Mounting Type 4 Stack – Commscope/RFS Model
(Standard)
GeneralRequirement Site Infrastructure
No Item Qty Unit Weight (kg) Total Weight (kg)
1 TTA 1 130 130
2 RRU 6 25 150
3 Filter 900 1 12 12
4 Junction Box 1 1.6 1.6
5 Antenna Hexaband 1 44 44
6 RF Cabling & Accessories 2 1.3 2.6
340.2
Total beban jika semua ruang digunakan
untuk semua equipment RAN
• Material Aluminum (mounting)+Steel
Galvanize (arm mounting)
• Butuh plate adaptor/bracket untuk
install RRU
GSM900
DCS1800
3G2100
Filter/Combiner
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type 4 Stack – Cuedee Model
(Standard)
GeneralRequirement Site Infrastructure
Total beban jika semua ruang digunakan untuk
semua equipment RAN
No Item Qty Unit Weight (kg) Total Weight (kg)
1 TTA 1 90 90
2 RRU 6 25 150
3 Filter 900 1 12 12
4 Junction Box 2 1.6 3.2
5 Antenna Hexaband 1 44 44
6 RF Cabling & Accessories 2 1.3 2.6
301.8
*)Material Aluminum (mounting and arm)+
Stainless steel(universal bracket RRU)
*)Butuh baut untuk install RRU
GSM900
DCS1800
3G2100
Filter/Combiner
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type 1
(Management of cable & RAN accessories kits)
GeneralRequirement Site Infrastructure
• Kabel jumper terpisah dengan kabel optic
dan kabel grounding
• Gunakan bagian lubang yang sama di
setiap Qsik untuk masuk jumper dari RRU
ke port antenna
• Kabel RF Jumper dari Main dan Diversity
tidak boleh cross. Harus parallel.
• Pengukuran Mounting Type 1 harus
mengikuti guideline.
GSM900
DCS1800
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type 3 Stack
(Standard – Dedicated Solution)
GeneralRequirement Site Infrastructure
GSM900
DCS1800
3G2100
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type Perkuatan
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
New Concept Split Antenna & RRU
(Standard – Optional – Mitratel (tsel sites) & XL Sites )
GeneralRequirement Site Infrastructure
• Pemisahan antara Antenna dan RRU harus di
level ketinggian yang sama.
• RRU di install langsung pakai bracket
bawaan RRU tersebut ke mounting tanpa RRM6
HUAWEI
GSM900
DCS1800
3G2100
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Monopole Solution
(Standard – Optional)
GeneralRequirement Site Infrastructure
• RRU di install ke mounting menggunakan RRM6
atau langsung ke Tower Monopole tanpa RRM6
dengan menggunakan bracket rantai.
• Filter 900 di install di mounting antenna
dan back to back dengan antenna sektor
WITH CHAIN BRACKET
WITH RRM
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Pole Rooftop Solution For Huawei
(Standard)
GeneralRequirement Site Infrastructure
• Jika ruang terbatas pada struktur tiang
yang ada, perlu pemasangan offset
tambahan untuk tempat braket RRU
• Filter 900 Instal pada pemasangan antena
dan kembali ke belakang dengan antena
sektoral
2
nd
RRU
1
st
RRU
3
rd
RRU
GSM900
DCS1800
3G2100
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Design Mounting Type HOS
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
HOS Installation in TBG tower
Khusus untuk Semua Tower TBG.
 Antenna HOS berada di bawah Antenna existing dengan Azimuth yang sama.
 Penempatan RRU HOS langsung Direct to LEG di sejajar dengan Antenna HOS
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard Mounting miring PT.SAP
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Special Mounting di site Protelindo
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Labelling & Color Coding
(Standard)
GeneralRequirement Site Infrastructure
• Semua kabel (mis. Jumper RF,Feeder, dan kabel Serat Optik) harus diberi label dengan
tepat
• Ultraviolet (UV) stabilized, fluorescent tape harus digunakan.
• Kabel Serat Hibrid harus dilabeli pada kedua ujungnya dengan identitas sektor yang
sesuai sebagaimana ditentukan
• Kabel CPRI harus diberi label di kedua ujungnya dengan identitas sektor yang sesuai
sebagaimana ditentukan
(Sample : 900 sector 2)
top bottom
Hybrid Feeder Banding
Sector 1 1 x White
Sector 2 2 x White
Sector 3 3 x White
CPRI+DCCable Sector1 Sector2 Sector3
900Mhz 1x Red + 1x White 1x Red + 2x White 1x Red + 3x White
1800Mhz (1st) 1x Blue + 1x White 1x Blue + 2x White 1x Blue + 3x White
1800Mhz (2nd) 1x Orange + 1x White 1x Orange + 2x White 1x Orange + 3x White
2100Mhz (1st) 1x White + 1x White 1x White + 2x White 1x White + 3x White
2100Mhz (2nd) 1x Yellow + 1x White 1x Yellow + 2x White 1x Yellow + 3x White
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Label isolatip warna hanya untuk kabel
jumper sebagai penanda system
Label isolatip warna untuk jumper, CPRI dan Power
RRU.
Untuk Power RRU dan CPRI di tambahkan label
warna penanda sektor (isolatip putih)
Label Isolatip Penanda sektor dan system (Selain RRU5502)
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
PPE Tools
Tools and PPE
Torch Wrench 8-25 NM
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
First Aid Kit Huawei Pass ID, WAH Certificate, Electricity
Certificate, First Aid Certificate
CERTIFICATES
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
LIFTING ANTENNA MINIMUM REQUIREMENTS
Sling Wire
SWL
minimum 2
TONS
Manual Winch
SWL MINIMUM 2 TONS
BOW SACKLE SWL minimum
2 TONS
WEBBING SWL minimum
2 TONS
HANDY TALKY 2 PIECES
Pulley SWL Minimum 2 TONS
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
TECHNICAL LIFTING ANTENNA
Electric Winch di kaki
Tower menggunakan bracket
di baut
Manual Winch di install
di kaki Tower
menggunakan bracket
dibaut dan ikat webbing.
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Alokasi Koneksi jumper di port antenna Pentaband
