MATERIAL or METHODS Part No. 87M44161U01
Specification Rev:AC
Date:11/16/06
TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 1 of 5
ECN No. Rev. Date Originator Details of change
71909 4-6-99 AA M Fulcher New Release
NB103527 03-08-01 AB M.
FULCHER
Pages 2, 3, 4, 6
DP120253 11-16-06 AC R.Jones Replace Motorola AIEG to Continental, change QS-
9000 to ISO/TS16949. Delete Motorola Reference.
Note: All released revision level changes to this document will also require the Originator to update the
Revision level of this document in CONTINENTAL specification number 87M42999T85 - “Index of
Manufacturer’s Requirements and Reference Specifications.”
MATERIAL or METHODS Part No. 87M44161U01
Specification Rev:AC
Date:11/16/06
TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 2 of 5
I. PURPOSE
The purpose of this document is to define quality systems requirements and supplier development
methods that a manufacturer must meet to supply components to CONTINENTAL.
CONTINENTAL’s supplier quality goals are to develop best-in-class performance from suppliers
and subsuppliers to CONTINENTAL, attain continuous improvement in quality performance of
purchased material and provide Total Customer Satisfaction.
II. SCOPE
This document applies to all suppliers who provide components or material used in the production
of CONTINENTAL products.
III. REFERENCED DOCUMENTS
Automotive Industry Action Group (AIAG) ISO/TS16949 reference series
87M42999T85, ‘Index of Manufacturer’s Requirements and Reference Specifications.’
87M43300S80, ‘General Requirements for Suppliers of Purchased Components for
CONTINENTAL.’
87M43113U01, ‘Supplier Component Change.’
87M43300S51, ‘Production Part Approval Process.’
12M41378U01, ‘Supplier Report Card Procedure.’
87M44162U01, ‘Process Average Testing and Statistical Yield Analysis.’
87M44799F66 'Component Reliability Requirements'
IV. ADHERENCE TO CONTINENTAL SPECIFICATIONS.
A. The CONTINENTAL purchase order (P/O) and component or material specification are documents
that the supplier must exactly meet in order to provide a quality component or material to
CONTINENTAL.
Terms and conditions explicitly listed on the front of the P/O or as general items on the back of the
P/O are requirements.
In the event the supplier needs to make a PERMANENT change to the component that the supplier is
shipping to CONTINENTAL, the supplier shall initiate a Supplier Component Change (SCC) per
87M43113U01. CONTINENTAL may revise its specification if the form, fit or function of the
component is changing. CONTINENTAL may require that suppliers submit PPAP per 87M43300S51.
In the event the supplier needs to make a TEMPORARY change to the form, fit or function of the
component that the supplier is shipping to CONTINENTAL, or if the supplier wishes to ship material
that does not conform to the CONTINENTAL specification and requirements or the purchase order,
the supplier shall notify CONTINENTAL plant purchasing or SQA in order to initiate a Request for
Material Deviation (RFD) form.
MATERIAL or METHODS Part No. 87M44161U01
Specification Rev:AC
Date:11/16/06
TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 3 of 5
B. Specifications listed in 87M42999T85, 'Index of Manufacturer's Requirements and Reference
Specifications' are a summary of CONTINENTAL's general requirements. These requirements apply
to all components and materials even if these specifications are not called out in the P/O or
specification.
In the event the supplier cannot meet all applicable specifications listed in the T85, the supplier shall
notify CONTINENTAL. All exceptions to specifications in the T85 index must be negotiated and
documented with CONTINENTAL before shipment of affected material.
C. Special, critical or safety related parameters in specifications will be identified as such on the
component or material specification per 87M43300S51, Production Part Approval Process. Suppliers
are required to test these parameters per AIAG PPAP requirements, or per CONTINENTAL
instruction. Upon request from CONTINENTAL, in the form of a Special Characteristics Agreement
Document (SCAD), suppliers are required to submit data for these parameters with each shipment, or
as deemed appropriate by CONTINENTAL plant purchasing or SQA. CONTINENTAL reserves the
right to inspect such data at the supplier’s site.
D. Suppliers may be held responsible for corrective actions and costs when their products do not
conform to the CONTINENTAL purchase order, component specification or specifications listed in
87M42999T85.
V. QUALITY SYSTEM REQUIREMENTS
A. CONTINENTAL requires that its suppliers establish and maintain a quality system in compliance to
ISO/TS16949 Quality Systems Standard.
B. Every supplier to CONTINENTAL should achieve and maintain third party certification of its quality
system to the ISO/TS16949 standard.
Suppliers may be required to submit periodic updates of plans for and ongoing status of quality
system assessments. Plans should include detailed milestones, i.e. benchmarks, self-quality system
assessments (QSA's), ISO certification, QS assessments, 2nd party assessments, etc.
C. Suppliers must keep CONTINENTAL updated on its quality system in place, and ISO-9000 or
ISO/TS16949 certification status. The updates shall be copies of the certificate, including auditor,
