SlideShare a Scribd company logo
1 of 21
3D Project Plus™
• Continuous VUCA*
* Volatility, uncertainty, complexity, ambiguity
• Dysfunctional operations
• Excessive litigation
• Punitive contracts and late payment
• Unintended consequences of low bid process
• Lack of trust and absence of ethics
Industry Problems
What is the one most
disruptive issue in
today’s construction
industry?
© All rights reserved
This question generated over 300 responses in the Commercial
Construction Discussion Group…..sponsored by Marc Howell
Enterprise, LLC. (A summary will be sent upon request)
Fulbright’s 9th Annual
Litigation Trends Report on
Construction:
Businesses on both sides of the Atlantic initiated and faced more lawsuits.
Most responders expect that an easing in litigation unlikely in 2014 and
beyond.
92% of the companies surveyed expect the number of legal disputes to rise
or stay the same.
80% of construction companies filed at least one suit in the 12 month study
period.
Litigation Trend Report on Construction
• We’ve thought long and hard about the
best way to bring constructive change to
the construction industry.
• …and how to improve project controls,
minimize risk, and avoid litigation.
3D Project Plus™
• Develop a program that measures
profit & loss daily.
• Reduce risk and avoid litigation
through advances in forensic information
modeling.
Mission Statement
We have the qualifications, the
will, and the passion to improve
industry standards and accomplish
our mission…
3D Project Plus™
This project was one year behind schedule when Mr. Gogulski
was recruited as Owner’s Representative for Disney. By
insisting that the architect bring two full time designers on
site, and working 1200 craftsmen two 12 hour shifts seven
days/wk. ,the project met its critical opening schedule.
Contemporary
Resort Hotel
Orlando, FL
…..here is how it is done
3D Project Plus™
Inserting significant events into the project time line is only the beginning.
Integrating a totally
new program…
…into the client’s
project is the end.
3D Project Plus™
This is an example
of how we would
start a new 3D
Project Plus
program. The fly
by is the first step.
Any part of this
model can be
separated and
expanded.
Convergence Training.com
3D Project Plus™ - Data Base Synchronization
Gathering data
Gathering data from several
sources and linking it together
into a format that it is easy to
understand and visualize as the
project is built….
3D Project Plus Master Format
5/17/2014
• Production (estimated v. actual)
• Labor (hours) (estimated v. actual)
• Labor (dollars) (estimated v. actual)
• Equipment (owned) (estimated v. actual)
• Equipment (rented) (estimated v. actual)
• Purchase Orders (estimated v actual)
• Supplies (estimated v actual)
• Services (estimated v actual)
• Base Contract (estimated v actual)
• Change Orders ( site specific)
,
• Total Cost (estimated v actual)
*************************************
• Discreet Events (site specific issues)
Timeline: (days) (weeks) (months)
Navigatio
n
Bar
Multiple Means and Methods for
Generating Images
…gives you a picture of cost,
progress and profit/loss of
any part of the project as it is
being built.
For example, labor……
Master Format Labor (demo)
...is captured in a way you can
see each day’s man-hours and
cost in comparison to the
estimate..and see the project at
the same time.
Inputs
Data
Time-lapse
Photography
3D Models
Date Stamped
Project
Performance
Metrics
3D Project Plus
Conversion
Outputs
PowerPoint
Slide Deck
Verification
Review
Converted
to PDF
format for
Presentations
Process
Validation
Review
Project
Reports
BIM Models
© All rights reserved
3D Project Plus™ Flow Diagram
Deliverables
Expect: visualization of the project’s progress in
a video that can print each day’s profit and loss.
Result: reduction of risk, avoidance of litigation.
phone 843 470-0459 email: paulg@construction-expert.com
3D Project Plus™
What to expect and what we offer

More Related Content

What's hot

Embrace Complexity (Trends in BPM 2011)
Embrace Complexity (Trends in BPM 2011)Embrace Complexity (Trends in BPM 2011)
Embrace Complexity (Trends in BPM 2011)
Jeroen van Grondelle
 
15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper
Todd Sullivan
 
BIM presentation by ali al dujaili
BIM presentation by ali al dujailiBIM presentation by ali al dujaili
BIM presentation by ali al dujaili
Ali Al-Dujaili
 

What's hot (13)

Ac2017 1. bit & bites
Ac2017   1. bit & bitesAc2017   1. bit & bites
Ac2017 1. bit & bites
 
NW BIM 2018 2 MGF
NW BIM 2018 2 MGFNW BIM 2018 2 MGF
NW BIM 2018 2 MGF
 
From Problems to Solutions in Capital Construction
From Problems to Solutions in Capital ConstructionFrom Problems to Solutions in Capital Construction
From Problems to Solutions in Capital Construction
 
Security best ways to protect your intellectual capital
Security   best ways to protect your intellectual capitalSecurity   best ways to protect your intellectual capital
Security best ways to protect your intellectual capital
 
