SlideShare a Scribd company logo
1 of 49
Download to read offline
API SPEC Q2 FOR AUDITING
STANDARDIZATION OF INDUSTRY
EXPECTATIONS FOR OIL AND GAS
Stacey W. Hagen
ExxonMobil Development Company
Drilling Services & Systems Team Lead
API Sub-Committee 18 Chairman - Quality
Bo Creek
Orion Drilling Company
Quality Assurance / Quality Control Manager
API SPEC Q2 FOR AUDITING
AGENDA
Objective
– Provide History and Industry Expectations on API Q2
Outline
– Brief History of API
– Business Drivers for New Industry Standard – API Q2
– API Q2 Overview
– Benefits
API SPEC Q2 FOR AUDITING
BRIEF HISTORY
API SPEC Q1
API SPEC Q2 FOR AUDITING
History of API and Spec Q1
• July 28, 1914 – November 11, 1918
• National Petroleum War Services Committee
• Pooling Program
• 1919 – American Petroleum Institute
• Program was transitioned into a third party audit
program in the mid 1980’s under the Specification
of Quality Programs, API Spec Q1 that is now in its
9th Edition
• Just as there were drivers for the Monogram
Program, one now exists for the certification of
services
API SPEC Q2 FOR AUDITING
BUSINESS DRIVERS
FOR API SPEC Q2
API SPEC Q2 FOR AUDITING
Absence of a Corporate Management System
Inconsistency in Risk Mitigation
Lack of Implementation
Lack of Oversight
BUSINESS DRIVERS
API SPEC Q2 FOR AUDITING
BUSINESS DRIVERS
Increasing complexity of wells
• Need for improved service technology and
equipment / tool reliability
Increasing spread rates on rigs
• Need for systems to ensure uninterrupted
operations
API SPEC Q2 FOR AUDITING
BUSINESS DRIVERS
Service centers have more than one
customer
• Additional requirements typically
specified by one or two customers
• A customer may only be 10% of total
business
• Implementation / compliance of
requirements only 10% of the time is
next to impossible
API SPEC Q2 FOR AUDITING
BUSINESS DRIVERS - PerceptionThe incident killed 11 workers and
spewed more than 200 million gallons
of crude in what is touted as the
country’s worst oil spill ever.
Subsequently, a moratorium was
imposed on offshore drilling.
API SPEC Q2 FOR AUDITING
ROOT CAUSES OF NPT
LACK OF:
Service execution
planning
Personnel
Competency
Lack of or not
Following
procedures
Lack of using history
logs
Contingency
planning
Quality Checks,
Inspection and Test
Preventive Maintenance, Inspection, Test
Programs (PMITP)
API SPEC Q2 FOR AUDITING
INDUSTRY
RESPONSE
API SPEC Q2 FOR AUDITING
INDUSTRY RESPONSE
• Realization that ISO 9001 , ISO TS29001 and API
Spec Q1 apply to manufacturing
• API Task Group (TG) 5 developed under API
SC18
• Specification for QMS Requirements for Service
Supply Organizations
• Identify the expectations for execution of
upstream services including well construction,
intervention, production and abandonment
• Published December 15, 2011
API SPEC Q2 FOR AUDITING
API SUBCOMMITTEE 18
Life Cycle
Management
API
Spec Q2
API
Spec Q1
Auditor
Effectiveness
Min. Mfg.
Requirements
WeldingMonogram
Program
TG2TG1 TG3 TG4 TG5 TG6 TG7
SC18
CSOEM
API SPEC Q2 FOR AUDITING
API TG5 MEMBERS
API SPEC Q2 FOR AUDITING
API SPEC Q2
HOW IS IT DIFFERENT?
API SPEC Q2 FOR AUDITING
PROCESS-BASED QMS (ISO 9001, 29001 & API Q1)
API SPEC Q2 FOR AUDITING
CUSTOMER
REQUIREMENTS
CUSTOMER
SATISFACTION
INPUT OUTPUT
CONTINUAL
IMPROVEMENT
PROCESS- AND RISK-BASED QMS (API Q2)
API SPEC Q2 FOR AUDITING
OVERLAP - API SPEC Q1 VS. API SPEC Q2
General Requirements
Quality Manual
Control of Documents &
Records
Quality Policy
Quality Objectives
Planning
Management Review
Control of Monitoring and
Measurement Equipment
Measurement, Analysis
and Improvement
Training
Corrective and Preventive
Action
API SPEC Q2 FOR AUDITING
SERVICE-SPECIFIC Additions - API SPEC Q2
No Claims to Exclusions
Competency of Personnel
Risk Management
Detection Equipment
Service Design
Contingency Planning
Control over Critical Suppliers
Service Quality Plan
Preventive Maintenance, Inspection and
Test
Service Performance Validation
Management of Change
Corrective and Preventive Action
resulting in a change of controls
Customer Notification
Traceability of Critical Services and SRP
API SPEC Q2 FOR AUDITING
Elements Requiring Procedures
