AKSI NYATA Numerasi Meningkatkan Kompetensi Murid_compressed (1) (1).pptx
SITE MODEL INSTALLATION OF RAN-INDOSAT AOP2021 PROJECT__PENTING !!!!.pdf
1. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
SITE MODEL INSTALLATION OF RAN-INDOSAT
AOP2021 PROJECT
Drafted by Marwan Purba/MWX541748
(QA Division)
2. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type 4 Stack – Commscope/RFS Model
(Standard)
GeneralRequirement Site Infrastructure
No Item Qty Unit Weight (kg) Total Weight (kg)
1 TTA 1 130 130
2 RRU 6 25 150
3 Filter 900 1 12 12
4 Junction Box 1 1.6 1.6
5 Antenna Hexaband 1 44 44
6 RF Cabling & Accessories 2 1.3 2.6
340.2
Total beban jika semua ruang digunakan
untuk semua equipment RAN
• Material Aluminum (mounting)+Steel
Galvanize (arm mounting)
• Butuh plate adaptor/bracket untuk
install RRU
GSM900
DCS1800
3G2100
Filter/Combiner
3. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type 4 Stack – Cuedee Model
(Standard)
GeneralRequirement Site Infrastructure
Total beban jika semua ruang digunakan untuk
semua equipment RAN
No Item Qty Unit Weight (kg) Total Weight (kg)
1 TTA 1 90 90
2 RRU 6 25 150
3 Filter 900 1 12 12
4 Junction Box 2 1.6 3.2
5 Antenna Hexaband 1 44 44
6 RF Cabling & Accessories 2 1.3 2.6
301.8
*)Material Aluminum (mounting and arm)+
Stainless steel(universal bracket RRU)
*)Butuh baut untuk install RRU
GSM900
DCS1800
3G2100
Filter/Combiner
4. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Mounting Type 1
(Management of cable & RAN accessories kits)
GeneralRequirement Site Infrastructure
• Kabel jumper terpisah dengan kabel optic
dan kabel grounding
• Gunakan bagian lubang yang sama di
setiap Qsik untuk masuk jumper dari RRU
ke port antenna
• Kabel RF Jumper dari Main dan Diversity
tidak boleh cross. Harus parallel.
• Pengukuran Mounting Type 1 harus
mengikuti guideline.
GSM900
DCS1800
7. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
New Concept Split Antenna & RRU
(Standard – Optional – Mitratel (tsel sites) & XL Sites )
GeneralRequirement Site Infrastructure
• Pemisahan antara Antenna dan RRU harus di
level ketinggian yang sama.
• RRU di install langsung pakai bracket
bawaan RRU tersebut ke mounting tanpa RRM6
HUAWEI
GSM900
DCS1800
3G2100
8. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Monopole Solution
(Standard – Optional)
GeneralRequirement Site Infrastructure
• RRU di install ke mounting menggunakan RRM6
atau langsung ke Tower Monopole tanpa RRM6
dengan menggunakan bracket rantai.
• Filter 900 di install di mounting antenna
dan back to back dengan antenna sektor
WITH CHAIN BRACKET
WITH RRM
9. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Pole Rooftop Solution For Huawei
(Standard)
GeneralRequirement Site Infrastructure
• Jika ruang terbatas pada struktur tiang
yang ada, perlu pemasangan offset
tambahan untuk tempat braket RRU
• Filter 900 Instal pada pemasangan antena
dan kembali ke belakang dengan antena
sektoral
2
nd
RRU
1
st
RRU
3
rd
RRU
GSM900
DCS1800
3G2100
11. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
HOS Installation in TBG tower
Khusus untuk Semua Tower TBG.
Antenna HOS berada di bawah Antenna existing dengan Azimuth yang sama.
Penempatan RRU HOS langsung Direct to LEG di sejajar dengan Antenna HOS
13. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Special Mounting di site Protelindo
14. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Labelling & Color Coding
(Standard)
GeneralRequirement Site Infrastructure
• Semua kabel (mis. Jumper RF,Feeder, dan kabel Serat Optik) harus diberi label dengan
tepat
• Ultraviolet (UV) stabilized, fluorescent tape harus digunakan.
• Kabel Serat Hibrid harus dilabeli pada kedua ujungnya dengan identitas sektor yang
sesuai sebagaimana ditentukan
• Kabel CPRI harus diberi label di kedua ujungnya dengan identitas sektor yang sesuai
sebagaimana ditentukan
(Sample : 900 sector 2)
top bottom
Hybrid Feeder Banding
Sector 1 1 x White
Sector 2 2 x White
Sector 3 3 x White
CPRI+DCCable Sector1 Sector2 Sector3
900Mhz 1x Red + 1x White 1x Red + 2x White 1x Red + 3x White
1800Mhz (1st) 1x Blue + 1x White 1x Blue + 2x White 1x Blue + 3x White
1800Mhz (2nd) 1x Orange + 1x White 1x Orange + 2x White 1x Orange + 3x White
2100Mhz (1st) 1x White + 1x White 1x White + 2x White 1x White + 3x White
2100Mhz (2nd) 1x Yellow + 1x White 1x Yellow + 2x White 1x Yellow + 3x White
15. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Label isolatip warna hanya untuk kabel
jumper sebagai penanda system
Label isolatip warna untuk jumper, CPRI dan Power
RRU.
