SlideShare a Scribd company logo
1 of 7
RHANDY CANADA DARAGOSA
Registered Mechanical Engineer
License #: 0077261
Address: Bonifacio St. Poblacion Argao, Cebu
Email : rhandydaragosa@yahoo.com; rdaragosa43@gmail.com
Contact: 639-204-743229 / 639-055-214011
OBJECTIVES:
• To obtain a position in a reputable company that utilizes my knowledge and learning in
my bachelor’s degree in mechanical engineering
• To be a part of a dynamic firm where I can effectively utilize all my skills for the growth
of the organization.
SKILLS:
Computer literate:
• Microsoft Application (MS Word, Excel, Power Point)
• Basic AutoCAD
• Professional Driving
QUALIFICATION:
• A good listener- has the ability to give full attention to what superiors and other people
and are saying, to understand their points made, and to ask questions appropriately.
• A good communicator- has a good communication skill in English, Cebuano and Tagalog.
• Has a good time management to manage my own time and the time of my subordinates
to perform tasks and responsibilities on time.
• A logical thinker-enables to plan and think solutions or alternatives quickly especially
when problems arise.
EXPERIENCE:
COMPANY: Weatherford Asia Pacific Philippines Branch 2015 at present
POSITION: TRS Field Technician 1
DUTIES &
RESPONSIBILITIES:
In Field:
• Pre-job equipment checks the all the equipment and handling gears in the rig prior in
running casing and tubing based on the checklist order to insure that all the equipment
is in good condition.
• Rig up and rig down all handling gears in rig site and equipment like power unit, Power
Tong and Jam pro in accordance with company instruction then installed it and get ready
for a job.
• Running Casing and Tubing in the rig site with Jampro Computer
• Running Tubing Pipe for completion dual string and upper and lower completion job with
Jam Pro Computer.
• Operate Weatherford power tong 14-150, 14-100, 14-50, 16-25, 7.6-30, and 5.5-15.
• Operate Power Tong for casing and tubing completion Job
• Operate Jam Pro and function test for callibration
• Stabber
• Do maintenance work on equipment at workshop
• Participate in JSA stop card in day to day
• Prepare equipment and gear based task
• Pre-job equipment checks for operation and ensure fit for purpose
In Workshop
• In charge in inventory and double checks all handling gear and equipment for TRS job.
• Do repaired and maintenance work on handling gear and equipment at workshop
• Prepare and Function test all TRS equipment and gear.
• Function test power Tong and Diesel and Electric Power Unit before send to the rig site
• Responsible for maintained, Rig up and rig down the handling gear and equipment)
• Operate Power Tong for casing and tubing completion Job
• Operate Jam Pro and function test Power tong for calibration to insure its readiness for
operation in the rig site
• Do maintenance and repair of equipment and handling gear at workshop for preparation
in the job in rig site
• Participate in JSA stop card in day to day
• Prepare equipment and gear based task on the rig site
• Pre-job equipment checks for operation and ensure fit for purpose
Rig Experience 2014
Client Name: Brunei Shell
Type of Job: Completion
Duties and Responsibilities:
• Operate Weatherford Power Tong 7.625 inch-30k Torque
• Operate Jam Pro to monitor the torque produced by Power Tong to the casing.
• Do rig up and down with the TRS supervisor handling gear and equipment
COMPANY: REPUBLIC FLOUR MILL (RFM) 2011
POSITION: MAINTENANCE TECHNICIAN
DUTIES &
RESPONSIBILITIES:
Mechanical:
• Checked and inspected daily, plant Equipment and Auxilliary like Motors, pump,
Blower, Fans, Chiller, Compressor, Heat Exchanger, Water and air Piping, Water
Treatment facilities.
• Trouble shoot Motors, Motors Alignment, Chain Coupling & Bearing Alignment
• Troubleshoot Pump, Fan and Blower
• Troubleshoot Boiler, Chillers, and Compressor.
Electrical:
• Checked the amperes of all motors if it is not beyond the rated amperes as the
manufacturer designate and write it in our monitoring sheets.
• Checked the electrical wiring on the motors and control panel if it tightens well.
• Testing Motor to run after undergo repair and getting the rated ampere and determine if
it is ready to operate.
PAPER WORKS:
• Prepare a requisition order of all spare parts and materials needed in our plant
Mechanical or Electrical parts and make inventory on such spare parts.
• Make a job order in such spare need to fabricate in our machine shop and coordinate
to the machinist to discuss the job order.
• Prepare a work order on such, plant equipment and auxiliary need to undergo
preventive maintenance as far as their actual condition and time schedule are concern
based on the manual and discuss it the plant mechanics.
• Prepare accomplish report after the preventive maintenance done include the repair
accomplish in such equipment, parts to be replace and the status on the machine if is
ready for the operation.
LEADERSHIP:
• Discuss the work order for the Schedule Preventive Maintenance to the Mechanics in
the plant and gives work assignment based on their skills.
• Manage the whole preventive maintenance operation to insure the right equipment
which repair is on the list on the work order and to insure to comply the time limit of the
maintenance to avoid delay of mill production operation.
• Inspected the equipment and auxiliary which listed on the work order undergoing
preventive maintenance are properly repair by the mechanics and technician.
COMPANY: MACTAN SHIPYARD CORPORATION 2010
POSITION: PROCUREMENT OFFICER
DUTIES &
RESPONSIBILITIES:
• Understand and apply the benefits of contracted agreements with preferred suppliers in
all purchasing activities to maximise savings, consolidate spend and reduce deliveries
and invoices.
• In consultation with the Warehouse Coordinator, ensure stocked goods par levels
Are adequately maintained and replenished ensuring continuous supply.
• Ensure goods received from the suppliers match the purchase order requirements in
terms of pricing, quantity, and quality reporting non-conformances.
• Identify opportunities to test market for pricing and product substitutions to achieve cost
savings while still meeting product specifications. Ensure all procurement activities
conducted within delegations of authority and that appropriate approvals have been
provided prior to issuing purchase order for goods.
• Ensure that all goods sourced and delivered from contracted suppliers meet
specifications and fixed contracted pricing
EDUCATION BACKGROUND:
• High School- Argao National High School (2002-2006) Argao Cebu
• College – University Of Cebu (2006-2011) Cebu City
CERTIFICATES AND TRAININGS
• Operational Technical Training -Singapore 2014
• Weatherford Competency Level 1 Theory –Brunei 2014
• Technical Safety Training ( High Risk Level) 2013
(World Safety Organization) WSO
• BOSIET (Basic Offshore Safety Induction and Emergency Training) 2012
• Preventive Maintenance & Proper Care Technical Symposium
(Atlas Copco, Oil Free Compressor) 2011
• Exxon Mobile SHC Lubricant & Specialties 2011
MEMBERSHIP OF PROFESSIONAL BODIE:
• Philippine Society of Mechanical Engineer
REFFERENCES:
Name: Milo Florendo
Company: Weatherford TRS Crew Chief
Contact No: +639287701121/ +639156184144
Name: Connie Bilongilot
Company: Nautilus Shipyard
Contact No: +639178220649 / +639055176035
I hereby certify that the above information is true to the best of my knowledge.
Rhandy C. Daragosa, RME
resume _2015