• Personnel Competency / Training
• Document Control
• Control of Records
• Risk Assessment
• Service Design
• Contingency Planning
• Purchasing
• Verification of Purchased Services &Service
Related Product
• Execution of Service
• Identification & Traceability
• Service Related Product Status
• Customer Property
• Preservation of Service Related Product
• PMIT
• TMMDE
• Service Performance Validation
• Nonconformities
• Management of Change
• Monitoring, Measuring & Improvement
• Internal Audit
• Analysis of Data
• Improvement
• Corrective Action
• Preventative Action
API SPEC Q2 FOR AUDITING
1.2 EXCLUSIONS
“When an organization performs activities addressed by this document,
including the provision of service-related product, all requirements shall
be performed and no claims to exclusion of those requirements shall be
permitted.”
Service-related products (SRP): Materials, equipment, and software
used in the execution of a service.
API SPEC Q2 FOR AUDITING
COMPETENT
4.3.2 PERSONNEL COMPETENCE
NEW
• Risk Based
• Problem Solving
Competency =
• Education
• Training
• Skills (OJT)
• Experience
API SPEC Q2 FOR AUDITING
4.3.2 PERSONNEL COMPETENCE
THE FOUR LEVELS OF LEARNING
Novice
Not
expected
to be able
to perform
Competent
Expected to
perform to
basic
standards
Expert
Creates
knowledge
and teaches
others
Experienced
Beyond
understanding
of what must
be done
API SPEC Q2 FOR AUDITING
5.3 RISKS Management
Immediately
1 years
5 years
10 years
API SPEC Q2 FOR AUDITING
5.3 RISK MANAGEMENT
Maintain Procedures to controls Risk
throughout Service Execution
• Identify service related risk
• Implement controls
• Notify customer of remaining risk
API SPEC Q2 FOR AUDITING
5.4 Design & Development
Every Service includes Design and Development
Planning Inputs Outputs Review Verification Changes
API Q1
Products
Validation
Planning Inputs Outputs Verification Changes
API Q2
Services
Final
Review
Failing to understand what is and is not critical will impact the service design
which will result in increased risks, lack of controls and potential for loss.
API SPEC Q2 FOR AUDITING
5.5 CONTINGENCY PLAN
Contingency planning shall be
integrated into services and
supporting processes between
the organization, its suppliers
and the customer”.
API SPEC Q2 FOR AUDITING
5.5 CONTINGENCY PLAN
• Actions required
for significant risk
• Assignment of
responsibility &
authority
• Internal and
external
communications
Outputs
Integration
Disruption
Prevention
Mitigation
Measures
Spares
History Risk
Reliability
Contingency
Planning
API SPEC Q2 FOR AUDITING
5.6 PURCHASING & CONTROL OF SUPPLIERS
• Determine criticality of the
services and SRP
• Evaluation & Onsite audits
for critical suppliers.
Critical – That deemed by the organization or customer as indispensable or essential,
needed for a stated purpose or task, and requiring specific action
API SPEC Q2 FOR AUDITING
5.7.2 SERVICE QUALITY PLAN
Customer Specific for the
Service being performed
Takes into account
Environmental &
Operational Conditions Design and
Development
Personnel
Competence
Contract
Requirements Identification of
Equipment
Risk
Assessment
Contingency
Planning
API SPEC Q2 FOR AUDITING
5.7.3 IDENTIFICATION AND TRACEABILITY
• Identification controls must be
put into place to clearly identify
all stages of delivery,
installation, repair
(maintenance), and redress
• Service-related product shall be
identified.
• Critical service-related product
shall be identified and
traceable.
API SPEC Q2 FOR AUDITING
5.7.8 PMITP
Is applicable to Service Related Product (SRP)
Equipment Maintenance is handled under Work Environment.
Corrective
Preventive
Predictive• Expensive
• Results in NPT
• Minimizes Corrective
Maintenance
• Focus of API Spec Q2
• SRP Integrity and
Reliability
API SPEC Q2 FOR AUDITING
5.7.8 PMITP
Corrective
Preventive
Predictive• Expensive
• Results in NPT
• Minimizes Corrective
Maintenance
• Focus of API Spec Q2
• SRO Integrity and
Reliability
• Reports that document history use, repairs,
modifications, remanufacturing, inspection and test
activities that all direct verification for reuse of
product;