date and scope of certification.
D. A supplier's own quality system assessment cannot supplant an objective 3rd party ISO/TS16949
audit.
Assessments based on Q1, Pentastar, GM Awards for Excellence, QSR, etc. may be submitted as
additional evidence of system compliance to elements of ISO/TS16949.
Because ISO/TS16949 is based on fundamentals of ISO-9000, assessments based on ISO-9000,
ISO-9001 or ISO-9002 may be submitted as evidence of system compliance to some elements of
ISO/TS16949, but should not be considered as meeting all of the quality systems requirements of
suppliers as stated in this procedure.
Assessments based on ANSI Z1.8 (ASQ standard C-1 'General Requirements for a Quality Program')
are not accepted as objective evidence of a quality system to the ISO/TS16949 standard.
CONTINENTAL reserves the right to inspect records/evidence of a quality system at the supplier's
design and manufacturing sites. This may be included in the scope of a Quality System Assessment
(QSA), self assessment, or Process Sign-Off (PSO) site audit.
MATERIAL or METHODS Part No. 87M44161U01
Specification Rev:AC
Date:11/16/06
TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 4 of 5
CONTINENTAL may require suppliers to submit a self-assessed Quality System Assessment (QSA)
based on the AIAG standard.
E. Suppliers should use the AIAG methods for Statistical Process Control (SPC), Measurement
System Analysis (MSA), Production Part Approval Process (PPAP), etc. in developing and deploying
their own systems for design and manufacturing control.
F. Suppliers are required to develop their sub-suppliers' capabilities and quality systems to support the
supplier's compliance to 's requirements and specifications.
VI. OTHER ELEMENTS OF ISO/TS16949.
A. Supplier should have a management review process or Quality Operating System (QOS) to drive
quality improvement.
B. Suppliers are required to execute specific elements of the AIAG ISO/TS16949 quality system upon
request of CONTINENTAL, i.e. FMEA, control plan, MSA, SPC, continuous improvement, etc.
C. Suppliers should control processes with statistical methods, such as Ppk, Cpk, process capability
charts, etc.; prototype, preproduction and production control plans; lot acceptance test data; etc.
Control plans should be based on design reviews, design FMEA’s, process capability studies, and
customer specifications.
E. Advanced Product Quality Planning (APQP) should be reviewed with CONTINENTAL in order to
assure meeting design and product sampling deliverables periodically throughout the design process.
F. A Process Signoff (PSO) may be conducted at the supplier’s site by a CONTINENTAL Product
Quality Team to ensure that all control plans, process instructions and gage/test equipment are in
place for production.
G. CONTINENTAL reserves the right to inspect purchased material at the supplier’s site prior to
shipment to CONTINENTAL.
MATERIAL or METHODS Part No. 87M44161U01
Specification Rev:AC
Date:11/16/06
TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 5 of 5
VII. OTHER SUPPLIER DEVELOPMENT METHODS
A. Design data and records shall be maintained by the supplier during the product development and
validation process.
B. Suppliers must embrace continuous improvement as a business and quality systems methodology.
This methodology should include:
1. Campaign to correct and eliminate manufacturing defects.
2. Design of Experiments for optimization prior to starting production following significant
process changes.
3. Develop ‘0-Defect’ plans where all known or predicted failure modes are evaluated (See
AIAG GM GP-12).
4. Use structured problem resolution and corrective action methods such as the ‘8-
Discipline’ (8-D) methodology for problem solution and corrective action.
C. Process Average Testing (PAT), Statistical Yield Analysis (SYA) and Junction Verification Testing
(JVT) are described in 87M44162U01, ‘Process Average Testing and Statistical Yield Analysis.’
Meeting the intent of this document, either by performing one or all of these methods or some other
similar method, is required.
D. CONTINENTAL’s supplier rating procedure is the official feedback on supplier performance. See
specification 12M41378U01 for detail on what metrics are tracked and reported by
CONTINENTAL.
1. All failures and lot rejections that are attributable to a supplier’s design or process are
counted.
2. Upon notification of a product problem, suppliers are required to develop containment
actions within 48 hours, and must identify root cause and corrective action within 10
working days of the notification.
3. Suppliers are required to meet CONTINENTAL’s On-time delivery performance window
for 100% of the shipments sent to CONTINENTAL.
4. A supplier’s intent and ability to comply to section V of this specification are assessed in
the supplier rating procedure.
E. Suppliers shall identify, maintain and use scheduled and predictive methods to monitor tool
performance. These methods should ensure minimal downtime, good correlation to statistical data
and minimal product variation.
CONTINENTAL reserves the right to inspect records/evidence of tool maintenance at the
supplier’s manufacturing sites. This may be included in the scope of a QSA or PSO audit.

