COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 1 
LA METRO MEASURE R PUBLIC DASHBOARD
Julie Owen and Rudy Ising
LA Metro and DRMcNatty and Associates
Abstract:
LA Metro identified a need to publish cost and schedule details to the general public based on real data
extracted from multiple systems, including P6, PCM, and Financial. Dashboard design needed to
automate data extraction, perform all necessary data translations, and provide a robust administration
tool to securely review data prior to publication and provide audit controls for published data.
Background:
LA Metro is the third largest public transportation system in the United States. California State Measure R
provides funding for $40 billion dollars in transportation upgrades, spread over a 30 year program period.
This will create more than half a million new jobs.
As part of Measure R requirements, there is an increased oversight and accountability required. In
addition, aggressive, accelerated schedules will account for a serious draw against current Metro
resources.
As a result, LA Metro sought out to develop a comprehensive and more efficient management system to
manage and account for the Measure R work. The systems put in place to manage these projects
provide internal and agency reporting, but does not provide a means of conveying to the general public
and Metro ridership status on these often high profile projects.
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 2 
PMIS:
The Project Management Information System (“PMIS”) is a suite of tools developed specifically to handle
the requirements of Measure R and general Metro reporting requirements. PMIS utilizes
Oracle|Primavera P6, Oracle|Primavera Contract Management, and EcoSys integrated with LA Metro FIS
(financial) system.
 
Figure 1‐‐PMIS Environment
PMIS provides a centralized repository for documents, and provides improved data accuracy, avoids the
need for managing by spreadsheet, and assists in enhancing communication by removing data silos.
Data is web-accessible and controlled by user role-based access restrictions.
Solution:
While the PMIS system facilitates internal project management, LA Metro has the need to provide the
general public and its ridership with accurate project status information via their website. Currently, the
process of reporting and collecting the information is labor-intensive, manual effort and very time
consuming.
 
Figure 2‐‐Dashboard Considerations
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 3 
The solution chosen was to develop a custom dashboard interface that automates the data collection
from the varied PMIS systems, and publish this information monthly. The Dashboard design would
incorporate security provisions, full administration of the publication process, as well as historical audit
trail.
Primary PMIS software tools are currently in a hosted environment, and it was determined that hosting
this dashboard within that same environment was the most effective, and link the Metro homepage to this
site. Dashboard would include design elements to match the general Metro site for consistency of views.
Architecture:
The architecture of the dashboard includes the use of pre-built elements for speed of development. The
design is modular, to facilitate ease of design configuration. The site needed to be platform/browser
neutral, since this is a general public website, and must conform to all ADA requirements.
The data retrieval from PMIS systems was automated, and used web services. The administration of the
site was designed specifically to Metro requirements, and includes role-based security, full audit trail,
publication controls for data set reviews and also maintains a full publication history. Data security
adheres to same requirements as PMIS systems.
 
Figure 3‐System Architecture
Datasources include Primavera P6 (which includes general scope and status updates as well as schedule
progress) and EcoSys (which collects FIS and Contract Management data.)
At core, the dashboard uses a Mongo.db for the dashboard data. Kettle is used to extract and import
data from the PMIS systems, and the Administration component is a custom element built. Graphical web
pages use Hicharts for most charts, and javascript web components are used to display the dashboard
content without the need for java or any other program installation for the client browsers. The entire site
is contained within secured systems.
Browser neutral, and mobile accessible, the site is ADA compliant as well as compatible with Metro
website standards.
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 4 
Design Operation:
Daily, data from PMIS systems is extracted automatically and placed in a data set. Publication takes
place monthly including the following roles: reviewer, administrator and publisher. All review participants
are notified by email of any actions required. Once all reviewers have approved the content of the data
set, the Publisher role approves the set for publication. Once published, this becomes the only set of
data visible to the general public. Prior published data sets are maintained in a historical audit trail, but
not accessible to the general public. In addition, a full audit trail of the publication process, including
review comments and status is available in a historical archive. The site Administrator role has the ability
to archive or remove data sets that were never used.
 