• List of critical spare parts requirements by the
customer and/or technical requirements including
those by the OEM
• Controls that ensure equipment integrity to original
performance requirements and design acceptance
criteria are maintained
• Original performance requirements that cannot be
met shall undergo the MOC process
API SPEC Q2 FOR AUDITING
5.7.8 PMITP
• OEM
• Application, use, environments
• PMIT = OEM Recommendations + Owner
of the equipment
API SPEC Q2 FOR AUDITING
5.9 SERVICE PERFORMANCE VALIDATION
Validation must be:
• Differs from Validation for
manufactured product
• Validations occur during and
after execution of service(s)
• Carried out in accordance with
Design (5.4), SQP (5.7.2) and
acceptance criteria
API SPEC Q2 FOR AUDITING
5.10.4 CUSTOMER NOTIFICATION
• Customers shall be notified:
– When service execution,
does not conform to
requirements
– When SRP does not
conform which has been
delivered or used in the
execution of a service
API SPEC Q2 FOR AUDITING
Management
of Change
Process
Execution
Changes
Management
System
Changes
SRP & Design
Changes
Risk
Assessment
Customer
Notification
No
Yes
No
Customer
Accepts?
Higher
Risk?
End of Process
End of Process
Change in
Personnel &
Suppliers
Yes
5.11 Management of Change
API SPEC Q2 FOR AUDITING
Impact on Drilling Operations
Resources
-90+ 0 4010 20 160+80
Risk
Assessment
Drilling Operations
Design of
Service
PM
Programs
Contingency
Planning
Maintenance
& Critical Spares
• Assembly
Insp / Test
QA/QC
• Service
Performance
Validation
•BHA Inspections
•MOC
Critical
Suppliers
Time ( rig days)(AFE) Spud
Operations Support
• Well Integrity
Reduction of NPT
Contractor Influence
APISpecQ2
• Tool Insp
@ delivery
Competency
Service
Quality Plans
API SPEC Q2 FOR AUDITING
SUMMARY & BENEFITS
API SPEC Q2 FOR AUDITING
INDUSTRY IMPACT
Operators
Service
Providers
Suppliers
Regulators
and other
Interested
Parties
API SPEC Q2 FOR AUDITING
It is not a template that
you fill in and claim
compliance.
It is not a cross
reference between your
management system
and your customer’s.
It is not a manual with
new buzz words that
you present to your
customers.
WHAT API SPEC Q2 IS NOT
API SPEC Q2 FOR AUDITING
It is about service quality and risk mitigation supported by
validation and actual service provider performance.
WHAT API SPEC Q2 IS
API SPEC Q2 FOR AUDITING
Benefits of Standardization
• Improves service related product reliability
• Minimizes risk through identification, planning & controls
• Identifies critical tasks that impact quality, safety and the
environment
• Minimizes service related risk and improves efficiencies
• Improves communication between service providers and their
suppliers and operators.
API SPEC Q2 FOR AUDITING
INDUSTRY
COLLABORATION
API SPEC Q2 FOR AUDITING
Industry Collaboration
Beta Test Site Assessments:
• Gaps, hurdles and milestones for auditing to Q2
• Identify competencies / training for API Staff / Auditors
• Identify needed resources
• Types of certifications needed to meet industry needs
• Baker - Completed
• Schlumberger – Completed
• Weatherford – Completed
• Halliburton – Completed
• Orion Drilling – Completed
API SPEC Q2 FOR AUDITING
Industry Collaboration
API Spec Q2 Mock Audit:
• Halliburton – Bakersfield, CA
• July 29th – August 2nd 2013
PSL Covered
• Drilling Fluids & Solids
• Cementing
• Completion Tools
• Production Enhancement
• Directional Drilling / MWD / LWD
• Wireline and Perforating
API SPEC Q2 FOR AUDITING
Industry Collaboration
API Spec Q2 Reviews:
•Orion Drilling
•Maersk Drilling
•Akita Drilling
•Parker Drilling
•Transocean
•MI Swaco
API SPEC Q2 FOR AUDITING
EVOLUTION OF API SPEC Q2
DEVELOPED PUBLISHED BETA TESTING COMPLIANCE CERTIFICATION
API Spec Q2 was
developed in 2010
through 2011.
API Spec Q2 was
published in
December 2011.
A combination of
operators and service
providers participated
in the beta test.
Service providers
start getting their
QMSs in compliance
with API Spec Q2.
Service providers
become certified in
API Spec Q2.
EXPECTATION
Service providers shall
be in compliance in
order to bid on jobs
requiring API Spec Q2.
API SPEC Q2 FOR AUDITING
QUESTIONS ?