Contoh sharing sektor 2T2R RRU1800. Untuk RRU2100 juga berlaku
standard yang sama.
Spare kabel jumper harus berada di bawah bottom bracket dan di
gulung rapi serta ikat kabel ties ukuran 300 mm dengan kuat.
Label sticker di dekat port antenna dan RRU harus di pasang label
sebagai bukti bahwa koneksi lurus sesuai standard pengkoneksian
Standard Pelabelan RRU sharing sektor
Sharing Sektor
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Power: 1 Ring Biru
1 Ring Putih
CPRI: 1 Ring Biru.
1 Ring Putih.
Kasih jarak 1 inch dibawahnya
1 ring isolatipPutih>>>Sektor 1
2 ring isolatipputih>>>Sektor2
3 ring isolatipputih>>>Sektor3
Port: A
TX
1 ring Biru
1 ring Putih
Port: C
RX
2 ring Biru
2 ring Putih
Port: D
TX
1 ring Orange
1 ring Yellow
Port: B
RX
2 ring Orange
2 ring Yellow
Standard label isolatip warna di RRU5502
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard label isolatip warna di RRU5502 Selang seling bisa tidak selang seling juga tidak masalah
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard label isolatip warna di RRU5502 + HOS
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard label isolatip warna di RRU5502 + HOS
Site Information
Site ID : 03SUK602.
Site Name : Jl.Pangrerekan_SUK.
Site Type : Green Field Outdoor.
Region : West Java.
Project Name : Indosat AOP2021 Project (Q1B1).
Site Solution Scenario : New Site G900/L900/L1800(2T2R) – 112/10Mhz/20MHz.
MDR AOP2021 Reference: A.3.2 Wiring Configuration G900/L900/L1800 (2T2R) 112/10 Mhz/20 Mhz
Pre-assembly : On site.
Lifting Type : using Manual Winch SWL 3T.
Installed by:
PT. Digital Solusindo Bestama.
On Site Supervised by Huawei Team:
1.Marwan Purba (QC HQ)
2.Bagus Mulya Primadhana (QC WJ)
MDR AOP2021: Dual Band
Mounting Type 1A
HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Kabinet utama di install di sisi paling kiri. Kabinet penambahan di sisi kiri cabinet utama. Jarak
cabinet ke pinggir pedestal sisi kanan dan belakang maksimal 10 cm agar pada saat di bor untuk
baut cabinet pedestal tidak pecah.
Posisi Kabinet Utama adalah di sisi paling kiri
Mounting Type 1A
(Management of cable & RAN accessories kits)
General Requirement Site Infrastructure
• Kabel jumper,Optic CPRI,RET di routing sisi
sebelah kanan (jika posisi kita berada di belakang
antenna).
• Kabel Power RRU dan grounding RRU, Grounding
Combiner, Grounding Filter di routing sisi sebelah
kiri (jika posisi kita berada di belakang antenna).
• Routing kabel menggunakan kabel ties hitam
300mm yang di anyam dengan rapi.
• Kabel RF Jumper dari Main dan Diversity tidak
boleh cross. Harus parallel.
• Pengukuran jarak RRU di Mounting Type 1 harus
mengikuti guideline.
GSM
900
Propose 3G
or Expansion
RRU
DCS
1800
GSM
900
DCS
1800
3G
2100
1. Routing kabel di sisi kiri adalah kabel Grounding RRU, Grounding Filter, Grounding Combiner & kabel Power RRU.
2. Routing kabel di sisi kanan adalah kabel Jumper RRU, Jumper Filter, Jumper Combiner, kabel CPRI & kabel RET
Assembly Antenna and RRU
Sisi kiri
Grounding RRU,
Grounding Filter,
Grounding
Combiner &
Power RRU
Sisi kanan kabel
Jumper
RRU,Jumper
Filter, Jumper
Combiner, CPRI
& RET
Port A (TX) RRU konek ke Port (+) di antenna.
Port B (RX) RRU konek ke Port (–) di antenna.
Assembly Antenna, RRU GSM900 5909
GSM 900
Port B RX
Isolatip merah
2 Ring
GSM 900
Port A TX
Isolatip merah
1 Ring
GSM 900
Port (+) TX
Isolatip merah 1
Ring
GSM 900
Port (-) RX
Isolatip
merah 2 Ring
Assembly Antenna, RRU DCS1800 5909
DCS 1800
Port (+) TX
Isolatip Biru 1 Ring
DCS 1800
Port (-) RX
Isolatip Biru 2 Ring
DCS 1800
Port B RX
Isolatip Biru 2
Ring
DCS 1800
Port A TX
Isolatip Biru 1
Ring
Port A (TX) RRU konek ke Port (+) di antenna.
Port B (RX) RRU konek ke Port (–) di antenna.
Service Cabinet
(Standard)
General Requirement Site Infrastructure
• Vendor harus menggunakan salah satu dari penempatan kabinet layanan berikut yang disetujui di
bawah ini:
• Outdoor: Posisi Main Cabinet di sisi kiri jika kita menghadap Kabinet.Tray Horizontal berada di
belakang kabinet.
• Outdoor: Pintu cabinet Outdoor harus bisa terbuka 120˚.
• Outdoor: Jarak Kabinet ke pinggir semen pedestal minimal 10 cm (samping dan belakang).
• Indoor: Kabinet harus ada jarak bebas minimal 30 cm ke belakang,samping kiri dan samping kanan.
Outdoor Service Cabinet Indoor Service Cabinet
OUTDOOR
INDOOR
Fence and Gate
1. Harus menunjukan kondisi pagar site.
2. Bila ada pagar atau pintu gerbang yang rusak,
maka harus difoto.
Site Access
1. Harus menunjukan adanya jalan menuju site.
2. Harus memperlihatkan area site.
Ground Part_RAN Installation Photos based on ATP Checklist
Tower Full View
Note: Sebisa mungkin, tower harus terlihat
secara utuh.
Site Identity or information
Note: Jika name plate tidak tersedia di tower, maka bisa di
tulis di banner atau di kertas, kemudian photokan.
Ground Part_RAN Installation Photos based on ATP Checklist
New/Existing Grounding Bar at HCT
Pastikan koneksiGroundingGI Wire 3 tarikan sudah terkonek di
busbarpakai metal konduit,skun,heatshrink dan label
Site Clean and Tidy
Kondisi site harus bersih dan rapih, tidak ada sampah sisa
instalasi, bekas bakaran ataupun sisa dismantle material.
Ground Part_RAN Installation Photos based on ATP Checklist
CPRI connectionto module inside service cabinet
1. Semua label CPRI harus terpasang.
2. Jalur kabel dan Optik harus rapih.
Cabinet Door Open
1. Kabel grounding pintu harus terlihat jelas.
2. Semua modul & battery harus terlihat
3. Pintu harus bisa terbuka bebas 120˚
2
3
1
1
Ground Part_RAN Installation Photos based on ATP Checklist