Figure 4‐Dashboard Administration
Dashboard Design Examples:
Here are some sample screens from the dashboard.
Key components include variety of graphs, ability to print and save to PDF, color coordination with LA
Metro website, simple tabbed navigation and breadcrumbs.
Graphical elements provide pop up details when mouse hovered over an element.
Details include costs, schedule, general scope and progress, key milestones as well as maps and project
image slideshow.
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 5 
 
Figure 5‐Measure R Rail Projects Summary 
 
 
Figure 6‐Project Scope Page 
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 6 
 
 
Figure 7‐Project Status 
 
 
Figure 8‐Project Costs 
 
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 7 
 
Figure 9‐Project Schedule 
 
COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 8 
 
Figure 10‐Schedule Milestones 
Conclusions:
Developing the custom dashboard involved effort and planning. It required management input as well as
input from communications group to determine the exact information and format for the dashboard. In
addition, consideration had to be made for the Project Management staff who would be responsible for
data reviews.
One lesson learned is to be clear on data requirements early on to avoid re-programming. Another
lesson learned was to keep the data input requirements simple to minimize the work effort of Project
Management staff, while maintaining the ability to publish data simply and avoid much manual efforts
previously required.
The dashboard began with one component only (Rail Projects). Future plans and considerations are to
include Measure R Highway Projects, as well as other project portfolios into the same dashboard
design/process.

More Related Content

Viewers also liked

การจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไร
การจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไรการจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไร
การจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไรZiwapohn Peecharoensap
 
Focus group and questionnaire results
Focus group and questionnaire resultsFocus group and questionnaire results
Focus group and questionnaire resultskelseytreich
 
Harish Kumar-CV updated
Harish Kumar-CV updatedHarish Kumar-CV updated
Harish Kumar-CV updatedHarish Kumar
 
NetSuite International Product Overview_Mar 2013
NetSuite International Product Overview_Mar 2013NetSuite International Product Overview_Mar 2013
NetSuite International Product Overview_Mar 2013CuriousRubik
 
การให้บริการเภสัชกรรมในร้านยา
การให้บริการเภสัชกรรมในร้านยาการให้บริการเภสัชกรรมในร้านยา
การให้บริการเภสัชกรรมในร้านยาZiwapohn Peecharoensap
 
Espesso Plus Hair Color Treatment for Hair Salon
Espesso Plus Hair Color Treatment for Hair SalonEspesso Plus Hair Color Treatment for Hair Salon
Espesso Plus Hair Color Treatment for Hair SalonCharlie Tai
 
Class focus group questionnaire results
Class focus group questionnaire resultsClass focus group questionnaire results
Class focus group questionnaire resultsabisemple12
 
Cap 28: Administración de Crédito e Inventario
Cap 28: Administración de Crédito e InventarioCap 28: Administración de Crédito e Inventario
Cap 28: Administración de Crédito e InventarioLesly Román
 
ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.
ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.
ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.Ziwapohn Peecharoensap
 
Nursing management patient with Myocardial infraction
Nursing management patient with Myocardial infraction Nursing management patient with Myocardial infraction
Nursing management patient with Myocardial infraction ANILKUMAR BR
 
Click Thru Spring 2016
Click Thru Spring 2016Click Thru Spring 2016
Click Thru Spring 2016Hannah Huggins
 

Viewers also liked (13)

การจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไร
การจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไรการจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไร
การจัด Promotion มีผลต่อการตัดสินใจซื้อระยะสั้น และระยะยาวอย่างไร
 
Focus group and questionnaire results
Focus group and questionnaire resultsFocus group and questionnaire results
Focus group and questionnaire results
 
Harish Kumar-CV updated
Harish Kumar-CV updatedHarish Kumar-CV updated
Harish Kumar-CV updated
 
NetSuite International Product Overview_Mar 2013
NetSuite International Product Overview_Mar 2013NetSuite International Product Overview_Mar 2013
NetSuite International Product Overview_Mar 2013
 
การให้บริการเภสัชกรรมในร้านยา
การให้บริการเภสัชกรรมในร้านยาการให้บริการเภสัชกรรมในร้านยา
การให้บริการเภสัชกรรมในร้านยา
 
Espesso Plus Hair Color Treatment for Hair Salon
Espesso Plus Hair Color Treatment for Hair SalonEspesso Plus Hair Color Treatment for Hair Salon
Espesso Plus Hair Color Treatment for Hair Salon
 
Class focus group questionnaire results
Class focus group questionnaire resultsClass focus group questionnaire results
Class focus group questionnaire results
 
Cap 28: Administración de Crédito e Inventario
Cap 28: Administración de Crédito e InventarioCap 28: Administración de Crédito e Inventario
Cap 28: Administración de Crédito e Inventario
 
ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.
ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.
ตอบคำถามจาก Soap note กรณีศึกษา Hypertension non compliance.
 
