM15
The FIRST
INTERVIEW
2. Ar’s Digest
HIS JOURNEY TO SUCCESS
In 1998,he had been through SPM
examination and started the journey to
become an architect.
Page 2
Construction
Process
Build a building is not
as easy as you think.Page 3
APRIL 2013
MR SYARIL EXPERINCE AND
ACHIEVEMENTS
Mr Syahril as an senior architect in
Anuar Aziz Architect company has more
than 10 years of working experience..
Page 4
THE
CONCLUSION
A pleasure to meet
Page 5
3. His
journey
To Success
About him
Name : Mr . Syahril
Age : 34years old
Year of birth :July of 1979
Working experience : 10years
Horoscope :cancer
He ended his SPM in 1996.He then studied
A-level in 1997.After a year,1998,Malaysia
underwent an economic downturn which
brought the result of no scholarship for all A-
level students to study abroad. He then
joined the architecture course in UITM which
is the same school as Ms Delliya Zain.
In 2002,he finished his part I ,and started
working. After a year , he continued his part
II. In 2005,he completed his part II study and
joined a company in Shah Alam . In 2008,he
joined the current company which is Anuar
Aziz Architect company until now.
4. Schematic Drawing
Team joined in. E.g.
engineers, quantity
surveyor..
Contract
implementation and
management phase
Contractor taking
part . Construction
process starts.
Detail Drawing
Building is built before
getting signature from
the architect and
government.
Construction
Process
5. His Experiences
through 10years
“The worst part of
work is when you actually
paid a lot of efforts in
designing and arranging
those data for the building
,and almost the time to get
approval ,suddenly the the
project is canceled.”
The most amazing part is
experiencing the graduation day .
After knowing you had been
through all days and night in
studying and finally it’s the time to
put an end of it. By the way
,staying over at school is also the
most interesting part of the
experience.
“You can’t work
individually unless
you are a genius.”
Said
Mr.Syahril
6. “Architecture
is not as easy as you
think it is.”
Said Mr. Syahril
The
ConclusionThrough the interview, we had
realized that there are far more
details we need to take care of
such as the contract and the law .
Architecture is not only about
design , it involves in overall vision
,the customers’ requirement and
also taking care of the law .
Through the interview ,he kept on
repeating the law , which shows
that it is really important to follow
the rules and regulation. Lastly I
would like to thank you Anuar Aziz
Architect company to give us this
great opportunity to get closer to
this profession.
Construction process is
like a puzzle because it
need a combination of
client’s requirement ,
contractor’s requirement
, engineer’s requirement
and architect’s
requirement.