More Related Content

What's hot

ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process Abdul Rahman
 
ISO 9001-2015 Structure 'with highlighting for documented information and risk'
ISO 9001-2015 Structure 'with highlighting for documented information and risk'ISO 9001-2015 Structure 'with highlighting for documented information and risk'
ISO 9001-2015 Structure 'with highlighting for documented information and risk'Islam El khateeb
 
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMSISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMSSubhendu Datta
 
What is iso 9001 qms
What is iso 9001 qmsWhat is iso 9001 qms
What is iso 9001 qmsBusiness Beam
 
Iso 9001 2015 iso geek
Iso 9001 2015 iso geekIso 9001 2015 iso geek
Iso 9001 2015 iso geekVarinder Kumar
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 
Iso awareness training
Iso awareness trainingIso awareness training
Iso awareness trainingmanojmridul
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015Enrique Biton
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpointPat Kilbane
 
Required documents list for ISO 17021:2015 certification
Required documents list for ISO 17021:2015 certificationRequired documents list for ISO 17021:2015 certification
Required documents list for ISO 17021:2015 certificationGlobal Manager Group
 
Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025quality_management
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation Govind Ramu
 
-ISO 45001-2018.pptx
-ISO 45001-2018.pptx-ISO 45001-2018.pptx
-ISO 45001-2018.pptxyousrazeidan1
 
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Govind Ramu
 
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB
 
Process Audit and ISO
Process Audit and ISOProcess Audit and ISO
Process Audit and ISOSadafhazel
 

What's hot (20)

ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process ISO17025 Accreditation Procedures and Process
ISO17025 Accreditation Procedures and Process
 
Iso 9001 versus api q2 presentation
Iso 9001 versus api q2 presentationIso 9001 versus api q2 presentation
Iso 9001 versus api q2 presentation
 
ISO 9001-2015 Structure 'with highlighting for documented information and risk'
ISO 9001-2015 Structure 'with highlighting for documented information and risk'ISO 9001-2015 Structure 'with highlighting for documented information and risk'
ISO 9001-2015 Structure 'with highlighting for documented information and risk'
 
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMSISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
 
What is iso 9001 qms
What is iso 9001 qmsWhat is iso 9001 qms
What is iso 9001 qms
 
Iso 9001 2015 iso geek
Iso 9001 2015 iso geekIso 9001 2015 iso geek
Iso 9001 2015 iso geek
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Iso awareness training
Iso awareness trainingIso awareness training
Iso awareness training
 
Overview of the iso 9001:2015
Overview of the iso 9001:2015Overview of the iso 9001:2015
Overview of the iso 9001:2015
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpoint
 
Iso 9001 2015
Iso 9001 2015 Iso 9001 2015
Iso 9001 2015
 
Required documents list for ISO 17021:2015 certification
Required documents list for ISO 17021:2015 certificationRequired documents list for ISO 17021:2015 certification
Required documents list for ISO 17021:2015 certification
 
Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025Testing Laboratory Practices and ISO 17025
Testing Laboratory Practices and ISO 17025
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO9001:2015 presentation
ISO9001:2015 presentationISO9001:2015 presentation
ISO9001:2015 presentation
 
-ISO 45001-2018.pptx
-ISO 45001-2018.pptx-ISO 45001-2018.pptx
-ISO 45001-2018.pptx
 
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
 
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
PECB Webinar: ISO 9001:2015 Transition – Understanding the changes
 
Process Audit and ISO
Process Audit and ISOProcess Audit and ISO
Process Audit and ISO
 
Ppt presentation 17065
Ppt presentation 17065Ppt presentation 17065
Ppt presentation 17065
 

Similar to Hs14 s-hagen

PPAP Awareness training.pptx
PPAP Awareness training.pptxPPAP Awareness training.pptx
PPAP Awareness training.pptxNeeraj Pandey
 
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...AJAYKUMAR836335
 
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10Scott Hamm
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviewsssusereb347d
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentationImran Jamil
 
GP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptxGP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptxNonameNoname50
 
Effect of iso 9001 2015 on api q1 9th ed
Effect of iso 9001 2015 on api q1 9th edEffect of iso 9001 2015 on api q1 9th ed
Effect of iso 9001 2015 on api q1 9th edJulián Rivera
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2amitsonuksms
 
Awareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standardAwareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standardAmit Mishra
 
Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles TGA Australia
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptxsonutyagi20
 

Similar to Hs14 s-hagen (20)

APQP
APQP APQP
APQP
 
PPAP Awareness training.pptx
PPAP Awareness training.pptxPPAP Awareness training.pptx
PPAP Awareness training.pptx
 
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...Advanced Product Quality Planning (APQP) and Production Part Approval Process...
Advanced Product Quality Planning (APQP) and Production Part Approval Process...
 
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
Lilly Risk-Based CQ_ ISPE-CCPIE China Conference 2010_9-19-10
 
APQP
APQPAPQP
APQP
 
Apqp to print
Apqp to printApqp to print
Apqp to print
 
Pradeep CV
Pradeep CV Pradeep CV
Pradeep CV
 
Resume
ResumeResume
Resume
 
14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews14. Process: ocp cfops audits and compliance reviews
14. Process: ocp cfops audits and compliance reviews
 
CV JAVED
CV JAVEDCV JAVED
CV JAVED
 
Quality assurance documentation
Quality assurance documentationQuality assurance documentation
Quality assurance documentation
 
GP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptxGP_Training_APQP-PPAP_RevAF.pptx
GP_Training_APQP-PPAP_RevAF.pptx
 
Resume .Thangam
Resume .ThangamResume .Thangam
Resume .Thangam
 
Effect of iso 9001 2015 on api q1 9th ed
Effect of iso 9001 2015 on api q1 9th edEffect of iso 9001 2015 on api q1 9th ed
Effect of iso 9001 2015 on api q1 9th ed
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
 
Awareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standardAwareness session on iatf 16949 2016 standard
Awareness session on iatf 16949 2016 standard
 
Rajesh mba resume - dubai
Rajesh mba resume - dubaiRajesh mba resume - dubai
Rajesh mba resume - dubai
 
Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles Presentation Updating the Manufacturing Principles
Presentation Updating the Manufacturing Principles
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 

Recently uploaded (20)

Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 

Hs14 s-hagen

  • 1. API SPEC Q2 FOR AUDITING STANDARDIZATION OF INDUSTRY EXPECTATIONS FOR OIL AND GAS Stacey W. Hagen ExxonMobil Development Company Drilling Services & Systems Team Lead API Sub-Committee 18 Chairman - Quality Bo Creek Orion Drilling Company Quality Assurance / Quality Control Manager
  • 2. API SPEC Q2 FOR AUDITING AGENDA Objective – Provide History and Industry Expectations on API Q2 Outline – Brief History of API – Business Drivers for New Industry Standard – API Q2 – API Q2 Overview – Benefits
  • 3. API SPEC Q2 FOR AUDITING BRIEF HISTORY API SPEC Q1
  • 4. API SPEC Q2 FOR AUDITING History of API and Spec Q1 • July 28, 1914 – November 11, 1918 • National Petroleum War Services Committee • Pooling Program • 1919 – American Petroleum Institute • Program was transitioned into a third party audit program in the mid 1980’s under the Specification of Quality Programs, API Spec Q1 that is now in its 9th Edition • Just as there were drivers for the Monogram Program, one now exists for the certification of services
  • 5. API SPEC Q2 FOR AUDITING BUSINESS DRIVERS FOR API SPEC Q2
  • 6. API SPEC Q2 FOR AUDITING Absence of a Corporate Management System Inconsistency in Risk Mitigation Lack of Implementation Lack of Oversight BUSINESS DRIVERS
  • 7. API SPEC Q2 FOR AUDITING BUSINESS DRIVERS Increasing complexity of wells • Need for improved service technology and equipment / tool reliability Increasing spread rates on rigs • Need for systems to ensure uninterrupted operations
  • 8. API SPEC Q2 FOR AUDITING BUSINESS DRIVERS Service centers have more than one customer • Additional requirements typically specified by one or two customers • A customer may only be 10% of total business • Implementation / compliance of requirements only 10% of the time is next to impossible
  • 9. API SPEC Q2 FOR AUDITING BUSINESS DRIVERS - PerceptionThe incident killed 11 workers and spewed more than 200 million gallons of crude in what is touted as the country’s worst oil spill ever. Subsequently, a moratorium was imposed on offshore drilling.
  • 10. API SPEC Q2 FOR AUDITING ROOT CAUSES OF NPT LACK OF: Service execution planning Personnel Competency Lack of or not Following procedures Lack of using history logs Contingency planning Quality Checks, Inspection and Test Preventive Maintenance, Inspection, Test Programs (PMITP)
  • 11. API SPEC Q2 FOR AUDITING INDUSTRY RESPONSE
  • 12. API SPEC Q2 FOR AUDITING INDUSTRY RESPONSE • Realization that ISO 9001 , ISO TS29001 and API Spec Q1 apply to manufacturing • API Task Group (TG) 5 developed under API SC18 • Specification for QMS Requirements for Service Supply Organizations • Identify the expectations for execution of upstream services including well construction, intervention, production and abandonment • Published December 15, 2011
  • 13. API SPEC Q2 FOR AUDITING API SUBCOMMITTEE 18 Life Cycle Management API Spec Q2 API Spec Q1 Auditor Effectiveness Min. Mfg. Requirements WeldingMonogram Program TG2TG1 TG3 TG4 TG5 TG6 TG7 SC18 CSOEM
  • 14. API SPEC Q2 FOR AUDITING API TG5 MEMBERS
  • 15. API SPEC Q2 FOR AUDITING API SPEC Q2 HOW IS IT DIFFERENT?
  • 16. API SPEC Q2 FOR AUDITING PROCESS-BASED QMS (ISO 9001, 29001 & API Q1)
  • 17. API SPEC Q2 FOR AUDITING CUSTOMER REQUIREMENTS CUSTOMER SATISFACTION INPUT OUTPUT CONTINUAL IMPROVEMENT PROCESS- AND RISK-BASED QMS (API Q2)
  • 18. API SPEC Q2 FOR AUDITING OVERLAP - API SPEC Q1 VS. API SPEC Q2 General Requirements Quality Manual Control of Documents & Records Quality Policy Quality Objectives Planning Management Review Control of Monitoring and Measurement Equipment Measurement, Analysis and Improvement Training Corrective and Preventive Action
  • 19. API SPEC Q2 FOR AUDITING SERVICE-SPECIFIC Additions - API SPEC Q2 No Claims to Exclusions Competency of Personnel Risk Management Detection Equipment Service Design Contingency Planning Control over Critical Suppliers Service Quality Plan Preventive Maintenance, Inspection and Test Service Performance Validation Management of Change Corrective and Preventive Action resulting in a change of controls Customer Notification Traceability of Critical Services and SRP