Spare CPRI cable inside cabinet left and right
1. Semua gulungan kabel optik, tertata dengan baik dan
rapih.
2. Sektor 1 dan 2 di sebelah kiri, sektor 3 di sebelah kanan.
Cable entry gland Left and Right inside
cabinet
1. Semua inlet kabinet pada sisi kiri dan kanan
harus terlihat jelas.
2.Inlet kabinet di rubber agar tidak masuk
serangga.
Sector
1 & 2 Sector
3
Ground Part_RAN Installation Photos based on ATP Checklist
Standard Koneksi Power AC, Power RRU,BBU,MW,NetEcodi MTS9304A
1. Power RRU konek di MCB Non Priority Load (LLVD) Kotak kuning.
2. Power IDU, BBU, Net Eco konek di MCB Priority Load (BLVD) Kotak
merah.
Power cable connection in MCB’s and label
1. Semua koneksi kabel Power harus pakai skun.
2. Semua kabel Power harus di pasang label.
3. Koneksi kabel Power harus mengikuti standard.
1 2
Ground Part_RAN Installation Photos based on ATP Checklist
Grounding connection inside cabinet
1. Semua equipment BBU,EMUA,IDU,SCC800 NetEco
harus di grounding ke grounding bar.
2. Grounding Kabinet GI Wire harus di konek 3
tarikan.
EMUA and DDF alarm label
(ada atau tidak ada EMUA dan DDF tetap ambil photo).
Ground Part_RAN Installation Photos based on ATP Checklist
Grounding Kit Power RRU (upper bending)
1. Waterproofing grounding kit harus 3 layers; isolatip, rubber,
isolatip dan ujung isolatip atas dan bawah di ikat kabel ties hitam.
2. Koneksi grounding kit di grounding bar harus kencang
menggunakan ring plat dan ring per.
3. Label penanda system dan penanda sektor cukup isolatip warna
Entry point CPRI and Power cable to the service cabinet
1. Jalur kabel harus searah,jangan ada kabel yang cross.
2. Setelah spare Optic di gulung dalam kabinet, sisanya di
gulung di bawah Horizontal Tray dgn rapi sektor 1,2,3.
Sector 1 Sector 2 Sector 3
Ground Part_RAN Installation Photos based on ATP Checklist
3
3
1
2
Horizontal & Vertical Tray
1. Clamp kabel di install per 1 meter. Jangan di
longkap.
2. Vertical Tray di photo per 20 meter sebagai bukti
bahwa install clamp per 1 meter.
Ground Part_RAN Installation Photos based on ATP Checklist
Clamp install
per 1 meter
Installation Assembly (Antenna,RRU,Filter,Combiner)
1. Harus terlihat jelas antenna secara utuh.
2. Stick rod yang di install jika menggunakan mounting
Huawei harus di photo mengarah ke antenna Top and Bottom
pakai(double mur, ring plat ring per) jgn longgar.
Routing CPRI & Powercable to RRU Assemblyon tower
1.Jalur routing kabel Hybrid ke arah assambly harus terlihat jelas
dan rapih.
2. Clamp kabel di install samping. Jangan ada kepala clamp
mengarah ke atas karena akan menjadi “Batu sandungan”.
Tower Part_RAN Installation Photos based on ATP Checklist
Top
Bottom
Bracket Assembly Top and Bottom
1. Semua baut pakai Lock nut (double mur, ring
per, ring plat) dan jangan ada yang longgar.
Installation RF Jumper RRU to Antenna
1. Port A: TX 1 ring isolatip.
2. Port B: RX 2 ring isolatip.
3. Port RRU dan Antenna yang tidak di pakai di bungkus isolatip kuning dan
di ikat pakai kabel ties hitam.
4. Waterproofing jumper dan antenna 3 layers dan ikat kabel ties hitam.
GSM900 DCS1800
Tower Part_RAN Installation Photos based on ATP Checklist
1
2 1
2
Antenna Height
1. Antenna height di ukur persis di tengah
antenna. Tarik meteran dari atas tanah.Jika
Tower Protelindo, Tarik meteran dari atas
pondasi kaki tower.
Antenna Alignment
1. Photo harus terlihat panoramic dan label (jika site Roof
Top harus ambil photo view dari belakang antenna).
2. Azimuth antenna harus mengikuti NDB atau NFI dan
terlihat jelas. (Toleransi photo dokumentasi +/- 5 derajat)
Tower Part_RAN Installation Photos based on ATP Checklist
Antenna Electrical Tilt
1. Jika antenna Huawei Type APE4517R2, maka RET
di remote dari Software, tidak ada setting
manual,maka jarum jangan di tarik.Hanya photo
port antenna saja.
2. Jika antenna lain, Electrical Tilt di setting
manual pake kunci bintang menunjukkan angka
derajat sesuai NDB.
Antenna Mechanical Tilt
1. Photo mechanical Tilt di ukur di bagian tengah
antenna.
2. Label penanda sektor harus terlihat jelas.
3. Mechanical Tilt harus mengikuti NDB.
4. Jarum merah mengarah ke Derajat Angle Meter,
Gelembung udara persis di tengah garis.
Tower Part_RAN Installation Photos based on ATP Checklist
RRU Power Cable and CPRI Connection
1. Harus ada label di dalam RRU sebagai penanda system contoh: “RRU GSM Sektor 1”
2. Koneksi Power harus pakai skun dan koneksi kencang dan kupas kulit kabel dan serabutnya pas di jepitan.
3. Bending koneksi CPRI harus smooth, tidak boleh extreme. Inlet yang tidak terpakai wajib tutup pakai rubber pabrikasi.
Label bendera di kabel Power dan kabel CPRI di dalam RRU. Kabel jumper dan CPRI di luar RRU tidak perlu pakai label bendera.
Tower Part_RAN Installation Photos based on ATP Checklist
1
2 3
1
2
3
RRU, Filter, Combiner Grounding Connection to Grounding Bar
1. Semua kabel grounding harus pakai label bendera.
2. Koneksi grounding pakai ring plat dan ring per pakai skun dan heat shrink atau vinyl dan koneksi kencang.
3. Posisi grounding bar tower yang di koneksikan harus di bawah antenna. Tidak boleh lebih tinggi dari antenna.
4. Jika koneksi lobang grounding penuh, maka maksimal 1 lobang bisa di isi 2 kabel grounding.
Tower Part_RAN Installation Photos based on ATP Checklist
2
1
Thank you
www.huawei.com
Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new technology, etc. There are a
number of factors that could cause actual results and developments to differ materially from those expressed
or implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