Embrace Complexity (Trends in BPM 2011)
Embrace Complexity (Trends in BPM 2011)Embrace Complexity (Trends in BPM 2011)
Embrace Complexity (Trends in BPM 2011)
 
CloudFIT_CSF_in_cloud_aug16
CloudFIT_CSF_in_cloud_aug16CloudFIT_CSF_in_cloud_aug16
CloudFIT_CSF_in_cloud_aug16
 
Benefits of offshore
Benefits of offshoreBenefits of offshore
Benefits of offshore
 
15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper15-MOR-101_IPDWhitepaper
15-MOR-101_IPDWhitepaper
 
BIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 SlidesBIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 Slides
 
BIM: What does the Contractor want from the Manufacturer? #BIM4M2help
BIM: What does the Contractor want from the Manufacturer? #BIM4M2helpBIM: What does the Contractor want from the Manufacturer? #BIM4M2help
BIM: What does the Contractor want from the Manufacturer? #BIM4M2help
 
BIM presentation by ali al dujaili
BIM presentation by ali al dujailiBIM presentation by ali al dujaili
BIM presentation by ali al dujaili
 
TSC Global and Western Forms Group Overview
TSC Global and Western Forms Group OverviewTSC Global and Western Forms Group Overview
TSC Global and Western Forms Group Overview
 
Voxell Brochure
Voxell BrochureVoxell Brochure
Voxell Brochure
 

Similar to 3D Project Plus

Company Software Design Proposal Powerpoint Presentation
Company Software Design Proposal Powerpoint PresentationCompany Software Design Proposal Powerpoint Presentation
Company Software Design Proposal Powerpoint Presentation
SlideTeam
 
International Data Center Delivery
International Data Center DeliveryInternational Data Center Delivery
International Data Center Delivery
David Newitt
 

Similar to 3D Project Plus (20)

Benchmarking As a Tool for Optimising Software Development Performance
Benchmarking As a Tool for Optimising Software Development PerformanceBenchmarking As a Tool for Optimising Software Development Performance
Benchmarking As a Tool for Optimising Software Development Performance
 
Course project scenario the course project scenario in this c
Course project scenario the course project scenario in this cCourse project scenario the course project scenario in this c
Course project scenario the course project scenario in this c
 
Optimizing Technology Refresh
Optimizing Technology RefreshOptimizing Technology Refresh
Optimizing Technology Refresh
 
Company Software Design Proposal Powerpoint Presentation
Company Software Design Proposal Powerpoint PresentationCompany Software Design Proposal Powerpoint Presentation
Company Software Design Proposal Powerpoint Presentation
 
70% of GCC Projects not using Collaboration Software
70% of GCC Projects not using Collaboration Software70% of GCC Projects not using Collaboration Software
70% of GCC Projects not using Collaboration Software
 
T/DG provides all technology components required for implementation of ERP so...
T/DG provides all technology components required for implementation of ERP so...T/DG provides all technology components required for implementation of ERP so...
T/DG provides all technology components required for implementation of ERP so...
 
Building more value with Capital Markets – Project Owner edition
Building more value with Capital Markets – Project Owner editionBuilding more value with Capital Markets – Project Owner edition
Building more value with Capital Markets – Project Owner edition
 
Increasing Construction Productivity with Information Management
Increasing Construction Productivity with Information ManagementIncreasing Construction Productivity with Information Management
Increasing Construction Productivity with Information Management
 
The Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and CapitalizationThe Economics of Scrum - Finance and Capitalization
The Economics of Scrum - Finance and Capitalization
 
Behind the Curtain of IT Cost Transparency - By: Carl Stumpf Managing Directo...
Behind the Curtain of IT Cost Transparency - By: Carl Stumpf Managing Directo...Behind the Curtain of IT Cost Transparency - By: Carl Stumpf Managing Directo...
Behind the Curtain of IT Cost Transparency - By: Carl Stumpf Managing Directo...
 
International Data Center Delivery
International Data Center DeliveryInternational Data Center Delivery
International Data Center Delivery
 
Leveraging Cloud for Non-Production Environments
Leveraging Cloud for Non-Production EnvironmentsLeveraging Cloud for Non-Production Environments
Leveraging Cloud for Non-Production Environments
 
Considerations for Moving Your Enterprise Mission Critical Applications to th...
Considerations for Moving Your Enterprise Mission Critical Applications to th...Considerations for Moving Your Enterprise Mission Critical Applications to th...
Considerations for Moving Your Enterprise Mission Critical Applications to th...
 