  • 20. API SPEC Q2 FOR AUDITING Elements Requiring Procedures • Personnel Competency / Training • Document Control • Control of Records • Risk Assessment • Service Design • Contingency Planning • Purchasing • Verification of Purchased Services &Service Related Product • Execution of Service • Identification & Traceability • Service Related Product Status • Customer Property • Preservation of Service Related Product • PMIT • TMMDE • Service Performance Validation • Nonconformities • Management of Change • Monitoring, Measuring & Improvement • Internal Audit • Analysis of Data • Improvement • Corrective Action • Preventative Action
  • 21. API SPEC Q2 FOR AUDITING 1.2 EXCLUSIONS “When an organization performs activities addressed by this document, including the provision of service-related product, all requirements shall be performed and no claims to exclusion of those requirements shall be permitted.” Service-related products (SRP): Materials, equipment, and software used in the execution of a service.
  • 22. API SPEC Q2 FOR AUDITING COMPETENT 4.3.2 PERSONNEL COMPETENCE NEW • Risk Based • Problem Solving Competency = • Education • Training • Skills (OJT) • Experience
  • 23. API SPEC Q2 FOR AUDITING 4.3.2 PERSONNEL COMPETENCE THE FOUR LEVELS OF LEARNING Novice Not expected to be able to perform Competent Expected to perform to basic standards Expert Creates knowledge and teaches others Experienced Beyond understanding of what must be done
  • 24. API SPEC Q2 FOR AUDITING 5.3 RISKS Management Immediately 1 years 5 years 10 years
  • 25. API SPEC Q2 FOR AUDITING 5.3 RISK MANAGEMENT Maintain Procedures to controls Risk throughout Service Execution • Identify service related risk • Implement controls • Notify customer of remaining risk
  • 26. API SPEC Q2 FOR AUDITING 5.4 Design & Development Every Service includes Design and Development Planning Inputs Outputs Review Verification Changes API Q1 Products Validation Planning Inputs Outputs Verification Changes API Q2 Services Final Review Failing to understand what is and is not critical will impact the service design which will result in increased risks, lack of controls and potential for loss.
  • 27. API SPEC Q2 FOR AUDITING 5.5 CONTINGENCY PLAN Contingency planning shall be integrated into services and supporting processes between the organization, its suppliers and the customer”.
  • 28. API SPEC Q2 FOR AUDITING 5.5 CONTINGENCY PLAN • Actions required for significant risk • Assignment of responsibility & authority • Internal and external communications Outputs Integration Disruption Prevention Mitigation Measures Spares History Risk Reliability Contingency Planning
  • 29. API SPEC Q2 FOR AUDITING 5.6 PURCHASING & CONTROL OF SUPPLIERS • Determine criticality of the services and SRP • Evaluation & Onsite audits for critical suppliers. Critical – That deemed by the organization or customer as indispensable or essential, needed for a stated purpose or task, and requiring specific action
  • 30. API SPEC Q2 FOR AUDITING 5.7.2 SERVICE QUALITY PLAN Customer Specific for the Service being performed Takes into account Environmental & Operational Conditions Design and Development Personnel Competence Contract Requirements Identification of Equipment Risk Assessment Contingency Planning
  • 31. API SPEC Q2 FOR AUDITING 5.7.3 IDENTIFICATION AND TRACEABILITY • Identification controls must be put into place to clearly identify all stages of delivery, installation, repair (maintenance), and redress • Service-related product shall be identified. • Critical service-related product shall be identified and traceable.
  • 32. API SPEC Q2 FOR AUDITING 5.7.8 PMITP Is applicable to Service Related Product (SRP) Equipment Maintenance is handled under Work Environment. Corrective Preventive Predictive• Expensive • Results in NPT • Minimizes Corrective Maintenance • Focus of API Spec Q2 • SRP Integrity and Reliability
  • 33. API SPEC Q2 FOR AUDITING 5.7.8 PMITP Corrective Preventive Predictive• Expensive • Results in NPT • Minimizes Corrective Maintenance • Focus of API Spec Q2 • SRO Integrity and Reliability • Reports that document history use, repairs, modifications, remanufacturing, inspection and test activities that all direct verification for reuse of product; • List of critical spare parts requirements by the customer and/or technical requirements including those by the OEM • Controls that ensure equipment integrity to original performance requirements and design acceptance criteria are maintained • Original performance requirements that cannot be met shall undergo the MOC process