More Related Content

Similar to SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf

Bab 2.1: Pendawaian Rangkaian
Bab 2.1: Pendawaian RangkaianBab 2.1: Pendawaian Rangkaian
Bab 2.1: Pendawaian RangkaianZulhana Zulkifle
 
WLAN 03-01-2023.ppt
WLAN 03-01-2023.pptWLAN 03-01-2023.ppt
WLAN 03-01-2023.pptSMKN111
 
Bab 3 : Penamatan kabel Rangkaian
Bab 3 : Penamatan kabel RangkaianBab 3 : Penamatan kabel Rangkaian
Bab 3 : Penamatan kabel RangkaianZulhana Zulkifle
 
Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)
Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)
Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)syahidscott123
 
Ant kaleng
Ant kalengAnt kaleng
Ant kalengmunk2323
 
Network access
Network accessNetwork access
Network accessnhonho10
 
AIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptx
AIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptxAIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptx
AIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptxTaufiq937935
 
Antenna j pole 1800mhz
Antenna j pole 1800mhzAntenna j pole 1800mhz
Antenna j pole 1800mhzJusti Alzahrah
 
Pertemuan 6 media transmisi-wireless ok
Pertemuan 6   media transmisi-wireless okPertemuan 6   media transmisi-wireless ok
Pertemuan 6 media transmisi-wireless okeli priyatna laidan
 
Langkah2 pemasagan cctv
Langkah2 pemasagan cctvLangkah2 pemasagan cctv
Langkah2 pemasagan cctvShikin Shukor
 
Materi 1 Basic ftth network 20160209
Materi 1    Basic ftth network 20160209Materi 1    Basic ftth network 20160209
Materi 1 Basic ftth network 201602095h4r3
 
Media transmisi wireless
Media transmisi wirelessMedia transmisi wireless
Media transmisi wirelessMr. FM
 
Presentation tugas 1 komunikasi nirkabel
Presentation tugas 1 komunikasi nirkabelPresentation tugas 1 komunikasi nirkabel
Presentation tugas 1 komunikasi nirkabelilos12 ilos12
 
Presentation tugas 1
Presentation tugas 1Presentation tugas 1
Presentation tugas 1ilos12 ilos12
 

Similar to SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf (20)

Bab 2.1: Pendawaian Rangkaian
Bab 2.1: Pendawaian RangkaianBab 2.1: Pendawaian Rangkaian
Bab 2.1: Pendawaian Rangkaian
 
WLAN 03-01-2023.ppt
WLAN 03-01-2023.pptWLAN 03-01-2023.ppt
WLAN 03-01-2023.ppt
 
Bab 3 : Penamatan kabel Rangkaian
Bab 3 : Penamatan kabel RangkaianBab 3 : Penamatan kabel Rangkaian
Bab 3 : Penamatan kabel Rangkaian
 
Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)
Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)
Tutorial Pembuatan Antena Kaleng (Hamzah Syahid & Salman Dalian)
 
Ant kaleng
Ant kalengAnt kaleng
Ant kaleng
 
GPON Solution
GPON SolutionGPON Solution
GPON Solution
 
Network access
Network accessNetwork access
Network access
 
AIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptx
AIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptxAIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptx
AIRFIELD LIGHTING SYSTEM (ALS) I - Final.pptx
 
Cwna jarkom
Cwna jarkomCwna jarkom
Cwna jarkom
 
Antenna j pole 1800mhz
Antenna j pole 1800mhzAntenna j pole 1800mhz
Antenna j pole 1800mhz
 
Pertemuan 6 media transmisi-wireless ok
Pertemuan 6   media transmisi-wireless okPertemuan 6   media transmisi-wireless ok
Pertemuan 6 media transmisi-wireless ok
 
Topologi wi fi
Topologi wi fiTopologi wi fi
Topologi wi fi
 
CAN OPEN PROTOKOL
CAN OPEN PROTOKOLCAN OPEN PROTOKOL
CAN OPEN PROTOKOL
 
Langkah2 pemasagan cctv
Langkah2 pemasagan cctvLangkah2 pemasagan cctv
Langkah2 pemasagan cctv
 
Data Teknis Fluke 1630-2 FC
Data Teknis Fluke 1630-2 FCData Teknis Fluke 1630-2 FC
Data Teknis Fluke 1630-2 FC
 
Materi 1 Basic ftth network 20160209
Materi 1    Basic ftth network 20160209Materi 1    Basic ftth network 20160209
Materi 1 Basic ftth network 20160209
 
Media transmisi wireless
Media transmisi wirelessMedia transmisi wireless
Media transmisi wireless
 
Dasar-dasar Wireless LAN
Dasar-dasar Wireless LANDasar-dasar Wireless LAN
Dasar-dasar Wireless LAN
 
Presentation tugas 1 komunikasi nirkabel
Presentation tugas 1 komunikasi nirkabelPresentation tugas 1 komunikasi nirkabel
Presentation tugas 1 komunikasi nirkabel
 
Presentation tugas 1
Presentation tugas 1Presentation tugas 1
Presentation tugas 1
 

More from penielin

SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf
SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING  !!!!.pdfSITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING  !!!!.pdf
SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdfpenielin
 
Site Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdfSite Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdfpenielin
 
Network Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptxNetwork Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptxpenielin
 
MW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptxMW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptxpenielin
 
SOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptxSOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptxpenielin
 
Site Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdfSite Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdfpenielin
 
MW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptxMW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptxpenielin
 
Network Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptxNetwork Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptxpenielin
 
SOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptxSOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptxpenielin
 
Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...
Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...
Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...penielin
 

More from penielin (10)

SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf
SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING  !!!!.pdfSITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING  !!!!.pdf
SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf
 
Site Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdfSite Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdf
 
Network Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptxNetwork Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptx
 
MW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptxMW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptx
 
SOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptxSOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptx
 
Site Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdfSite Model Dismantle IOH MOCN Project_27072022.pdf
Site Model Dismantle IOH MOCN Project_27072022.pdf
 
MW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptxMW equipment dismantle_v1.0.pptx
MW equipment dismantle_v1.0.pptx
 
Network Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptxNetwork Security Learning Partner-Bahasa.pptx
Network Security Learning Partner-Bahasa.pptx
 
SOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptxSOP Dismantle For Redeployment Program 30 jan 2020.pptx
SOP Dismantle For Redeployment Program 30 jan 2020.pptx
 
Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...
Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...
Standar untuk mengisi HFQR_Quality and EHS Refreshment QC Training May 2023_B...
 