Continuous Delivery Operating Model for Insurers: Building a Software “Value-...
Continuous Delivery Operating Model for Insurers: Building a Software “Value-...Continuous Delivery Operating Model for Insurers: Building a Software “Value-...
Continuous Delivery Operating Model for Insurers: Building a Software “Value-...
 
e-Filing: Immediate Operational benefits to UCC filings, public record search...
e-Filing: Immediate Operational benefits to UCC filings, public record search...e-Filing: Immediate Operational benefits to UCC filings, public record search...
e-Filing: Immediate Operational benefits to UCC filings, public record search...
 
Fwd50 djm updated oct 31
Fwd50 djm updated oct 31Fwd50 djm updated oct 31
Fwd50 djm updated oct 31
 
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery CenterFundamentals of Designing, Building, & Implementing a Service Delivery Center
Fundamentals of Designing, Building, & Implementing a Service Delivery Center
 
QuantiMetrics: Case Studies
QuantiMetrics: Case StudiesQuantiMetrics: Case Studies
QuantiMetrics: Case Studies
 
Comcast Business How to build a technology blueprint
Comcast Business How to build a technology blueprint Comcast Business How to build a technology blueprint
Comcast Business How to build a technology blueprint
 
Cloud: To Build or Buy - Can You Justify On-Premises IT?
Cloud: To Build or Buy - Can You Justify On-Premises IT?Cloud: To Build or Buy - Can You Justify On-Premises IT?
Cloud: To Build or Buy - Can You Justify On-Premises IT?
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

3D Project Plus

  • 2. • Continuous VUCA* * Volatility, uncertainty, complexity, ambiguity • Dysfunctional operations • Excessive litigation • Punitive contracts and late payment • Unintended consequences of low bid process • Lack of trust and absence of ethics Industry Problems
  • 3. What is the one most disruptive issue in today’s construction industry? © All rights reserved This question generated over 300 responses in the Commercial Construction Discussion Group…..sponsored by Marc Howell Enterprise, LLC. (A summary will be sent upon request)
  • 4. Fulbright’s 9th Annual Litigation Trends Report on Construction:
  • 5. Businesses on both sides of the Atlantic initiated and faced more lawsuits. Most responders expect that an easing in litigation unlikely in 2014 and beyond. 92% of the companies surveyed expect the number of legal disputes to rise or stay the same. 80% of construction companies filed at least one suit in the 12 month study period. Litigation Trend Report on Construction
  • 6. • We’ve thought long and hard about the best way to bring constructive change to the construction industry. • …and how to improve project controls, minimize risk, and avoid litigation. 3D Project Plus™
  • 7. • Develop a program that measures profit & loss daily. • Reduce risk and avoid litigation through advances in forensic information modeling. Mission Statement
  • 8. We have the qualifications, the will, and the passion to improve industry standards and accomplish our mission…
  • 9. 3D Project Plus™ This project was one year behind schedule when Mr. Gogulski was recruited as Owner’s Representative for Disney. By insisting that the architect bring two full time designers on site, and working 1200 craftsmen two 12 hour shifts seven days/wk. ,the project met its critical opening schedule. Contemporary Resort Hotel Orlando, FL
  • 10. …..here is how it is done
  • 11. 3D Project Plus™ Inserting significant events into the project time line is only the beginning.
  • 12. Integrating a totally new program… …into the client’s project is the end.
  • 13. 3D Project Plus™ This is an example of how we would start a new 3D Project Plus program. The fly by is the first step. Any part of this model can be separated and expanded. Convergence Training.com
  • 14. 3D Project Plus™ - Data Base Synchronization Gathering data
  • 15. Gathering data from several sources and linking it together into a format that it is easy to understand and visualize as the project is built….
  • 16. 3D Project Plus Master Format 5/17/2014 • Production (estimated v. actual) • Labor (hours) (estimated v. actual) • Labor (dollars) (estimated v. actual) • Equipment (owned) (estimated v. actual) • Equipment (rented) (estimated v. actual) • Purchase Orders (estimated v actual) • Supplies (estimated v actual) • Services (estimated v actual) • Base Contract (estimated v actual) • Change Orders ( site specific) , • Total Cost (estimated v actual) ************************************* • Discreet Events (site specific issues) Timeline: (days) (weeks) (months) Navigatio n Bar Multiple Means and Methods for Generating Images
  • 17. …gives you a picture of cost, progress and profit/loss of any part of the project as it is being built. For example, labor……
  • 19. ...is captured in a way you can see each day’s man-hours and cost in comparison to the estimate..and see the project at the same time.
  • 20. Inputs Data Time-lapse Photography 3D Models Date Stamped Project Performance Metrics 3D Project Plus Conversion Outputs PowerPoint Slide Deck Verification Review Converted to PDF format for Presentations Process Validation Review Project Reports BIM Models © All rights reserved 3D Project Plus™ Flow Diagram Deliverables
  • 21. Expect: visualization of the project’s progress in a video that can print each day’s profit and loss. Result: reduction of risk, avoidance of litigation. phone 843 470-0459 email: paulg@construction-expert.com 3D Project Plus™ What to expect and what we offer