  • 34. API SPEC Q2 FOR AUDITING 5.7.8 PMITP • OEM • Application, use, environments • PMIT = OEM Recommendations + Owner of the equipment
  • 35. API SPEC Q2 FOR AUDITING 5.9 SERVICE PERFORMANCE VALIDATION Validation must be: • Differs from Validation for manufactured product • Validations occur during and after execution of service(s) • Carried out in accordance with Design (5.4), SQP (5.7.2) and acceptance criteria
  • 36. API SPEC Q2 FOR AUDITING 5.10.4 CUSTOMER NOTIFICATION • Customers shall be notified: – When service execution, does not conform to requirements – When SRP does not conform which has been delivered or used in the execution of a service
  • 37. API SPEC Q2 FOR AUDITING Management of Change Process Execution Changes Management System Changes SRP & Design Changes Risk Assessment Customer Notification No Yes No Customer Accepts? Higher Risk? End of Process End of Process Change in Personnel & Suppliers Yes 5.11 Management of Change
  • 38. API SPEC Q2 FOR AUDITING Impact on Drilling Operations Resources -90+ 0 4010 20 160+80 Risk Assessment Drilling Operations Design of Service PM Programs Contingency Planning Maintenance & Critical Spares • Assembly Insp / Test QA/QC • Service Performance Validation •BHA Inspections •MOC Critical Suppliers Time ( rig days)(AFE) Spud Operations Support • Well Integrity Reduction of NPT Contractor Influence APISpecQ2 • Tool Insp @ delivery Competency Service Quality Plans
  • 39. API SPEC Q2 FOR AUDITING SUMMARY & BENEFITS
  • 40. API SPEC Q2 FOR AUDITING INDUSTRY IMPACT Operators Service Providers Suppliers Regulators and other Interested Parties
  • 41. API SPEC Q2 FOR AUDITING It is not a template that you fill in and claim compliance. It is not a cross reference between your management system and your customer’s. It is not a manual with new buzz words that you present to your customers. WHAT API SPEC Q2 IS NOT
  • 42. API SPEC Q2 FOR AUDITING It is about service quality and risk mitigation supported by validation and actual service provider performance. WHAT API SPEC Q2 IS
  • 43. API SPEC Q2 FOR AUDITING Benefits of Standardization • Improves service related product reliability • Minimizes risk through identification, planning & controls • Identifies critical tasks that impact quality, safety and the environment • Minimizes service related risk and improves efficiencies • Improves communication between service providers and their suppliers and operators.
  • 44. API SPEC Q2 FOR AUDITING INDUSTRY COLLABORATION
  • 45. API SPEC Q2 FOR AUDITING Industry Collaboration Beta Test Site Assessments: • Gaps, hurdles and milestones for auditing to Q2 • Identify competencies / training for API Staff / Auditors • Identify needed resources • Types of certifications needed to meet industry needs • Baker - Completed • Schlumberger – Completed • Weatherford – Completed • Halliburton – Completed • Orion Drilling – Completed
  • 46. API SPEC Q2 FOR AUDITING Industry Collaboration API Spec Q2 Mock Audit: • Halliburton – Bakersfield, CA • July 29th – August 2nd 2013 PSL Covered • Drilling Fluids & Solids • Cementing • Completion Tools • Production Enhancement • Directional Drilling / MWD / LWD • Wireline and Perforating
  • 47. API SPEC Q2 FOR AUDITING Industry Collaboration API Spec Q2 Reviews: •Orion Drilling •Maersk Drilling •Akita Drilling •Parker Drilling •Transocean •MI Swaco
  • 48. API SPEC Q2 FOR AUDITING EVOLUTION OF API SPEC Q2 DEVELOPED PUBLISHED BETA TESTING COMPLIANCE CERTIFICATION API Spec Q2 was developed in 2010 through 2011. API Spec Q2 was published in December 2011. A combination of operators and service providers participated in the beta test. Service providers start getting their QMSs in compliance with API Spec Q2. Service providers become certified in API Spec Q2. EXPECTATION Service providers shall be in compliance in order to bid on jobs requiring API Spec Q2.
  • 49. API SPEC Q2 FOR AUDITING QUESTIONS ?