Recently uploaded

BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024
BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024
BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024ssuser0bf64e
 
Prov.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdf
Prov.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdfProv.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdf
Prov.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdfIwanSumantri7
 
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdfMODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdfAndiCoc
 
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptxBAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptxJuliBriana2
 
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptxPPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptxriscacriswanda
 
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdfMODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdfAndiCoc
 
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat UI 2024
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat  UI 2024Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat  UI 2024
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat UI 2024editwebsitesubdit
 
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxBab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxssuser35630b
 
E-modul Materi Ekosistem untuk kelas X SMA
E-modul Materi Ekosistem untuk kelas X SMAE-modul Materi Ekosistem untuk kelas X SMA
E-modul Materi Ekosistem untuk kelas X SMAAmmar Ahmad
 
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKAKELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKAppgauliananda03
 
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptxBab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptxrizalhabib4
 
AKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTX
AKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTXAKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTX
AKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTXIksanSaputra6
 
Materi Sosialisasi US 2024 Sekolah Dasar pptx
Materi Sosialisasi US 2024 Sekolah Dasar pptxMateri Sosialisasi US 2024 Sekolah Dasar pptx
Materi Sosialisasi US 2024 Sekolah Dasar pptxSaujiOji
 
Regresi Linear Kelompok 1 XI-10 revisi (1).pptx
Regresi Linear Kelompok 1 XI-10 revisi (1).pptxRegresi Linear Kelompok 1 XI-10 revisi (1).pptx
Regresi Linear Kelompok 1 XI-10 revisi (1).pptxRizalAminulloh2
 
TEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptx
TEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptxTEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptx
TEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptxMOHDAZLANBINALIMoe
 
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKAMODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKAAndiCoc
 
vIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsxvIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsxsyahrulutama16
 
Contoh PPT Seminar Proposal Teknik Informatika.pptx
Contoh PPT Seminar Proposal Teknik Informatika.pptxContoh PPT Seminar Proposal Teknik Informatika.pptx
Contoh PPT Seminar Proposal Teknik Informatika.pptxIvvatulAini
 
MODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdfMODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdfAndiCoc
 
AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
AKSI NYATA  Numerasi  Meningkatkan Kompetensi Murid_compressed (1) (1).pptxAKSI NYATA  Numerasi  Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptxnursariheldaseptiana
 

Recently uploaded (20)

BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024
BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024
BAHAN PAPARAN UU DESA NOMOR 3 TAHUN 2024
 
Prov.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdf
Prov.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdfProv.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdf
Prov.Jabar_1504_Pengumuman Seleksi Tahap 2_CGP A11 (2).pdf
 
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdfMODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL PENDIDIKAN PANCASILA KELAS 6 KURIKULUM MERDEKA.pdf
 
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptxBAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
BAB 5 KERJASAMA DALAM BERBAGAI BIDANG KEHIDUPAN.pptx
 
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptxPPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
PPT MODUL 6 DAN 7 PDGK4105 KELOMPOK.pptx
 
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdfMODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
MODUL AJAR IPAS KELAS 3 KURIKULUM MERDEKA.pdf
 
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat UI 2024
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat  UI 2024Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat  UI 2024
Tim Yang Lolos Pendanaan Hibah Kepedulian pada Masyarakat UI 2024
 
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptxBab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
Bab 7 - Perilaku Ekonomi dan Kesejahteraan Sosial.pptx
 
E-modul Materi Ekosistem untuk kelas X SMA
E-modul Materi Ekosistem untuk kelas X SMAE-modul Materi Ekosistem untuk kelas X SMA
E-modul Materi Ekosistem untuk kelas X SMA
 
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKAKELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
KELAS 10 PERUBAHAN LINGKUNGAN SMA KURIKULUM MERDEKA
 
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptxBab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
Bab 4 Persatuan dan Kesatuan di Lingkup Wilayah Kabupaten dan Kota.pptx
 
AKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTX
AKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTXAKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTX
AKSI NYATA TOPIK 1 MERDEKA BELAJAR. PPTX
 
Materi Sosialisasi US 2024 Sekolah Dasar pptx
Materi Sosialisasi US 2024 Sekolah Dasar pptxMateri Sosialisasi US 2024 Sekolah Dasar pptx
Materi Sosialisasi US 2024 Sekolah Dasar pptx
 
Regresi Linear Kelompok 1 XI-10 revisi (1).pptx
Regresi Linear Kelompok 1 XI-10 revisi (1).pptxRegresi Linear Kelompok 1 XI-10 revisi (1).pptx
Regresi Linear Kelompok 1 XI-10 revisi (1).pptx
 
TEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptx
TEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptxTEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptx
TEKNIK MENJAWAB RUMUSAN SPM 2022 - UNTUK MURID.pptx
 
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKAMODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
MODUL AJAR IPAS KELAS 6 KURIKULUM MERDEKA
 
vIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsxvIDEO kelayakan berita untuk mahasiswa.ppsx
vIDEO kelayakan berita untuk mahasiswa.ppsx
 
Contoh PPT Seminar Proposal Teknik Informatika.pptx
Contoh PPT Seminar Proposal Teknik Informatika.pptxContoh PPT Seminar Proposal Teknik Informatika.pptx
Contoh PPT Seminar Proposal Teknik Informatika.pptx
 
MODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdfMODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdf
MODUL AJAR BAHASA INDONESIA KELAS 6 KURIKULUM MERDEKA.pdf
 
AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
AKSI NYATA  Numerasi  Meningkatkan Kompetensi Murid_compressed (1) (1).pptxAKSI NYATA  Numerasi  Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
 

SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf

  • 1. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT Drafted by Marwan Purba/MWX541748 (QA Division)
  • 2. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Mounting Type 4 Stack – Commscope/RFS Model (Standard) GeneralRequirement Site Infrastructure No Item Qty Unit Weight (kg) Total Weight (kg) 1 TTA 1 130 130 2 RRU 6 25 150 3 Filter 900 1 12 12 4 Junction Box 1 1.6 1.6 5 Antenna Hexaband 1 44 44 6 RF Cabling & Accessories 2 1.3 2.6 340.2 Total beban jika semua ruang digunakan untuk semua equipment RAN • Material Aluminum (mounting)+Steel Galvanize (arm mounting) • Butuh plate adaptor/bracket untuk install RRU GSM900 DCS1800 3G2100 Filter/Combiner
  • 3. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Mounting Type 4 Stack – Cuedee Model (Standard) GeneralRequirement Site Infrastructure Total beban jika semua ruang digunakan untuk semua equipment RAN No Item Qty Unit Weight (kg) Total Weight (kg) 1 TTA 1 90 90 2 RRU 6 25 150 3 Filter 900 1 12 12 4 Junction Box 2 1.6 3.2 5 Antenna Hexaband 1 44 44 6 RF Cabling & Accessories 2 1.3 2.6 301.8 *)Material Aluminum (mounting and arm)+ Stainless steel(universal bracket RRU) *)Butuh baut untuk install RRU GSM900 DCS1800 3G2100 Filter/Combiner
  • 4. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Mounting Type 1 (Management of cable & RAN accessories kits) GeneralRequirement Site Infrastructure • Kabel jumper terpisah dengan kabel optic dan kabel grounding • Gunakan bagian lubang yang sama di setiap Qsik untuk masuk jumper dari RRU ke port antenna • Kabel RF Jumper dari Main dan Diversity tidak boleh cross. Harus parallel. • Pengukuran Mounting Type 1 harus mengikuti guideline. GSM900 DCS1800
  • 5. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Mounting Type 3 Stack (Standard – Dedicated Solution) GeneralRequirement Site Infrastructure GSM900 DCS1800 3G2100
  • 6. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Mounting Type Perkuatan
  • 7. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com New Concept Split Antenna & RRU (Standard – Optional – Mitratel (tsel sites) & XL Sites ) GeneralRequirement Site Infrastructure • Pemisahan antara Antenna dan RRU harus di level ketinggian yang sama. • RRU di install langsung pakai bracket bawaan RRU tersebut ke mounting tanpa RRM6 HUAWEI GSM900 DCS1800 3G2100
  • 8. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Monopole Solution (Standard – Optional) GeneralRequirement Site Infrastructure • RRU di install ke mounting menggunakan RRM6 atau langsung ke Tower Monopole tanpa RRM6 dengan menggunakan bracket rantai. • Filter 900 di install di mounting antenna dan back to back dengan antenna sektor WITH CHAIN BRACKET WITH RRM
  • 9. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Pole Rooftop Solution For Huawei (Standard) GeneralRequirement Site Infrastructure • Jika ruang terbatas pada struktur tiang yang ada, perlu pemasangan offset tambahan untuk tempat braket RRU • Filter 900 Instal pada pemasangan antena dan kembali ke belakang dengan antena sektoral 2 nd RRU 1 st RRU 3 rd RRU GSM900 DCS1800 3G2100
  • 10. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Design Mounting Type HOS
  • 11. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com HOS Installation in TBG tower Khusus untuk Semua Tower TBG.  Antenna HOS berada di bawah Antenna existing dengan Azimuth yang sama.  Penempatan RRU HOS langsung Direct to LEG di sejajar dengan Antenna HOS
  • 12. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Standard Mounting miring PT.SAP
  • 13. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Special Mounting di site Protelindo
  • 14. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Labelling & Color Coding (Standard) GeneralRequirement Site Infrastructure • Semua kabel (mis. Jumper RF,Feeder, dan kabel Serat Optik) harus diberi label dengan tepat • Ultraviolet (UV) stabilized, fluorescent tape harus digunakan. • Kabel Serat Hibrid harus dilabeli pada kedua ujungnya dengan identitas sektor yang sesuai sebagaimana ditentukan • Kabel CPRI harus diberi label di kedua ujungnya dengan identitas sektor yang sesuai sebagaimana ditentukan (Sample : 900 sector 2) top bottom Hybrid Feeder Banding Sector 1 1 x White Sector 2 2 x White Sector 3 3 x White CPRI+DCCable Sector1 Sector2 Sector3 900Mhz 1x Red + 1x White 1x Red + 2x White 1x Red + 3x White 1800Mhz (1st) 1x Blue + 1x White 1x Blue + 2x White 1x Blue + 3x White 1800Mhz (2nd) 1x Orange + 1x White 1x Orange + 2x White 1x Orange + 3x White 2100Mhz (1st) 1x White + 1x White 1x White + 2x White 1x White + 3x White 2100Mhz (2nd) 1x Yellow + 1x White 1x Yellow + 2x White 1x Yellow + 3x White
  • 15. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Label isolatip warna hanya untuk kabel jumper sebagai penanda system Label isolatip warna untuk jumper, CPRI dan Power RRU. Untuk Power RRU dan CPRI di tambahkan label warna penanda sektor (isolatip putih) Label Isolatip Penanda sektor dan system (Selain RRU5502)
  • 16. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com PPE Tools Tools and PPE Torch Wrench 8-25 NM
  • 17. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com First Aid Kit Huawei Pass ID, WAH Certificate, Electricity Certificate, First Aid Certificate CERTIFICATES
  • 18. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com LIFTING ANTENNA MINIMUM REQUIREMENTS Sling Wire SWL minimum 2 TONS Manual Winch SWL MINIMUM 2 TONS BOW SACKLE SWL minimum 2 TONS WEBBING SWL minimum 2 TONS HANDY TALKY 2 PIECES Pulley SWL Minimum 2 TONS