More Related Content

What's hot

What's hot (20)

Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Ppap training-presentation
Ppap training-presentationPpap training-presentation
Ppap training-presentation
 
Ppap la
Ppap laPpap la
Ppap la
 
Comparis
ComparisComparis
Comparis
 
009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015009 what are the systems validation protocol methods at atl 05 28-2015
009 what are the systems validation protocol methods at atl 05 28-2015
 
Urs,dq, iq,oq,pq
Urs,dq, iq,oq,pqUrs,dq, iq,oq,pq
Urs,dq, iq,oq,pq
 
NM CV 041114
NM CV 041114NM CV 041114
NM CV 041114
 
Validation process
Validation processValidation process
Validation process
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and Qualification
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Equipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak KumarEquipment Qualification by- Deepak Kumar
Equipment Qualification by- Deepak Kumar
 
Barcelona mazliach sap_qm
Barcelona mazliach sap_qmBarcelona mazliach sap_qm
Barcelona mazliach sap_qm
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
Equipment Qualification
Equipment QualificationEquipment Qualification
Equipment Qualification
 
Vish- Validation Master Plan
Vish- Validation Master PlanVish- Validation Master Plan
Vish- Validation Master Plan
 
Barry Crowley CV April 15
Barry Crowley CV April 15Barry Crowley CV April 15
Barry Crowley CV April 15
 
Apqp training presentation
Apqp   training presentationApqp   training presentation
Apqp training presentation
 
Sop Process validation protocol execution
Sop Process validation protocol executionSop Process validation protocol execution
Sop Process validation protocol execution
 
Ppap la
Ppap laPpap la
Ppap la
 

Similar to Tieu chuan chat luong yeu cau cua continental

209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-listUsama Waly
 
Production part approval process ppt 1
Production part approval process ppt 1Production part approval process ppt 1
Production part approval process ppt 1Inder Pal Dua
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material營松 林
 
FMEA.pdf
FMEA.pdfFMEA.pdf
FMEA.pdfinfoqtc
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.AKunal Roy
 
Gmp change control by amsavel
Gmp  change control  by amsavelGmp  change control  by amsavel
Gmp change control by amsavelAmsavel Vel
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfMILRAB1
 
WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS Kunal Roy
 
Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles TGA Australia
 
Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemAkshay Trivedi , Maliba Pharmacy College
 
Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...
Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...
Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...TGA Australia
 
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualLuisa Polanco
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 

Similar to Tieu chuan chat luong yeu cau cua continental (20)

209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-list
 
Production part approval process ppt 1
Production part approval process ppt 1Production part approval process ppt 1
Production part approval process ppt 1
 
04 ppap training material
04 ppap training material04 ppap training material
04 ppap training material
 
FMEA.pdf
FMEA.pdfFMEA.pdf
FMEA.pdf
 
DOCUMENTATION -- CoA & SPECIFICATIONS
DOCUMENTATION -- CoA & SPECIFICATIONSDOCUMENTATION -- CoA & SPECIFICATIONS
DOCUMENTATION -- CoA & SPECIFICATIONS
 
Pharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.APharma Hand Book of GMP and Q.A
Pharma Hand Book of GMP and Q.A
 
Gmp change control by amsavel
Gmp  change control  by amsavelGmp  change control  by amsavel
Gmp change control by amsavel
 
Training ppt
Training pptTraining ppt
Training ppt
 
Rajesh mba resume - dubai
Rajesh mba resume - dubaiRajesh mba resume - dubai
Rajesh mba resume - dubai
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdf
 
Certification procedure and implementation rules
Certification procedure and implementation rulesCertification procedure and implementation rules
Certification procedure and implementation rules
 
Phụ lục 15 GMP EU. Chuẩn hóa và thẩm định
Phụ lục 15 GMP EU. Chuẩn hóa và thẩm địnhPhụ lục 15 GMP EU. Chuẩn hóa và thẩm định
Phụ lục 15 GMP EU. Chuẩn hóa và thẩm định
 
Dol status for suppliers
Dol status for suppliersDol status for suppliers
Dol status for suppliers
 
Closing the Gap
Closing the GapClosing the Gap
Closing the Gap
 
WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS WHO-GMP & QUALITY FOR PHARMACEUTICALS
WHO-GMP & QUALITY FOR PHARMACEUTICALS
 
Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles
 
Qualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility SystemQualification of Dissolution Test Apparatus and Validation of Utility System
Qualification of Dissolution Test Apparatus and Validation of Utility System
 
Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...
Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...
Presentation: TGA manufacturing principles update - Adoption of PIC/S Guide t...
 
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference ManualADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
ADVANCED PRODUCT QUALITY PLANNING AND CONTROL PLAN Reference Manual
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 