Untuk Power RRU dan CPRI di tambahkan label
warna penanda sektor (isolatip putih)
Label Isolatip Penanda sektor dan system (Selain RRU5502)
16. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
PPE Tools
Tools and PPE
Torch Wrench 8-25 NM
17. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
First Aid Kit Huawei Pass ID, WAH Certificate, Electricity
Certificate, First Aid Certificate
CERTIFICATES
19. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
TECHNICAL LIFTING ANTENNA
Electric Winch di kaki
Tower menggunakan bracket
di baut
Manual Winch di install
di kaki Tower
menggunakan bracket
dibaut dan ikat webbing.
20. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Alokasi Koneksi jumper di port antenna Pentaband
25. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Power: 1 Ring Biru
1 Ring Putih
CPRI: 1 Ring Biru.
1 Ring Putih.
Kasih jarak 1 inch dibawahnya
1 ring isolatipPutih>>>Sektor 1
2 ring isolatipputih>>>Sektor2
3 ring isolatipputih>>>Sektor3
Port: A
TX
1 ring Biru
1 ring Putih
Port: C
RX
2 ring Biru
2 ring Putih
Port: D
TX
1 ring Orange
1 ring Yellow
Port: B
RX
2 ring Orange
2 ring Yellow
Standard label isolatip warna di RRU5502
26. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard label isolatip warna di RRU5502 Selang seling bisa tidak selang seling juga tidak masalah
27. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard label isolatip warna di RRU5502 + HOS
28. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Standard label isolatip warna di RRU5502 + HOS
29. Site Information
Site ID : 03SUK602.
Site Name : Jl.Pangrerekan_SUK.
Site Type : Green Field Outdoor.
Region : West Java.
Project Name : Indosat AOP2021 Project (Q1B1).
Site Solution Scenario : New Site G900/L900/L1800(2T2R) – 112/10Mhz/20MHz.
MDR AOP2021 Reference: A.3.2 Wiring Configuration G900/L900/L1800 (2T2R) 112/10 Mhz/20 Mhz
Pre-assembly : On site.
Lifting Type : using Manual Winch SWL 3T.
Installed by:
PT. Digital Solusindo Bestama.
On Site Supervised by Huawei Team:
1.Marwan Purba (QC HQ)
2.Bagus Mulya Primadhana (QC WJ)
32. HUAWEI TECHNOLOGIES CO., LTD.
Security Level:
www.huawei.com
Kabinet utama di install di sisi paling kiri. Kabinet penambahan di sisi kiri cabinet utama. Jarak
cabinet ke pinggir pedestal sisi kanan dan belakang maksimal 10 cm agar pada saat di bor untuk
baut cabinet pedestal tidak pecah.
Posisi Kabinet Utama adalah di sisi paling kiri
33. Mounting Type 1A
(Management of cable & RAN accessories kits)
General Requirement Site Infrastructure
• Kabel jumper,Optic CPRI,RET di routing sisi
sebelah kanan (jika posisi kita berada di belakang
antenna).
• Kabel Power RRU dan grounding RRU, Grounding
Combiner, Grounding Filter di routing sisi sebelah
kiri (jika posisi kita berada di belakang antenna).
• Routing kabel menggunakan kabel ties hitam
300mm yang di anyam dengan rapi.
• Kabel RF Jumper dari Main dan Diversity tidak
boleh cross. Harus parallel.
• Pengukuran jarak RRU di Mounting Type 1 harus
mengikuti guideline.
GSM
900
Propose 3G
or Expansion
RRU
DCS
1800
GSM
900
DCS
1800
3G
2100
34. 1. Routing kabel di sisi kiri adalah kabel Grounding RRU, Grounding Filter, Grounding Combiner & kabel Power RRU.
2. Routing kabel di sisi kanan adalah kabel Jumper RRU, Jumper Filter, Jumper Combiner, kabel CPRI & kabel RET
Assembly Antenna and RRU
Sisi kiri
Grounding RRU,
Grounding Filter,
Grounding
Combiner &
Power RRU
Sisi kanan kabel
Jumper
RRU,Jumper
Filter, Jumper
Combiner, CPRI
& RET
35. Port A (TX) RRU konek ke Port (+) di antenna.
Port B (RX) RRU konek ke Port (–) di antenna.