Pengurusan murid
Pengurusan murid Pengurusan murid
Pengurusan murid
 
Nursing management patient with Myocardial infraction
Nursing management patient with Myocardial infraction Nursing management patient with Myocardial infraction
Nursing management patient with Myocardial infraction
 
Encephalitis
EncephalitisEncephalitis
Encephalitis
 
Click Thru Spring 2016
Click Thru Spring 2016Click Thru Spring 2016
Click Thru Spring 2016
 

Similar to La metro measure r dashboard wp

La metro measure using Dashboards - Oracle Primavera P6 Collaborate 14
La metro measure using Dashboards  - Oracle Primavera P6 Collaborate 14La metro measure using Dashboards  - Oracle Primavera P6 Collaborate 14
La metro measure using Dashboards - Oracle Primavera P6 Collaborate 14p6academy
 
Project Time Managment.pptx
Project Time Managment.pptxProject Time Managment.pptx
Project Time Managment.pptxA ALAM
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Cognizant
 
tt-and-camms-digital-pm
tt-and-camms-digital-pmtt-and-camms-digital-pm
tt-and-camms-digital-pmCAMMS
 
Project Management Information System.pptx
Project Management Information System.pptxProject Management Information System.pptx
Project Management Information System.pptxAlyzaCaszyUmayat
 
Sample Product Profile
Sample Product ProfileSample Product Profile
Sample Product Profilemhobren
 
ANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTER
ANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTERANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTER
ANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTERClaire Webber
 
The "Big Data" Ecosystem at LinkedIn
The "Big Data" Ecosystem at LinkedInThe "Big Data" Ecosystem at LinkedIn
The "Big Data" Ecosystem at LinkedInSam Shah
 
The “Big Data” Ecosystem at LinkedIn
The “Big Data” Ecosystem at LinkedInThe “Big Data” Ecosystem at LinkedIn
The “Big Data” Ecosystem at LinkedInKun Le
 
Construction Viz Project Tracker
Construction Viz Project TrackerConstruction Viz Project Tracker
Construction Viz Project TrackerJeffrey Lydon
 
Resume - Paul Chambless
Resume - Paul ChamblessResume - Paul Chambless
Resume - Paul ChamblessPaul Chambless
 
IRJET- Recommendation System based on Graph Database Techniques
IRJET- Recommendation System based on Graph Database TechniquesIRJET- Recommendation System based on Graph Database Techniques
IRJET- Recommendation System based on Graph Database TechniquesIRJET Journal
 
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...Citadelh2020
 
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...Gayane Sedrakyan
 
Brand Niemann12102009
Brand Niemann12102009Brand Niemann12102009
Brand Niemann12102009guest8c518a8
 
Analysing Transportation Data with Open Source Big Data Analytic Tools
Analysing Transportation Data with Open Source Big Data Analytic ToolsAnalysing Transportation Data with Open Source Big Data Analytic Tools
Analysing Transportation Data with Open Source Big Data Analytic Toolsijeei-iaes
 
Colacioppo T APTA Paper ISIM B The Letter Lines
Colacioppo T APTA Paper ISIM B The Letter LinesColacioppo T APTA Paper ISIM B The Letter Lines
Colacioppo T APTA Paper ISIM B The Letter LinesTom Colacioppo, CCM, CSEP
 

Similar to La metro measure r dashboard wp (20)

La metro measure using Dashboards - Oracle Primavera P6 Collaborate 14
La metro measure using Dashboards  - Oracle Primavera P6 Collaborate 14La metro measure using Dashboards  - Oracle Primavera P6 Collaborate 14
La metro measure using Dashboards - Oracle Primavera P6 Collaborate 14
 
Project Time Managment.pptx
Project Time Managment.pptxProject Time Managment.pptx
Project Time Managment.pptx
 
IBC-12-76 Zink
IBC-12-76 ZinkIBC-12-76 Zink
IBC-12-76 Zink
 
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
Six Data Architecture and IT Infrastructure Governance Mandates for Multinati...
 
tt-and-camms-digital-pm
tt-and-camms-digital-pmtt-and-camms-digital-pm
tt-and-camms-digital-pm
 
project management information system
project management information systemproject management information system
project management information system
 
Project Management Information System.pptx
Project Management Information System.pptxProject Management Information System.pptx
Project Management Information System.pptx
 
Sample Product Profile
Sample Product ProfileSample Product Profile
Sample Product Profile
 
Topic 1 imf
Topic 1 imfTopic 1 imf
Topic 1 imf
 
ANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTER
ANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTERANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTER
ANALYSIS OF PROJECT CHARTER PROJECT MANAGEMENT ANALYSIS OF PROJECT CHARTER
 
The "Big Data" Ecosystem at LinkedIn
The "Big Data" Ecosystem at LinkedInThe "Big Data" Ecosystem at LinkedIn
The "Big Data" Ecosystem at LinkedIn
 