Tieu chuan chat luong yeu cau cua continental

  • 1. MATERIAL or METHODS Part No. 87M44161U01 Specification Rev:AC Date:11/16/06 TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 1 of 5 ECN No. Rev. Date Originator Details of change 71909 4-6-99 AA M Fulcher New Release NB103527 03-08-01 AB M. FULCHER Pages 2, 3, 4, 6 DP120253 11-16-06 AC R.Jones Replace Motorola AIEG to Continental, change QS- 9000 to ISO/TS16949. Delete Motorola Reference. Note: All released revision level changes to this document will also require the Originator to update the Revision level of this document in CONTINENTAL specification number 87M42999T85 - “Index of Manufacturer’s Requirements and Reference Specifications.”
  • 2. MATERIAL or METHODS Part No. 87M44161U01 Specification Rev:AC Date:11/16/06 TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 2 of 5 I. PURPOSE The purpose of this document is to define quality systems requirements and supplier development methods that a manufacturer must meet to supply components to CONTINENTAL. CONTINENTAL’s supplier quality goals are to develop best-in-class performance from suppliers and subsuppliers to CONTINENTAL, attain continuous improvement in quality performance of purchased material and provide Total Customer Satisfaction. II. SCOPE This document applies to all suppliers who provide components or material used in the production of CONTINENTAL products. III. REFERENCED DOCUMENTS Automotive Industry Action Group (AIAG) ISO/TS16949 reference series 87M42999T85, ‘Index of Manufacturer’s Requirements and Reference Specifications.’ 87M43300S80, ‘General Requirements for Suppliers of Purchased Components for CONTINENTAL.’ 87M43113U01, ‘Supplier Component Change.’ 87M43300S51, ‘Production Part Approval Process.’ 12M41378U01, ‘Supplier Report Card Procedure.’ 87M44162U01, ‘Process Average Testing and Statistical Yield Analysis.’ 87M44799F66 'Component Reliability Requirements' IV. ADHERENCE TO CONTINENTAL SPECIFICATIONS. A. The CONTINENTAL purchase order (P/O) and component or material specification are documents that the supplier must exactly meet in order to provide a quality component or material to CONTINENTAL. Terms and conditions explicitly listed on the front of the P/O or as general items on the back of the P/O are requirements. In the event the supplier needs to make a PERMANENT change to the component that the supplier is shipping to CONTINENTAL, the supplier shall initiate a Supplier Component Change (SCC) per 87M43113U01. CONTINENTAL may revise its specification if the form, fit or function of the component is changing. CONTINENTAL may require that suppliers submit PPAP per 87M43300S51. In the event the supplier needs to make a TEMPORARY change to the form, fit or function of the component that the supplier is shipping to CONTINENTAL, or if the supplier wishes to ship material that does not conform to the CONTINENTAL specification and requirements or the purchase order, the supplier shall notify CONTINENTAL plant purchasing or SQA in order to initiate a Request for Material Deviation (RFD) form.
  • 3. MATERIAL or METHODS Part No. 87M44161U01 Specification Rev:AC Date:11/16/06 TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 3 of 5 B. Specifications listed in 87M42999T85, 'Index of Manufacturer's Requirements and Reference Specifications' are a summary of CONTINENTAL's general requirements. These requirements apply to all components and materials even if these specifications are not called out in the P/O or specification. In the event the supplier cannot meet all applicable specifications listed in the T85, the supplier shall notify CONTINENTAL. All exceptions to specifications in the T85 index must be negotiated and documented with CONTINENTAL before shipment of affected material. C. Special, critical or safety related parameters in specifications will be identified as such on the component or material specification per 87M43300S51, Production Part Approval Process. Suppliers are required to test these parameters per AIAG PPAP requirements, or per CONTINENTAL instruction. Upon request from CONTINENTAL, in the form of a Special Characteristics Agreement Document (SCAD), suppliers are required to submit data for these parameters with each shipment, or as deemed appropriate by CONTINENTAL plant purchasing or SQA. CONTINENTAL reserves the right to inspect such data at the supplier’s site. D. Suppliers may be held responsible for corrective actions and costs when their products do not conform to the CONTINENTAL purchase order, component specification or specifications listed in 87M42999T85. V. QUALITY SYSTEM REQUIREMENTS A. CONTINENTAL requires that its suppliers establish and maintain a quality system in compliance to ISO/TS16949 Quality Systems Standard. B. Every supplier to CONTINENTAL should achieve and maintain third party certification of its quality system to the ISO/TS16949 standard. Suppliers may be required to submit periodic updates of plans for and ongoing status of quality system assessments. Plans should include detailed milestones, i.e. benchmarks, self-quality system assessments (QSA's), ISO certification, QS assessments, 2nd party assessments, etc. C. Suppliers must keep CONTINENTAL updated on its quality system in place, and ISO-9000 or ISO/TS16949 certification status. The