Assembly Antenna, RRU GSM900 5909
GSM 900
Port B RX
Isolatip merah
2 Ring
GSM 900
Port A TX
Isolatip merah
1 Ring
GSM 900
Port (+) TX
Isolatip merah 1
Ring
GSM 900
Port (-) RX
Isolatip
merah 2 Ring
36. Assembly Antenna, RRU DCS1800 5909
DCS 1800
Port (+) TX
Isolatip Biru 1 Ring
DCS 1800
Port (-) RX
Isolatip Biru 2 Ring
DCS 1800
Port B RX
Isolatip Biru 2
Ring
DCS 1800
Port A TX
Isolatip Biru 1
Ring
Port A (TX) RRU konek ke Port (+) di antenna.
Port B (RX) RRU konek ke Port (–) di antenna.
37. Service Cabinet
(Standard)
General Requirement Site Infrastructure
• Vendor harus menggunakan salah satu dari penempatan kabinet layanan berikut yang disetujui di
bawah ini:
• Outdoor: Posisi Main Cabinet di sisi kiri jika kita menghadap Kabinet.Tray Horizontal berada di
belakang kabinet.
• Outdoor: Pintu cabinet Outdoor harus bisa terbuka 120˚.
• Outdoor: Jarak Kabinet ke pinggir semen pedestal minimal 10 cm (samping dan belakang).
• Indoor: Kabinet harus ada jarak bebas minimal 30 cm ke belakang,samping kiri dan samping kanan.
Outdoor Service Cabinet Indoor Service Cabinet
OUTDOOR
INDOOR
38. Fence and Gate
1. Harus menunjukan kondisi pagar site.
2. Bila ada pagar atau pintu gerbang yang rusak,
maka harus difoto.
Site Access
1. Harus menunjukan adanya jalan menuju site.
2. Harus memperlihatkan area site.
Ground Part_RAN Installation Photos based on ATP Checklist
39. Tower Full View
Note: Sebisa mungkin, tower harus terlihat
secara utuh.
Site Identity or information
Note: Jika name plate tidak tersedia di tower, maka bisa di
tulis di banner atau di kertas, kemudian photokan.
Ground Part_RAN Installation Photos based on ATP Checklist
40. New/Existing Grounding Bar at HCT
Pastikan koneksiGroundingGI Wire 3 tarikan sudah terkonek di
busbarpakai metal konduit,skun,heatshrink dan label
Site Clean and Tidy
Kondisi site harus bersih dan rapih, tidak ada sampah sisa
instalasi, bekas bakaran ataupun sisa dismantle material.
Ground Part_RAN Installation Photos based on ATP Checklist
41. CPRI connectionto module inside service cabinet
1. Semua label CPRI harus terpasang.
2. Jalur kabel dan Optik harus rapih.
Cabinet Door Open
1. Kabel grounding pintu harus terlihat jelas.
2. Semua modul & battery harus terlihat
3. Pintu harus bisa terbuka bebas 120˚
2
3
1
1
Ground Part_RAN Installation Photos based on ATP Checklist
42. Spare CPRI cable inside cabinet left and right
1. Semua gulungan kabel optik, tertata dengan baik dan
rapih.
2. Sektor 1 dan 2 di sebelah kiri, sektor 3 di sebelah kanan.
Cable entry gland Left and Right inside
cabinet
1. Semua inlet kabinet pada sisi kiri dan kanan
harus terlihat jelas.
2.Inlet kabinet di rubber agar tidak masuk
serangga.
Sector
1 & 2 Sector
3
Ground Part_RAN Installation Photos based on ATP Checklist
43. Standard Koneksi Power AC, Power RRU,BBU,MW,NetEcodi MTS9304A
1. Power RRU konek di MCB Non Priority Load (LLVD) Kotak kuning.
2. Power IDU, BBU, Net Eco konek di MCB Priority Load (BLVD) Kotak
merah.
Power cable connection in MCB’s and label
1. Semua koneksi kabel Power harus pakai skun.
2. Semua kabel Power harus di pasang label.
3. Koneksi kabel Power harus mengikuti standard.
1 2
Ground Part_RAN Installation Photos based on ATP Checklist
44. Grounding connection inside cabinet
1. Semua equipment BBU,EMUA,IDU,SCC800 NetEco
harus di grounding ke grounding bar.
2. Grounding Kabinet GI Wire harus di konek 3
tarikan.
EMUA and DDF alarm label
(ada atau tidak ada EMUA dan DDF tetap ambil photo).
Ground Part_RAN Installation Photos based on ATP Checklist
45. Grounding Kit Power RRU (upper bending)
1. Waterproofing grounding kit harus 3 layers; isolatip, rubber,
isolatip dan ujung isolatip atas dan bawah di ikat kabel ties hitam.