The “Big Data” Ecosystem at LinkedIn
The “Big Data” Ecosystem at LinkedInThe “Big Data” Ecosystem at LinkedIn
The “Big Data” Ecosystem at LinkedIn
 
Construction Viz Project Tracker
Construction Viz Project TrackerConstruction Viz Project Tracker
Construction Viz Project Tracker
 
Resume - Paul Chambless
Resume - Paul ChamblessResume - Paul Chambless
Resume - Paul Chambless
 
IRJET- Recommendation System based on Graph Database Techniques
IRJET- Recommendation System based on Graph Database TechniquesIRJET- Recommendation System based on Graph Database Techniques
IRJET- Recommendation System based on Graph Database Techniques
 
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
 
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
Data Harvesting, Curation and Fusion Model to Support Public Service Recommen...
 
Brand Niemann12102009
Brand Niemann12102009Brand Niemann12102009
Brand Niemann12102009
 
Analysing Transportation Data with Open Source Big Data Analytic Tools
Analysing Transportation Data with Open Source Big Data Analytic ToolsAnalysing Transportation Data with Open Source Big Data Analytic Tools
Analysing Transportation Data with Open Source Big Data Analytic Tools
 
Colacioppo T APTA Paper ISIM B The Letter Lines
Colacioppo T APTA Paper ISIM B The Letter LinesColacioppo T APTA Paper ISIM B The Letter Lines
Colacioppo T APTA Paper ISIM B The Letter Lines
 

More from p6academy

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015p6academy
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1p6academy
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2p6academy
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2p6academy
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1p6academy
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1p6academy
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1p6academy
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1p6academy
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktopp6academy
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announcedp6academy
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1p6academy
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overviewp6academy
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and laterp6academy
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientationp6academy
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Propositionp6academy
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition p6academy
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)p6academy
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guidep6academy
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guidep6academy
 

More from p6academy (20)

Oracle OpenWorld 2015
Oracle OpenWorld 2015Oracle OpenWorld 2015
Oracle OpenWorld 2015
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1What's New In Primavera P6 EPPM 17.1
What's New In Primavera P6 EPPM 17.1
 
Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2Oracle Primavera Unifier What's New in Release 16.2
Oracle Primavera Unifier What's New in Release 16.2
 
Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2Oracle What's New In Primavera P6 16.2
Oracle What's New In Primavera P6 16.2
 
What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1What's New in Primavera Prime 16.1
What's New in Primavera Prime 16.1
 
What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1What's New in Primavera Gateway 16.1
What's New in Primavera Gateway 16.1
 
What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1What's New In Primavera Analytics 16.1
What's New In Primavera Analytics 16.1
 
What's New in Unifier 16.1
What's New in Unifier 16.1What's New in Unifier 16.1
What's New in Unifier 16.1
 
20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop20160405 How to Install Primavera P6 16.1 Professional desktop
20160405 How to Install Primavera P6 16.1 Professional desktop
 
Oracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 AnnouncedOracle Primavera P6 16.1 Announced
Oracle Primavera P6 16.1 Announced
 
Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1Oracle Primavera Unifier 16.1
Oracle Primavera Unifier 16.1
 
P6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations OverviewP6 Release 8 Application Considerations Overview
P6 Release 8 Application Considerations Overview
 
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM  (Web) Release 8 and laterAdministering Users, Access and Views in P6 EPPM  (Web) Release 8 and later
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
 
P6 Release 8 Installation Orientation
P6 Release 8 Installation OrientationP6 Release 8 Installation Orientation
P6 Release 8 Installation Orientation
 
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value PropositionOracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 R8 Release Value Proposition
 
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
 
Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)Oracle Primavera P6 Release Content Document (RCD)
Oracle Primavera P6 Release Content Document (RCD)
 
Oracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study GuideOracle Support Accreditation – Level 1 Study Guide
Oracle Support Accreditation – Level 1 Study Guide
 
Oracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study GuideOracle Primavera Support Accreditation Study Guide
Oracle Primavera Support Accreditation Study Guide
 