More Related Content

What's hot (15)

Iwd4000120462@focus career.com
Iwd4000120462@focus career.comIwd4000120462@focus career.com
Iwd4000120462@focus career.com
 
ZS CV final
ZS CV finalZS CV final
ZS CV final
 
Updated Resume
Updated ResumeUpdated Resume
Updated Resume
 
CVsilas
CVsilasCVsilas
CVsilas
 
Bongani levison tavengwa
Bongani levison tavengwaBongani levison tavengwa
Bongani levison tavengwa
 
Karthick mm
Karthick  mmKarthick  mm
Karthick mm
 
Mechanical Engineer
Mechanical EngineerMechanical Engineer
Mechanical Engineer
 
Shakeb_CV
Shakeb_CVShakeb_CV
Shakeb_CV
 
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
CV(Mechanical maintenance Engineer-project Manager)Alaa Abd ElKader - Last up...
 
alvin 2014 Resume (updated 29072015)
alvin 2014 Resume (updated 29072015)alvin 2014 Resume (updated 29072015)
alvin 2014 Resume (updated 29072015)
 
BILL_Lockwood_Res Apr 2016
BILL_Lockwood_Res Apr 2016BILL_Lockwood_Res Apr 2016
BILL_Lockwood_Res Apr 2016
 
RAVI CV
RAVI CVRAVI CV
RAVI CV
 
Resume
ResumeResume
Resume
 
sujit resume (1)
sujit resume (1)sujit resume (1)
sujit resume (1)
 
Ian Bullen-CV
Ian Bullen-CVIan Bullen-CV
Ian Bullen-CV
 

Similar to resume _2015 (20)

new cv kishor
new cv kishornew cv kishor
new cv kishor
 
2016 Resume_SanfordFernades (1)
2016 Resume_SanfordFernades (1)2016 Resume_SanfordFernades (1)
2016 Resume_SanfordFernades (1)
 
VENKADESAN RESUME.
VENKADESAN RESUME.VENKADESAN RESUME.
VENKADESAN RESUME.
 
