3. Manufacturing Process
Sequence
What is your primary process?
Why did you choose this
process?
The main process is cutting because
manufacturing fly killer . The first step cut the
plastic bottle into 3 part and assembled
together.
4.
5. Manufacturing Process
Sequence
What is your secondary
process? Why did you choose
this process?
The secondary process is Drilling process. We
will drill hole at the upper part of product to a
size 2×2 cm² because nature of the mayfly will
fly approach light.
6.
7. Manufacturing Process
Sequence
What is your tertiary
process? Why did you
choose this process?
The tertiary process is painting process . We
will painting the black color because mayfly
will fly into hole with a light and assembled
with the lamp.
8.
9. Product function
With your selected
material, how is your material
compatible with product
geometry and manufacturing
processes?
The material selected is appropriate to product
and the product is circular cylinder because
easy to find and convenient.
10. Product function
What is the normal applied
load to the material? Can
your material take such
load?
Product can get load.
Load estimate have 1 Newton.
11. Product function
What is the normal ambient
conditions to your material?
Heat of the lamp affect product have heat.
Water have affect cause frazzle of lamp.
12. Product function
With your selected manufacturing
process, how is your process
compatible with the product
geometry?
Product is associated with circular cylinder as
material used is circular cylinder