  • 19. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com TECHNICAL LIFTING ANTENNA Electric Winch di kaki Tower menggunakan bracket di baut Manual Winch di install di kaki Tower menggunakan bracket dibaut dan ikat webbing.
  • 20. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Alokasi Koneksi jumper di port antenna Pentaband
  • 21. Contoh sharing sektor 2T2R RRU1800. Untuk RRU2100 juga berlaku standard yang sama.
  • 22. Spare kabel jumper harus berada di bawah bottom bracket dan di gulung rapi serta ikat kabel ties ukuran 300 mm dengan kuat.
  • 23. Label sticker di dekat port antenna dan RRU harus di pasang label sebagai bukti bahwa koneksi lurus sesuai standard pengkoneksian
  • 24. Standard Pelabelan RRU sharing sektor Sharing Sektor
  • 25. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Power: 1 Ring Biru 1 Ring Putih CPRI: 1 Ring Biru. 1 Ring Putih. Kasih jarak 1 inch dibawahnya 1 ring isolatipPutih>>>Sektor 1 2 ring isolatipputih>>>Sektor2 3 ring isolatipputih>>>Sektor3 Port: A TX 1 ring Biru 1 ring Putih Port: C RX 2 ring Biru 2 ring Putih Port: D TX 1 ring Orange 1 ring Yellow Port: B RX 2 ring Orange 2 ring Yellow Standard label isolatip warna di RRU5502
  • 26. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Standard label isolatip warna di RRU5502 Selang seling bisa tidak selang seling juga tidak masalah
  • 27. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Standard label isolatip warna di RRU5502 + HOS
  • 28. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Standard label isolatip warna di RRU5502 + HOS
  • 29. Site Information Site ID : 03SUK602. Site Name : Jl.Pangrerekan_SUK. Site Type : Green Field Outdoor. Region : West Java. Project Name : Indosat AOP2021 Project (Q1B1). Site Solution Scenario : New Site G900/L900/L1800(2T2R) – 112/10Mhz/20MHz. MDR AOP2021 Reference: A.3.2 Wiring Configuration G900/L900/L1800 (2T2R) 112/10 Mhz/20 Mhz Pre-assembly : On site. Lifting Type : using Manual Winch SWL 3T. Installed by: PT. Digital Solusindo Bestama. On Site Supervised by Huawei Team: 1.Marwan Purba (QC HQ) 2.Bagus Mulya Primadhana (QC WJ)
  • 32. HUAWEI TECHNOLOGIES CO., LTD. Security Level: www.huawei.com Kabinet utama di install di sisi paling kiri. Kabinet penambahan di sisi kiri cabinet utama. Jarak cabinet ke pinggir pedestal sisi kanan dan belakang maksimal 10 cm agar pada saat di bor untuk baut cabinet pedestal tidak pecah. Posisi Kabinet Utama adalah di sisi paling kiri
  • 33. Mounting Type 1A (Management of cable & RAN accessories kits) General Requirement Site Infrastructure • Kabel jumper,Optic CPRI,RET di routing sisi sebelah kanan (jika posisi kita berada di belakang antenna). • Kabel Power RRU dan grounding RRU, Grounding Combiner, Grounding Filter di routing sisi sebelah kiri (jika posisi kita berada di belakang antenna). • Routing kabel menggunakan kabel ties hitam 300mm yang di anyam dengan rapi. • Kabel RF Jumper dari Main dan Diversity tidak boleh cross. Harus parallel. • Pengukuran jarak RRU di Mounting Type 1 harus mengikuti guideline. GSM 900 Propose 3G or Expansion RRU DCS 1800 GSM 900 DCS 1800 3G 2100
  • 34. 1. Routing kabel di sisi kiri adalah kabel Grounding RRU, Grounding Filter, Grounding Combiner & kabel Power RRU. 2. Routing kabel di sisi kanan adalah kabel Jumper RRU, Jumper Filter, Jumper Combiner, kabel CPRI & kabel RET Assembly Antenna and RRU Sisi kiri Grounding RRU, Grounding Filter, Grounding Combiner & Power RRU Sisi kanan kabel Jumper RRU,Jumper Filter, Jumper Combiner, CPRI & RET
  • 35. Port A (TX) RRU konek ke Port (+) di antenna. Port B (RX) RRU konek ke Port (–) di antenna. Assembly Antenna, RRU GSM900 5909 GSM 900 Port B RX Isolatip merah 2 Ring GSM 900 Port A TX Isolatip merah 1 Ring GSM 900 Port (+) TX Isolatip merah 1 Ring GSM 900 Port (-) RX Isolatip merah 2 Ring
  • 36. Assembly Antenna, RRU DCS1800 5909 DCS 1800 Port (+) TX Isolatip Biru 1 Ring DCS 1800 Port (-) RX Isolatip Biru 2 Ring DCS 1800 Port B RX Isolatip Biru 2 Ring DCS 1800 Port A TX Isolatip Biru 1 Ring Port A (TX) RRU konek ke Port (+) di antenna. Port B (RX) RRU konek ke Port (–) di antenna.
  • 37. Service Cabinet (Standard) General Requirement Site Infrastructure • Vendor harus menggunakan salah satu dari penempatan kabinet layanan berikut yang disetujui di bawah ini: • Outdoor: Posisi Main Cabinet di sisi kiri jika kita menghadap Kabinet.Tray Horizontal berada di belakang kabinet. • Outdoor: Pintu cabinet Outdoor harus bisa terbuka 120˚. • Outdoor: Jarak Kabinet ke pinggir semen pedestal minimal 10 cm (samping dan belakang). • Indoor: Kabinet harus ada jarak bebas minimal 30 cm ke belakang,samping kiri dan samping kanan. Outdoor Service Cabinet Indoor Service Cabinet OUTDOOR INDOOR
  • 38. Fence and Gate 1. Harus menunjukan kondisi pagar site. 2. Bila ada pagar atau pintu gerbang yang rusak, maka harus difoto. Site Access 1. Harus menunjukan adanya jalan menuju site. 2. Harus memperlihatkan area site. Ground Part_RAN Installation Photos based on ATP Checklist
  • 39. Tower Full View Note: Sebisa mungkin, tower harus terlihat secara utuh. Site Identity or information Note: Jika name plate tidak tersedia di tower, maka bisa di tulis di banner atau di kertas, kemudian photokan. Ground Part_RAN Installation Photos based on ATP Checklist
  • 40. New/Existing Grounding Bar at HCT Pastikan koneksiGroundingGI Wire 3 tarikan sudah terkonek di busbarpakai metal konduit,skun,heatshrink dan label Site Clean and Tidy Kondisi site harus bersih dan rapih, tidak ada sampah sisa instalasi, bekas bakaran ataupun sisa dismantle material. Ground Part_RAN Installation Photos based on ATP Checklist