updates shall be copies of the certificate, including auditor, date and scope of certification. D. A supplier's own quality system assessment cannot supplant an objective 3rd party ISO/TS16949 audit. Assessments based on Q1, Pentastar, GM Awards for Excellence, QSR, etc. may be submitted as additional evidence of system compliance to elements of ISO/TS16949. Because ISO/TS16949 is based on fundamentals of ISO-9000, assessments based on ISO-9000, ISO-9001 or ISO-9002 may be submitted as evidence of system compliance to some elements of ISO/TS16949, but should not be considered as meeting all of the quality systems requirements of suppliers as stated in this procedure. Assessments based on ANSI Z1.8 (ASQ standard C-1 'General Requirements for a Quality Program') are not accepted as objective evidence of a quality system to the ISO/TS16949 standard. CONTINENTAL reserves the right to inspect records/evidence of a quality system at the supplier's design and manufacturing sites. This may be included in the scope of a Quality System Assessment (QSA), self assessment, or Process Sign-Off (PSO) site audit.
  • 4. MATERIAL or METHODS Part No. 87M44161U01 Specification Rev:AC Date:11/16/06 TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 4 of 5 CONTINENTAL may require suppliers to submit a self-assessed Quality System Assessment (QSA) based on the AIAG standard. E. Suppliers should use the AIAG methods for Statistical Process Control (SPC), Measurement System Analysis (MSA), Production Part Approval Process (PPAP), etc. in developing and deploying their own systems for design and manufacturing control. F. Suppliers are required to develop their sub-suppliers' capabilities and quality systems to support the supplier's compliance to 's requirements and specifications. VI. OTHER ELEMENTS OF ISO/TS16949. A. Supplier should have a management review process or Quality Operating System (QOS) to drive quality improvement. B. Suppliers are required to execute specific elements of the AIAG ISO/TS16949 quality system upon request of CONTINENTAL, i.e. FMEA, control plan, MSA, SPC, continuous improvement, etc. C. Suppliers should control processes with statistical methods, such as Ppk, Cpk, process capability charts, etc.; prototype, preproduction and production control plans; lot acceptance test data; etc. Control plans should be based on design reviews, design FMEA’s, process capability studies, and customer specifications. E. Advanced Product Quality Planning (APQP) should be reviewed with CONTINENTAL in order to assure meeting design and product sampling deliverables periodically throughout the design process. F. A Process Signoff (PSO) may be conducted at the supplier’s site by a CONTINENTAL Product Quality Team to ensure that all control plans, process instructions and gage/test equipment are in place for production. G. CONTINENTAL reserves the right to inspect purchased material at the supplier’s site prior to shipment to CONTINENTAL.
  • 5. MATERIAL or METHODS Part No. 87M44161U01 Specification Rev:AC Date:11/16/06 TITLE: QUALITY REQUIREMENTS FOR SUPPLIERS TO CONTINENTAL Page 5 of 5 VII. OTHER SUPPLIER DEVELOPMENT METHODS A. Design data and records shall be maintained by the supplier during the product development and validation process. B. Suppliers must embrace continuous improvement as a business and quality systems methodology. This methodology should include: 1. Campaign to correct and eliminate manufacturing defects. 2. Design of Experiments for optimization prior to starting production following significant process changes. 3. Develop ‘0-Defect’ plans where all known or predicted failure modes are evaluated (See AIAG GM GP-12). 4. Use structured problem resolution and corrective action methods such as the ‘8- Discipline’ (8-D) methodology for problem solution and corrective action. C. Process Average Testing (PAT), Statistical Yield Analysis (SYA) and Junction Verification Testing (JVT) are described in 87M44162U01, ‘Process Average Testing and Statistical Yield Analysis.’ Meeting the intent of this document, either by performing one or all of these methods or some other similar method, is required. D. CONTINENTAL’s supplier rating procedure is the official feedback on supplier performance. See specification 12M41378U01 for detail on what metrics are tracked and reported by CONTINENTAL. 1. All failures and lot rejections that are attributable to a supplier’s design or process are counted. 2. Upon notification of a product problem, suppliers are required to develop containment actions within 48 hours, and must identify root cause and corrective action within 10 working days of the notification. 3. Suppliers are required to meet CONTINENTAL’s On-time delivery performance window for 100% of the shipments sent to CONTINENTAL. 4. A supplier’s intent and ability to comply to section V of this specification are assessed in the supplier rating procedure. E. Suppliers shall identify, maintain and use scheduled and predictive methods to monitor tool performance. These methods should ensure minimal downtime, good correlation to statistical data and minimal product variation. CONTINENTAL reserves the right to inspect records/evidence of tool maintenance at the supplier’s manufacturing sites. This may be included in the scope of a QSA or PSO audit.