La metro measure r dashboard wp

  • 1. COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 1  LA METRO MEASURE R PUBLIC DASHBOARD Julie Owen and Rudy Ising LA Metro and DRMcNatty and Associates Abstract: LA Metro identified a need to publish cost and schedule details to the general public based on real data extracted from multiple systems, including P6, PCM, and Financial. Dashboard design needed to automate data extraction, perform all necessary data translations, and provide a robust administration tool to securely review data prior to publication and provide audit controls for published data. Background: LA Metro is the third largest public transportation system in the United States. California State Measure R provides funding for $40 billion dollars in transportation upgrades, spread over a 30 year program period. This will create more than half a million new jobs. As part of Measure R requirements, there is an increased oversight and accountability required. In addition, aggressive, accelerated schedules will account for a serious draw against current Metro resources. As a result, LA Metro sought out to develop a comprehensive and more efficient management system to manage and account for the Measure R work. The systems put in place to manage these projects provide internal and agency reporting, but does not provide a means of conveying to the general public and Metro ridership status on these often high profile projects.
  • 2. COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 2  PMIS: The Project Management Information System (“PMIS”) is a suite of tools developed specifically to handle the requirements of Measure R and general Metro reporting requirements. PMIS utilizes Oracle|Primavera P6, Oracle|Primavera Contract Management, and EcoSys integrated with LA Metro FIS (financial) system.   Figure 1‐‐PMIS Environment PMIS provides a centralized repository for documents, and provides improved data accuracy, avoids the need for managing by spreadsheet, and assists in enhancing communication by removing data silos. Data is web-accessible and controlled by user role-based access restrictions. Solution: While the PMIS system facilitates internal project management, LA Metro has the need to provide the general public and its ridership with accurate project status information via their website. Currently, the process of reporting and collecting the information is labor-intensive, manual effort and very time consuming.   Figure 2‐‐Dashboard Considerations
  • 3. COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 3  The solution chosen was to develop a custom dashboard interface that automates the data collection from the varied PMIS systems, and publish this information monthly. The Dashboard design would incorporate security provisions, full administration of the publication process, as well as historical audit trail. Primary PMIS software tools are currently in a hosted environment, and it was determined that hosting this dashboard within that same environment was the most effective, and link the Metro homepage to this site. Dashboard would include design elements to match the general Metro site for consistency of views. Architecture: The architecture of the dashboard includes the use of pre-built elements for speed of development. The design is modular, to facilitate ease of design configuration. The site needed to be platform/browser neutral, since this is a general public website, and must conform to all ADA requirements. The data retrieval from PMIS systems was automated, and used web services. The administration of the site was designed specifically to Metro requirements, and includes role-based security, full audit trail, publication controls for data set reviews and also maintains a full publication history. Data security adheres to same requirements as PMIS systems.   Figure 3‐System Architecture Datasources include Primavera P6 (which includes general scope and status updates as well as schedule progress) and EcoSys (which collects FIS and Contract Management data.) At core, the dashboard uses a Mongo.db for the dashboard data. Kettle is used to extract and import data from the PMIS systems, and the Administration component is a custom element built. Graphical web pages use Hicharts for most charts, and javascript web components are used to display the dashboard content without the need for java or any other program installation for the client browsers. The entire site is contained within secured systems. Browser neutral, and mobile accessible, the site is ADA compliant as well as compatible with Metro website standards.
  • 4. COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 4  Design Operation: Daily, data from PMIS systems is extracted automatically and placed in a data set. Publication takes place monthly including the following roles: reviewer, administrator and publisher. All review participants are notified by email of any actions required. Once all reviewers have approved the content of the data set, the Publisher role approves the set for publication. Once published, this becomes the only set of data visible to the general public. Prior published data sets are maintained in a historical audit trail, but not accessible to the general public. In addition, a full audit trail of the publication process, including review comments and status is available in a historical archive. The site Administrator role has the ability to archive or remove data sets that were never used.   Figure 4‐Dashboard Administration Dashboard Design Examples: Here are some sample screens from the dashboard. Key components include variety of graphs, ability to print and save to PDF, color coordination with LA Metro website, simple tabbed navigation and breadcrumbs. Graphical elements provide pop up details when mouse hovered over an element. Details include costs, schedule, general scope and progress, key milestones as well as maps and project image slideshow.
  • 8. COLLABORATE 14  Copyright ©2014 Julie Owen and Rudy Ising  Page 8    Figure 10‐Schedule Milestones  Conclusions: Developing the custom dashboard involved effort and planning. It required management input as well as input from communications group to determine the exact information and format for the dashboard. In addition, consideration had to be made for the Project Management staff who would be responsible for data reviews. One lesson learned is to be clear on data requirements early on to avoid re-programming. Another lesson learned was to keep the data input requirements simple to minimize the work effort of Project Management staff, while maintaining the ability to publish data simply and avoid much manual efforts previously required. The dashboard began with one component only (Rail Projects). Future plans and considerations are to include Measure R Highway Projects, as well as other project portfolios into the same dashboard design/process.