khalid RESUME 2
khalid RESUME  2khalid RESUME  2
khalid RESUME 2
 
Rig Chief Mechanic
Rig Chief MechanicRig Chief Mechanic
Rig Chief Mechanic
 
Latest CV
Latest CVLatest CV
Latest CV
 
LARRY CV
LARRY CVLARRY CV
LARRY CV
 
Resume-Ramasamy Ganapathy
Resume-Ramasamy GanapathyResume-Ramasamy Ganapathy
Resume-Ramasamy Ganapathy
 
QNFS_Rajasekhar Murugaiyan REV 1
QNFS_Rajasekhar Murugaiyan REV 1QNFS_Rajasekhar Murugaiyan REV 1
QNFS_Rajasekhar Murugaiyan REV 1
 
Patrick Harper
Patrick HarperPatrick Harper
Patrick Harper
 
Michael Carlin's Resume for the internet
Michael Carlin's Resume for the internetMichael Carlin's Resume for the internet
Michael Carlin's Resume for the internet
 
Roberto-CV-F
Roberto-CV-FRoberto-CV-F
Roberto-CV-F
 
Iftekhar-CURRICULUM VITAE
Iftekhar-CURRICULUM VITAEIftekhar-CURRICULUM VITAE
Iftekhar-CURRICULUM VITAE
 
Mr.Lacy Resume 2
Mr.Lacy Resume 2Mr.Lacy Resume 2
Mr.Lacy Resume 2
 
Terry List Resume new manager
Terry List Resume new managerTerry List Resume new manager
Terry List Resume new manager
 
AGBORO DONA (CV ) FACILITIES MANAGEMENT
AGBORO DONA  (CV ) FACILITIES MANAGEMENTAGBORO DONA  (CV ) FACILITIES MANAGEMENT
AGBORO DONA (CV ) FACILITIES MANAGEMENT
 