  • 41. CPRI connectionto module inside service cabinet 1. Semua label CPRI harus terpasang. 2. Jalur kabel dan Optik harus rapih. Cabinet Door Open 1. Kabel grounding pintu harus terlihat jelas. 2. Semua modul & battery harus terlihat 3. Pintu harus bisa terbuka bebas 120˚ 2 3 1 1 Ground Part_RAN Installation Photos based on ATP Checklist
  • 42. Spare CPRI cable inside cabinet left and right 1. Semua gulungan kabel optik, tertata dengan baik dan rapih. 2. Sektor 1 dan 2 di sebelah kiri, sektor 3 di sebelah kanan. Cable entry gland Left and Right inside cabinet 1. Semua inlet kabinet pada sisi kiri dan kanan harus terlihat jelas. 2.Inlet kabinet di rubber agar tidak masuk serangga. Sector 1 & 2 Sector 3 Ground Part_RAN Installation Photos based on ATP Checklist
  • 43. Standard Koneksi Power AC, Power RRU,BBU,MW,NetEcodi MTS9304A 1. Power RRU konek di MCB Non Priority Load (LLVD) Kotak kuning. 2. Power IDU, BBU, Net Eco konek di MCB Priority Load (BLVD) Kotak merah. Power cable connection in MCB’s and label 1. Semua koneksi kabel Power harus pakai skun. 2. Semua kabel Power harus di pasang label. 3. Koneksi kabel Power harus mengikuti standard. 1 2 Ground Part_RAN Installation Photos based on ATP Checklist
  • 44. Grounding connection inside cabinet 1. Semua equipment BBU,EMUA,IDU,SCC800 NetEco harus di grounding ke grounding bar. 2. Grounding Kabinet GI Wire harus di konek 3 tarikan. EMUA and DDF alarm label (ada atau tidak ada EMUA dan DDF tetap ambil photo). Ground Part_RAN Installation Photos based on ATP Checklist
  • 45. Grounding Kit Power RRU (upper bending) 1. Waterproofing grounding kit harus 3 layers; isolatip, rubber, isolatip dan ujung isolatip atas dan bawah di ikat kabel ties hitam. 2. Koneksi grounding kit di grounding bar harus kencang menggunakan ring plat dan ring per. 3. Label penanda system dan penanda sektor cukup isolatip warna Entry point CPRI and Power cable to the service cabinet 1. Jalur kabel harus searah,jangan ada kabel yang cross. 2. Setelah spare Optic di gulung dalam kabinet, sisanya di gulung di bawah Horizontal Tray dgn rapi sektor 1,2,3. Sector 1 Sector 2 Sector 3 Ground Part_RAN Installation Photos based on ATP Checklist 3 3 1 2
  • 46. Horizontal & Vertical Tray 1. Clamp kabel di install per 1 meter. Jangan di longkap. 2. Vertical Tray di photo per 20 meter sebagai bukti bahwa install clamp per 1 meter. Ground Part_RAN Installation Photos based on ATP Checklist Clamp install per 1 meter
  • 47. Installation Assembly (Antenna,RRU,Filter,Combiner) 1. Harus terlihat jelas antenna secara utuh. 2. Stick rod yang di install jika menggunakan mounting Huawei harus di photo mengarah ke antenna Top and Bottom pakai(double mur, ring plat ring per) jgn longgar. Routing CPRI & Powercable to RRU Assemblyon tower 1.Jalur routing kabel Hybrid ke arah assambly harus terlihat jelas dan rapih. 2. Clamp kabel di install samping. Jangan ada kepala clamp mengarah ke atas karena akan menjadi “Batu sandungan”. Tower Part_RAN Installation Photos based on ATP Checklist Top Bottom
  • 48. Bracket Assembly Top and Bottom 1. Semua baut pakai Lock nut (double mur, ring per, ring plat) dan jangan ada yang longgar. Installation RF Jumper RRU to Antenna 1. Port A: TX 1 ring isolatip. 2. Port B: RX 2 ring isolatip. 3. Port RRU dan Antenna yang tidak di pakai di bungkus isolatip kuning dan di ikat pakai kabel ties hitam. 4. Waterproofing jumper dan antenna 3 layers dan ikat kabel ties hitam. GSM900 DCS1800 Tower Part_RAN Installation Photos based on ATP Checklist 1 2 1 2
  • 49. Antenna Height 1. Antenna height di ukur persis di tengah antenna. Tarik meteran dari atas tanah.Jika Tower Protelindo, Tarik meteran dari atas pondasi kaki tower. Antenna Alignment 1. Photo harus terlihat panoramic dan label (jika site Roof Top harus ambil photo view dari belakang antenna). 2. Azimuth antenna harus mengikuti NDB atau NFI dan terlihat jelas. (Toleransi photo dokumentasi +/- 5 derajat) Tower Part_RAN Installation Photos based on ATP Checklist
  • 50. Antenna Electrical Tilt 1. Jika antenna Huawei Type APE4517R2, maka RET di remote dari Software, tidak ada setting manual,maka jarum jangan di tarik.Hanya photo port antenna saja. 2. Jika antenna lain, Electrical Tilt di setting manual pake kunci bintang menunjukkan angka derajat sesuai NDB. Antenna Mechanical Tilt 1. Photo mechanical Tilt di ukur di bagian tengah antenna. 2. Label penanda sektor harus terlihat jelas. 3. Mechanical Tilt harus mengikuti NDB. 4. Jarum merah mengarah ke Derajat Angle Meter, Gelembung udara persis di tengah garis. Tower Part_RAN Installation Photos based on ATP Checklist
  • 51. RRU Power Cable and CPRI Connection 1. Harus ada label di dalam RRU sebagai penanda system contoh: “RRU GSM Sektor 1” 2. Koneksi Power harus pakai skun dan koneksi kencang dan kupas kulit kabel dan serabutnya pas di jepitan. 3. Bending koneksi CPRI harus smooth, tidak boleh extreme. Inlet yang tidak terpakai wajib tutup pakai rubber pabrikasi. Label bendera di kabel Power dan kabel CPRI di dalam RRU. Kabel jumper dan CPRI di luar RRU tidak perlu pakai label bendera. Tower Part_RAN Installation Photos based on ATP Checklist 1 2 3 1 2 3
  • 52. RRU, Filter, Combiner Grounding Connection to Grounding Bar 1. Semua kabel grounding harus pakai label bendera. 2. Koneksi grounding pakai ring plat dan ring per pakai skun dan heat shrink atau vinyl dan koneksi kencang. 3. Posisi grounding bar tower yang di koneksikan harus di bawah antenna. Tidak boleh lebih tinggi dari antenna. 4. Jika koneksi lobang grounding penuh, maka maksimal 1 lobang bisa di isi 2 kabel grounding. Tower Part_RAN Installation Photos based on ATP Checklist 2 1
  • 53. Thank you www.huawei.com Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.