2. Koneksi grounding kit di grounding bar harus kencang
menggunakan ring plat dan ring per.
3. Label penanda system dan penanda sektor cukup isolatip warna
Entry point CPRI and Power cable to the service cabinet
1. Jalur kabel harus searah,jangan ada kabel yang cross.
2. Setelah spare Optic di gulung dalam kabinet, sisanya di
gulung di bawah Horizontal Tray dgn rapi sektor 1,2,3.
Sector 1 Sector 2 Sector 3
Ground Part_RAN Installation Photos based on ATP Checklist
3
3
1
2
46. Horizontal & Vertical Tray
1. Clamp kabel di install per 1 meter. Jangan di
longkap.
2. Vertical Tray di photo per 20 meter sebagai bukti
bahwa install clamp per 1 meter.
Ground Part_RAN Installation Photos based on ATP Checklist
Clamp install
per 1 meter
47. Installation Assembly (Antenna,RRU,Filter,Combiner)
1. Harus terlihat jelas antenna secara utuh.
2. Stick rod yang di install jika menggunakan mounting
Huawei harus di photo mengarah ke antenna Top and Bottom
pakai(double mur, ring plat ring per) jgn longgar.
Routing CPRI & Powercable to RRU Assemblyon tower
1.Jalur routing kabel Hybrid ke arah assambly harus terlihat jelas
dan rapih.
2. Clamp kabel di install samping. Jangan ada kepala clamp
mengarah ke atas karena akan menjadi “Batu sandungan”.
Tower Part_RAN Installation Photos based on ATP Checklist
Top
Bottom
48. Bracket Assembly Top and Bottom
1. Semua baut pakai Lock nut (double mur, ring
per, ring plat) dan jangan ada yang longgar.
Installation RF Jumper RRU to Antenna
1. Port A: TX 1 ring isolatip.
2. Port B: RX 2 ring isolatip.
3. Port RRU dan Antenna yang tidak di pakai di bungkus isolatip kuning dan
di ikat pakai kabel ties hitam.
4. Waterproofing jumper dan antenna 3 layers dan ikat kabel ties hitam.
GSM900 DCS1800
Tower Part_RAN Installation Photos based on ATP Checklist
1
2 1
2
49. Antenna Height
1. Antenna height di ukur persis di tengah
antenna. Tarik meteran dari atas tanah.Jika
Tower Protelindo, Tarik meteran dari atas
pondasi kaki tower.
Antenna Alignment
1. Photo harus terlihat panoramic dan label (jika site Roof
Top harus ambil photo view dari belakang antenna).
2. Azimuth antenna harus mengikuti NDB atau NFI dan
terlihat jelas. (Toleransi photo dokumentasi +/- 5 derajat)
Tower Part_RAN Installation Photos based on ATP Checklist
50. Antenna Electrical Tilt
1. Jika antenna Huawei Type APE4517R2, maka RET
di remote dari Software, tidak ada setting
manual,maka jarum jangan di tarik.Hanya photo
port antenna saja.
2. Jika antenna lain, Electrical Tilt di setting
manual pake kunci bintang menunjukkan angka
derajat sesuai NDB.
Antenna Mechanical Tilt
1. Photo mechanical Tilt di ukur di bagian tengah
antenna.
2. Label penanda sektor harus terlihat jelas.
3. Mechanical Tilt harus mengikuti NDB.
4. Jarum merah mengarah ke Derajat Angle Meter,
Gelembung udara persis di tengah garis.
Tower Part_RAN Installation Photos based on ATP Checklist
51. RRU Power Cable and CPRI Connection
1. Harus ada label di dalam RRU sebagai penanda system contoh: “RRU GSM Sektor 1”
2. Koneksi Power harus pakai skun dan koneksi kencang dan kupas kulit kabel dan serabutnya pas di jepitan.
3. Bending koneksi CPRI harus smooth, tidak boleh extreme. Inlet yang tidak terpakai wajib tutup pakai rubber pabrikasi.
Label bendera di kabel Power dan kabel CPRI di dalam RRU. Kabel jumper dan CPRI di luar RRU tidak perlu pakai label bendera.
Tower Part_RAN Installation Photos based on ATP Checklist
1
2 3
1
2
3
52. RRU, Filter, Combiner Grounding Connection to Grounding Bar
1. Semua kabel grounding harus pakai label bendera.
2. Koneksi grounding pakai ring plat dan ring per pakai skun dan heat shrink atau vinyl dan koneksi kencang.
3. Posisi grounding bar tower yang di koneksikan harus di bawah antenna. Tidak boleh lebih tinggi dari antenna.
4. Jika koneksi lobang grounding penuh, maka maksimal 1 lobang bisa di isi 2 kabel grounding.
Tower Part_RAN Installation Photos based on ATP Checklist
2
1