xinyuan resume
xinyuan resumexinyuan resume
xinyuan resume
 
johnson_Resume 2015
johnson_Resume 2015johnson_Resume 2015
johnson_Resume 2015
 
Irfan Qamar Cv
Irfan Qamar CvIrfan Qamar Cv
Irfan Qamar Cv
 
Resume34
Resume34Resume34
Resume34
 

resume _2015

  • 1. RHANDY CANADA DARAGOSA Registered Mechanical Engineer License #: 0077261 Address: Bonifacio St. Poblacion Argao, Cebu Email : rhandydaragosa@yahoo.com; rdaragosa43@gmail.com Contact: 639-204-743229 / 639-055-214011 OBJECTIVES: • To obtain a position in a reputable company that utilizes my knowledge and learning in my bachelor’s degree in mechanical engineering • To be a part of a dynamic firm where I can effectively utilize all my skills for the growth of the organization. SKILLS: Computer literate: • Microsoft Application (MS Word, Excel, Power Point) • Basic AutoCAD • Professional Driving QUALIFICATION: • A good listener- has the ability to give full attention to what superiors and other people and are saying, to understand their points made, and to ask questions appropriately. • A good communicator- has a good communication skill in English, Cebuano and Tagalog. • Has a good time management to manage my own time and the time of my subordinates to perform tasks and responsibilities on time. • A logical thinker-enables to plan and think solutions or alternatives quickly especially when problems arise.
  • 2. EXPERIENCE: COMPANY: Weatherford Asia Pacific Philippines Branch 2015 at present POSITION: TRS Field Technician 1 DUTIES & RESPONSIBILITIES: In Field: • Pre-job equipment checks the all the equipment and handling gears in the rig prior in running casing and tubing based on the checklist order to insure that all the equipment is in good condition. • Rig up and rig down all handling gears in rig site and equipment like power unit, Power Tong and Jam pro in accordance with company instruction then installed it and get ready for a job. • Running Casing and Tubing in the rig site with Jampro Computer • Running Tubing Pipe for completion dual string and upper and lower completion job with Jam Pro Computer. • Operate Weatherford power tong 14-150, 14-100, 14-50, 16-25, 7.6-30, and 5.5-15. • Operate Power Tong for casing and tubing completion Job • Operate Jam Pro and function test for callibration • Stabber • Do maintenance work on equipment at workshop • Participate in JSA stop card in day to day • Prepare equipment and gear based task • Pre-job equipment checks for operation and ensure fit for purpose In Workshop • In charge in inventory and double checks all handling gear and equipment for TRS job. • Do repaired and maintenance work on handling gear and equipment at workshop • Prepare and Function test all TRS equipment and gear. • Function test power Tong and Diesel and Electric Power Unit before send to the rig site • Responsible for maintained, Rig up and rig down the handling gear and equipment) • Operate Power Tong for casing and tubing completion Job
  • 3. • Operate Jam Pro and function test Power tong for calibration to insure its readiness for operation in the rig site • Do maintenance and repair of equipment and handling gear at workshop for preparation in the job in rig site • Participate in JSA stop card in day to day • Prepare equipment and gear based task on the rig site • Pre-job equipment checks for operation and ensure fit for purpose Rig Experience 2014 Client Name: Brunei Shell Type of Job: Completion Duties and Responsibilities: • Operate Weatherford Power Tong 7.625 inch-30k Torque • Operate Jam Pro to monitor the torque produced by Power Tong to the casing. • Do rig up and down with the TRS supervisor handling gear and equipment COMPANY: REPUBLIC FLOUR MILL (RFM) 2011 POSITION: MAINTENANCE TECHNICIAN DUTIES & RESPONSIBILITIES: Mechanical: • Checked and inspected daily, plant Equipment and Auxilliary like Motors, pump, Blower, Fans, Chiller, Compressor, Heat Exchanger, Water and air Piping, Water Treatment facilities. • Trouble shoot Motors, Motors Alignment, Chain Coupling & Bearing Alignment • Troubleshoot Pump, Fan and Blower • Troubleshoot Boiler, Chillers, and Compressor.
  • 4. Electrical: • Checked the amperes of all motors if it is not beyond the rated amperes as the manufacturer designate and write it in our monitoring sheets. • Checked the electrical wiring on the motors and control panel if it tightens well. • Testing Motor to run after undergo repair and getting the rated ampere and determine if it is ready to operate. PAPER WORKS: • Prepare a requisition order of all spare parts and materials needed in our plant Mechanical or Electrical parts and make inventory on such spare parts. • Make a job order in such spare need to fabricate in our machine shop and coordinate to the machinist to discuss the job order. • Prepare a work order on such, plant equipment and auxiliary need to undergo preventive maintenance as far as their actual condition and time schedule are concern based on the manual and discuss it the plant mechanics. • Prepare accomplish report after the preventive maintenance done include the repair accomplish in such equipment, parts to be replace and the status on the machine if is ready for the operation. LEADERSHIP: • Discuss the work order for the Schedule Preventive Maintenance to the Mechanics in the plant and gives work assignment based on their skills. • Manage the whole preventive maintenance operation to insure the right equipment which repair is on the list on the work order and to insure to comply the time limit of the maintenance to avoid delay of mill production operation. • Inspected the equipment and auxiliary which listed on the work order undergoing preventive maintenance are properly repair by the mechanics and technician.
  • 5. COMPANY: MACTAN SHIPYARD CORPORATION 2010 POSITION: PROCUREMENT OFFICER DUTIES & RESPONSIBILITIES: • Understand and apply the benefits of contracted agreements with preferred suppliers in all purchasing activities to maximise savings, consolidate spend and reduce deliveries and invoices. • In consultation with the Warehouse Coordinator, ensure stocked goods par levels Are adequately maintained and replenished ensuring continuous supply. • Ensure goods received from the suppliers match the purchase order requirements in terms of pricing, quantity, and quality reporting non-conformances. • Identify opportunities to test market for pricing and product substitutions to achieve cost savings while still meeting product specifications. Ensure all procurement activities conducted within delegations of authority and that appropriate approvals have been provided prior to issuing purchase order for goods. • Ensure that all goods sourced and delivered from contracted suppliers meet specifications and fixed contracted pricing EDUCATION BACKGROUND: • High School- Argao National High School (2002-2006) Argao Cebu • College – University Of Cebu (2006-2011) Cebu City CERTIFICATES AND TRAININGS • Operational Technical Training -Singapore 2014 • Weatherford Competency Level 1 Theory –Brunei 2014 • Technical Safety Training ( High Risk Level) 2013
  • 6. (World Safety Organization) WSO • BOSIET (Basic Offshore Safety Induction and Emergency Training) 2012 • Preventive Maintenance & Proper Care Technical Symposium (Atlas Copco, Oil Free Compressor) 2011 • Exxon Mobile SHC Lubricant & Specialties 2011 MEMBERSHIP OF PROFESSIONAL BODIE: • Philippine Society of Mechanical Engineer REFFERENCES: Name: Milo Florendo Company: Weatherford TRS Crew Chief Contact No: +639287701121/ +639156184144 Name: Connie Bilongilot Company: Nautilus Shipyard Contact No: +639178220649 / +639055176035 I hereby certify that the above information is true to the best of my knowledge. Rhandy C. Daragosa, RME