58. Some Early Warnings of
Potential for Failure of
Fundão Dam
58
Piping at downstream slope
of Dyke 1, 13 April 2009
Seepage, cracking and slumping
at left abutment on 15 November 2013
Cracks on dam crest and saturation at toe on 27 August 2014
148. • It is designed to operate safely in an
environment where "to bog is not bogged".
• It can traverse to its traffickability limits then
recover easily and safely.
• Permitting CPTu testing and Vertek Sampling
in very soft materials in situations that are not
accessible by any other means.
155. Engineering Testing of Mine
Tailings Dams
Weird Tests And Weird
Machines Are Used In This
Weird Environment
156.
157.
158.
159.
160. elevated pore pressure
u here
may be
smaller
than u
here
If the “system” is
“soft”, a tiny amount of
pore fluid must flow to
transmit the pressure
161.
162.
163.
164. 72 hours in heated glycerol under 99% vacuum
vibrated randomly